{"id":19397,"date":"2025-11-06T11:42:03","date_gmt":"2025-11-06T10:42:03","guid":{"rendered":"https:\/\/www.darda.de\/light-well"},"modified":"2026-04-24T07:48:03","modified_gmt":"2026-04-24T05:48:03","slug":"light-well","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/light-well","title":{"rendered":"Light well"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>A light well brings daylight and outside air to lower-lying rooms such as basements. It creates an open space in front of the basement window, shields the opening from soil and precipitation, and enables lighting, ventilation, and, in individual cases, a secondary escape route. In new construction and existing buildings, the light well is a small but building-physics-relevant component: it affects moisture protection, thermal insulation, safety, and the usability of basements. When adapting, refurbishing, or dismantling, precise, low-vibration methods are often used depending on design and space constraints &#8211; such as those achievable with <a href=\"https:\/\/www.darda.de\/en\/product-overview\/concrete-crushers\">Concrete Crushers<\/a> or <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a> from Darda GmbH in typical application areas of concrete demolition and specialized deconstruction. Thoughtful planning and execution reduce moisture risks, enhance daylight quality, and maintain structural integrity across the component&#8217;s service life.<\/p>\n<h2>Definition: What is meant by a light well?<\/h2>\n<p>A light well (also basement light well, basement shaft, or light trench) is an excavation with a shaft-shaped component arranged in front of a low-lying window opening, usually closed on the sides and at the bottom. It retains soil, brings light and air to the window, and is usually covered at the top with a grating or a cover. The shaft body is often made of precast concrete elements or robust plastic elements and is attached to the exterior basement wall. Drainage components, filter gravel, and correct backfilling ensure that rainwater does not press against the masonry and no standing moisture develops. Bright, reflective inner surfaces and clean geometries improve light distribution into the room and reduce glare on the glazing.<\/p>\n<ul>\n<li><strong>Core functions:<\/strong> retaining soil, introducing daylight and air, keeping surface water away from the window, and, where applicable, enabling a secondary escape route.<\/li>\n<li><strong>Common variations:<\/strong> monolithic concrete shafts, modular plastic systems with height extensions, and custom-built masonry upstands with integrated gratings.<\/li>\n<\/ul>\n<h2>Structure and components of a light well<\/h2>\n<p>A typical light well consists of the shaft body, the fastening to the exterior wall, the cover (grating or walkable plate), drainage (drainage, filter and base layer), as well as connection and sealing elements to the basement wall. Choice of materials, dimensions, and details depend on basement use, site elevation, soil conditions, loads (for example, areas subject to vehicular traffic), and requirements for daylighting or fire protection. Smooth, light-colored interior faces with high reflectance improve daylight yield; service-friendly access to drainage points simplifies maintenance.<\/p>\n<ul>\n<li><strong>Shaft body:<\/strong> concrete or plastic with optional extensions and side openings.<\/li>\n<li><strong>Cover:<\/strong> grating, intrusion-resistant grille, or transparent walkable plate with appropriate load class.<\/li>\n<li><strong>Drainage:<\/strong> percolation layer, drain line with backwater protection, and filter media.<\/li>\n<li><strong>Connections:<\/strong> mechanical fastening and watertight sealing to the basement wall and window reveal.<\/li>\n<\/ul>\n<h3>Shaft body and materials<\/h3>\n<p>Concrete light wells are dimensionally stable, durable, and suitable for higher earth loads. Plastic light wells are lighter, installation-friendly, and available in many geometries. Both variants are available with extension frames for height adjustment, with side openings for supply air or cable penetrations, and with reinforced frames for drivable areas. UV-stabilized plastics and corrosion-resistant fixings increase longevity; factory-applied reflective or abrasion-resistant coatings can improve light distribution and reduce soiling. Where fire protection requirements apply, components with verified fire behavior classes are selected.<\/p>\n<h3>Cover and grating<\/h3>\n<p>At the top, the light well is usually closed with a grating. Depending on the location, slip-resistant surfaces, different mesh sizes, intrusion-resistant grilles, or transparent covers are used. In the vicinity of driveways and walkways, higher load capacities are required; in front of occupied areas, safe walkability is paramount. <em>Leaf trap<\/em> and tailored edge profiles reduce contamination and the risk of water ingress. Covers should be removable for inspection, secured against lifting, and detailed with drip edges to prevent fa\u00e7ade staining.<\/p>\n<ul>\n<li><strong>Selection criteria:<\/strong> load class, anti-slip rating, mesh or opening size, intrusion resistance, accessibility, and ease of cleaning.<\/li>\n<li><strong>Safety elements:<\/strong> guard rails or upstands where fall heights are critical, childproof fasteners where necessary.<\/li>\n<\/ul>\n<h3>Drainage and backfilling<\/h3>\n<p>Drainage is provided via a drainage line, a percolation pack of filter gravel, or &#8211; on impermeable ground &#8211; via a connected drain with backwater protection. Clean, frost-resistant backfill prevents settlement. Between soil and the shaft body, capillary-breaking layers and, where appropriate, geotextiles are used to prevent fines from being washed in. Inspection access, sediment traps, and sufficient fall to the drain reduce the likelihood of clogging and standing water; in frost-prone climates, drainage components are placed below the frost line where feasible.<\/p>\n<h3>Connection to the basement wall<\/h3>\n<p>The connection to the exterior basement wall must be watertight, load-bearing, and compatible with the waterproofing plane. For components exposed to water, careful detailing of sealing connections is crucial to prevent moisture from entering the masonry. Thermal bridges are minimized through suitable fasteners and spacers. Seals and terminations must be compatible with bituminous, mineral, or synthetic waterproofing systems; penetrations and anchors are sealed with matched accessories and, if required, tested injection or swellable profiles.<\/p>\n<h2>Planning and sizing: light, air, loads<\/h2>\n<p>The size of the light well depends on the window opening, the desired daylight input, and the use of the room. Greater depth and width increase brightness but must be managed structurally and in terms of drainage. The top edge is generally a few centimeters above the surrounding terrain to keep surface water away. For escape or rescue routes, minimum dimensions, a safe cover, and easy operability must be considered. Load capacities and embedded components are matched to the expected traffic loads. Highly reflective shaft surfaces and generous side clearances relative to the window width improve sky view and daylight penetration; unobstructed opening angles at the sash ensure adequate air exchange.<\/p>\n<ul>\n<li><strong>Rules of thumb:<\/strong> provide lateral clearance beyond the window reveal, limit shaft depth where possible, and favor light-colored, smooth interior faces for better light reflectance.<\/li>\n<li><strong>Functional checks:<\/strong> verify free drainage fall, top edge above finished grade, and compatibility with smoke venting or emergency egress requirements where applicable.<\/li>\n<\/ul>\n<h2>Installation in new construction and retrofit in existing buildings<\/h2>\n<p>Installation follows a clear sequence: earthworks, setting or fastening the shaft body, connection to the wall (including waterproofing), establishing drainage, backfilling, and surface finishing. In retrofits, these steps vary depending on the existing basement wall, waterproofing system, and site profile. Protection of existing waterproofing, temporary water management, and careful reconciliation with as-built conditions are essential to avoid consequential damage.<\/p>\n<h3>Earthworks and soil conditions<\/h3>\n<p>The excavation is laid out to provide sufficient working space for installation, waterproofing, and backfilling. In cohesive soils, slopes or shoring must be planned. If excavation encounters rock or heavily compacted concrete from previous works, methods that cause minimal vibrations are advisable. <strong>Rock and concrete splitting devices<\/strong> from Darda GmbH enable controlled, low-noise opening of the material in special operations or in the sensitive vicinity of foundations &#8211; an advantage when vibrations and noise must be minimized. Prior to digging, utility locating and a concept for temporary drainage or groundwater handling reduce risks and interruptions.<\/p>\n<h3>Installation and fastening<\/h3>\n<p>The shaft body is set plumb and true and fastened to the basement wall with suitable dowels or anchors. With WU concrete or existing perimeter insulation, special fastening solutions are required. Waterproofing is run continuously; the transition to the window reveal must be splash-waterproof. Where anchors penetrate the waterproofing, sealing sleeves or tested gaskets are used; thermal breaks and non-corroding fixings help limit thermal bridging and long-term staining.<\/p>\n<h3>Backfilling and surfaces<\/h3>\n<p>Backfilling is performed in layers with suitable material that drains water and prevents settlement. Surfaces around the light well are graded so that rainwater is directed away from the building. A perimeter upstand or a frame profile prevents surface water from running into the shaft. Compaction is carried out in thin lifts with controlled energy to avoid undue pressure on the shaft body; separation layers or geotextiles prevent mixing of base layers and topsoil or paving bedding.<\/p>\n<ol>\n<li><strong>Quality assurance on completion:<\/strong> function test of drainage and backwater protection, verification of cover fit and locking, inspection of seals and terminations.<\/li>\n<li><strong>Documentation:<\/strong> photographic record of sealing layers and drainage, notes on buried components and maintenance access points.<\/li>\n<\/ol>\n<h2>Refurbishment, deconstruction, and adaptation of light wells<\/h2>\n<p>In existing buildings, light wells are frequently renewed or adapted &#8211; for example, when converting basements into habitable rooms, upgrading basement waterproofing, or when larger window openings are planned. Refurbishment includes replacing damaged shaft bodies, improving drainage, increasing the upstand, or retrofitting intrusion-resistant covers. A diagnostic review of moisture paths, settlement, and load history informs the choice of measures and prevents repeat defects.<\/p>\n<h3>Selective concrete removal on the shaft body<\/h3>\n<p>Massive concrete light wells or upstands call for precise demolition methods to avoid cracks in the basement wall. <strong>Concrete pulverizers<\/strong> from Darda GmbH allow controlled, piece-by-piece deconstruction with minimal vibrations &#8211; well-suited for <em>concrete demolition and specialized deconstruction<\/em> directly at the facade. <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">Hydraulic Power Units<\/a><\/strong> supply the tools with the required power, even in confined work areas. Dust suppression and debris control protect adjacent waterproofing and interior finishes.<\/p>\n<h3>Separating reinforcement and embedded parts<\/h3>\n<p>During deconstruction, crews often encounter reinforcing steel, grating frames, or embedded parts. Safe separation can be performed with <strong>combination shears<\/strong>, <strong>steel shears<\/strong>, or universal <strong>Multi Cutters<\/strong> &#8211; a typical task in <em>strip-out and cutting<\/em> prior to the actual refurbishment of the wall and waterproofing layer. Cold cutting reduces spark formation and heat input at the fa\u00e7ade connection.<\/p>\n<h3>Adaptations for larger window openings<\/h3>\n<p>Anyone deepening or widening windows must adjust the light well structurally and in terms of drainage. Larger geometries increase daylight input but require high-performance drainage and sufficiently load-bearing covers. Transitions to the perimeter insulation and the detailing of the reveals must be carefully planned to avoid thermal bridges and moisture ingress. Structural verifications of the opening edges and lintels, as well as temporary support concepts during works, are integral to a safe sequence.<\/p>\n<h2>Safety, waterproofing, and moisture protection<\/h2>\n<p>The area in front of basement windows is particularly relevant for moisture and safety. Covers must be walkable and slip-resistant; fall protection must be provided wherever people could fall into the shaft. Intrusion-resistant grilles enhance security without hindering air exchange. Waterproofing is detailed so that splash and surface water do not penetrate the component. In areas with high water exposure, additional measures against backwater are advisable; the design follows the applicable technical rules and should, in case of doubt, be supported by specialist planning. Where drains connect to public systems, backwater valves and accessible cleanouts facilitate inspection and maintenance.<\/p>\n<ul>\n<li><strong>Protective measures:<\/strong> secure gratings against lifting, integrate guard rails where required, and ensure safe, non-slip access for maintenance.<\/li>\n<li><strong>Waterproofing details:<\/strong> continuous terminations, protected edges, and robust transitions to window frames and reveals.<\/li>\n<\/ul>\n<h2>Typical damage, causes, and indicators<\/h2>\n<p>Damage to light wells appears as damp spots at the window reveal, standing water in the shaft, corrosion on the grating, deformations of the shaft body, or settlement of adjacent surfaces. Common causes are inadequate drainage, silted filter gravel packs, missing backwater protection, undersized covers where driven over, and poor connections to the basement waterproofing. Early maintenance and drainage adapted to the soil help prevent such damage. Additional indicators include efflorescence on interior reveals, musty odors near the window area, and recurring puddles after moderate rainfall.<\/p>\n<h3>Prevention and maintenance<\/h3>\n<ul>\n<li>Regularly clean grating and cover; remove leaves and sludge.<\/li>\n<li>Check drainage devices, keep drainage lines clear; flush if necessary.<\/li>\n<li>Inspect joints and sealing connections; repair cracks early.<\/li>\n<li>Monitor the backfill area for settlement or washouts.<\/li>\n<li>Reassess the cover\u2019s load capacity if traffic loads have increased.<\/li>\n<li>Inspect backwater protection and cleanouts at defined intervals; verify proper function after heavy rain.<\/li>\n<li>Recoat or galvanically protect steel components when corrosion is first observed.<\/li>\n<\/ul>\n<h2>Work in the confined surroundings of a light well<\/h2>\n<p>The construction situation in front of basement walls is often tight and sensitive. Tools must work precisely, quietly, and with low vibration to protect masonry, waterproofing, and interior spaces. In such situations, hydraulic hand tools have proven their worth. <strong>Rock and concrete splitting devices<\/strong> from Darda GmbH make it possible to open concrete or natural stone without blasting &#8211; helpful at excavation edges near foundations or when adjusting shaft upstands. <strong>Concrete pulverizers<\/strong> enable selective deconstruction of shaft components, while <strong>combination shears<\/strong> and <strong>steel shears<\/strong> cut inserts and reinforcement. These approaches are typical applications in the fields of <em>concrete demolition and specialized deconstruction<\/em> as well as <em>strip-out and cutting<\/em>. Low-dust methods, shielding of the work area, and careful sequencing reduce nuisance and safeguard adjacent building elements.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A light well brings daylight and outside air to lower-lying rooms such as basements. It creates an open space in front of the basement window, shields the opening from soil and precipitation, and enables lighting, ventilation, and, in individual cases, a secondary escape route. In new construction and existing buildings, <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/light-well\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19397","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Light Well for Basement Windows - Design Guide<\/title>\n<meta name=\"description\" content=\"Discover how an architectural light well brings daylight and air to basements \u2713 design, drainage and safety.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/light-well\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Light Well for Basement Windows - Design Guide\" \/>\n<meta property=\"og:description\" content=\"Discover how an architectural light well brings daylight and air to basements \u2713 design, drainage and safety.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/light-well\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-24T05:48:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/light-well\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/light-well\",\"name\":\"Light Well for Basement Windows - Design Guide\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-11-06T10:42:03+00:00\",\"dateModified\":\"2026-04-24T05:48:03+00:00\",\"description\":\"Discover how an architectural light well brings daylight and air to basements \u2713 design, drainage and safety.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/light-well#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/light-well\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/light-well#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Light well\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Light Well for Basement Windows - Design Guide","description":"Discover how an architectural light well brings daylight and air to basements \u2713 design, drainage and safety.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/light-well","og_locale":"en_US","og_type":"article","og_title":"Light Well for Basement Windows - Design Guide","og_description":"Discover how an architectural light well brings daylight and air to basements \u2713 design, drainage and safety.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/light-well","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-04-24T05:48:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/light-well","url":"https:\/\/www.darda.de\/en\/knowledge\/light-well","name":"Light Well for Basement Windows - Design Guide","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-11-06T10:42:03+00:00","dateModified":"2026-04-24T05:48:03+00:00","description":"Discover how an architectural light well brings daylight and air to basements \u2713 design, drainage and safety.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/light-well#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/light-well"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/light-well#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Light well"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19397","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19397"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19397\/revisions"}],"predecessor-version":[{"id":26592,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19397\/revisions\/26592"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19397"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}