{"id":19391,"date":"2025-08-22T13:11:03","date_gmt":"2025-08-22T11:11:03","guid":{"rendered":"https:\/\/www.darda.de\/guardrail-cutter-tool"},"modified":"2026-04-24T16:40:04","modified_gmt":"2026-04-24T14:40:04","slug":"guardrail-cutter-tool","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/guardrail-cutter-tool","title":{"rendered":"Guardrail cutter tool"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p><strong>Guardrail cutter tools<\/strong> are specialized hydraulic cutting tools for the cold cutting of guardrails, posts, and spacers made of steel along roads, bridges, and traffic areas. They are used in deconstruction, during repairs, and in special operations whenever guardrails must be separated quickly, with low sparking, and in a controlled manner. In combination with <strong>hydraulic power packs<\/strong> from Darda GmbH, high shear forces can be provided on a mobile basis. Typical advantages include the elimination of hot-work requirements, minimal vibration near sensitive structures, and predictable cut quality with low noise compared with abrasive cutting. In projects where guardrails are connected to concrete elements or foundations, concrete demolition shears or <a href=\"https:\/\/www.darda.de\/en\/product-overview\/rock-splitters\">rock and concrete splitters<\/a> are often used in addition, enabling single-grade (single-sort) separation of materials.<\/p>\n<h2>Definition: What is meant by a guardrail cutter tool?<\/h2>\n<p>A guardrail cutter tool is a hydraulically powered cutting device with a specially shaped cutting jaw that cold-cuts the typical profiles of guardrails (for example, W-beam profiles, spacers, and posts). The tool operates on a shearing principle: two blades move against each other and generate a concentrated shear force that separates the material plastically, without heat input, without sparks, and usually without significant changes to the material structure. <em>Replaceable<\/em> blades and robust jaw guides ensure consistent performance over time. Guardrail cutter tools are available as handheld devices, as carrier-mounted variants, or as modular cutting heads integrated into hydraulic systems from Darda GmbH, allowing selection according to access, profile dimensions, and productivity targets.<\/p>\n<h2>Functionality and types of guardrail cutter tools<\/h2>\n<p>The guardrail cutter tool consists of a robust main body, a hydraulically actuated cylinder, and a cutting-jaw geometry designed for guardrail profiles. The hydraulics deliver pressure and flow &#8211; usually from a compact hydraulic power pack by Darda GmbH &#8211; via a hose bundle to the cylinder. When the jaw closes, upper and lower blades engage each other with an offset, creating high local stress and cutting the material through. The cut is <em>cold<\/em>, low-sparking, and controlled. Designs differ in jaw opening, blade shape (V- or U-shaped seats for W-beam profiles), cutting force, weight, and operating concept (handheld, carrier-mounted, stationary). Attention to blade clearance and correct seating on the profile increases cut quality and reduces wear.<\/p>\n<h2>Fields of application: deconstruction, repair, and special operations<\/h2>\n<p>Guardrail cutter tools are required wherever guardrails need to be dismantled, shortened, repaired, or opened for modifications. The typical fields of application overlap with those of Darda GmbH, especially in <strong>building gutting and cutting<\/strong>, in <strong>concrete demolition and special demolition<\/strong>, and in <strong>special operations<\/strong> when traffic routes must be cleared quickly. Cold cutting facilitates work under tight time windows and in zones where sparks and heat must be avoided.<\/p>\n<h3>Typical tasks<\/h3>\n<ul>\n<li>Cutting W-beam profiles and spacers during bridge and road repairs<\/li>\n<li>Severing damaged sections after accidents or weather-related damage<\/li>\n<li>Dismantling entire guardrail fields in the course of conversions or deconstruction<\/li>\n<li>Shortening posts and notching elements for replacement<\/li>\n<li>Creating temporary openings for traffic management and site access<\/li>\n<li>Removing terminal ends and transitions during system upgrades<\/li>\n<\/ul>\n<h3>Combination with additional tools<\/h3>\n<p>Many guardrail systems are embedded in concrete foundations. To release such embedments, concrete demolition shears are often used to break off overlays, or rock and concrete splitters are used to open foundations in a controlled manner. This creates a coherent workflow: cold-cut the steel, open the concrete in a targeted way, and remove components sorted by material. The sequence minimizes percussive loads on adjacent structures and reduces closure times on traffic routes.<\/p>\n<h2>Materials and profiles: What do guardrail cutter tools cut<\/h2>\n<p>Guardrails are generally made of galvanized structural steel in sheet thicknesses designed for energy absorption and shape retention. Common are W-beam and sigma profiles as well as posts and spacers. The yield strength depends on the system within the range of common structural steels. A guardrail cutter tool is designed to reliably shear these profiles in the specified material thickness. The corrosion protection layer (usually zinc) has only a minor influence on the cut but does require clean blades and a suitable blade geometry to avoid built-up edges. For atypical alloys, hardened pins, or cable systems, suitability should be verified against the tool specification.<\/p>\n<h2>Workflow: from the first cut to safe removal<\/h2>\n<p>An orderly process increases safety and efficiency. The process starts with securing the work area and ends with single-grade separation of materials.<\/p>\n<h3>Step-by-step procedure<\/h3>\n<ol>\n<li>Secure the work area and define traffic control; mark the hazard zone.<\/li>\n<li>Inspect the component: profile type, material thickness, connections, stress state.<\/li>\n<li>Position the hydraulic power pack, route the hose bundle, check for leaks.<\/li>\n<li>Perform a functional check of controls and safety features; verify emergency stop.<\/li>\n<li>Position the guardrail cutter tool, define the cut line, and counteract potential spring-back if necessary.<\/li>\n<li>Cold-cut in one or multiple passes; control the drop movement of the cut-off piece.<\/li>\n<li>Check edges, remove sharp burrs; place components sorted by material.<\/li>\n<li>Release foundations: if needed, use concrete demolition shears or rock and concrete splitters.<\/li>\n<li>Clear the work area, documentation, and handover.<\/li>\n<\/ol>\n<h2>Safety and occupational safety<\/h2>\n<p>Hydraulic cutting forces are high. Safe working practices are therefore essential. Basic measures include barriers, personal protective equipment, and clear communication. Additionally, pay attention to spring-back in pre-tensioned mounted components; spacers and profiles can move during cutting. Where larger segments are separated, <em>catch slings<\/em> or supports prevent uncontrolled movements. Adequate lighting and visibility are necessary in night or winter operations.<\/p>\n<h3>Recommendations<\/h3>\n<ul>\n<li>Cut only within the authorized area; anticipate load paths and potential movements.<\/li>\n<li>Keep <strong>crush and shear points<\/strong> clear; adopt a stable stance.<\/li>\n<li>Protect hydraulic hose lines against mechanical damage; depressurize before re-coupling.<\/li>\n<li>Galvanized surfaces do not generate fumes during cold cutting; avoid hot work when low-spark operation is required.<\/li>\n<li>Never misuse the cutting jaw as a lifting device; secure loads.<\/li>\n<li>Use catch ropes or slings to control the movement of larger cut sections.<\/li>\n<li>Define escape routes and hand signals for coordinated cutting and removal.<\/li>\n<li>Ensure sufficient lighting and conspicuous marking during low-visibility operations.<\/li>\n<\/ul>\n<h2>Selection criteria: determining the right guardrail cutter tool<\/h2>\n<p>The suitability of a guardrail cutter tool depends on profile shape, material thickness, work environment, and available hydraulic power. At the same time, system integration with the hydraulic power packs from Darda GmbH is key. Duty cycle, accessibility, and permissible emissions and noise levels in the work zone further influence selection.<\/p>\n<h3>Technical parameters<\/h3>\n<ul>\n<li>Cutting force and jaw opening relative to profile and wall thicknesses<\/li>\n<li>Blade geometry for W-beam profiles, spacers, and posts<\/li>\n<li>Weight, ergonomics, handling in confined areas<\/li>\n<li>Required hydraulic pressure and flow rate of the power pack<\/li>\n<li>Hose lengths, coupling system, transport, and storage<\/li>\n<li>Noise and spark constraints in the work environment<\/li>\n<li>Availability of spare blades, service intervals, and tool support<\/li>\n<\/ul>\n<h2>System components: hydraulic power packs, cutting heads, accessories<\/h2>\n<p>A guardrail cutter tool delivers its performance in a system. Hydraulic power packs from Darda GmbH provide the required pressure; cutting heads convert it into cutting force. Accessories such as guards, supports, carrying straps, and hose protection increase work safety. Quick-coupling systems, remote control pendants, and transport frames simplify setup and logistics. For demanding mixed tasks, combination shears or multi cutters can be useful additions when, in addition to guardrails, other metal cross-sections must also be cut.<\/p>\n<h2>Cut quality and rework<\/h2>\n<p>Cold cutting produces clean cut surfaces with moderate burr. Depending on the profile, minimal deformation may occur at the exit. For precise reattachment, it is advisable to start in the straightest area of the wave and perform a firm, continuous cut without \u201cchewing.\u201d Sharp edges must be deburred to prevent injuries and ensure safe further processing. Monitoring blade wear and maintaining correct blade seating improve repeatability and reduce rework.<\/p>\n<h3>Quality assurance<\/h3>\n<ul>\n<li>Visually inspect each cut for burr height, deformation, and squareness; rework as required.<\/li>\n<li>Document blade wear and rotation or replacement to maintain consistent quality.<\/li>\n<li>Record cut positions and segment lengths for traceable reconstruction or reinstallation.<\/li>\n<li>Verify that sorted materials remain free of foreign matter for efficient recycling.<\/li>\n<\/ul>\n<h2>Differentiation: guardrail cutter tool, steel shears, combination shears<\/h2>\n<p>Guardrail cutter tools are optimized for the geometry of guardrails and cut them particularly efficiently. Steel shears are more universal and cover a wide range of steel cross-sections, but often require more cuts on W-beam profiles or provide less form-fitting seating. Combination shears unite cutting and crushing, which is versatile in mixed deconstruction, but does not replace specialization for guardrail profiles. In projects dominated by guardrail work, the specialized guardrail cutter tool has the advantage; with changing cross-sections, steel shears or multi cutters are suitable.<\/p>\n<ul>\n<li>Predominantly W-beam and posts: specialized guardrail cutter tool.<\/li>\n<li>Mixed metal cross-sections: steel shears or multi cutters.<\/li>\n<li>Concurrent concrete removal: combination shears to reduce tool changes.<\/li>\n<\/ul>\n<h2>Relation to concrete demolition shears and rock and concrete splitters<\/h2>\n<p>Guardrails are often clamped into concrete foundations or coupled to concrete components. This ties directly to concrete demolition shears and rock and concrete splitters from Darda GmbH: while the guardrail cutter tool separates steel profiles, concrete shears remove build-ups and caps, and splitters open foundations in a controlled manner without unnecessarily affecting surrounding structures. Prior mapping of reinforcement prevents unintended contact with rebar when cutting adjacent components. This combination enables a structured deconstruction with single-grade separation of steel and concrete.<\/p>\n<h2>Maintenance, care, and service life<\/h2>\n<p>Service life depends on clean hydraulics, intact seals, and well-maintained blades. Blades are wear parts; regular visual inspections, removal of deposits, and timely turning or replacement ensure consistent cut quality. The condition of the hydraulic oil and filters should be checked at the recommended intervals. Seals and couplings must be checked for tightness; remedy leaks immediately. Dry and protected storage, including blade protection, prevents corrosion and accidental damage.<\/p>\n<ul>\n<li>Keep jaw guides clean and lightly lubricated as specified.<\/li>\n<li>Use only approved hydraulic fluids; document oil changes and filter replacements.<\/li>\n<li>Check fasteners for correct torque after blade service.<\/li>\n<li>Replace damaged hose protection immediately to avoid secondary failures.<\/li>\n<\/ul>\n<h2>Sustainability and recycling<\/h2>\n<p>The <em>cold cut<\/em> facilitates single-grade separation. Separated steel parts can be sent directly to recycling; concrete residues are reused as mineral construction material if conditions are met. Clean separation of galvanized steel and concrete reduces rework during processing and supports resource-conserving workflows. Low-spark, low-heat cutting reduces consumables and energy use compared with abrasive methods, and proper collection of zinc flakes contributes to environmentally sound handling.<\/p>\n<h2>Legal and organizational aspects<\/h2>\n<p>The use of guardrail cutter tools in public traffic areas requires coordinated traffic management and safeguards. Depending on the country and region, specific road and occupational safety regulations apply. Training for operators, regular inspections of hydraulic equipment, and traceable documentation are recommended. Legal requirements must always be checked for each project; binding information is provided by the responsible authorities. Permits for lane closures, noise constraints, and environmental management measures should be integrated into the work plan and records.<\/p>\n<h2>Avoiding common mistakes<\/h2>\n<ul>\n<li>Cutting under tension in highly pre-stressed areas without counterholding<\/li>\n<li>Unsuitable blade positioning on W-beam profiles leading to material jam<\/li>\n<li>Underestimating hose lengths or missing protective measures against chafing<\/li>\n<li>Overloading by cutting profiles that exceed the approved specification<\/li>\n<li>Skipping single-grade separation, which complicates recycling processes<\/li>\n<li>Operating with dull or damaged blades that increase deformation and risk<\/li>\n<li>Cutting near bolted joints without removing or relieving fasteners<\/li>\n<li>Ignoring temperature effects on hydraulic performance and hose flexibility<\/li>\n<\/ul>\n<h2>Practical example from deconstruction<\/h2>\n<p>During the deconstruction of a bridge guardrail, the W-beam profiles are segmented first. The guardrail cutter tool is applied to the fields, separating spacers and posts. Concrete demolition shears then break off the overlay concrete above the post heads. Rock and concrete splitters open the foundations so that the posts can be pulled. Steel parts go to metal recycling, concrete to mineral reuse. Coordinated traffic control and a clearly defined cutting sequence reduce closure times. The process shows how the interplay of specialized tools from Darda GmbH enables technically clean, safe, and efficient deconstruction.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Guardrail cutter tools are specialized hydraulic cutting tools for the cold cutting of guardrails, posts, and spacers made of steel along roads, bridges, and traffic areas. They are used in deconstruction, during repairs, and in special operations whenever guardrails must be separated quickly, with low sparking, and in a controlled <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/guardrail-cutter-tool\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19391","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Guardrail Cutter Tool - Hydraulic Cold Cutting<\/title>\n<meta name=\"description\" content=\"Hydraulic guardrail cutter tool for cold, low-spark steel cuts on roads &amp; bridges \u27a4 safe deconstruction and repairs.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/guardrail-cutter-tool\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Guardrail Cutter Tool - Hydraulic Cold Cutting\" \/>\n<meta property=\"og:description\" content=\"Hydraulic guardrail cutter tool for cold, low-spark steel cuts on roads &amp; bridges \u27a4 safe deconstruction and repairs.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/guardrail-cutter-tool\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-24T14:40:04+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/guardrail-cutter-tool\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/guardrail-cutter-tool\",\"name\":\"Guardrail Cutter Tool - Hydraulic Cold Cutting\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-08-22T11:11:03+00:00\",\"dateModified\":\"2026-04-24T14:40:04+00:00\",\"description\":\"Hydraulic guardrail cutter tool for cold, low-spark steel cuts on roads & bridges \u27a4 safe deconstruction and repairs.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/guardrail-cutter-tool#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/guardrail-cutter-tool\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/guardrail-cutter-tool#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Guardrail cutter tool\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Guardrail Cutter Tool - Hydraulic Cold Cutting","description":"Hydraulic guardrail cutter tool for cold, low-spark steel cuts on roads & bridges \u27a4 safe deconstruction and repairs.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/guardrail-cutter-tool","og_locale":"en_US","og_type":"article","og_title":"Guardrail Cutter Tool - Hydraulic Cold Cutting","og_description":"Hydraulic guardrail cutter tool for cold, low-spark steel cuts on roads & bridges \u27a4 safe deconstruction and repairs.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/guardrail-cutter-tool","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-04-24T14:40:04+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/guardrail-cutter-tool","url":"https:\/\/www.darda.de\/en\/knowledge\/guardrail-cutter-tool","name":"Guardrail Cutter Tool - Hydraulic Cold Cutting","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-08-22T11:11:03+00:00","dateModified":"2026-04-24T14:40:04+00:00","description":"Hydraulic guardrail cutter tool for cold, low-spark steel cuts on roads & bridges \u27a4 safe deconstruction and repairs.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/guardrail-cutter-tool#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/guardrail-cutter-tool"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/guardrail-cutter-tool#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Guardrail cutter tool"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19391","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19391"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19391\/revisions"}],"predecessor-version":[{"id":26620,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19391\/revisions\/26620"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19391"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}