{"id":19392,"date":"2025-08-22T09:03:46","date_gmt":"2025-08-22T07:03:46","guid":{"rendered":"https:\/\/www.darda.de\/utility-trench-excavation"},"modified":"2026-04-24T08:59:03","modified_gmt":"2026-04-24T06:59:03","slug":"utility-trench-excavation","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/utility-trench-excavation","title":{"rendered":"Utility trench excavation"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>A utility trench excavation is the linear excavation used in utility construction: it provides space for pipes, cables, and protective conduits and is subsequently backfilled in layers. In practice, civil engineering teams encounter very different boundary conditions &#8211; from asphalt surfaces and reinforced concrete slabs to foundation remnants, rock, and highly compacted gravel. In these situations, controlled demolition and cutting methods are often required. Tools from Darda GmbH, such as <strong>concrete crushers<\/strong> and <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a>, support low-vibration separation of concrete and rock so that utilities can be installed safely and precisely. A sectional, low-emission approach also protects adjacent structures and reduces traffic disruption.<\/p>\n<h2>Definition: What is meant by a utility trench excavation?<\/h2>\n<p>A utility trench excavation is an elongated, usually narrow earth excavation for creating utility corridors for drinking water, wastewater, gas, district heating, power, and data lines. Unlike a large-area excavation pit, the utility trench excavation follows the alignment, receives suitable <strong>bedding<\/strong>, the utilities are installed in the correct position, and the trench is closed again with layered compaction. Requirements arise from geometry, stability, dewatering, shoring, occupational safety, and the protection of existing infrastructure. Typical widths and depths follow the pipe geometry, minimum cover, and traffic load classes, with tolerances defined by project specifications.<\/p>\n<h2>Planning, construction sequence, and typical work steps<\/h2>\n<p>The construction of a utility trench excavation follows a clear sequence: investigation and marking of the route, surface breaking, excavation with shoring, dewatering where necessary, construction of the <em>pipe bedding<\/em>, installation of the utilities, testing, backfilling, and restoration of the surface. In urban environments, a <strong>low-vibration and low-impact<\/strong> approach is essential, especially when cutting concrete and loosening rock along the alignment. Permits, traffic management, and coordination with network operators frame the process.<\/p>\n<ol>\n<li><strong>Utility detection and marking<\/strong> &#8211; review of plans, selective exposure, and marking of safe corridors<\/li>\n<li><strong>Surface opening<\/strong> &#8211; saw cutting and removal in sections to protect adjacent structures<\/li>\n<li><strong>Excavation and shoring<\/strong> &#8211; dimensioned to soil class, depth, and workspace needs<\/li>\n<li><strong>Dewatering<\/strong> &#8211; as required to maintain stability and bedding quality<\/li>\n<li><strong>Bedding and installation<\/strong> &#8211; alignment, grade control, and restraint per specification<\/li>\n<li><strong>Testing<\/strong> &#8211; pressure, leak, or electrical tests prior to backfill<\/li>\n<li><strong>Backfilling and compaction<\/strong> &#8211; lift-by-lift with documented densities<\/li>\n<li><strong>Surface reinstatement<\/strong> &#8211; layer build-up matched to existing structures<\/li>\n<\/ol>\n<h2>Use in utility construction: application fields and requirements<\/h2>\n<p>Utility trench excavations are created in conventional utility construction, in building service connections, during rehabilitation of existing lines, and for cross passages under traffic areas. Requirements include alignment accuracy, protection of adjacent utilities, low construction emissions, safe workspaces, and a load-bearing, low-settlement backfill. Where reinforced concrete surfaces, reinforced edge beams, foundation remnants, or rock block the alignment, precise demolition and splitting methods are used to enable a controlled construction process. Trenchless methods may supplement the approach, yet open-cut trenches remain essential for complex junctions and gravity lines.<\/p>\n<h2>Geology, soil, and groundwater in utility trench excavation<\/h2>\n<p>Soil type, grain size distribution, and moisture content determine excavability, stability, and compaction capability. In cohesive soils, slope angles and water flow are critical; in non-cohesive soils, the grain interlock and compaction play a greater role. With a high groundwater level, dewatering and drainage ensure occupational safety and bedding quality. Where stratified soils or lenses occur, separation layers and quality-assured backfill materials prevent fines migration and settlements.<\/p>\n<h3>Pipe bedding and backfilling<\/h3>\n<p>The bedding distributes loads evenly on the utility and prevents point loads. Common are fine-grained, well-compacting materials. After installation, protection and backfill layers are compacted in lifts to minimize subsequent settlements under roadways and sidewalks. Key aspects include:<\/p>\n<ul>\n<li><strong>Material selection<\/strong> &#8211; clean, frost-resistant aggregates with suitable grading<\/li>\n<li><strong>Lift thickness<\/strong> &#8211; adapted to compaction equipment and trench width<\/li>\n<li><strong>Compaction targets<\/strong> &#8211; documented degrees of compaction per specification<\/li>\n<li><strong>Separation layers<\/strong> &#8211; geotextiles where native soils and backfill must be kept apart<\/li>\n<\/ul>\n<h3>Dewatering and stability<\/h3>\n<p>Lowering the water table, temporary drainage, and a shoring selection adapted to the soil conditions ensure a safe workspace. For narrow alignments, compact equipment is advantageous to avoid unnecessarily enlarging the cross-section. Depending on inflow, sump pumping, wellpoint systems, or drainage trenches are used, with discharge routed and monitored per local requirements.<\/p>\n<h2>Construction methods and shoring in utility trench excavation<\/h2>\n<p>Open-cut excavation is the classic method. Alternatives such as guided drilling complement the toolbox but do not replace the utility trench excavation in all situations, for example where there are many utilities, gravity lines, or complex branches. Shoring stabilizes the trench walls and protects workers. Inspection and adjustment of shoring are continuous tasks as the excavation progresses.<\/p>\n<h3>Overview of shoring types<\/h3>\n<ul>\n<li>Lightweight shoring and trench sheets for narrow, changing alignments<\/li>\n<li>Panel shoring for recurring cross-sections<\/li>\n<li>Strutted shoring in confined locations<\/li>\n<li>Slide-rail systems for deeper, longer sections with reduced ground movement<\/li>\n<\/ul>\n<p>Where obstacles are present within the shoring area, selective removal is required. <strong>Concrete crushers<\/strong> allow controlled removal of reinforced concrete edges, and <strong>rock and concrete splitters<\/strong> enable low-noise, low-vibration loosening of massive blocks.<\/p>\n<h2>Surface breaking and obstacles along the alignment<\/h2>\n<p>Before excavation, the surface must be opened and local structural elements penetrated. The choice of method depends on material, layer build-up, noise control, and the protection of adjacent utilities. Clean saw cuts and sectional removal reduce edge damage and help maintain clear joint lines for reinstatement.<\/p>\n<h3>Concrete slabs, curbs, foundation remnants<\/h3>\n<p>Reinforced concrete slabs, edge beams, and foundation remnants are often removed in sections using <strong>concrete crushers<\/strong>. The advantage is precise, controlled demolition with good material separation. For massive components or thick foundations, <strong>rock splitting cylinders<\/strong> or <strong>rock and concrete splitters<\/strong> can be used to break the concrete into defined fragments. Rebar is then separated and prepared for recycling.<\/p>\n<h3>Rock, boulders, and blast-free rock breaking<\/h3>\n<p>If the alignment encounters rock or large boulders, <strong>rock and concrete splitters<\/strong> enable <strong>non-explosive rock removal<\/strong> with minimal vibration. This method is particularly suitable in inner-city areas, near sensitive infrastructure, and in zones with restrictions on vibrations. Borehole patterns are planned to match the rock fabric and desired fragment size.<\/p>\n<h3>Metal inserts and reinforcement<\/h3>\n<p>When removing reinforcement, railings, or steel sections along the alignment, depending on the cross-section, <em><a href=\"https:\/\/www.darda.de\/en\/product-overview\/multi-cutters\">Multi Cutters<\/a><\/em>, <em>steel shears<\/em>, or <em>combination shears<\/em> may be considered. For thick walls, such as old steel tanks along industrial lines, <em>tank cutters<\/em> are an option for special applications.<\/p>\n<h2>Protecting existing utilities and the construction environment<\/h2>\n<p>Existing utilities are located, exposed, and secured. Mechanical impacts and vibrations must be minimized. A controlled, sectional approach reduces the risk of damage and keeps traffic flowing. Protective measures include timbering or padding around exposed utilities, temporary supports, and clear separation from excavation equipment.<\/p>\n<h3>Low-vibration work<\/h3>\n<p><strong>Concrete crushers<\/strong> and <strong>rock and concrete splitters<\/strong> enable work with reduced vibrations. This is advantageous in areas with sensitive components, historic buildings, laboratories, or near fiber-optic networks. The approach also reduces the likelihood of settlement-induced distress to adjacent pavements.<\/p>\n<h3>Dust and noise mitigation<\/h3>\n<p>Wet working methods, pinpoint removal, and short, plannable work cycles reduce emissions. This is particularly important in densely built-up areas to protect operations and residents. Where required, acoustic barriers and time-windowed operations further reduce environmental impact.<\/p>\n<h2>Safety, health, and environment in utility trench excavation<\/h2>\n<p>Work in the trench requires special care. Safe access, fall protection, adequate ventilation, protection from falling objects, traffic management, and suitable personal protective equipment must be considered. Requirements from codes and standards apply in general and must be implemented project-specifically. Confined-space and atmospheric hazards are assessed where applicable, and emergency procedures are defined before excavation begins.<\/p>\n<h3>Safe access and workspace<\/h3>\n<p>Ladders or stair towers ensure safe entry and exit. Exposed utilities must not be used as steps or supports. Shoring and working width must be matched to the selected equipment. Housekeeping, lighting, and clear escape routes support safe, efficient work.<\/p>\n<h3>Environmental and material flow management<\/h3>\n<p>Material separation already during removal facilitates processing and disposal. Hydraulic power packs must be operated leak-free and clean; the release of operating fluids must be avoided. Cleanly separated fractions (asphalt, concrete, soil) support recycling. Stockpiles are managed to prevent runoff, dusting, and cross-contamination.<\/p>\n<h2>Quality assurance and documentation<\/h2>\n<p>The position of the utilities, the bedding and backfill layer thicknesses, and compaction results are documented. Leak tests, pressure tests, or cable measurements ensure functionality. Careful restoration of the surface delivers durable, low-settlement results. Georeferenced as-built information and photo documentation provide traceability for future maintenance.<\/p>\n<h3>As-built and digital records<\/h3>\n<p>Digital logs of alignment, cover, materials, and test results streamline handover. Where available, coordinated models and updated records ensure that changes in the field are captured consistently.<\/p>\n<h2>Typical mistakes and how to avoid them<\/h2>\n<ul>\n<li>Insufficient investigation: avoid utility damage by locating, probing, and exposing in sections<\/li>\n<li>Incorrect tool selection: work with low vibration when adjacent utilities or sensitive components are affected<\/li>\n<li>Poor bedding or compaction: prevent future settlements with suitable material and lift-by-lift compaction<\/li>\n<li>Inadequate shoring: ensure stability and safe workspaces<\/li>\n<li>Missing dewatering concept: prevent instability and loss of bedding quality with a fit-for-purpose plan<\/li>\n<\/ul>\n<h2>Tools and equipment in the context of utility trench excavation<\/h2>\n<p>Depending on the obstacle and boundary conditions, different tools are used effectively. Power is often supplied by <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">compact hydraulic power units<\/a>, which allow easy switching between attachment tools. Compact carriers, quick couplers, and clear hose management improve efficiency in narrow alignments.<\/p>\n<h3>When are concrete crushers useful?<\/h3>\n<p>For reinforced concrete slabs, curbs, edge beams, foundation heads, and manhole covers that need to be selectively removed along the alignment. Advantages include controlled fracture lines, low vibrations, and good separation of concrete and reinforcement for disposal. Precision at edges and interfaces supports high-quality reinstatement.<\/p>\n<h3>When are rock and concrete splitters useful?<\/h3>\n<p>For massive components or rock bodies when removal without strong vibrations is required. Typical cases are rock ribs in the trench, large boulders, thick foundation areas, or concrete blocks with limited access. Defined splitting boreholes break the material down into transportable pieces. Borehole spacing and orientation are adapted to the structure to achieve predictable fragment sizes.<\/p>\n<h2>Examples from Darda GmbH application areas in the utility trench excavation context<\/h2>\n<h3>Concrete demolition and special deconstruction along a route<\/h3>\n<p>When removing reinforced concrete pavements or edge beams over utility crossings, <strong>concrete crushers<\/strong> can create a precise cutout without unnecessarily loading the adjacent structure. Sectional handling keeps lanes available and reduces reinstatement areas.<\/p>\n<h3>Strip-out and cutting for building service connections<\/h3>\n<p>For service connections to existing buildings, breakthroughs through floor slabs or foundation parts are often necessary. Low-vibration, controlled removal protects interior finishes and installations. Clean interfaces simplify sealing and structural tie-in.<\/p>\n<h3>Rock breaking and tunnel construction at the corridor tie-in<\/h3>\n<p>If an open-field alignment meets rocky subsoil, <strong>rock and concrete splitters<\/strong> can produce the trench without blasting. This facilitates connection to existing structures and manholes. Where access is limited, compact equipment supports safe sequencing.<\/p>\n<h3>Special operations in inner-city areas<\/h3>\n<p>Where space is very tight, neighboring buildings are sensitive, or strict noise protection requirements apply, compact tools with a controlled working principle are advantageous. Sectional removal reduces traffic disruption. Predictable work cycles enable reliable coordination with stakeholders.<\/p>\n<h2>Normative and organizational notes<\/h2>\n<p>Generally applicable technical rules for civil and utility construction govern planning and execution. They regulate, among other things, occupational safety, shoring, dewatering, bedding, and compaction. Specifications must be applied project-specifically; local authority requirements must be observed. Documentation, permits, and communication with network operators are integral parts of quality execution.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A utility trench excavation is the linear excavation used in utility construction: it provides space for pipes, cables, and protective conduits and is subsequently backfilled in layers. In practice, civil engineering teams encounter very different boundary conditions &#8211; from asphalt surfaces and reinforced concrete slabs to foundation remnants, rock, and <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/utility-trench-excavation\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19392","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Utility Trench Excavation in Construction<\/title>\n<meta name=\"description\" content=\"Explore safe, low-vibration utility trench excavation for pipes &amp; cables \u2713 with shoring, dewatering, precise cuts.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/utility-trench-excavation\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Utility Trench Excavation in Construction\" \/>\n<meta property=\"og:description\" content=\"Explore safe, low-vibration utility trench excavation for pipes &amp; cables \u2713 with shoring, dewatering, precise cuts.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/utility-trench-excavation\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-24T06:59:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/utility-trench-excavation\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/utility-trench-excavation\",\"name\":\"Utility Trench Excavation in Construction\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-08-22T07:03:46+00:00\",\"dateModified\":\"2026-04-24T06:59:03+00:00\",\"description\":\"Explore safe, low-vibration utility trench excavation for pipes & cables \u2713 with shoring, dewatering, precise cuts.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/utility-trench-excavation#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/utility-trench-excavation\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/utility-trench-excavation#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Utility trench excavation\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Utility Trench Excavation in Construction","description":"Explore safe, low-vibration utility trench excavation for pipes & cables \u2713 with shoring, dewatering, precise cuts.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/utility-trench-excavation","og_locale":"en_US","og_type":"article","og_title":"Utility Trench Excavation in Construction","og_description":"Explore safe, low-vibration utility trench excavation for pipes & cables \u2713 with shoring, dewatering, precise cuts.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/utility-trench-excavation","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-04-24T06:59:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/utility-trench-excavation","url":"https:\/\/www.darda.de\/en\/knowledge\/utility-trench-excavation","name":"Utility Trench Excavation in Construction","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-08-22T07:03:46+00:00","dateModified":"2026-04-24T06:59:03+00:00","description":"Explore safe, low-vibration utility trench excavation for pipes & cables \u2713 with shoring, dewatering, precise cuts.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/utility-trench-excavation#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/utility-trench-excavation"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/utility-trench-excavation#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Utility trench excavation"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19392","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19392"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19392\/revisions"}],"predecessor-version":[{"id":26598,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19392\/revisions\/26598"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19392"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}