{"id":19355,"date":"2025-08-26T14:53:11","date_gmt":"2025-08-26T12:53:11","guid":{"rendered":"https:\/\/www.darda.de\/controlled-demolition"},"modified":"2026-04-21T09:08:02","modified_gmt":"2026-04-21T07:08:02","slug":"controlled-demolition","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/controlled-demolition","title":{"rendered":"Controlled demolition"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p><strong>Controlled demolition<\/strong> refers to the targeted, planned deconstruction of structures, components, or rock formations with high precision and low environmental impact. The focus is on safety, protection of adjacent structures, and a low-emission approach. Typical methods include the hydraulic splitting of concrete and rock as well as <em>low-vibration crushing<\/em> with concrete demolition shears. Tools and systems such as <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a>, concrete demolition shears, combination shears, Multi Cutters, steel shears, tank cutters, and the associated hydraulic power units from Darda GmbH cover all relevant work steps &#8211; from gutting through selective deconstruction to special operations. In professional practice, controlled demolition is aligned with structural requirements, environmental protection, and documentation obligations to ensure predictable results and efficient downstream logistics.<\/p>\n<h2>Definition: What is meant by controlled demolition?<\/h2>\n<p>Controlled demolition means the <strong>selective, low-emission, and structurally verified deconstruction<\/strong> of structures or rock with defined work steps. Instead of large-scale, vibration-intensive procedures, precise techniques are used to minimize <em>noise, dust, and vibration<\/em>, separate material flows, and protect adjacent components. These include, in particular, <strong>hydraulic splitting<\/strong> of concrete or natural stone as well as <strong>crushing with concrete demolition shears<\/strong> and the <strong>material-appropriate separation<\/strong> of reinforcing steel or plant components. The goal is a reproducible, safe process with high-quality cut and fracture edges, clear separation of material streams, and impeccable documentation. Typical characteristics are:<\/p>\n<ul>\n<li><strong>Defined process sequences<\/strong> from surveying through execution to verification<\/li>\n<li><strong>Measured and monitored impacts<\/strong> on the surroundings (e.g., vibration and noise)<\/li>\n<li><strong>Material-selective dismantling<\/strong> to enable lawful disposal and high recycling rates<\/li>\n<\/ul>\n<h2>Basic principles, goals, and differentiation<\/h2>\n<p>Controlled demolition combines technical understanding of load-bearing structures with suitable tools and careful organization. Key goals are:<\/p>\n<ul>\n<li>Protection of people, neighboring buildings, and infrastructure through <em>low-vibration<\/em> and <em>precise<\/em> methods<\/li>\n<li>Preservation of components to be reused as well as <strong>selective disassembly<\/strong> prior to structural removal<\/li>\n<li>Minimization of <em>noise, dust, vibration<\/em>, and secondary damage<\/li>\n<li>Clean separation of material streams for disposal and recycling<\/li>\n<li>Traceability through planning, measurement, and documentation<\/li>\n<li><strong>Resource efficiency<\/strong> through reuse of components and maximized recycling quotas<\/li>\n<li><strong>Compliance<\/strong> with permit conditions and coordination with stakeholders<\/li>\n<\/ul>\n<p>Differentiation: While conventional demolition targets rapid mass movement, controlled demolition relies on <strong>sequences, cut paths, and material-appropriate mechanics<\/strong>. Hydraulic splitting and shear technology as well as cutting processes are at the forefront. Continuous monitoring and stepwise execution ensure stability and transparency throughout all phases.<\/p>\n<h2>Methods and techniques in controlled demolition<\/h2>\n<h3>Hydraulic splitting of concrete and rock<\/h3>\n<p><strong>Rock and concrete splitters<\/strong> generate targeted splitting forces within the component via predrilled core holes. The pressure is introduced into the material in a controlled manner, cracks propagate in a defined way, and vibrations remain minimal. Splitting is particularly suitable for massive foundations, thick walls, rock heads, tunnel cross-sections, or confined workspaces. <em>Advantages<\/em> include minimal secondary damage, good control of fracture lines, and quiet operation. Rock splitting cylinders are used in natural stone extraction and rock demolition when blasting is not possible or not desired. Practical parameters include hole diameter and spacing, staged pressurization, and verification of crack propagation before proceeding to the next segment.<\/p>\n<h3>Concrete demolition shears and combination shears<\/h3>\n<p><strong>Concrete demolition shears<\/strong> crush cast-in-place concrete, precast elements, and masonry by squeezing, cutting, and nibbling. They separate concrete from reinforcement and produce manageable piece sizes. In combination with <em>combination shears<\/em> or <em>Multi Cutters<\/em>, reinforcements, sections, and embedded parts can be cut in a material-appropriate manner. This technique is ideal for <strong>concrete demolition and special deconstruction<\/strong>, openings in slabs and walls, edge strips on bridge caps, and localized deconstruction in existing buildings. The associated <strong>hydraulic power units<\/strong> provide the required energy with compact dimensions, facilitating work in existing buildings and inner-city locations. Selection criteria include jaw geometry, working range, rotation capability, and the reinforcement ratio in the component.<\/p>\n<h3>Cutting and separating metal, tanks, and plant components<\/h3>\n<p><strong>Steel shears<\/strong> and <strong>tank cutters<\/strong> enable the safe cutting of vessels, pipelines, and steelwork components &#8211; often without thermal impact. This is advantageous in areas with fire or explosion hazards, such as during the deconstruction of tanks or pipelines. In <em>strip-out and cutting<\/em>, pipeline networks, units, and beams are thus dismantled in a controlled manner. Cold cutting minimizes sparks, avoids heat-affected zones, and reduces fumes compared with thermal processes.<\/p>\n<h3>Supplementary methods<\/h3>\n<p>Depending on structural behavior, material, and target geometry, hydraulic splitting and shear techniques are often combined with sawing and core drilling. This produces defined cut edges for removal with concrete demolition shears or prepared weakenings for the <em>splitting of massive components<\/em>. Such combinations improve dimensional accuracy, reduce overbreak, and optimize handling weights.<\/p>\n<h2>Overview of applications<\/h2>\n<h3>Concrete demolition and special deconstruction<\/h3>\n<p>In highly dense urban environments and existing structures, <strong>low-vibration removal<\/strong> is essential. Concrete demolition shears create cleanly broken edges, reduce vibrations, and facilitate the separation of concrete and reinforcing steel. For massive foundations or piers, <em>rock and concrete splitters<\/em> are used to create controlled cracks and divide loads into manageable segments. Temporary shoring and cut sequencing ensure that remaining structural elements are not overstressed.<\/p>\n<h3>Strip-out and cutting<\/h3>\n<p>Before structural removal, there is selective disassembly of fit-out, installations, and plant equipment. <strong>Multi Cutters<\/strong>, <strong>steel shears<\/strong>, and <strong>tank cutters<\/strong> allow precise separation of metal components, while concrete demolition shears define openings and penetrations. This makes removal <em>component-oriented<\/em> and logistically manageable. Cable routes, media lines, and hazardous materials must be identified and isolated prior to cutting operations.<\/p>\n<h3>Rock demolition and tunneling<\/h3>\n<p>Underground and in rock, <strong>hydraulic splitting<\/strong> is an established alternative to blasting &#8211; especially in sensitive areas, near infrastructure, or in small cross-sections. Rock splitting cylinders enable controlled fracture patterns with minimal vibration and low noise. Preconditioning by drilling and staged pressurization helps maintain rock stability and protect adjacent structures.<\/p>\n<h3>Natural stone extraction<\/h3>\n<p>In natural stone quarrying, reproducible split lines and material-conserving methods are crucial. Hydraulic splitting technology supports extraction <em>without thermal or dynamic loading<\/em> of the rock. Block geometry, bedding, and natural fissures are considered to maximize yield and surface quality.<\/p>\n<h3>Special operations<\/h3>\n<p>In areas with explosion risk, in sensitive facilities, hospitals, or during ongoing operations, <strong>cold, low-spark cutting and splitting methods<\/strong> are preferred. Tank cutters and steel shears are used where flames or high temperatures must be excluded. Additional shielding, gas monitoring, and work permits are coordinated in advance.<\/p>\n<h2>Planning, structural analysis, and sequence<\/h2>\n<p>Controlled demolition begins with a <strong>survey of the existing structure<\/strong>: building data, material classification, reinforcement content, routing of services, hazardous substances, and accessibility. Based on this, the structural analysis, cutting sequence, temporary shoring, and load transfers are defined. For load-bearing interventions, a structural assessment is required. The sequence typically includes:<\/p>\n<ol>\n<li>Expose, decouple, and gut the affected zones<\/li>\n<li>Define <em>cut and split lines<\/em>, and if necessary carry out core drilling and sawing<\/li>\n<li>Use concrete demolition shears or rock and concrete splitters for controlled fragmentation<\/li>\n<li>Safe handling, intermediate storage, and transport of segments<\/li>\n<li>Finishing of edges, reinforcement, and embedded parts<\/li>\n<\/ol>\n<p>The <strong>hydraulic power units<\/strong> are positioned to suit the site; hose routing must be planned to minimize trip and pinch hazards. Connections and pressure ranges must be checked prior to commissioning. Digital coordination models and method statements improve interface management with other trades and streamline approvals.<\/p>\n<h2>Emissions and protection of the surroundings<\/h2>\n<p>Vibrations, noise, and dust must be minimized. Hydraulic splitting and shear-based demolition are considered <em>low-vibration<\/em> and have a favorable emissions profile. In addition, dust suppression (e.g., water misting), protective walls, enclosures, and low-vibration methods are used. In sensitive areas, measurements (e.g., vibration, sound levels) and baseline documentation are recommended. Working hours, access routes, and logistics should be coordinated with residents and authorities. Effective measures include:<\/p>\n<ul>\n<li><strong>Dust control<\/strong> with fine mist, point extraction, and sealed transfer routes<\/li>\n<li><strong>Noise reduction<\/strong> via acoustic screens, tool selection, and optimized duty cycles<\/li>\n<li><strong>Vibration management<\/strong> through pre-weakening, segmentation, and real-time monitoring<\/li>\n<\/ul>\n<h2>Selection of equipment and parameters<\/h2>\n<p>The choice of tools depends on material, component thickness, reinforcement ratio, target geometry, and accessibility. Principles:<\/p>\n<ul>\n<li><strong>Concrete demolition shears<\/strong> for slabs, walls, beams, edge areas, selective openings; with high steel content in combination with steel shears<\/li>\n<li><strong>Rock and concrete splitters<\/strong> for massive, thick components, foundation heads, rock, and tunnel cross-sections<\/li>\n<li><strong>Combination shears<\/strong> and <strong>Multi Cutters<\/strong> for mixed materials and changing tasks<\/li>\n<li><strong>Tank cutters<\/strong> for vessels and pipelines, especially where ignition hazards exist or in ATEX zones<\/li>\n<li><strong>Hydraulic power units<\/strong> matched to the required output, hose lengths, and operating environment<\/li>\n<\/ul>\n<p>Parameters such as splitter-hole spacing, cutting sequences, segment sizes, and gripping positions must be defined project-specifically. The objective is a <em>balanced segmentation<\/em> that facilitates handling and does not uncontrollably weaken residual load-bearing capacity. Additional selection factors are access constraints, lifting capacity on site, energy availability, and the desired throughput per shift.<\/p>\n<h2>Occupational safety and legal notes<\/h2>\n<p>Occupational safety has top priority. Required measures include, among others, hazard assessment, instruction, personal protective equipment, barriers, and clear communication structures. Depending on the project, permits, notifications, or special protective measures may be required. For activities in potentially explosive atmospheres, suitable methods and tools must be selected to avoid ignition sources. The notes in this article are general in nature and do not replace an individual assessment. Further essentials include lockout-tagout, fall protection at edges and openings, handling of sharp rebar ends, and defined lifting procedures for heavy segments.<\/p>\n<h2>Quality assurance, disposal, and documentation<\/h2>\n<p>Quality is reflected in <strong>defined cut edges<\/strong>, controlled fracture patterns, minimal secondary damage, and clean separation of material streams. Accompanying documentation &#8211; from planning through measurements to proof-of-disposal &#8211; provides transparency. For recycling, separate collection of concrete, reinforcing steel, fit-out materials, and plant components is essential. Typical QA elements include acceptance criteria for edge quality, dimensional checks, measurement logs, and photo documentation aligned with the execution plan.<\/p>\n<h2>Practical workflow: typical procedures<\/h2>\n<h3>Opening in a reinforced concrete wall<\/h3>\n<ol>\n<li>Locate services, verify load-bearing behavior, install shoring<\/li>\n<li>Mark the cutting path, create core holes or saw cuts<\/li>\n<li>Use <strong>concrete demolition shears<\/strong> to remove the wall section by section; cut reinforcement with steel shears<\/li>\n<li>Finish edges, secure rebar ends, clean the site<\/li>\n<\/ol>\n<h3>Reducing a foundation head in an existing structure<\/h3>\n<ol>\n<li>Clarify load paths, protect the surroundings, define the drilling pattern<\/li>\n<li>Drill holes, apply <strong>rock and concrete splitters<\/strong>, perform controlled splitting<\/li>\n<li>Lift out by segments, transport away, and dispose of according to material fractions<\/li>\n<\/ol>\n<h3>Segmenting a bridge edge strip<\/h3>\n<ol>\n<li>Survey reinforcement and bearings, implement traffic and fall protection<\/li>\n<li>Pre-cut or core-drill to define separation, then crush with <strong>concrete demolition shears<\/strong><\/li>\n<li>Remove segments in balanced sizes, protect remaining structure, and document vibrations<\/li>\n<\/ol>\n<h2>Limits, interfaces, and combinations<\/h2>\n<p>Controlled demolition is particularly economical when precision, emission control, and selective disassembly are paramount. For large-volume quantities, combining with mechanical removal can be sensible. A <em>hybrid approach<\/em> often proves effective: preparatory sawing or drilling followed by hydraulic splitting and crushing with <strong>concrete demolition shears<\/strong>. This keeps structural behavior, safety, and environmental aspects under control at all times. Clear trigger points for method changes &#8211; such as reaching vibration or noise thresholds &#8211; support safe, schedule-compliant execution.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Controlled demolition refers to the targeted, planned deconstruction of structures, components, or rock formations with high precision and low environmental impact. The focus is on safety, protection of adjacent structures, and a low-emission approach. Typical methods include the hydraulic splitting of concrete and rock as well as low-vibration crushing with <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/controlled-demolition\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19355","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Controlled Demolition for Low-Impact Construction<\/title>\n<meta name=\"description\" content=\"Low-vibration, precise controlled demolition of structures &amp; rock \u2713 hydraulic splitting, concrete shears, safe results.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/controlled-demolition\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Controlled Demolition for Low-Impact Construction\" \/>\n<meta property=\"og:description\" content=\"Low-vibration, precise controlled demolition of structures &amp; rock \u2713 hydraulic splitting, concrete shears, safe results.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/controlled-demolition\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-21T07:08:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/controlled-demolition\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/controlled-demolition\",\"name\":\"Controlled Demolition for Low-Impact Construction\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-08-26T12:53:11+00:00\",\"dateModified\":\"2026-04-21T07:08:02+00:00\",\"description\":\"Low-vibration, precise controlled demolition of structures & rock \u2713 hydraulic splitting, concrete shears, safe results.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/controlled-demolition#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/controlled-demolition\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/controlled-demolition#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Controlled demolition\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Controlled Demolition for Low-Impact Construction","description":"Low-vibration, precise controlled demolition of structures & rock \u2713 hydraulic splitting, concrete shears, safe results.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/controlled-demolition","og_locale":"en_US","og_type":"article","og_title":"Controlled Demolition for Low-Impact Construction","og_description":"Low-vibration, precise controlled demolition of structures & rock \u2713 hydraulic splitting, concrete shears, safe results.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/controlled-demolition","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-04-21T07:08:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/controlled-demolition","url":"https:\/\/www.darda.de\/en\/knowledge\/controlled-demolition","name":"Controlled Demolition for Low-Impact Construction","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-08-26T12:53:11+00:00","dateModified":"2026-04-21T07:08:02+00:00","description":"Low-vibration, precise controlled demolition of structures & rock \u2713 hydraulic splitting, concrete shears, safe results.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/controlled-demolition#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/controlled-demolition"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/controlled-demolition#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Controlled demolition"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19355","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19355"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19355\/revisions"}],"predecessor-version":[{"id":26481,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19355\/revisions\/26481"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19355"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}