{"id":19395,"date":"2025-08-22T16:09:47","date_gmt":"2025-08-22T14:09:47","guid":{"rendered":"https:\/\/www.darda.de\/lamp-holder-unit"},"modified":"2026-04-24T12:38:02","modified_gmt":"2026-04-24T10:38:02","slug":"lamp-holder-unit","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/lamp-holder-unit","title":{"rendered":"Lamp holder unit"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Lamp holder units are a central element of safe, efficient, and ergonomic task lighting. In areas such as concrete demolition, special demolition, interior demolition\/strip-out, <a href=\"https:\/\/www.darda.de\/en\/applications\/rock-demolition-and-tunnel-construction\">rock demolition and tunnel construction<\/a>, they ensure visibility, orientation, and precision &#8211; even where daylight is absent or dust, water, and vibration make work more difficult. Whether as a tripod for work floodlights, as a magnetic or clamp solution on steel beams, as wall and ceiling brackets, or as a rail-guided system: A suitable lamp holder unit makes the difference between improvised lighting and reliable, reproducible illumination of sensitive work zones, for example at concrete demolition shears, <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">stone and concrete splitters<\/a>, or in adjacent work areas. Thoughtful placement shortens setup times and supports consistent visual inspection quality in demanding environments.<\/p>\n<h2>Definition: What is a lamp holder unit?<\/h2>\n<p>A lamp holder unit is the mechanical mounting and positioning of light sources or luminaires for temporary or permanent task lighting. This includes tripods, telescopic masts, clamps, magnetic holders, ceiling and wall brackets, jib arm and rail systems, as well as protective cages. A lamp holder unit provides secure fastening and alignment, and in some cases cable routing, strain relief, and secondary retention. It is distinct from the luminaire itself: the luminaire generates the light, the holder brings it to where it is needed. In harsh environments, properties such as <strong>protection rating<\/strong> (e.g., IP protection against dust and splashing water), <strong>impact resistance<\/strong> (e.g., IK), corrosion resistance, and reliable load transfer are essential. Lamp holder units are used in workshops and on construction sites, particularly in concrete demolition and special demolition, in interior demolition, in rock excavation and tunnel construction, as well as in special operations. Where applicable, regional regulations on load securing and electrical protection must be observed.<\/p>\n<h2>Design, types, and characteristics of lamp holder units<\/h2>\n<p>Lamp holder units combine mechanical robustness with ease of use. They should hold luminaires securely, aim them precisely, and illuminate the workspace with minimal glare. Depending on the application, different designs exist with specific strengths.<\/p>\n<h3>Common designs<\/h3>\n<ul>\n<li>Tripod holders and telescopic masts: flexible height adjustment, stable stance, suitable for floodlights and wide-beam work lights.<\/li>\n<li>Scaffold and pipe clamps: secure fastening to guardrails, scaffold tubes, handrails, or machine booms.<\/li>\n<li>Magnetic and vacuum holders: quick mounting on ferromagnetic or smooth, solid surfaces; ideal for steel beams, tanks, and machine housings.<\/li>\n<li>Wall and ceiling brackets: permanent mounting in areas with defined working positions or tight space conditions.<\/li>\n<li>Rail systems and jib-arm holders: linear or swiveling alignment along work paths, e.g., in tunnels or on production lines.<\/li>\n<li>Protective basket\/cage solutions: mechanical protection of the luminaire in areas with falling objects or impact hazards.<\/li>\n<li>Base plates and counterweighted stands: stable placement where tripods cannot be fully spread or anchored.<\/li>\n<\/ul>\n<h3>Materials and protection features<\/h3>\n<p>Steel, stainless steel, aluminum, and engineering plastics are used for holders. Important aspects include <strong>corrosion protection<\/strong> (e.g., galvanizing or powder coating), suitable <em>protection ratings<\/em> against dust and moisture, and high <em>impact and vibration resistance<\/em>. In wet, muddy, or dust-intensive environments, robust surfaces and sealed joints prove their worth; in tunnel areas, temperature ranges and cleanability also matter. The mounting points (e.g., M8\/M10 threads, eyes, clamps) should be standardized and designed for the intended loads. Attention to <em>galvanic compatibility<\/em> of mixed materials, UV stability of polymers, and replaceable wear parts (feet, knobs, pads) increases service life.<\/p>\n<h3>Lighting technology and compatibility<\/h3>\n<p>Lamp holder units are compatible with various luminaires: LED floodlights and work lights, linear luminaires for corridors and niches, as well as compact spotlights for near-field illumination. Key criteria are aiming (spot\/asymmetric\/wide-beam), <em>luminous flux<\/em>, and <em>glare control<\/em>. In metallic environments or narrow shafts, <strong>glare-controlled, directional lighting<\/strong> is often safer than broadly diffused light. Depending on the environment, mains voltages (e.g., 230 V), site voltages (e.g., 110 V), or protective extra-low voltages (e.g., 24 V) are used; battery-powered lights reduce cable risks. The holder should route cables without kinks or chafing.<\/p>\n<ul>\n<li><strong>CCT<\/strong> (color temperature) and <strong>CRI<\/strong> (color rendering) support contrast perception on concrete, rebar, and rock.<\/li>\n<li>Low <em>flicker<\/em> and compliant <em>EMC<\/em> behavior protect sensitive measurement tasks and radio traffic.<\/li>\n<li><em>Dimming<\/em> or step switching helps adapt brightness to changing tasks and reduces glare.<\/li>\n<li>Defined aiming scales or indexed joints enable repeatable alignment.<\/li>\n<\/ul>\n<h2>Use in concrete demolition, special demolition, and interior demolition<\/h2>\n<p>When demolishing concrete components, dust, chips, and strong vibrations are generated. Lamp holder units must therefore be stable, low-vibration, and securely fixed. In interior demolition\/strip-out, slim clamps and wall brackets help to avoid trip hazards in confined spaces. For special demolition, a combination of height-adjustable tripods for base illumination and locally positioned clamps for detail work is recommended. <em>Glare shields<\/em> and asymmetric optics reduce disruptive reflections on wet or polished concrete surfaces, while abrasion-resistant cable sleeves protect supply lines along edges.<\/p>\n<h3>Relation to concrete demolition shears<\/h3>\n<p>Concrete demolition shears open and crush components, often close to reinforcement. Precise lighting of the working joint makes it easier to detect cracks, stress zones, and embedded parts. Lamp holder units are positioned to <em>reduce shadow casting<\/em> while remaining outside danger and pinch areas. Magnetic or scaffold clamps on nearby steel structures, railings, or auxiliary structures allow flexible, repeatable positioning. Lockable joints prevent drift due to vibration and keep the beam on target.<\/p>\n<h3>Relation to stone and concrete splitting equipment<\/h3>\n<p>When splitting, rows of boreholes and splitting wedges are in focus. Here, narrow, targeted light holders support millimeter-accurate placement. In wet-drilled zones, holders benefit from corrosion-resistant surfaces and splash-protected cable runs. A safe distance from the splitting line prevents damage from micro-impacts. Sealed connectors and strain reliefs maintain electrical integrity when relocating equipment across wet ground.<\/p>\n<h2>Rock excavation and tunnel construction<\/h2>\n<p>In tunnel construction, long, often curved sections must be illuminated. Rail-guided lamp holder units or robust wall mounts create continuous lines of sight. In drifts, shafts, and caverns, telescopic masts and lockable jib arms ensure luminaires are positioned flush and without glare. In rock excavation, mobile, shock-resistant tripods are used, while clamps on shotcrete anchors or steel profiles allow rapid relocation. Depending on the environment, reduced voltages and redundant supply lines can increase operational safety. Consistent mounting heights and anti-rotation features improve visual uniformity along escape routes and work fronts.<\/p>\n<h2>Selection criteria and sizing<\/h2>\n<ul>\n<li>Light level and distribution: sufficient <strong>luminous flux<\/strong> and suitable <em>optics<\/em> for area and detail work; uniform illumination without harsh shadows.<\/li>\n<li>Glare limitation: glare-controlled luminaires and smart aiming to avoid direct view into the light source.<\/li>\n<li>Mechanics: load capacity, tip stability, vibration resistance, impact protection; reliable secondary retention (e.g., safety lanyards).<\/li>\n<li>Protection ratings and robustness: dust, moisture, cleaning, temperature range; impact-resistant housings and durable surfaces.<\/li>\n<li>Mounting flexibility: compatible clamps, threads, eyes; quick, low-tool repositioning.<\/li>\n<li>Power supply: mains, battery, or protective extra-low voltage; safe plug systems and tested, mechanically protected cable runs.<\/li>\n<li>Weight and handling: manageable for frequent relocation while sufficiently stable.<\/li>\n<li>Lifecycle: maintainability, spare parts availability, and cleanability.<\/li>\n<li>Compliance and documentation: clear load data, torque specs, and inspection records for audits and safety briefings.<\/li>\n<li>EMC and flicker: electromagnetic compatibility with site equipment and low-flicker operation for visual comfort.<\/li>\n<\/ul>\n<h2>Installation, operation, and safety<\/h2>\n<p>Installation is carried out according to load requirements and the applicable rules of good engineering practice. Load paths must be traceable, and clamps and screw connections are tightened to the specified torque. In areas with pedestrian traffic, secondary retention is used. Cables are routed to avoid <em>trip and pinch points<\/em> and to bypass sharp edges. In damp or conductive environments, appropriate protective measures (e.g., residual-current devices, protective extra-low voltage) can be advisable; the locally applicable requirements are decisive in each case. For recurring setups, documented aiming positions and marked mounting points accelerate safe commissioning.<\/p>\n<ul>\n<li>Commissioning checklist: torque verified, secondary retention fitted, and cables strain-relieved.<\/li>\n<li>Orientation check: glare to traffic routes minimized and shadows at the work edge reduced.<\/li>\n<li>Function test: switching, dimming, and emergency stop pathways remain unobstructed.<\/li>\n<\/ul>\n<h3>Occupational safety and ergonomics<\/h3>\n<p>Lamp holder units should be positioned to illuminate work surfaces without causing glare. Neutral white light is suitable for visual inspections of concrete cracks or reinforcement, while slightly broader, diffuse illumination is often best for heavy demolition tasks. Height adjustability makes it easier to adapt to changing work steps, for example during the successive deconstruction of ceiling bays. Adequate <em>CRI<\/em> and controlled luminance gradients support contrast detection and reduce visual fatigue.<\/p>\n<h3>Special operating conditions<\/h3>\n<p>With dust generation, sealed housings and sealed cable entries increase reliability. In potentially hazardous areas, only appropriately approved components may be used; selection is always made cautiously and aligned with general requirements and does not replace case-by-case advice. Temperature extremes and frequent decontamination cycles require materials with stable friction coefficients and seals that retain elasticity over time.<\/p>\n<h2>Maintenance, inspection, and cleaning<\/h2>\n<p>Regular visual and functional checks reveal loosened connections, damaged cables, or worn clamping surfaces. After dusty or wet operations, surfaces and sealing faces are cleaned, moving parts are kept smooth-running, and markings are checked. Inspection and maintenance intervals depend on stress levels and internal guidelines. Documentation helps track irregularities and ensure readiness for use. Periodic pull-off tests of magnets and clamps, replacement of deformed components, and verification of secondary retention capacity increase operational safety.<\/p>\n<h2>Sustainability and energy efficiency<\/h2>\n<p>In combination with LED luminaires, lamp holder units reduce energy demand because <strong>directed illumination<\/strong> produces less stray light. Robust, modular holder systems extend service life, reduce replacement needs, and support reuse of individual components. Durable materials and repair-friendly designs improve the carbon footprint over the entire lifecycle. Refurbishment options, shared spare parts platforms, and recyclable surface finishes further strengthen resource efficiency.<\/p>\n<h2>Interfaces to machines and tools<\/h2>\n<p>In work environments with <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power units<\/a>, combination shears, steel shears, tank cutters, or multi cutters, light is needed close to the action &#8211; yet outside pinch and swing areas. Lamp holder units with compact clamps or magnetic feet can be placed on auxiliary structures, scaffold tubes, or steel beams to provide visibility of cutting edges, splitting wedges, or gripping zones. For work on hydraulic power packs, glare-free illumination supports checks of pressure gauges, couplings, and sealing faces. Heat-resistant cable routing and abrasion guards prevent damage where hoses, cables, and holders share limited space.<\/p>\n<h2>Best practices for typical scenarios<\/h2>\n<h3>Interior demolition and strip-out<\/h3>\n<p>Compact clamps on door and window openings as well as telescopic tripods in room corners save space and keep traffic routes clear. Asymmetric optics help avoid glare at eye level. Cable guards along baseboards and defined crossing points reduce snagging risks during material removal.<\/p>\n<h3>Night work and shift operations<\/h3>\n<p>Redundant holder positions secure illumination when relocating equipment. A combination of base and accent lighting supports orientation and detail work. Color-consistent lighting along paths and recorded aiming presets help maintain uniform conditions across shifts.<\/p>\n<h3>Moisture, mud, and cleaning cycles<\/h3>\n<p>Dirt-resistant surfaces, high protection ratings, and protected cable runs maintain function even with frequent cleaning. Non-slip feet increase safety on wet ground. Drainage openings and sealed fasteners reduce water ingress after washing.<\/p>\n<h3>Dust-intensive work<\/h3>\n<p>Sealed housings, smooth surfaces, and easily accessible cleaning points prevent dust from blocking adjustment mechanisms. Cable management reduces buildup and minimizes maintenance effort. Replacement of dust-exposed pads and clamps at defined intervals preserves clamping force.<\/p>\n<h3>Cold and heat<\/h3>\n<p>At low temperatures, lubricants and elastomers can stiffen, increasing adjustment forces; in heat, clamp friction may decrease. Select materials and surface finishes with stable coefficients of friction, and verify joint preload to maintain aiming accuracy across the full temperature range.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Lamp holder units are a central element of safe, efficient, and ergonomic task lighting. In areas such as concrete demolition, special demolition, interior demolition\/strip-out, rock demolition and tunnel construction, they ensure visibility, orientation, and precision &#8211; even where daylight is absent or dust, water, and vibration make work more difficult. <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/lamp-holder-unit\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19395","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Lamp Holder Unit for Work Light Mounting<\/title>\n<meta name=\"description\" content=\"Engineered for demolition and tunnels, a lamp holder unit secures task lighting \u2713 with tripods, magnetic mounts.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/lamp-holder-unit\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Lamp Holder Unit for Work Light Mounting\" \/>\n<meta property=\"og:description\" content=\"Engineered for demolition and tunnels, a lamp holder unit secures task lighting \u2713 with tripods, magnetic mounts.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/lamp-holder-unit\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-24T10:38:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/lamp-holder-unit\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/lamp-holder-unit\",\"name\":\"Lamp Holder Unit for Work Light Mounting\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-08-22T14:09:47+00:00\",\"dateModified\":\"2026-04-24T10:38:02+00:00\",\"description\":\"Engineered for demolition and tunnels, a lamp holder unit secures task lighting \u2713 with tripods, magnetic mounts.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/lamp-holder-unit#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/lamp-holder-unit\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/lamp-holder-unit#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Lamp holder unit\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Lamp Holder Unit for Work Light Mounting","description":"Engineered for demolition and tunnels, a lamp holder unit secures task lighting \u2713 with tripods, magnetic mounts.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/lamp-holder-unit","og_locale":"en_US","og_type":"article","og_title":"Lamp Holder Unit for Work Light Mounting","og_description":"Engineered for demolition and tunnels, a lamp holder unit secures task lighting \u2713 with tripods, magnetic mounts.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/lamp-holder-unit","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-04-24T10:38:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/lamp-holder-unit","url":"https:\/\/www.darda.de\/en\/knowledge\/lamp-holder-unit","name":"Lamp Holder Unit for Work Light Mounting","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-08-22T14:09:47+00:00","dateModified":"2026-04-24T10:38:02+00:00","description":"Engineered for demolition and tunnels, a lamp holder unit secures task lighting \u2713 with tripods, magnetic mounts.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/lamp-holder-unit#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/lamp-holder-unit"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/lamp-holder-unit#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Lamp holder unit"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19395","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19395"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19395\/revisions"}],"predecessor-version":[{"id":26614,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19395\/revisions\/26614"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19395"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}