{"id":19351,"date":"2025-08-26T10:13:26","date_gmt":"2025-08-26T08:13:26","guid":{"rendered":"https:\/\/www.darda.de\/compressor-station-facility"},"modified":"2026-04-21T14:45:03","modified_gmt":"2026-04-21T12:45:03","slug":"compressor-station-facility","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/compressor-station-facility","title":{"rendered":"Compressor station facility"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>A compressor station facility provides the central <strong>compressed air supply<\/strong> on construction sites, in tunnels, or in quarries. It feeds drilling technologies and methods, blow guns, cleaning devices, and other pneumatic consumers &#8211; often as <em>front-end infrastructure<\/em> for hydraulic tools such as <em>concrete demolition shear<\/em> or <em><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a><\/em> by Darda GmbH. When planned correctly, it reduces downtime, <strong>dust exposure<\/strong>, and energy consumption and is therefore a key building block for precise <em>concrete demolition<\/em>, <em>rock excavation<\/em>, interior demolition, <em>tunnel construction<\/em>, and natural stone extraction. A well-dimensioned station also centralizes air-quality management and connection logistics, ensuring consistent tool performance across shifts.<\/p>\n<h2>Definition: What is meant by a compressor station facility?<\/h2>\n<p>A compressor station facility comprises the entirety of compressor(s), air treatment, storage vessel, distribution network, and safety devices that together provide <strong>compressed air<\/strong> at the required pressure and flow rate. Unlike a standalone compressor, the compressor station facility is designed as a <em>system<\/em>: it stabilizes peak loads, maintains air quality at a defined level, and provides outlets for different consumers across various work zones. It is engineered for reliability and scalability, with clearly defined pressure zones, monitoring points, and maintenance access for rapid servicing.<\/p>\n<h2>Design and components of a compressor station facility<\/h2>\n<p>The specific design depends on the application, but typically follows a modular structure. Key building blocks include:<\/p>\n<ul>\n<li>Compressor unit (screw or piston) with motor (diesel- or electric-driven)<\/li>\n<li>Aftercooler, water separator, and optionally refrigeration or adsorption dryer<\/li>\n<li>Filter stages (coarse, fine, and, if required, activated carbon)<\/li>\n<li>Compressed air receiver (tank) to buffer peak loads<\/li>\n<li>Pressure regulation, safety valves, condensate drainage<\/li>\n<li>Distribution network with manifold, shut-off valves, couplings, hoses, and hose rupture <em>whip checks<\/em><\/li>\n<li>Monitoring and control (pressure, temperature, dew point, operating hours)<\/li>\n<\/ul>\n<p>In practice, robust frames or containers protect components against weather and dust, while <strong>N+1 redundancy<\/strong> and modular manifolds increase availability. Clear connection panels with labeled take-offs simplify setup and shorten changeover times.<\/p>\n<h3>Screw vs. piston compressor<\/h3>\n<p>Screw compressors deliver a continuously high flow rate at stable pressure and are suitable for continuous loads in concrete demolition or tunnel construction. Piston compressors are more robust in dusty environments but are geared toward intermittent loads. The choice depends on consumption profile, mobility needs, and maintenance concept. Additional selection factors include part-load efficiency (variable-speed drive on screw compressors), noise emissions, and service intervals in relation to dust load.<\/p>\n<h3>Compressed air receiver and control<\/h3>\n<p>The receiver smooths load changes &#8211; such as when drilling devices cycle on and off &#8211; and prevents pressure drops at distant outlets. Load-dependent control (e.g., variable speed) reduces idling and energy consumption. As a rule of thumb, 6 to 10 liters of receiver volume per liter per second of free air delivery help buffer short peaks; where frequent start-stop occurs, a narrower pressure band via variable-speed control further stabilizes the supply.<\/p>\n<h2>Importance in concrete demolition, rock excavation, and tunnel construction<\/h2>\n<p>Even though the concrete demolition shear and hydraulic wedge splitter by Darda GmbH are hydraulically operated, the compressor station facility is indispensable in many workflows. It enables the preparatory and supporting steps that unlock the full performance of the hydraulic tools. Well-planned compressed-air logistics reduce rework, handling time, and waiting periods.<\/p>\n<ul>\n<li><em>Borehole drilling<\/em> for hydraulic wedge splitter and stone splitting cylinders: pneumatic hammer \/ jackhammer and <em>drilling rig<\/em> require a stable flow rate.<\/li>\n<li>Blowing off and cleaning boreholes, reinforcement edges, cut joints, and contact surfaces before using concrete demolition shear or combination shears.<\/li>\n<li>Dust extraction in enclosed areas (interior demolition, tunnel construction) through targeted blow-off into suction systems.<\/li>\n<li>Pneumatic auxiliary devices for interior demolition and cutting work, such as chiseling hammers to expose reinforcement before using Multi Cutters or <em>steel shear<\/em>.<\/li>\n<li>Targeted debris removal with blow lances in grooves, joints, and cavities to improve access for hydraulic tools.<\/li>\n<\/ul>\n<h2>Interfaces with hydraulic power pack and concrete demolition shear<\/h2>\n<p><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">Hydraulic power units<\/a> drive concrete demolition shear, combination shears, and other tools by Darda GmbH. The compressor station facility complements these systems: it supports the <em>drilling and cleaning processes<\/em> that precede hydraulic cutting or splitting and facilitates logistics at the work site. A <strong>coordinated energy and space concept<\/strong> is important to prevent the compressed-air and hydraulic supplies from interfering with each other (waste heat, exhaust routing, access routes).<\/p>\n<ul>\n<li>Plan non-conflicting hose and cable routes with sufficient clearance to moving machinery and transport paths.<\/li>\n<li>Separate hot exhaust and intake air streams; avoid recirculation into compressor intakes.<\/li>\n<li>Group outlets by pressure level and dryness to serve drilling, blow-off, and auxiliary tools efficiently.<\/li>\n<\/ul>\n<h3>Boreholes for hydraulic wedge splitter<\/h3>\n<p>Controlled splitting requires boreholes with defined geometry and surface quality. Constant pressure and sufficient flow rate from the compressor station facility ensure drilling performance, reduce drilling time, and minimize enlargement or spalling at the hole edge &#8211; important for force transmission of the splitting wedges. Where permitted, air-assisted flushing improves chip evacuation and borehole cleanliness.<\/p>\n<h3>Preparation for concrete demolition shear<\/h3>\n<p>With concrete demolition shear, clean, low-dust contact surfaces increase precision when positioning. Compressed air is used to blow off edges, expose anchor points, and clean cutting areas before hydraulic tools engage. This reduces contamination of interfaces and can improve cut quality.<\/p>\n<h2>Sizing: pressure, flow rate, and line technology<\/h2>\n<p>Dimensioning is based on the peak demands of pneumatic consumers and line losses to the most distant take-off point. In practice, planning is done in bar (<em>operating pressure<\/em>) and m\u00c2\u00b3\/min or l\/s (flow rate).<\/p>\n<ol>\n<li>Record consumers: drilling devices, blow guns, cleaning devices, reserves.<\/li>\n<li>Define simultaneity: Which consumers run in parallel? Establish load profiles.<\/li>\n<li>Sketch the line network: lengths, elevations, couplings, branches.<\/li>\n<li>Calculate pressure losses and define permissible end pressure at the consumer.<\/li>\n<li>Select compressor performance and storage volume; define the control strategy.<\/li>\n<li>Size air treatment (drying\/filtration) according to the application environment.<\/li>\n<\/ol>\n<p>Typical planning targets: total pressure loss to the most distant outlet below 10 percent of set pressure, main line air velocity approximately 6 to 10 m\/s, and lower velocities on drops to minimize pressure spikes and water carry-over. For long distances or varying loads, ring mains and intermediate receivers stabilize pressure.<\/p>\n<h3>Line cross-section and hose length<\/h3>\n<p>Undersized cross-sections cause pressure drop and performance loss. Generously sized mains, short branches, and as few couplings as possible improve the supply. Long hose runs should be buffered with intermediate receivers or ring mains. As a guideline, increase hose internal diameter from 1\/2 inch to 3\/4 inch for higher flow devices or distances beyond moderate ranges to limit pressure loss.<\/p>\n<h3>Fittings and couplings<\/h3>\n<p>Robust quick couplings, well-positioned shut-off valves, and <strong>whip checks<\/strong> increase operational safety. Clearly label outlets (pressure level, filtered\/unfiltered, dry\/wet) to avoid misuse. Safety clips, anti-kink sleeves, and periodic leak checks improve reliability and reduce unplanned downtime.<\/p>\n<h2>Air quality: drying, filtration, and oil management<\/h2>\n<p>The quality of compressed air affects drilling speed, tool service life, and cleanliness of work areas. Condensate, dust, and oil mist must be controlled.<\/p>\n<ul>\n<li>Drying: Aftercoolers and dryers lower the dew point. In cold environments, this prevents icing in valves and tools. As a practical target, select a pressure dew point sufficiently below the lowest expected line temperature.<\/li>\n<li>Filtration: Multi-stage filters protect valves and drilling devices from particles; in sensitive areas, fine filtration may be advisable. Ensure correct sizing to limit pressure drop as elements load.<\/li>\n<li>Oil management: Depending on tool requirements, provide oil-lubricated or oil-free air. If needed, use lubricators near the consumers.<\/li>\n<li>Condensate handling: Legally compliant collection and disposal of condensate; avoid water-hazardous substances. Keep separators accessible and protected from freezing.<\/li>\n<\/ul>\n<h2>Energy, noise, and emissions<\/h2>\n<p>The choice between a diesel- or electrically driven compressor station facility affects work organization, costs, and environmental parameters. In indoor or sensitive areas, electrified solutions often prevail. Load-dependent control reduces idle times, saves fuel, and lowers emissions. Noise control, placement away from reflective surfaces, and controlled ventilation improve working conditions. Acoustic enclosures, barrier elements, and optimized intake and exhaust routing further reduce sound power and heat build-up.<\/p>\n<h2>Safety, operation, and maintenance<\/h2>\n<p>Safe operation combines suitable technology, clear procedures, and regular care. The following points are proven practices but do not replace individual risk assessments or regulations:<\/p>\n<ul>\n<li>Set up with secure footing, well ventilated, and away from ignition sources; arrange air intake in low-dust areas.<\/li>\n<li>Secure hose routes, avoid tripping hazards, use whip checks.<\/li>\n<li>Mark pressure zones; never operate above the permissible <em>operating pressure<\/em>.<\/li>\n<li>Regularly inspect safety valves, couplings, filters, and condensate drains.<\/li>\n<li>Maintenance according to manufacturer specifications; adapt filter change intervals to dust load.<\/li>\n<li>Train operating personnel; clearly label emergency stop and shut-offs.<\/li>\n<li>After modifications or relocations, perform functional and leak tests before resuming operation.<\/li>\n<\/ul>\n<h2>Mobile or stationary: selecting for the application<\/h2>\n<p>Mobile compressor station facilities (self-propelled or trailer-mounted) suit changing sites, such as selective deconstruction or natural stone extraction. Stationary or containerized solutions excel in long projects like tunnel drives, where constant load and extended treatment (e.g., dew point monitoring) are required. Containerized layouts with integrated lighting, cable management, and weather protection accelerate setup and simplify maintenance access.<\/p>\n<h2>Common mistakes and how to avoid them<\/h2>\n<p>Many problems arise from underestimated line losses or unclear responsibilities between trades. The following points help minimize failures and delays:<\/p>\n<ul>\n<li>Tight cross-sections: Plan generously sized mains, avoid bottlenecks.<\/li>\n<li>Insufficient drying: Match the dew point to ambient conditions and duration; keep aftercoolers clean.<\/li>\n<li>Arbitrary coupling of outlets: Define and label pressure zones.<\/li>\n<li>Missing buffering: Provide receivers for peak loads.<\/li>\n<li>Unplanned simultaneity: Assume realistic load profiles and include reserves.<\/li>\n<li>Long dead ends: Avoid stagnation zones that accumulate condensate and particles.<\/li>\n<li>Mixed coupling standards: Standardize interfaces to prevent mismatches and leaks.<\/li>\n<\/ul>\n<h2>Practice-oriented planning in interplay with tools by Darda GmbH<\/h2>\n<p>The compressor station facility is not an isolated unit but part of an integrated workflow. Those who consider interfaces to hydraulic power pack and the specific tools by Darda GmbH at an early stage get more out of every workday. Clearly assigned connection points, labeled pressure levels, and defined cleaning procedures streamline the sequence from drilling to splitting or cutting.<\/p>\n<h3>Concrete demolition shear<\/h3>\n<p>Concrete demolition shear is hydraulically operated. However, the compressed air supply supports preparation: blowing off separation joints, exposing reinforcement, cleaning bearing surfaces, or removing dust in cutting areas. A clean surface makes positioning easier and can increase precision.<\/p>\n<h3>Hydraulic wedge splitter<\/h3>\n<p>Precisely matched boreholes are crucial for splitting operations. Continuous flow and sufficient pressure from the compressor station facility stabilize drilling performance. After drilling, targeted blow-out ensures dust-free borehole walls before inserting splitting cylinders or wedge sets.<\/p>\n<h3>Other tools and applications<\/h3>\n<p>In interior demolition and cutting, pneumatic devices help expose component layers before hydraulic tools such as combination shears, Multi Cutters, steel shear, or cutting torch are used. In tunnel construction and rock excavation, well-planned compressed-air logistics improve the supply to distant tunnel faces and reduce downtime.<\/p>\n<h2>Ambient conditions and logistics<\/h2>\n<p>Altitude, temperature, and dust load directly affect performance and reliability. At high altitude, intake air density decreases; temperature peaks require generous cooling. A well-considered hose and routing concept prevents crushing, minimizes leaks, and improves work safety. Where possible, ring mains are preferred to achieve even pressure distribution. In corrosive atmospheres or areas with salt spray, select suitable materials and protective coatings for fittings, receivers, and manifolds.<\/p>\n<h2>Legal and normative aspects (general)<\/h2>\n<p>When operating compressor station facilities, the relevant requirements for pressure equipment, occupational safety, noise and emission control, and condensate disposal must be observed. These requirements may vary by country, project, and environment. The information in this article is general and does not replace an individual review of the applicable provisions.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A compressor station facility provides the central compressed air supply on construction sites, in tunnels, or in quarries. It feeds drilling technologies and methods, blow guns, cleaning devices, and other pneumatic consumers &#8211; often as front-end infrastructure for hydraulic tools such as concrete demolition shear or hydraulic rock and concrete <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/compressor-station-facility\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19351","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Compressor Station Facility for Compressed Air<\/title>\n<meta name=\"description\" content=\"Guide to compressor station facilities for compressed air in construction, tunneling &amp; quarrying \u2713 design, sizing, safety.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/compressor-station-facility\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Compressor Station Facility for Compressed Air\" \/>\n<meta property=\"og:description\" content=\"Guide to compressor station facilities for compressed air in construction, tunneling &amp; quarrying \u2713 design, sizing, safety.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/compressor-station-facility\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-21T12:45:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/compressor-station-facility\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/compressor-station-facility\",\"name\":\"Compressor Station Facility for Compressed Air\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-08-26T08:13:26+00:00\",\"dateModified\":\"2026-04-21T12:45:03+00:00\",\"description\":\"Guide to compressor station facilities for compressed air in construction, tunneling & quarrying \u2713 design, sizing, safety.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/compressor-station-facility#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/compressor-station-facility\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/compressor-station-facility#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Compressor station facility\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Compressor Station Facility for Compressed Air","description":"Guide to compressor station facilities for compressed air in construction, tunneling & quarrying \u2713 design, sizing, safety.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/compressor-station-facility","og_locale":"en_US","og_type":"article","og_title":"Compressor Station Facility for Compressed Air","og_description":"Guide to compressor station facilities for compressed air in construction, tunneling & quarrying \u2713 design, sizing, safety.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/compressor-station-facility","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-04-21T12:45:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/compressor-station-facility","url":"https:\/\/www.darda.de\/en\/knowledge\/compressor-station-facility","name":"Compressor Station Facility for Compressed Air","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-08-26T08:13:26+00:00","dateModified":"2026-04-21T12:45:03+00:00","description":"Guide to compressor station facilities for compressed air in construction, tunneling & quarrying \u2713 design, sizing, safety.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/compressor-station-facility#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/compressor-station-facility"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/compressor-station-facility#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Compressor station facility"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19351","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19351"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19351\/revisions"}],"predecessor-version":[{"id":26508,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19351\/revisions\/26508"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19351"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}