{"id":19400,"date":"2025-11-06T14:39:52","date_gmt":"2025-11-06T13:39:52","guid":{"rendered":"https:\/\/www.darda.de\/linear-formwork"},"modified":"2026-04-24T10:30:04","modified_gmt":"2026-04-24T08:30:04","slug":"linear-formwork","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/linear-formwork","title":{"rendered":"Linear formwork"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Linear formwork describes the deliberate alignment and guidance of formwork along a straight or gently curved axis to produce linear concrete elements with precision, repeatability, and a defined joint pattern. Whether strip footing, wall run, edge beam, or bridge cap-the exact line control determines quality, tolerances, and architectural concrete requirements. This quality in planning and execution carries through the life cycle, for example during conversion, gutting and cutting, or selective deconstruction, where controlled separation lines are efficiently used with tools such as <strong>concrete pulverizers<\/strong> or <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a><\/strong>. In practice, linear formwork is also referred to as <em>line-guided formwork<\/em> or <em>axis-guided formwork<\/em>, highlighting its consistent guidance along a precisely surveyed reference line.<\/p>\n<h2>Definition: What is meant by linear formwork?<\/h2>\n<p>Linear formwork refers to formwork operations for continuous concrete members guided linearly in plan. The formwork is set, aligned, and braced along a defined axis so that the member width, height, and position remain constant over the entire length. Key features include dimensional accuracy, a homogeneous joint pattern, reliable transfer of formwork pressure, and a surface that-depending on the requirement-meets fair-faced concrete standards. Linear formwork is not a specific formwork system but a working method that can be implemented with frame formwork, girder formwork, or project-specific special formwork.<\/p>\n<ul>\n<li><strong>Dimensional stability<\/strong> along the axis with consistent width and height over the entire length.<\/li>\n<li><strong>Repetitive setup<\/strong> enabling cycle-based pours and predictable tie forces.<\/li>\n<li><strong>Defined joint and tie layouts<\/strong> that can be documented and reproduced.<\/li>\n<li><strong>Surface control<\/strong> up to architectural concrete, including uniform texture and minimized visible cone patterns.<\/li>\n<\/ul>\n<h2>Construction, elements, and functional principle<\/h2>\n<p>Linear formwork typically consists of formwork sheathing, girders or frames, walers, anchors, and supports arranged along a defined axis. The axis is established by staking out, laser, or total station; batter boards and straightedge guides secure position. Infills and end formwork close pours; joint seals and inserts (e.g., waterstops, swelling tapes) define construction and expansion joints. Loads from fresh concrete pressure are transferred via anchors and bracing into the ground or auxiliary falsework. Uniform stiffness along the length is crucial to avoid misalignments, cupping, and leakage at joints. For elevated architectural concrete requirements, form-facing with uniform texture and minimized joints is used; anchor patterns are planned and documented. Concreting is executed in suitable pour lengths with a coordinated placement and compaction strategy to achieve a continuous, deaerated concrete flow without cold joints. The permissible rate of rise, temperature of fresh concrete, and vibration method are coordinated so that the resulting formwork pressure remains within the calculated tie and waler capacities.<\/p>\n<h2>Areas of application and typical components<\/h2>\n<p>Linear formwork is used in building and structural engineering, transportation infrastructure, and in parts of tunnel construction. Typical are long, straight or gently curved members constructed in a cyclic sequence.<\/p>\n<ul>\n<li>Building construction: concrete walls, cross-walls, downstand beams, rows of columns with continuous strip footings, parapets on slabs.<\/li>\n<li>Civil engineering (underground works): strip footings, cantilever retaining walls, cable ducts, channels, U-shaped troughs, base slabs with integral edge beams.<\/li>\n<li>Transportation works: edge beams, bridge caps, guide walls, curb and cap zones, barrier elements with continuous alignment.<\/li>\n<li>Tunnel and gallery construction: line-guided sections of the inner lining, invert slabs, strip foundations for equipment, plinths and walkways.<\/li>\n<\/ul>\n<h2>Relation to deconstruction, separation techniques, and selective demolition<\/h2>\n<p>The clearly defined construction and intended separation lines of linear formwork facilitate later interventions: during conversion, <em>building gutting and cutting<\/em>, or in <em>concrete demolition and special demolition<\/em>, components can be separated in a controlled manner along these lines. Tools such as <strong>concrete pulverizers<\/strong> enable edge-near demolition along joints and edges, while <strong>stone and concrete hydraulic wedge splitters<\/strong> as well as <strong>rock wedge splitters<\/strong> propagate cracks in the member direction through rows of drill holes-low in vibration and with reduced secondary damage. <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">Hydraulic power units<\/a> supply these devices with energy. Exposed reinforcement is cut with <strong>steel shears<\/strong> or <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/multi-cutters\">Multi Cutters<\/a><\/strong>; <strong>combination shears<\/strong> combine cutting and crushing functions. In <em>rock excavation and tunnel construction<\/em>, openings in concrete inner linings can be precisely enlarged along existing construction joints. For <em>special applications<\/em> in existing structures with steel or tank components, <strong>cutting torch<\/strong> can additionally be considered when steel parts embedded in concrete need to be opened selectively. Complementary measures such as dust suppression, slurry collection, and vibration monitoring improve process control in sensitive surroundings.<\/p>\n<h3>Line-accurate opening of construction joints<\/h3>\n<p>At construction joints or control joints, a concrete pulverizer enables step-by-step removal without overloading adjacent members. Splitters create a defined crack path via lines of drill holes; remaining reinforcement is then trimmed with steel shears. This approach is particularly advantageous in interior spaces (<em>building gutting and cutting<\/em>), as it is often quieter and produces less dust and vibration than percussive tools.<\/p>\n<ul>\n<li>Mark and verify the joint course based on documentation and as-built checks.<\/li>\n<li>Pre-drill along the axis at defined spacing, then apply splitting pressure in a controlled sequence.<\/li>\n<li>Finish edges with the pulverizer and cut exposed bars flush where specified.<\/li>\n<\/ul>\n<h3>Low-vibration deconstruction in sensitive areas<\/h3>\n<p>In sensitive environments-such as operating facilities or neighboring buildings-the linear member structure supports controlled, cycle-based removal. Using the defined edges, chamfers, and joint patterns of linear formwork allows clean cut lines and minimizes collateral damage. Threshold values for vibration and noise are set in advance; monitoring and staged work sequences keep impacts within agreed limits.<\/p>\n<h2>Planning, formwork pressure, and safety<\/h2>\n<p>The design and execution of linear formwork depend on member geometry, concrete mix, placement rate, and temperature. Fresh concrete pressure, anchoring, bracing, and ground bearing capacity must be planned so that deformations remain small. Safety-relevant aspects-such as handling of tie points, access, work platforms, and fall protection-must be considered proactively. Notes on standards and specifications are always to be understood in general terms; detailed planning is project-specific in accordance with applicable rules of practice and manufacturer instructions. Wind loads on tall setups, edge protection at walkways, and exclusion zones during concrete placement are coordinated in advance; pre-pour briefings align roles and checks.<\/p>\n<ol>\n<li>Define axis and elevation, set a tolerance concept.<\/li>\n<li>Select the formwork system (frame, girder, special formwork) and ensure continuous stiffness.<\/li>\n<li>Detail tie plan, tie loads, and bearings; plan seals and waterstops.<\/li>\n<li>Coordinate embedded items, reinforcement clearances, and penetrations.<\/li>\n<li>Define the concreting and compaction concept along the line (pour lengths, pour joints).<\/li>\n<li>Schedule stripping after reaching the required concrete compressive strength and member temperature.<\/li>\n<li>Establish rate-of-rise limits and concrete delivery cadence consistent with calculated formwork pressure.<\/li>\n<li>Plan access, platforms, and rescue routes; document inspection points and hold points.<\/li>\n<\/ol>\n<h2>Quality of the concrete surface and tolerances<\/h2>\n<p>For architectural concrete, uniform form-facing, a well-thought-out anchor pattern, and clean panel joints are decisive. The linear guidance of the formwork facilitates compliance with flatness and straightness tolerances. Edges are often protected with chamfer strips; curing (moisture retention, covering) reduces the risk of cracking. A documented comparison of design versus as-built position supports acceptance and later assessment of the structure&#8217;s condition. Release agents compatible with the sheathing are applied sparingly and evenly; where required, sample panels and mock-ups establish the target visual standard and achievable tie grid.<\/p>\n<ul>\n<li>Measure straightness and plumb with stringline, laser, or total station; record deviations against the tolerance concept.<\/li>\n<li>Coordinate cone closures and surface repair procedures to maintain a consistent appearance.<\/li>\n<li>Control curing with coverings or curing compounds to mitigate early-age surface defects.<\/li>\n<\/ul>\n<h2>Typical mistakes and how to avoid them<\/h2>\n<ul>\n<li>Offset in line guidance due to insufficient bracing or settlements: ensure a continuous stiffness chain and solid bearings.<\/li>\n<li>Leaky joints and honeycombing: close facing joints carefully, apply even contact pressure, coordinate compaction with pour lengths.<\/li>\n<li>Visible tie points: plan the anchor pattern, close cones properly, maintain consistent grids for architectural concrete.<\/li>\n<li>Edge breakouts during stripping: observe stripping times, protect edges, plan the stripping direction.<\/li>\n<li>Inconsistent pour rhythm: keep the delivery rate stable to avoid cold joints and pressure spikes.<\/li>\n<li>Uncoordinated embedded items: verify clearances early to prevent clashes that force local patches.<\/li>\n<\/ul>\n<p>If subsequent corrections are required, material-sparing methods along joints or edges can be useful. <strong>Concrete pulverizers<\/strong> allow localized removal; <strong>stone and concrete hydraulic wedge splitters<\/strong> promote controlled crack propagation; exposed reinforcement is then cut with <strong>steel shears<\/strong>. Sequenced removal and surface protection reduce secondary damage and preserve adjacent finishes.<\/p>\n<h2>Workflow: From setup to stripping<\/h2>\n<p>A structured workflow reduces risk and increases repeatability-especially for long lines and high architectural concrete demands.<\/p>\n<ol>\n<li>Staking: define axes, reference points, and elevations; set up the string line.<\/li>\n<li>Prepare the subgrade: ensure load-bearing support, blinding layer, and drainage.<\/li>\n<li>Assemble the formwork: butt elements tightly, install ties and bracing as planned.<\/li>\n<li>Adjust: check straightness, plumb, and elevation; record tolerances.<\/li>\n<li>Place reinforcement and embedded items: coordinate penetrations and block-outs.<\/li>\n<li>Concrete and compact: continuously, in cycles, with attention to joint quality.<\/li>\n<li>Cure: retain moisture, protect against drying and temperature effects.<\/li>\n<li>Strip: gently, parallel to edges; for adjustments proceed selectively, if necessary with <strong>concrete pulverizers<\/strong> or splitting techniques.<\/li>\n<li>Post-process: close cones, repair minor defects consistent with the agreed concrete class, clean and store reusable elements.<\/li>\n<li>Document: update as-built axis and joint records for future interventions and acceptance.<\/li>\n<\/ol>\n<h2>Specifics in tunnel and rock environments<\/h2>\n<p>For tunnel inner linings, linear formwork sections are often executed in cycles. The linear formwork follows the alignment and must account for settlements, curvature, and transitions. For later integrations (recesses, cross passages), clean joint guidance enables low-stress openings-within <em>rock excavation and tunnel construction<\/em>, hydraulic splitting methods support controlled crack extension, while <strong>concrete pulverizers<\/strong> handle edge finishing on the inner lining. Waterproofing interfaces, ventilation and access constraints, and clearance envelopes are considered from the outset to keep line control and joint detailing consistent across cycles.<\/p>\n<h2>Material selection and sustainability<\/h2>\n<p>The choice of formwork sheathing (wood, plastic, steel) influences the surface and reuse rate. Homogeneous pour lengths and repeatable linear formwork reduce waste and rework. During deconstruction, hydraulic, low-vibration separation and splitting methods contribute to lower emissions and support selective removal-an advantage for <em>building gutting and cutting<\/em> as well as <em>concrete demolition and special demolition<\/em>. Reusable formwork skins, durable walers, and recoverable tie components improve life cycle performance when paired with careful handling and documented reuse cycles.<\/p>\n<h2>Documentation and acceptance<\/h2>\n<p>Traceable documentation includes axis and elevation checks, tolerance inspections, records of tie loads and formwork pressure assumptions, and curing logs. For future interventions-such as openings or partial removal-the location and course of construction joints, tie points, and embedded items are valuable. This information facilitates targeted separation, for example with <strong>stone and concrete hydraulic wedge splitters<\/strong> along rows of drill holes and subsequent reinforcement cutting using <strong>steel shears<\/strong> or <strong>Multi Cutters<\/strong>. Consolidated as-built data sets, photos, and inspection reports provide an evidence base for acceptance and inform maintenance and later deconstruction strategies.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Linear formwork describes the deliberate alignment and guidance of formwork along a straight or gently curved axis to produce linear concrete elements with precision, repeatability, and a defined joint pattern. Whether strip footing, wall run, edge beam, or bridge cap-the exact line control determines quality, tolerances, and architectural concrete requirements. <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/linear-formwork\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19400","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Linear Formwork in Concrete Construction Guide<\/title>\n<meta name=\"description\" content=\"Master linear formwork in concrete construction \u2713 precise axis control, joints &amp; tolerances for high quality results.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/linear-formwork\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Linear Formwork in Concrete Construction Guide\" \/>\n<meta property=\"og:description\" content=\"Master linear formwork in concrete construction \u2713 precise axis control, joints &amp; tolerances for high quality results.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/linear-formwork\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-24T08:30:04+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/linear-formwork\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/linear-formwork\",\"name\":\"Linear Formwork in Concrete Construction Guide\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-11-06T13:39:52+00:00\",\"dateModified\":\"2026-04-24T08:30:04+00:00\",\"description\":\"Master linear formwork in concrete construction \u2713 precise axis control, joints & tolerances for high quality results.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/linear-formwork#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/linear-formwork\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/linear-formwork#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Linear formwork\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Linear Formwork in Concrete Construction Guide","description":"Master linear formwork in concrete construction \u2713 precise axis control, joints & tolerances for high quality results.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/linear-formwork","og_locale":"en_US","og_type":"article","og_title":"Linear Formwork in Concrete Construction Guide","og_description":"Master linear formwork in concrete construction \u2713 precise axis control, joints & tolerances for high quality results.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/linear-formwork","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-04-24T08:30:04+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/linear-formwork","url":"https:\/\/www.darda.de\/en\/knowledge\/linear-formwork","name":"Linear Formwork in Concrete Construction Guide","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-11-06T13:39:52+00:00","dateModified":"2026-04-24T08:30:04+00:00","description":"Master linear formwork in concrete construction \u2713 precise axis control, joints & tolerances for high quality results.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/linear-formwork#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/linear-formwork"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/linear-formwork#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Linear formwork"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19400","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19400"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19400\/revisions"}],"predecessor-version":[{"id":26603,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19400\/revisions\/26603"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19400"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}