{"id":19369,"date":"2025-08-25T13:13:16","date_gmt":"2025-08-25T11:13:16","guid":{"rendered":"https:\/\/www.darda.de\/circle-cutter-tool"},"modified":"2026-04-22T07:26:02","modified_gmt":"2026-04-22T05:26:02","slug":"circle-cutter-tool","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/circle-cutter-tool","title":{"rendered":"Circle cutter tool"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Circle cutter tools are tools and fixtures used to produce precise circular openings, cutouts, and cylindrical bores in materials such as concrete, masonry, natural stone, sheet steel, or composite materials. In the context of deconstruction, strip-out, and cutting operations, they serve to create round penetrations for pipes, anchors, flanges, or inspection openings and to produce cut edges with defined geometry. In practice, circle cutter tools range from handheld hole saws to adjustable circle drills and diamond-equipped core drilling systems. Especially in concrete demolition, the circular cut is often a preparatory step before hydraulic tools from Darda GmbH &#8211; such as concrete demolition shears or stone and concrete splitters &#8211; separate material in a controlled manner, release it, or divide it into transportable segments. Compared with freehand cutting, circular cutters enable repeatable diameters, tight tolerances, and cleaner interfaces that reduce rework and improve downstream process stability.<\/p>\n<h2>Definition: What Is Meant by a Circle Cutter Tool?<\/h2>\n<p>A circle cutter tool is a tool that produces a circular cutting path through rotational motion. The spectrum ranges from adjustable cutting arms for sheet metal and hole saws (carbide\/HSS) to diamond-impregnated core bits for mineral materials. The goal is a round opening with a specified diameter, defined edge quality, and minimal edge damage. In construction, the term is often used as an umbrella for circular drill cutters and core drills that use a core bit to extract a cylindrical section of material from the workpiece. Essential characteristics include <em>centering<\/em> (e.g., via pilot drill or drill stand), the <strong>cutting energy<\/strong> (torque, feed), and the type of <em>cutting edge<\/em> (carbide teeth or diamond segments). In connection with hydraulic demolition processes, the circular cut permits controlled force introduction and can deliberately influence crack formation or expose reinforcement. Interfaces and mounts such as UNC threads, quick-change adapters, and system-specific shanks improve concentricity, reduce runout, and protect the spindle.<\/p>\n<h2>Circle Cutter Tools in Concrete Demolition: Role, Sequence, and Benefits<\/h2>\n<p>In concrete demolition and specialized deconstruction, circle cutter tools are used to create round openings, predefine edges, and relieve stresses. Typical uses include core drilling for anchor points, relief drill holes along planned separation joints, and precise penetrations for service routing. The circular cut delivers a clean, reproducible geometry, minimizes spalled edges, and facilitates subsequent processing with concrete demolition shears or stone and concrete splitters from Darda GmbH.<\/p>\n<ul>\n<li><strong>Reduced disturbance<\/strong>: lower noise and vibration compared with percussive methods, less risk of microcracking.<\/li>\n<li><strong>Accuracy<\/strong>: exact positioning and diameter control for fit-critical penetrations and anchors.<\/li>\n<li><strong>Protection of adjoining areas<\/strong>: fewer collateral damages and cleaner edges for sealing or coating.<\/li>\n<li><strong>Process reliability<\/strong>: predictable interfaces for subsequent splitting and shearing steps.<\/li>\n<\/ul>\n<h2>Design and Operating Principles<\/h2>\n<p>Circle cutter tools operate circularly around a defined axis. The cutting forces result from speed, torque, and feed, while cooling\/lubrication (wet or dry cutting) controls wear. A rigid drill stand increases precision and safety; centering prevents wobble and breakout. The choice of tooling depends on the material: carbide for metals and wood-based materials, sintered or brazed diamond segments for concrete, natural stone, and asphalt.<\/p>\n<p>Key parameters include <strong>peripheral speed<\/strong> (matched to diameter and segment bond), <strong>feed control<\/strong> (to avoid glazing and segment loss), and <strong>cooling and chip removal<\/strong> (steady flow, effective slurry evacuation). Balanced tooling and backlash-free guidance reduce runout and improve roundness.<\/p>\n<h3>Cutting Tools and Outfitting<\/h3>\n<ul>\n<li>Carbide or HSS hole saws: suitable for sheets, profiles, sandwich panels; limited cutting depth.<\/li>\n<li>Adjustable circle drills: flexible in diameter; preferred for thin sheets, covers, and flanges.<\/li>\n<li>Diamond core bits: standard for concrete and rock; high dimensional accuracy and good edge quality with proper cooling.<\/li>\n<li>Thin-wall vs. standard-wall core barrels: thin-wall increases penetration rate, standard-wall improves stability and lifespan.<\/li>\n<\/ul>\n<h3>Centering, Guidance, and Drive<\/h3>\n<ul>\n<li>Pilot drill: short lead, stabilizes the start and prevents wandering.<\/li>\n<li>Drill stand: ensures perpendicular guidance, especially for larger diameters and significant drilling depths.<\/li>\n<li>Drives: electric or hydraulic; match speed and torque to core bit diameter and material.<\/li>\n<li>Base fixation: choose anchors, vacuum pads, or bracing as appropriate; verify pull-off safety on smooth or weak substrates.<\/li>\n<li>Safety features: overload protection, slip clutch, soft start, and emergency stop increase operational safety.<\/li>\n<\/ul>\n<h3>Wet and Dry Cutting<\/h3>\n<ul>\n<li>Wet cutting: water cooling reduces dust, improves tool life and cut finish, but generates slurry (ensure proper disposal).<\/li>\n<li>Dry cutting: mobile and fast, requires dust extraction and an appropriately segmented core bit.<\/li>\n<li>Slurry management: collection rings and filtration minimize contamination and simplify disposal logistics.<\/li>\n<li>Dust control: high-efficiency extraction and appropriate respirators support compliance with exposure limits for mineral dust.<\/li>\n<\/ul>\n<h2>Combination with Hydraulic Demolition Tools<\/h2>\n<p>The circular cut is not an end in itself, but part of a coordinated process design. Combined with hydraulic tools from Darda GmbH, forces and separation paths can be controlled so that components are released safely, quietly, and with low vibration. Circular cuts serve as relief or starting points, as anchors for lifting eyes and slings, or to expose reinforcement before concrete demolition shears or stone and concrete splitters are applied in a targeted manner.<\/p>\n<ul>\n<li>Core drilling to accommodate expanding or wedge systems, followed by splitting with <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a>.<\/li>\n<li>Round cutouts establish defined edges that concrete demolition shears can break in a controlled manner.<\/li>\n<li>In steel and composite structures, circular preparations followed by cutting with combination shears, steel shears, or multi cutters.<\/li>\n<li>For vessels and tanks, circular openings followed by segmenting cuts with tank-cutter concepts.<\/li>\n<li>Pilot and relief holes placed at corner radii reduce overbreak and guide crack propagation during downsizing.<\/li>\n<\/ul>\n<h3>Concrete Demolition Shears: Clean Fracture Initiation<\/h3>\n<p>A circularly weakened zone reduces uncontrolled spalling. Concrete demolition shears can crush and break material precisely along the circular edge, while reinforcement becomes visible and can be separated if required. The defined curvature acts as a crack arrester and enables selective load introduction.<\/p>\n<h3>Stone and Concrete Splitters: Borehole Geometry as the Key<\/h3>\n<p>For splitting, the diameter, depth, and axial accuracy of the drill holes are crucial. Circle cutter tools in the sense of precise core drilling deliver reproducible borehole quality that safely guides the wedges, distributes loads evenly, and makes crack paths predictable. The alignment of holes with expected joint orientation further increases splitting efficiency.<\/p>\n<h3>Metal Structures: Combination Shears, Steel Shears, Multi Cutters<\/h3>\n<p>In steel plates or composite decks, circular openings provide engagement points for cutting tools, ease threading, and reduce material stresses. This lowers cutting forces and improves cut quality and cycle time. Burrs and heat tint are minimized when speeds and lubricants are selected to suit the alloy.<\/p>\n<h2>Applications Across Use Cases<\/h2>\n<p>Circle cutter tools are used in various scenarios &#8211; from utility corridors and inspection openings to segmental dismantling of large components. The following examples show typical applications in Darda GmbH\u2019s fields of use. Diameters range from small pilot holes to large penetrations measuring several hundred millimeters, depending on structural requirements and access conditions.<\/p>\n<h3>Concrete Demolition and Specialized Deconstruction<\/h3>\n<p>Core drillings create safe pickup points for lifting or suspension devices and define fracture edges before concrete demolition shears downsize components. Relief drill holes along planned separation lines reduce crack propagation into areas that must not be damaged. For long cut perimeters, staged hole patterns act as kerfs and guide subsequent separation tools.<\/p>\n<h3>Strip-Out and Cutting<\/h3>\n<p>During deconstruction in existing buildings, circular penetrations route new installations. The clean edge facilitates subsequent work, for example with combination shears on steel profiles or with multi cutters in mixed materials. Retrofit penetrations can be created without dismantling entire assemblies, preserving adjacent finishes.<\/p>\n<h3>Rock Demolition and Tunnel Construction<\/h3>\n<p>In rock and hard stone, diamond core bits produce precise drill holes that serve as starting points for stone and concrete splitters. This creates controlled crack lines and dimensionally accurate cutouts, even in confined environments. The low-vibration approach supports sensitive surroundings and existing structures.<\/p>\n<h3>Natural Stone Extraction<\/h3>\n<p>In the extraction and processing of natural stone, circular cuts help create fit openings and technical boreholes without weakening the block uncontrollably. Subsequent splitting steps become more predictable. Orientation relative to bedding planes and veining increases yield and edge integrity.<\/p>\n<h3>Special Applications<\/h3>\n<p>In special cases &#8211; such as tanks, silos, or thick steel plates &#8211; circle cutter tools create entry openings and defined contours on which tank cutters or steel shears can operate safely. This reduces sparking, heat input, and distortion. In environments with hot-work restrictions, circular cutting supports compliance by limiting thermal loads.<\/p>\n<h2>Planning and Execution<\/h2>\n<p>Careful work preparation reduces risks, shortens cycles, and increases cut quality. The following steps have proven effective:<\/p>\n<ol>\n<li>Existing-conditions survey: identify material, reinforcement density, embedded parts; locate utilities (e.g., using appropriate testing methods).<\/li>\n<li>Geometry planning: define diameter, axis offset, edge distances, and drilling depth; consider the element\u2019s structural behavior.<\/li>\n<li>Tool selection: carbide vs. diamond, wet\/dry cutting, speed and torque window, mounting on the drill stand.<\/li>\n<li>Marking and centering: visible scribe lines, pilot drill with short lead; use a starter aid on inclined surfaces.<\/li>\n<li>Chip and slurry removal: effective water management and extraction, safe routing and disposal.<\/li>\n<li>Control cuts: proceed stepwise for large diameters, cool intermittently.<\/li>\n<li>Finishing: break edges, clean the surface; expose reinforcement if subsequent cutting or shear work is planned.<\/li>\n<li>Test run and parameter check: verify coolant flow, segment exposure, stand rigidity, and anchorage before full-depth drilling.<\/li>\n<li>Documentation and acceptance: record diameter, depth, and position; include as-built photos and inspection results for quality assurance.<\/li>\n<\/ol>\n<h2>Quality, Tolerances, and Cut Edges<\/h2>\n<p>Dimensional accuracy and edge quality determine the usability of the opening. Key influencing factors are runout, feed, segment condition, and cooling. In concrete, stable drill stands, correctly segmented core bits, and constant cooling water quantities improve results.<\/p>\n<ul>\n<li>Roundness: ensure via backlash-free guidance and appropriate rotational speed.<\/li>\n<li>Minimize edge spalling: low wobble, reduced feed on entry and exit, if necessary drill from both sides.<\/li>\n<li>Control heat input: pauses and sufficient cooling prevent burning of segments and microstructural damage.<\/li>\n<li>Perpendicularity: maintain axial alignment to avoid tapered holes and misfit of inserts or sleeves.<\/li>\n<li>Surface finish: choose segment bond and feed to achieve edges suitable for sealing, coating, or gasket seating.<\/li>\n<\/ul>\n<h2>Occupational Safety and Environmental Protection<\/h2>\n<p>Safety takes priority. Circle cutter tools generate rotating mass forces, dust, noise, and slurry during wet cutting. Personal protective equipment, safe machine handling, protection against electricity and water, and site-appropriate barricading are essential. Requirements and limits vary by country and project; they should always be verified and observed on a project-specific basis. Proper capture and disposal of drilling slurry protects the environment and the construction site.<\/p>\n<ul>\n<li>PPE: eye and hearing protection, cut-resistant gloves, suitable footwear; respiratory protection for dry cutting and high-dust tasks.<\/li>\n<li>Electrical safety: use GFCI\/RCD protection, inspect cables and connectors, and ensure appropriate IP ratings for wet work.<\/li>\n<li>Water management: contain runoff with bunds or trays; avoid uncontrolled discharge into drains or soil.<\/li>\n<li>Machine handling: secure stands against pull-off, apply lockout\/tagout for nearby systems, and maintain safe cord and hose routing.<\/li>\n<\/ul>\n<h2>Common Failure Patterns and Remedies<\/h2>\n<ul>\n<li>Jamming when starting the hole: use a pilot drill, reduce speed, use a drill stand.<\/li>\n<li>Edge spalling: reduce feed, support at exit, if necessary drill from both sides.<\/li>\n<li>Overheating\/glazed segments: increase cooling, select segment bond suited to the material, cut intermittently.<\/li>\n<li>Loss of centering: check guide wear, eliminate play, renew clamping devices.<\/li>\n<li>Hitting reinforcement: locate in advance; upon contact reduce torque and adapt the cutting strategy (e.g., separate reinforcement independently).<\/li>\n<li>Core stuck in barrel: reverse briefly at low speed, use extraction keys, and avoid excessive feed that deforms the core.<\/li>\n<li>Vacuum stand losing hold: clean sealing ring and substrate, verify vacuum level, and switch to mechanical anchoring if required.<\/li>\n<\/ul>\n<h2>Maintenance, Operating Supplies, and Service Life<\/h2>\n<p>Regular inspection of core bits, teeth, interface, and drive increases process reliability. Diamond core bits should be dressed on suitable dressing blocks when the cut becomes dull; hole saws with broken teeth should be replaced promptly. Clean cooling water, functioning extraction, and tight connections extend service life and improve cut quality. Store dry, protected from impact, and shielded from corrosion. Selecting a segment bond matched to aggregate hardness and abrasive content delays wear and stabilizes performance over the tool\u2019s lifecycle.<\/p>\n<h2>Selection Criteria for Circle Cutter Tools<\/h2>\n<p>The right choice depends on material, diameter, and installation situation. For concrete and natural stone, diamond-segmented core bits are standard; for sheet steel and thin-walled components, adjustable circle drills and hole saws play to their strengths. Depth, access, edge distances, and subsequent steps (e.g., splitting with stone and concrete splitters or downsizing with concrete demolition shears) should be considered from the outset. This yields a coherent workflow with high quality and reproducible results.<\/p>\n<ul>\n<li>Material class and reinforcement content.<\/li>\n<li>Required diameter, drilling depth, and tolerances.<\/li>\n<li>Access conditions and stand fixation options.<\/li>\n<li>Drive power, speed range, and torque capability.<\/li>\n<li>Cooling strategy (wet vs. dry) and site constraints.<\/li>\n<li>Interface compatibility with existing equipment and accessories.<\/li>\n<li>Downstream process requirements for edges and geometry.<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Circle cutter tools are tools and fixtures used to produce precise circular openings, cutouts, and cylindrical bores in materials such as concrete, masonry, natural stone, sheet steel, or composite materials. In the context of deconstruction, strip-out, and cutting operations, they serve to create round penetrations for pipes, anchors, flanges, or <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/circle-cutter-tool\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19369","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Circle Cutter Tool - Definition &amp; Uses<\/title>\n<meta name=\"description\" content=\"Your guide to circle cutter tools for precise round openings in concrete, metal and stone \u2713 methods, uses and safety.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/circle-cutter-tool\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Circle Cutter Tool - Definition &amp; Uses\" \/>\n<meta property=\"og:description\" content=\"Your guide to circle cutter tools for precise round openings in concrete, metal and stone \u2713 methods, uses and safety.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/circle-cutter-tool\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-22T05:26:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"11 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/circle-cutter-tool\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/circle-cutter-tool\",\"name\":\"Circle Cutter Tool - Definition & Uses\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-08-25T11:13:16+00:00\",\"dateModified\":\"2026-04-22T05:26:02+00:00\",\"description\":\"Your guide to circle cutter tools for precise round openings in concrete, metal and stone \u2713 methods, uses and safety.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/circle-cutter-tool#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/circle-cutter-tool\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/circle-cutter-tool#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Circle cutter tool\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Circle Cutter Tool - Definition & Uses","description":"Your guide to circle cutter tools for precise round openings in concrete, metal and stone \u2713 methods, uses and safety.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/circle-cutter-tool","og_locale":"en_US","og_type":"article","og_title":"Circle Cutter Tool - Definition & Uses","og_description":"Your guide to circle cutter tools for precise round openings in concrete, metal and stone \u2713 methods, uses and safety.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/circle-cutter-tool","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-04-22T05:26:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"11 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/circle-cutter-tool","url":"https:\/\/www.darda.de\/en\/knowledge\/circle-cutter-tool","name":"Circle Cutter Tool - Definition & Uses","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-08-25T11:13:16+00:00","dateModified":"2026-04-22T05:26:02+00:00","description":"Your guide to circle cutter tools for precise round openings in concrete, metal and stone \u2713 methods, uses and safety.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/circle-cutter-tool#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/circle-cutter-tool"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/circle-cutter-tool#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Circle cutter tool"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19369","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19369"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19369\/revisions"}],"predecessor-version":[{"id":26522,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19369\/revisions\/26522"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19369"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}