{"id":19383,"date":"2025-08-23T09:54:33","date_gmt":"2025-08-23T07:54:33","guid":{"rendered":"https:\/\/www.darda.de\/cargo-crane"},"modified":"2025-08-23T09:54:33","modified_gmt":"2025-08-23T07:54:33","slug":"cargo-crane","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/cargo-crane","title":{"rendered":"Cargo crane"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Cargo cranes are central lifting devices on construction sites, in factory halls, and in deconstruction. They move heavy components, position equipment, and secure dismantled elements. In concrete demolition, during strip-out, or in natural stone extraction, particular value is created when a cargo crane works in tandem with hydraulic tools. For example, components can be separated with a <strong>concrete demolition shear<\/strong> and simultaneously lowered in a controlled manner under the hook. <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">Hydraulic rock and concrete splitters<\/a> can also be brought to level, held, or precisely repositioned for special operations. This article explains the term with technical precision and provides practical guidance for planning, operation, and safety.<\/p>\n<h2>Definition: What is a cargo crane<\/h2>\n<p>A cargo crane is a mechanical lifting and transport device for lifting, lowering, and moving loads in space. It typically consists of a load-bearing structure (e.g., jib, runway, bridge, or gantry), drives, hoist with rope or chain, and a control system. The spectrum ranges from tower cranes to mobile and loader cranes through to bridge and gantry cranes. Key parameters are <strong>load capacity<\/strong>, <strong>load moment<\/strong>, <strong>working radius<\/strong>, <strong>lifting height<\/strong>, and <strong>outreach<\/strong>. Cargo cranes serve material flow in construction, refurbishment, dismantling, and industrial maintenance\u2014they are not intended for lifting persons.<\/p>\n<h2>Core components and functionality<\/h2>\n<p>The functionality of a cargo crane follows the principle of safely transmitting force from the drive to the load pickup. The hoist generates the lifting force, while the load-bearing structure channels forces and moments into the ground or building structure. Lifting accessories connect the load positively or friction-locked to the hook. Modern systems often work with fine hoisting, load moment limiting, and radio remote control to position loads precisely. In deconstruction and demolition projects, cranes hold components in position during cutting and splitting operations and prevent uncontrolled movements\u2014such as when using a <strong>concrete demolition shear<\/strong> or stone and concrete splitters.<\/p>\n<h2>Types and designs of cargo cranes<\/h2>\n<p>The choice of design determines reach, maneuverability, and suitability in confined spaces. For concrete demolition and specialized deconstruction, the following variants are defining:<\/p>\n<h3>Mobile crane<\/h3>\n<p>Mobile cranes are flexible, quick to relocate, and reach great lifting heights with variable working radius. They are suitable for picking up concrete elements after separation by <strong>concrete demolition shears<\/strong>, repositioning fa\u00e7ade panels, or removing fit-out elements from upper floors. Set-up area, outrigger loads, and subbase must be planned early.<\/p>\n<h3>Tower crane<\/h3>\n<p>Tower cranes offer high reach over the construction site and are suitable in high-rise deconstruction for serial lifting of small and medium loads. Hydraulic power packs and tool sets\u2014such as for stone and concrete splitters or combination shears\u2014can be quickly moved between work areas.<\/p>\n<h3>Loader crane (truck-mounted crane on a truck)<\/h3>\n<p>Loader cranes are compact and ideal for inner-city strip-out work. They take care of inserting <strong>concrete demolition shears<\/strong>, multi cutters, or steel shears into courtyards, roofs, and intermediate floors where large machines cannot reach.<\/p>\n<h3>Bridge and gantry crane<\/h3>\n<p>In industrial buildings or factory halls, bridge and gantry cranes move plant components precisely under roof. When using a tank cutter, they ensure safe handling of sheet panels or shell segments that are lifted out after the cut.<\/p>\n<h2>Understanding load capacity, load moment, and working radius<\/h2>\n<p>The permissible load of a crane depends on the radius, jib configuration, and setup. Load charts define the maximum loads per radius. The governing factor is the load moment: the larger the lever arm, the lower the load capacity. In addition, lifting accessories, wind loads, and dynamic effects influence the actual lifting capability.<\/p>\n<h3>Lifting accessories and attachment points<\/h3>\n<p>The correct choice of lifting accessories is crucial so that load capacity and stability are not undermined:<\/p>\n<ul>\n<li>Slings and chains with sufficient rated capacity considering sling angle<\/li>\n<li>Shackles, rings, and spreader beam systems (spreading attachment points for load distribution)<\/li>\n<li>Grabs, shears, or specialized lifters for concrete elements and steel segments<\/li>\n<li>Taglines (guide ropes) to control swinging components<\/li>\n<\/ul>\n<p>For components separated with <strong>concrete demolition shears<\/strong>, the center of gravity must be determined. Drilled lifting points or cast-in building inserts may only be used if they are suitable for the load. For elongated components, a spreader beam increases stability by reducing tipping moments.<\/p>\n<h2>Interfaces with demolition technology and hydraulic tools<\/h2>\n<p>In projects where tools from <strong>Darda GmbH<\/strong> are used, the cargo crane often acts as a precise partner: It positions equipment, holds components in place, and enables controlled lowering. This reduces secondary damage and increases process safety in concrete demolition, strip-out, and special applications.<\/p>\n<h3>Concrete demolition shear under the hook<\/h3>\n<p>Concrete demolition shears cut reinforced concrete. The crane typically takes over:<\/p>\n<ul>\n<li>Preloading the load before the shear closes\u2014minimizes uncontrolled cracking<\/li>\n<li>Picking up the separated element with a defined center of gravity<\/li>\n<li>Controlled placement or direct removal<\/li>\n<\/ul>\n<p>Ensure sufficient clearance for the shear to open and maintain clear communication between rigger, crane operator, and the operator of the hydraulic power packs.<\/p>\n<h3>Stone and concrete splitters in lifting operations<\/h3>\n<p>Stone and concrete splitters generate separating forces without impact or vibration. The crane brings cylinders, wedges, and hydraulic power packs to working height, holds components during splitting, and lifts segments out after the split. In tight shafts or for ceiling openings, this is a low-emission, low-vibration method.<\/p>\n<h3>Steel deconstruction with steel shears, multi cutters, and tank cutter<\/h3>\n<p>When cutting steel sections or vessel shells, cranes hold the freed segments in a load-appropriate and position-stable manner. Using steel shears or a tank cutter requires adequately sized attachment points, spark and drip protection, and a clear lowering strategy.<\/p>\n<h2>Planning and logistics on the construction site<\/h2>\n<p>Crane logistics start with site selection and extend to the pacing of lifting tasks. Good planning reduces downtime and increases safety.<\/p>\n<h3>Set-up area, outrigger support, and ground<\/h3>\n<ul>\n<li>Check ground bearing capacity, provide load distribution mats<\/li>\n<li>Derive outrigger pressures from crane planning<\/li>\n<li>Cordon off or bridge hazard zones (trenches, shafts, utilities)<\/li>\n<\/ul>\n<h3>Crane configuration and setup times<\/h3>\n<ul>\n<li>Jib length, counterweights, and attachments to suit the load spectrum<\/li>\n<li>Integrate setup and dismantling times into the construction schedule<\/li>\n<li>Coordinate access routes for mobile cranes and transport vehicles<\/li>\n<\/ul>\n<h3>Lifting paths and material flow<\/h3>\n<ul>\n<li>Define short, conflict-free flight paths<\/li>\n<li>Provide laydown areas for separated components<\/li>\n<li>Position hydraulic power packs for shears and splitters so hose runs are short and protected<\/li>\n<\/ul>\n<h2>Safety and organization for lifting<\/h2>\n<p>Safe crane work requires clear responsibilities, inspected equipment, and unambiguous communication. In general: people must not remain under suspended loads, and loads must be secured against swinging.<\/p>\n<ul>\n<li>Define roles: crane operator, signaler\/rigger, equipment operator<\/li>\n<li>Specify communication means: hand signals or radio with call discipline<\/li>\n<li>Observe wind and weather limits, ensure visibility<\/li>\n<li>Mark exclusion zones and escape routes<\/li>\n<li>Before each lift: visual inspection of lifting accessories, hook, and latches<\/li>\n<\/ul>\n<p>Legal requirements and recognized rules of technology may vary by region. It is generally advisable to consider current regulations as well as manufacturers\u2019 operating manuals and to use only qualified personnel.<\/p>\n<h3>Weather and ambient conditions<\/h3>\n<p>Wind acts over the area of the load and the jib length. Large fa\u00e7ade panels, sheets, or debris pieces have significant sail area. In gusts, choose lifting loads conservatively, plan taglines, and postpone lifts if necessary.<\/p>\n<h3>Visibility, signals, and radio<\/h3>\n<p>If the crane operator has no direct line of sight, a designated, trained rigger with unambiguous signals is required. Radio can increase safety but does not replace a clear command structure.<\/p>\n<h2>Special applications in demolition, tunneling, and extraction<\/h2>\n<p>Cargo cranes are versatile and support a wide range of uses\u2014from concrete demolition and specialized deconstruction to strip-out and cutting, through to rock removal, tunneling, and natural stone extraction.<\/p>\n<h3>High-rise deconstruction and strip-out<\/h3>\n<p>Tower cranes lift <strong>concrete demolition shears<\/strong>, hydraulic power packs, and waste containers to upper floors. Separated elements are secured and lowered in small units. Stone and concrete splitters allow low-vibration opening of slabs while the crane holds the segment.<\/p>\n<h3>Tunneling and rock removal<\/h3>\n<p>In low cavities, gantry cranes or traveling girders handle heavy tools. Rock blocks released by splitting cylinders can be moved and loaded in a controlled manner.<\/p>\n<h3>Industrial and plant deconstruction<\/h3>\n<p>When dismantling tanks, silos, and pipe bridges, the crane fixes cut lines, picks up shell segments, and lowers them after separation with tank cutter, steel shear, or multi cutter.<\/p>\n<h2>Work preparation: load calculation and selecting lifting gear<\/h2>\n<p>Reliable load estimation is the basis of every lift briefing. For concrete, steel, and natural stone, simple approximations can help.<\/p>\n<ol>\n<li>Determine geometry: length, width, thickness\u2014calculate volume<\/li>\n<li>Assume material density: steel approx. 7.85 t\/m\u00b3, reinforced concrete often approx. 2.4\u20132.5 t\/m\u00b3, natural stone depending on type<\/li>\n<li>Consider reinforcement content and embedded items<\/li>\n<li>Provide safety allowance and dynamic factors<\/li>\n<li>Define the center of gravity and plan attachment points (spreader beam if necessary)<\/li>\n<li>Select lifting accessories by required rated capacity and angle<\/li>\n<li>Check crane reach and load chart; weigh alternatives<\/li>\n<\/ol>\n<p>When cutting with <strong>concrete demolition shears<\/strong>, residual connections or restrained reinforcement often remain. A short trial lift under observation can help assess the behavior of the load before final separation.<\/p>\n<h2>Documentation, inspections, and maintenance<\/h2>\n<p>Cranes and lifting accessories must be inspected regularly. Inspection intervals and scope depend on operating conditions and applicable rules. Complete documentation of inspections, commissioning, and briefings supports operational safety. Hydraulic power packs and tools\u2014such as combination shears or stone splitting cylinders\u2014must be checked for tightness, hose condition, and couplings before being moved with the cargo crane.<\/p>\n<h2>Selection criteria for the right cargo crane<\/h2>\n<ul>\n<li>Load spectrum: weight, geometry, center of gravity, surfaces (sail area)<\/li>\n<li>Reach and lifting height: building edges, obstacles, access openings<\/li>\n<li>Setup conditions: ground, outriggers, space requirements, access<\/li>\n<li>Cycle rate: number of lifts per day and setup times<\/li>\n<li>Cooperation with tools: <strong>concrete demolition shears<\/strong>, stone and concrete splitters, steel shears, tank cutter, multi cutters<\/li>\n<li>Environmental aspects: noise, vibration, emissions, protective measures<\/li>\n<\/ul>\n<h2>Term distinction and classification<\/h2>\n<p>Cargo cranes are to be distinguished from handling equipment such as forklifts or winches: cranes move loads freely in space, often with rotating jibs and great lifting height. Hoists such as winches or chain hoists operate locally. In combination with the demolition technology of <em>Darda GmbH<\/em>, cranes excel wherever controlled cutting, holding, and lowering are required\u2014be it in building construction, tunnels, or industrial deconstruction.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Cargo cranes are central lifting devices on construction sites, in factory halls, and in deconstruction. They move heavy components, position equipment, and secure dismantled elements. In concrete demolition, during strip-out, or in natural stone extraction, particular value is created when a cargo crane works in tandem with hydraulic tools. For <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/cargo-crane\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19383","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Cargo Crane Guide for Construction &amp; Demolition<\/title>\n<meta name=\"description\" content=\"Plan and execute cargo crane lifts in construction &amp; demolition \u2713 Types, load charts &amp; safety guidance.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/cargo-crane\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Cargo Crane Guide for Construction &amp; Demolition\" \/>\n<meta property=\"og:description\" content=\"Plan and execute cargo crane lifts in construction &amp; demolition \u2713 Types, load charts &amp; safety guidance.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/cargo-crane\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/cargo-crane\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/cargo-crane\",\"name\":\"Cargo Crane Guide for Construction & Demolition\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-08-23T07:54:33+00:00\",\"description\":\"Plan and execute cargo crane lifts in construction & demolition \u2713 Types, load charts & safety guidance.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/cargo-crane#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/cargo-crane\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/cargo-crane#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Cargo crane\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Cargo Crane Guide for Construction & Demolition","description":"Plan and execute cargo crane lifts in construction & demolition \u2713 Types, load charts & safety guidance.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/cargo-crane","og_locale":"en_US","og_type":"article","og_title":"Cargo Crane Guide for Construction & Demolition","og_description":"Plan and execute cargo crane lifts in construction & demolition \u2713 Types, load charts & safety guidance.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/cargo-crane","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/cargo-crane","url":"https:\/\/www.darda.de\/en\/knowledge\/cargo-crane","name":"Cargo Crane Guide for Construction & Demolition","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-08-23T07:54:33+00:00","description":"Plan and execute cargo crane lifts in construction & demolition \u2713 Types, load charts & safety guidance.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/cargo-crane#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/cargo-crane"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/cargo-crane#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Cargo crane"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19383","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19383"}],"version-history":[{"count":0,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19383\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19383"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}