{"id":19358,"date":"2025-08-26T09:54:32","date_gmt":"2025-08-26T07:54:32","guid":{"rendered":"https:\/\/www.darda.de\/basket-weave"},"modified":"2026-04-22T15:34:03","modified_gmt":"2026-04-22T13:34:03","slug":"basket-weave","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/basket-weave","title":{"rendered":"Basket weave"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Basket weave generally denotes a structure made of individual strands that are interlaced or appear interlaced. In construction, the term today primarily covers wire meshes, reinforcement cages made of steel, and stone-fillable wire baskets (gabions). In deconstruction and in natural stone extraction, professionals encounter basket weave as a functional component that provides load-bearing action, stability, or erosion protection &#8211; and that must be separated, released, or cut in a controlled manner during demolition. In practice, <strong>concrete pulverizers<\/strong>, <em>steel shears<\/em>, as well as <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a> are frequently used, supplied by suitable <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power units<\/a> from Darda GmbH. Selecting an appropriate tool combination limits secondary damage, keeps cut lines controllable, and accelerates downstream sorting.<\/p>\n<h2>Definition: What is meant by basket weave?<\/h2>\n<p>In a technical context, basket weave describes an ordered, usually regular configuration of crossing, interwoven, or laced elements. Originally, these were plant fibers (willow, rattan). In structural engineering, the term figuratively stands for:<\/p>\n<ul>\n<li>Wire meshes and wire grids with square or hexagonal apertures, galvanized, coated, or made of stainless steel,<\/li>\n<li>Reinforcement cages made of longitudinal bars and stirrups, tied or welded, for concrete members, bored pile foundations, and shafts,<\/li>\n<li>Stone-filled wire baskets (gabions) for slope stabilization, noise barrier walls, or bank protection.<\/li>\n<\/ul>\n<p>The defining feature is the net-like arrangement with a specific mesh size and wire or bar thickness. This results in direction-dependent load-bearing behavior as well as special requirements for cutting, separation, and deconstruction.<\/p>\n<p>In engineering usage, the term is often used interchangeably with <em>mesh<\/em>, <em>grid<\/em>, or <em>lattice<\/em>. In the context of reinforced concrete, <strong>rebar cages<\/strong> and <strong>reinforcing mats<\/strong> represent the most common basket-weave configurations.<\/p>\n<h2>Structure, materials, and properties of basket weave<\/h2>\n<p>Technical basket weaves consist predominantly of low-alloy steels, stainless steels, or corrosion-protected wires (for example, hot-dip galvanizing, zinc-aluminum). Polymer coatings are used with gabions or protection nets. Typical configurations are:<\/p>\n<ul>\n<li>Square mesh: right-angled, good dimensional stability, clearly defined support action.<\/li>\n<li>Hexagonal mesh: higher flexibility, suitable for irregular substrates.<\/li>\n<li>Reinforcement cage: longitudinal bars with stirrups or spirals, tied or welded as a \u201ccage\u201d.<\/li>\n<\/ul>\n<p>Properties relevant to demolition:<\/p>\n<ul>\n<li><strong>Mesh size and wire thickness:<\/strong> determine cutting forces and tool selection.<\/li>\n<li><strong>Corrosion condition:<\/strong> influences fracture behavior and spring-back.<\/li>\n<li><strong>Embedment in concrete or rock:<\/strong> increases resistance and requires coordinated approaches, such as pre-breaking or splitting.<\/li>\n<li><strong>Elastic rebound:<\/strong> tensioned wires may whip when being cut.<\/li>\n<\/ul>\n<p>The combination of wire ductility and bond to the surrounding material calls for stepwise, controlled separation with suitable hydraulic power.<\/p>\n<h3>Typical dimensions and performance aspects<\/h3>\n<ul>\n<li><strong>Common wire diameters:<\/strong> approx. 2 to 8 mm for meshes and nets; <strong>rebar diameters:<\/strong> approx. 8 to 40 mm depending on design.<\/li>\n<li><strong>Mesh apertures:<\/strong> typically 25 to 100 mm for square meshes; hexagonal meshes often larger for gabions.<\/li>\n<li><strong>Coatings and durability:<\/strong> choice of galvanizing, zinc-aluminum, or polymer layers follows the exposure class and expected service life.<\/li>\n<li><strong>Mechanical behavior:<\/strong> anisotropic stiffness, notch sensitivity at kinks, and potential for fatigue at repeated load cycles influence cut planning.<\/li>\n<\/ul>\n<h2>Basket weave in concrete and reinforced concrete: reinforcement cages, mats, formwork<\/h2>\n<p>In concrete members, rebar and mats form a \u201ccage\u201d via stirrups, spacers, and ties that takes up tensile forces. In deconstruction, such meshes are first exposed by breaking or splitting the concrete. <strong>Concrete pulverizers<\/strong> open concrete cross-sections in a targeted way and expose the reinforcement without overloading the mesh uncontrollably. For the subsequent separation, <em>steel shears<\/em>, <em>hydraulic demolition shears<\/em>, or <em><a href=\"https:\/\/www.darda.de\/en\/product-overview\/multi-cutters\">Multi Cutters<\/a><\/em> are used. For massive members, bored piles, or foundations, pre-splitting with <strong>rock wedge splitters and concrete splitters<\/strong> can reduce internal stresses and then make the wire or bar portions more safely accessible.<\/p>\n<ul>\n<li><strong>Good access practice:<\/strong> create small, alternating windows rather than one large opening to interrupt force paths.<\/li>\n<li><strong>Sequence control:<\/strong> relieve boundary conditions first, then progressively cut bars in short segments from the edge inward.<\/li>\n<li><strong>Handling ties and spacers:<\/strong> remove or cut auxiliary bindings early to prevent unintended force transfer.<\/li>\n<\/ul>\n<h3>Load-bearing behavior and consequences for demolition<\/h3>\n<p>Reinforcement cages act as continuous tension systems. When opening a member, redistributions occur. A safe approach is to open cross-sections in small stages, interrupt tension paths, and only then cut longer bars or mat segments. This minimizes spring-back and keeps the cut line controllable.<\/p>\n<h2>Wire meshes in earthworks: gabions, catch baskets, and protection systems<\/h2>\n<p>Gabions and similar baskets stabilize slopes and banks. The mesh is flexible; the stones provide mass and roughness. In deconstruction, individual baskets are often opened, the fill stones removed, and the mesh separated. Wires can be cut with <em>Multi Cutters<\/em> or <em>hydraulic demolition shears<\/em>. Large jammed stones can be split in advance with <strong>rock wedge splitters<\/strong> or <strong>rock wedge splitters and concrete splitters<\/strong>. In special operations, such as on damaged <strong>rockfall nets<\/strong>, safely de-tensioning the mesh takes priority before making cuts.<\/p>\n<p>Where gabions include geotextile liners or corrosion protection, cutting must avoid unnecessary damage to adjacent layers. In aggressive environments, corrosion-weakened wires can fail unpredictably &#8211; staged opening and protective screening reduce risk.<\/p>\n<h2>Procedure for separating basket weave in deconstruction<\/h2>\n<p>A structured approach increases safety and efficiency:<\/p>\n<ol>\n<li>Investigation: record material, mesh size, wire thickness, embedment depth, and stress states.<\/li>\n<li>Relieve: open concrete with <strong>concrete pulverizers<\/strong> or pre-split with <strong>rock wedge splitters and concrete splitters<\/strong> to reduce bond forces.<\/li>\n<li>Expose: gradually expose the relevant mesh areas, secure loose sections.<\/li>\n<li>Cut: using suitable cutting tools (steel shears, hydraulic demolition shears, Multi Cutters) cut in short sections, from near-edge to farther in.<\/li>\n<li>Separate: separate metals, mineral fractions, and coatings by type, prepare for transport.<\/li>\n<li>Document: record cut sequences, quantities, and segregation for traceability and recycling evidence.<\/li>\n<\/ol>\n<h3>Tool selection and parameters<\/h3>\n<p>For consistent results, the following criteria are crucial:<\/p>\n<ul>\n<li>Cutting force and jaw opening matched to wire or bar diameter and accessibility.<\/li>\n<li>Controllability of movement, especially in confined areas of interior demolition.<\/li>\n<li>Hydraulic performance of the power unit: provide stable flow and pressure.<\/li>\n<li>Cutting edge geometry: serrated for slippery wires, smooth edges for defined cuts.<\/li>\n<li>Low vibration levels and low noise for asset protection, e.g., in sensitive special demolition projects.<\/li>\n<li>Tool mass and reach in relation to carrier and work radius to maintain positional accuracy.<\/li>\n<li>Blade maintenance intervals and change-out concepts to keep cut quality consistent.<\/li>\n<\/ul>\n<h2>Safety, environment, and recycling<\/h2>\n<p>Cutting meshes produces sharp edges and possibly whipping wire ends. Appropriate personal protective equipment, shielding, and stepwise de-tensioning of the mesh are effective. Dust suppression and noise reduction measures have priority, particularly in interior demolition\/building gutting. Metallic meshes can usually be sent to recycling; mineral fractions are handled separately. Legal requirements and local regulations must be observed; project-specific assessments remain essential.<\/p>\n<ul>\n<li><strong>PPE specifics:<\/strong> eye and face protection, cut-resistant gloves, long sleeves, and safety footwear.<\/li>\n<li><strong>Exclusion zones:<\/strong> keep personnel away from the cut plane and potential rebound direction.<\/li>\n<li><strong>Environmental control:<\/strong> use misting, local extraction, and drip trays for hydraulic media.<\/li>\n<\/ul>\n<h2>Identification and assessment of basket weaves on site<\/h2>\n<p>A quick classification eases the choice of approach:<\/p>\n<ul>\n<li>Look and feel: hexagonal versus square pattern, wire versus bar geometry.<\/li>\n<li>Coating: bare, galvanized, polymer-coated.<\/li>\n<li>Grain size of the fill in gabions: influences whether splitting or direct opening is appropriate.<\/li>\n<li>Embedment depth in concrete: near-surface mesh or deeper reinforcement cage.<\/li>\n<\/ul>\n<p>Short test cuts or trial breaks can help estimate the required cutting force and spring-back behavior.<\/p>\n<ul>\n<li><strong>Simple checks:<\/strong> visual corrosion grading, magnet response for indicative material type, and review of drawings for anchorage details.<\/li>\n<\/ul>\n<h2>Typical mistakes and how to avoid them<\/h2>\n<ul>\n<li>Cutting a tensioned mesh without prior relief: leads to uncontrolled whipping.<\/li>\n<li>Cutting segments that are too long: work in short segments, secure edges.<\/li>\n<li>Underestimated embedment: reduce bond forces first by splitting or breaking.<\/li>\n<li>Wrong cutting edge geometry: avoid slipping wires, use suitable blades.<\/li>\n<li>Lack of separation of material streams: recycling rates drop, disposal costs rise.<\/li>\n<li>Standing in the plane of the mesh during final cuts: reposition to avoid rebound hazards.<\/li>\n<li>Skipping trial cuts: perform controlled tests to calibrate force and tool choice.<\/li>\n<\/ul>\n<h2>Relation to Darda GmbH application areas<\/h2>\n<p>In concrete demolition and special demolition, basket weave forms the internal tension carrier of many members. <strong>Concrete pulverizers<\/strong> create access to cut the reinforcement in a controlled manner with steel shears. In interior demolition and cutting, compact <em>hydraulic demolition shears<\/em> and <em>Multi Cutters<\/em> support safe opening of wire meshes and small-format baskets. In rock excavation and tunnel construction, meshes appear as shotcrete reinforcement or nets; here <strong>rock wedge splitters and concrete splitters<\/strong> help release bond forces before cutting. In natural stone extraction, gabionized structures or stuck blocks can be efficiently processed by splitting and subsequent cutting. Special assignments often require particularly controlled, low-vibration methods &#8211; a strength of hydraulic tools with finely metered output via suitable hydraulic power packs from Darda GmbH. Matching hydraulic performance to the tool ensures precise, low-noise operation, especially in sensitive environments.<\/p>\n<h2>Technical and regulatory notes<\/h2>\n<p>For planning and execution, material data, approvals, and applicable rules are relevant, for example for reinforcing steel, wire meshes, and corrosion protection. Project-specific requirements, structural analysis, and protection concepts must always be coordinated with the site management. The procedures presented here are general in nature and do not replace an object-specific assessment.<\/p>\n<ul>\n<li>Consult product data sheets and approvals for permissible loads, coatings, and expected service life.<\/li>\n<li>Observe documentation and evidence requirements for waste separation and metal recycling.<\/li>\n<li>Align method statements with local occupational safety rules and any restrictions on vibration and noise.<\/li>\n<\/ul>\n<h2>Practical examples from day-to-day deconstruction<\/h2>\n<p>When deconstructing a reinforced concrete column, the concrete is broken section by section with the <strong>concrete pulverizer<\/strong> until the reinforcement cage is exposed. The bars are then cut in short segments with <em>steel shears<\/em>. If a foundation with high reinforcement density has to be opened, pre-splitting with <strong>rock wedge splitters and concrete splitters<\/strong> can significantly reduce cutting forces. On a slope with a gabion wall, the wire mesh is first de-tensioned at stress points, individual wires are opened with <em>Multi Cutters<\/em>, and the fill stones are removed; jammed blocks are split with <strong>rock wedge splitters<\/strong> to separate the mesh without damage.<\/p>\n<p>In tunnel and slope protection works, damaged rockfall nets are first secured and de-tensioned. Local cuts are then made in short steps with <em>hydraulic demolition shears<\/em>, while large trapped rocks are split to relieve the mesh before full removal.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Basket weave generally denotes a structure made of individual strands that are interlaced or appear interlaced. In construction, the term today primarily covers wire meshes, reinforcement cages made of steel, and stone-fillable wire baskets (gabions). In deconstruction and in natural stone extraction, professionals encounter basket weave as a functional component <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/basket-weave\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19358","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Basket Weave - Wire Mesh, Reinforcement, Gabions<\/title>\n<meta name=\"description\" content=\"Construction basket weave explained - wire meshes, rebar cages and gabions, plus \u2713 safe cutting and demolition.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/basket-weave\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Basket Weave - Wire Mesh, Reinforcement, Gabions\" \/>\n<meta property=\"og:description\" content=\"Construction basket weave explained - wire meshes, rebar cages and gabions, plus \u2713 safe cutting and demolition.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/basket-weave\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-22T13:34:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/basket-weave\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/basket-weave\",\"name\":\"Basket Weave - Wire Mesh, Reinforcement, Gabions\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-08-26T07:54:32+00:00\",\"dateModified\":\"2026-04-22T13:34:03+00:00\",\"description\":\"Construction basket weave explained - wire meshes, rebar cages and gabions, plus \u2713 safe cutting and demolition.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/basket-weave#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/basket-weave\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/basket-weave#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Basket weave\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Basket Weave - Wire Mesh, Reinforcement, Gabions","description":"Construction basket weave explained - wire meshes, rebar cages and gabions, plus \u2713 safe cutting and demolition.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/basket-weave","og_locale":"en_US","og_type":"article","og_title":"Basket Weave - Wire Mesh, Reinforcement, Gabions","og_description":"Construction basket weave explained - wire meshes, rebar cages and gabions, plus \u2713 safe cutting and demolition.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/basket-weave","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-04-22T13:34:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/basket-weave","url":"https:\/\/www.darda.de\/en\/knowledge\/basket-weave","name":"Basket Weave - Wire Mesh, Reinforcement, Gabions","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-08-26T07:54:32+00:00","dateModified":"2026-04-22T13:34:03+00:00","description":"Construction basket weave explained - wire meshes, rebar cages and gabions, plus \u2713 safe cutting and demolition.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/basket-weave#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/basket-weave"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/basket-weave#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Basket weave"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19358","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19358"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19358\/revisions"}],"predecessor-version":[{"id":26548,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19358\/revisions\/26548"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19358"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}