{"id":19371,"date":"2025-08-23T08:44:46","date_gmt":"2025-08-23T06:44:46","guid":{"rendered":"https:\/\/www.darda.de\/cross-joint"},"modified":"2026-04-22T07:56:02","modified_gmt":"2026-04-22T05:56:02","slug":"cross-joint","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/cross-joint","title":{"rendered":"Cross joint"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p><strong>The cross joint<\/strong> is an apparently small detail with major technical impact. It describes the right-angled meeting of butt and bed joints, for example in masonry, in paving and slab surfaces, in concrete slabs with control joints, as well as in naturally jointed rock. For planning, execution, repair, and deconstruction it is a key factor: cross joints influence load-bearing behavior, crack formation, water paths, and the propagation direction of fracture surfaces. In work by Darda GmbH in the areas of <a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">concrete demolition and special deconstruction<\/a>, gutting\/strip-out and cutting, rock demolition and tunnel construction, natural stone extraction, as well as special operations, cross joints are used, evaluated, or deliberately avoided. In particular, concrete demolition shears as well as <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a> can make cross joints usable on site to achieve controlled separations with low vibration. When properly assessed, they shorten process times, improve predictability, and help meet tight emission targets.<\/p>\n<h2>Definition: What is meant by a cross joint?<\/h2>\n<p>A cross joint is the orthogonal meeting of two joint axes. In masonry it occurs when a vertical butt joint in one course aligns with the butt joint of the adjacent course and crosses the horizontal bed joint. In paving and slab coverings, cross-joint formation refers to the creation of four slab or stone corners at one point. In cast-in-place or precast constructions, control joints or movement joints can intersect. In geology, the term describes intersecting joint sets. Common to all contexts: a cross joint can act as a <em>notch effect<\/em>, concentrate stresses, and steer cracks when there is insufficient offset. In practice, the term also covers aligned joints without adequate bonding overlap, which reduce interlock and create preferred crack paths.<\/p>\n<ul>\n<li><strong>Contexts of occurrence<\/strong>: masonry bonds, surfacing grids, slab joint layouts, and intersecting joint sets in rock masses.<\/li>\n<li><strong>Typical function<\/strong>: line of weakness that can be mitigated constructively or used deliberately in deconstruction.<\/li>\n<\/ul>\n<h2>Origin, manifestations, and technical consequences<\/h2>\n<p>Cross joints arise due to insufficient joint staggering (lack of bond), dimensional tolerances, settlement, shrinkage and thermal deformation, or through intentionally arranged joints (e.g., saw cuts and expansion joints). The consequences range from local weakening and premature cracking to increased water and chloride ingress. In deconstruction, cross joints can be deliberately used as lines of weakness to define fracture planes.<\/p>\n<ul>\n<li><strong>Causes<\/strong>: execution deviations, unsuitable laying patterns, missing edge reinforcement, or intersecting shrinkage cracks.<\/li>\n<li><strong>Effects<\/strong>: reduced shear transfer, stress concentration at intersection points, corner breaks, and accelerated deterioration via moisture and de-icing media.<\/li>\n<li><strong>Opportunities in deconstruction<\/strong>: predictable segmentation with low vibration when cracks are steered along existing interfaces.<\/li>\n<\/ul>\n<h2>Structure, formation mechanisms, and typical appearances of the cross joint<\/h2>\n<p>Depending on the building material and construction method, the cross joint appears differently: in masonry as continuous butt joints without sufficient bonding overlap, in surfacing as a four-part slab junction, in concrete as intersecting control joints, and in rock as the crossing of two joint systems. Characteristic are elevated notch stresses at the intersection points. In practice, these points are either constructively mitigated (offset, reinforcement, joint planning) or deliberately used in deconstruction (starting point for splitting or cutting operations).<\/p>\n<p><strong>Design response<\/strong>: ensure minimum offset in masonry bonds, coordinate joint grids in slabs, avoid placing intersections in highly stressed regions, and provide detailing that interrupts continuous load paths through the intersection.<\/p>\n<h2>Cross joint in masonry<\/h2>\n<p>In masonry, sufficient joint offset is an established rule. If it is missing, continuous butt joints occur which, in combination with the bed joint, form a cross joint. This reduces shear bond between wythes and can lead to diagonal cracking. For deconstruction, these lines are valuable: concrete demolition shears grip at the joints to release the connection between stones. Rock and concrete splitters engage at selected points to separate the bond in a controlled manner and to steer fracture edges. <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">Hydraulic power units<\/a> provide the energy for repeatable, finely metered load cycles.<\/p>\n<h3>Practical notes<\/h3>\n<ul>\n<li>Before starting: Record the course of butt and bed joints in wall panels, locate and document cross joints.<\/li>\n<li>Plan removal sequence: First weaken along the cross joints, then remove components to avoid uncontrolled spalling.<\/li>\n<li>In mixed masonry, cut reinforcement, inserts, or anchors that bridge cross joints with combination shears or multi cutters.<\/li>\n<li>Identify hollow or perforated units and weak mortar zones to calibrate splitting pressure and avoid unintended breakout.<\/li>\n<li>If walls are load-bearing, install shoring before engaging at load-bearing cross joints and verify stability after each segment is released.<\/li>\n<\/ul>\n<h2>Cross joint in paving and slab surfaces<\/h2>\n<p>In surfacing, cross-joint formation is a typical damage pattern, often triggered by faulty laying patterns, insufficient interlock in the base layer, or point loads. Cross joints concentrate loads on four corners, promote edge spalling, and water ingress. In deconstruction, surfacing fields can be released section by section via cross joints. Rock and concrete splitters separate slabs along the joints with low vibration, protecting surfacing in adjacent areas. Where slabs are bonded, starter cuts at intersections can act as controlled initiators for splitting.<\/p>\n<h3>Low-impact surfacing removal<\/h3>\n<ul>\n<li>Analyze the paving grid, mark intersection points, and define the sequence.<\/li>\n<li>Pre-drilling at intersections can improve crack initiation for stone splitting cylinders.<\/li>\n<li>For reinforced slabs, cut inserts with steel shears or multi cutters as required.<\/li>\n<li>Protect adjacent fields with edging or damping mats and remove segments in alternating fields to limit load transfer.<\/li>\n<\/ul>\n<h2>Cross joint in concrete slabs and components<\/h2>\n<p>In concrete slabs, cross joints often occur as planned intersection points of control joints. If several control joints and shrinkage cracks meet unintentionally, corner breaks (corner cracking) can occur. In deconstruction, cross joints provide a natural division into segments. Concrete demolition shears can grip at joints; rock and concrete splitters generate split lines from the joint point to divide slabs in a controlled way. Attention to reinforcement layout is decisive, because bars can arrest or deflect cracks at the intersection.<\/p>\n<h3>Crack steering and segmentation<\/h3>\n<ul>\n<li>Review the joint plan, consider hidden reinforcement layers, and choose intersection points with low reinforcement density.<\/li>\n<li>Arrange split-drilling holes symmetrically around the intersection to promote uniform crack propagation.<\/li>\n<li>Size hydraulic power units so that the splitting energy is sufficient without overloading adjacent components.<\/li>\n<li>Where needed, add shallow score cuts at the joint to serve as starter notches and to stabilize crack direction.<\/li>\n<\/ul>\n<h2>Cross joint in rock: joint intersections in tunnel and extraction operations<\/h2>\n<p>In rock, the cross joint describes the intersection points of different joint sets. Wedge-shaped blocks can form there that may loosen under load. For rock demolition, tunnel construction, and natural stone extraction, knowledge of these intersections is crucial. Rock and concrete splitters as well as stone splitting cylinders use joint intersections to break out blocks with defined geometry. This minimizes vibrations and guides fracture surfaces in a targeted manner. Orientation of anisotropy, weathering, and infilling influence both initiation energy and fracture surface quality.<\/p>\n<h3>Geotechnical aspects<\/h3>\n<ul>\n<li>Map the orientation and spacing of joint sets, mark intersections as potential initiation points.<\/li>\n<li>Align split-hole spacing with joint spacing; in anisotropic rocks, expect crack propagation along weak planes.<\/li>\n<li>Secure cross-joint areas at tunnel faces before splitting operations begin.<\/li>\n<li>Monitor wedge stability and displacement at exposed faces and install temporary support where blocks are unlocked by splitting.<\/li>\n<\/ul>\n<h2>Significance of the cross joint for demolition and deconstruction processes<\/h2>\n<p>Cross joints indicate lines of weakness and are therefore starting points for controlled separations. In practice, they are used to divide components into manageable segments, limit loads in intermediate states, and reduce emissions. Tools from Darda GmbH such as concrete demolition shears and rock and concrete splitters play a central role; hydraulic power units ensure the energy supply. Combination shears, multi cutters, steel shears, and tank cutters are additionally employed when embedded parts, reinforcement, or adjacent steel structures cross the joint path. <strong>Result<\/strong>: more predictable crack paths, smaller handling weights, and safer intermediate conditions.<\/p>\n<h3>Concrete demolition and special deconstruction<\/h3>\n<ul>\n<li>Gripping at cross joints reduces the fiber\/interlock at edges and decreases spalling.<\/li>\n<li>Splitting from the intersection guides cracks along existing joints, making the fracture surface more predictable.<\/li>\n<li>Expose and cut reinforcement crossings at an early stage so that crack propagation is not unexpectedly deflected.<\/li>\n<li>Use contact protection plates at sensitive surfaces to prevent imprinting when gripping near exposed edges.<\/li>\n<\/ul>\n<h3>Strip-out and cutting<\/h3>\n<ul>\n<li>For openings in walls and slabs, cut along existing joint grids to minimize vibrations.<\/li>\n<li>Separate installations, profiles, and anchors that bridge cross joints with multi cutters or combination shears.<\/li>\n<li>In special operations, the tank cutter can be used additionally when steel tanks or pipelines adjacent to cross joints are being dismantled.<\/li>\n<li>Plan the support of partially separated components so that residual connections at cross joints do not tear unpredictably.<\/li>\n<\/ul>\n<h2>Planning, assessment, and documentation<\/h2>\n<p>A systematic survey of the joint layout is the basis for safe decisions. Cross joints are mapped, evaluated with regard to load-bearing behavior, moisture ingress, and potential crack paths, and integrated into the deconstruction strategy. Documenting the sequence &#8211; from marking at cross joints to segment removal &#8211; improves traceability. Non-destructive testing methods such as cover meters or ground-penetrating scans can complement visual mapping where reinforcement or inserts are suspected at intersections.<\/p>\n<h3>Recommendations for the survey<\/h3>\n<ol>\n<li>Record the joint grid (photos, sketch, dimensions), mark intersection points.<\/li>\n<li>Material and bond analysis (mortar or adhesive layer, reinforcement, inserts).<\/li>\n<li>Define environmental and emission targets (vibration, dust, noise) and adapt the method.<\/li>\n<li>Verify hidden constraints and service lines at intersections and define protective measures.<\/li>\n<li>Plan a test run at a representative cross joint to calibrate splitting energy and cutting sequence.<\/li>\n<\/ol>\n<h2>Avoidance and targeted use of cross joints<\/h2>\n<p>In new construction, cross-joint formation is avoided through sufficient bonding overlap, suitable laying patterns, and coordinated joint plans. In deconstruction, cross joints are used deliberately to create controlled separation planes. This dual perspective &#8211; avoid where they are harmful, use where they help &#8211; is efficient and material-appropriate.<\/p>\n<h3>New-build and repair notes<\/h3>\n<ul>\n<li>Consistently maintain bonding overlap and joint offset.<\/li>\n<li>Coordinate joint plans for concrete slabs so that intersections do not lie in highly stressed zones.<\/li>\n<li>Prefer laying patterns without continuous intersections; reinforce edge zones.<\/li>\n<li>Observe minimum offsets appropriate to unit dimensions and ensure detailing that prevents aligned butt joints across courses.<\/li>\n<li>Seal and detail intersections carefully in moisture-exposed zones to limit ingress and freeze-thaw damage.<\/li>\n<\/ul>\n<h3>Deconstruction notes<\/h3>\n<ul>\n<li>Define cross joints as starting points, align split-hole patterns accordingly.<\/li>\n<li>Observe load paths during segmentation; shore before separating at load-bearing cross joints.<\/li>\n<li>Match tool selection to the material and joint quality: concrete demolition shears for gripping and breaking at joints, rock and concrete splitters for crack-guided separation.<\/li>\n<li>Run a trial split to set pressure levels and adjust hole spacing until the crack follows the intended path from the intersection.<\/li>\n<\/ul>\n<h2>Occupational safety, environment, and emissions<\/h2>\n<p>Working at cross joints can reduce emissions because existing weak points are used. Nevertheless, the following applies: dust and noise reduction, secure support of components, and controlled load redistributions have priority. Measures must be planned project-specifically and general protection targets complied with.<\/p>\n<ul>\n<li>Use dust suppression and extraction, low-emission cutting techniques, and acoustic shielding where feasible.<\/li>\n<li>Define exclusion zones and lifting concepts before releasing segments at cross joints.<\/li>\n<li>Control hydraulic forces stepwise and monitor component response at each stage.<\/li>\n<li>Coordinate with structural supervision when intervening at load-bearing intersections.<\/li>\n<\/ul>\n<h2>Typical error patterns when dealing with cross joints<\/h2>\n<ul>\n<li>Cutting through load-bearing cross joints without temporary shoring.<\/li>\n<li>Failure to account for reinforcement or inserts that redirect crack paths.<\/li>\n<li>Too little energy during splitting, causing cracks to drift uncontrollably.<\/li>\n<li>Unplanned formation of cross joints in surfacing due to unsuitable laying patterns.<\/li>\n<li>Moisture ingress at intersections leading to frost or chloride damage.<\/li>\n<li>Starting separation too close to supports or restraints, causing stress redistribution and secondary cracking.<\/li>\n<\/ul>\n<h2>Correctly classifying terms in the environment of the cross joint<\/h2>\n<p>The cross joint arises from the butt joint (vertical) and the bed joint (horizontal). Control joints serve crack steering and can intersect. Movement or expansion joints deliberately separate components and should only pass intersections in highly stressed zones with a concept. In rock, intersections correspond to the crossing points of joint sets; they define wedges and blocks that are won with stone splitting cylinders and rock and concrete splitters or released in tunnel advance. Clear terminology supports planning decisions, especially when distinguishing crack-control measures from movement accommodation details.<\/p>\n<h2>Practical examples from construction and deconstruction<\/h2>\n<h3>Masonry wall in interior demolition<\/h3>\n<p>After mapping the joints, intersection points are chosen as starting zones. Concrete demolition shears release courses along the joints, and inserts are cut with multi cutters. This produces manageable segments with low vibration. A short test sequence at one cross joint confirms the crack path and optimizes the removal rhythm.<\/p>\n<h3>Industrial floor with control joints<\/h3>\n<p>The slab panels are segmented at the cross of the control joints using rock and concrete splitters. Reinforcement laps are opened locally and cut with steel shears. The sequence limits edge spalling and facilitates removal. Score cuts and symmetric hole patterns around the intersection improve crack stability between panels.<\/p>\n<h3>Rock bench in natural stone extraction<\/h3>\n<p>Joint intersections define block geometries. Split-hole patterns are aligned with the intersections, stone splitting cylinders produce calm fracture surfaces. This precisely achieves the desired block shape and reduces rework. Temporary supports secure wedges until the target block is detached and handled.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The cross joint is an apparently small detail with major technical impact. It describes the right-angled meeting of butt and bed joints, for example in masonry, in paving and slab surfaces, in concrete slabs with control joints, as well as in naturally jointed rock. For planning, execution, repair, and deconstruction <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/cross-joint\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19371","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Cross Joint in Construction - Definition &amp; Guide<\/title>\n<meta name=\"description\" content=\"Guide to cross joints in masonry, paving, concrete slabs and rock geology \u2713 effects, crack control and safe demolition.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/cross-joint\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Cross Joint in Construction - Definition &amp; Guide\" \/>\n<meta property=\"og:description\" content=\"Guide to cross joints in masonry, paving, concrete slabs and rock geology \u2713 effects, crack control and safe demolition.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/cross-joint\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-22T05:56:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"11 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/cross-joint\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/cross-joint\",\"name\":\"Cross Joint in Construction - Definition & Guide\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-08-23T06:44:46+00:00\",\"dateModified\":\"2026-04-22T05:56:02+00:00\",\"description\":\"Guide to cross joints in masonry, paving, concrete slabs and rock geology \u2713 effects, crack control and safe demolition.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/cross-joint#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/cross-joint\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/cross-joint#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Cross joint\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Cross Joint in Construction - Definition & Guide","description":"Guide to cross joints in masonry, paving, concrete slabs and rock geology \u2713 effects, crack control and safe demolition.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/cross-joint","og_locale":"en_US","og_type":"article","og_title":"Cross Joint in Construction - Definition & Guide","og_description":"Guide to cross joints in masonry, paving, concrete slabs and rock geology \u2713 effects, crack control and safe demolition.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/cross-joint","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-04-22T05:56:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"11 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/cross-joint","url":"https:\/\/www.darda.de\/en\/knowledge\/cross-joint","name":"Cross Joint in Construction - Definition & Guide","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-08-23T06:44:46+00:00","dateModified":"2026-04-22T05:56:02+00:00","description":"Guide to cross joints in masonry, paving, concrete slabs and rock geology \u2713 effects, crack control and safe demolition.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/cross-joint#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/cross-joint"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/cross-joint#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Cross joint"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19371","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19371"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19371\/revisions"}],"predecessor-version":[{"id":26526,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19371\/revisions\/26526"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19371"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}