{"id":19344,"date":"2025-08-27T13:59:18","date_gmt":"2025-08-27T11:59:18","guid":{"rendered":"https:\/\/www.darda.de\/kink-protection"},"modified":"2026-04-21T17:54:03","modified_gmt":"2026-04-21T15:54:03","slug":"kink-protection","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/kink-protection","title":{"rendered":"Kink protection"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Kink protection refers to measures and components that prevent excessive kinking of hoses, lines, or cables. In demolition and splitting technology, kink protection prevents malfunctions, leakages, and premature wear. Especially with hydraulically operated tools such as concrete demolition shears and <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a> that are moved, set down, and frequently reconfigured in the rough everyday construction site environment, reliable kink protection is an essential part of a safe and efficient workflow. By safeguarding the <em>minimum bend radius<\/em> and reducing abrasion, <strong>hydraulic hose assemblies<\/strong> remain stable in pressure and flow, which supports predictable tool performance and reduces unplanned downtime.<\/p>\n<h2>Definition: What is meant by kink protection?<\/h2>\n<p>Kink protection is understood to mean design elements and organizational measures that prevent exceeding the permissible bend radius on hoses, cables, or pipelines. The goal is to prevent cross-section constriction, material fatigue, crack formation, and the resulting failures. Typical designs include wire-spring kink protection, spiral protective wraps, bend radius limiters, kink-protection fittings, as well as textile- or plastic-based protective sleeves. In the environment of hydraulic tools and hydraulic power packs, kink protection supports compliance with the <em>minimum bend radius<\/em>, reduces chafing loads, and increases operational safety. Properly dimensioned protection also acts as <em>strain relief<\/em> at transitions and lowers the risk of whiplash effects in the event of pressure loss.<\/p>\n<h2>Kink protection in the hydraulic system of demolition and splitting technology<\/h2>\n<p>Hydraulic hose lines connect hydraulic power packs with tools such as concrete demolition shears, combination shears, or hydraulic wedge splitters. Bending, torsion, tensile load, and abrasion act on couplings, transitions, and moving line sections. Kink protection positions, supports, and guides the line so that tight radii and sharp edges are avoided. This preserves flow rate and pressure stability, and the tools operate reproducibly. In addition, robust guidance prevents pinch points between fixed and moving parts and helps manage pressure surges and vibration in demanding duty cycles.<\/p>\n<h3>Typical loads<\/h3>\n<ul>\n<li>Bending due to movement of the tool or the self-weight of the hose line<\/li>\n<li>Torsion when rotating and aligning the tool<\/li>\n<li>Tensile load during repositioning, lifting, or lowering<\/li>\n<li>Abrasion on edges, reinforcement, rock, and concrete debris<\/li>\n<li>Temperature changes and pressure surges in operation<\/li>\n<li>Vibration and shock from impact loads and start-stop cycles<\/li>\n<li>Environmental effects such as moisture, UV, and concrete slurry contamination<\/li>\n<\/ul>\n<h3>Critical points on the tool<\/h3>\n<ul>\n<li>Transition hose-fitting and coupling areas<\/li>\n<li>Guides on the cylinder and tight deflections<\/li>\n<li>Bearing points on component edges and on reinforcing steel<\/li>\n<li>Areas with recurring motion, e.g., the closing\/opening range of a concrete demolition shear<\/li>\n<li>Pivots and clamp interfaces where lines can be crushed or twisted<\/li>\n<\/ul>\n<h2>Types of kink protection and their suitability<\/h2>\n<p>The choice of the right kink protection solution depends on medium, pressure, environmental influences, and motion characteristics. Several protection types are often combined to address bend radius, abrasion protection, and strain relief at the same time. Retrofit solutions are suitable for upgrades during service, whereas integrated fittings are preferred for high-cycle applications with tight envelopes.<\/p>\n<h3>Wire-spring kink protection<\/h3>\n<p>Pushed-on or integrated spring sleeves support the hose at the transition to the fitting. They act as bend radius limiters and distribute local stresses. Suitable for dynamic areas close to the connection, for example on concrete demolition shears with frequent motion cycles. The spring length should cover the first bend zone without introducing additional stiffness at adjacent curves.<\/p>\n<h3>Spiral and abrasion protection<\/h3>\n<p>Spiral protective wraps made of plastic or steel increase abrasion resistance and prevent localized kink formation when in contact with edges. In environments with coarse debris, reinforcement, and natural stone, they prove themselves through robust <strong>all-round protection<\/strong>. Segmentable spirals allow quick replacement of damaged sections and targeted reinforcement of hot spots.<\/p>\n<h3>Textile and plastic sleeves<\/h3>\n<p>Braided sleeves or textile jackets provide surface protection against chafing and UV exposure. They are light, flexible, and can be integrated into existing hose guides. In combination with bend radius limiters, they comprehensively secure the line. For elevated ambient temperatures, versions with heat-reflective or flame-retardant coatings are advantageous.<\/p>\n<h3>Bend radius limiters and kink-protection fittings<\/h3>\n<p>Form parts on the fitting or red brass\/steel fittings with integrated bend protection maintain the minimum radius and guide the medium with low turbulence. They reduce pressure losses and prevent microcracks in the inner layer. Angle adapters and swivel fittings can additionally minimize torsion at the connection point.<\/p>\n<h3>Hose clamps and guides<\/h3>\n<p>Mechanical brackets organize hose bundles, relieve transitions, and define safe deflections. In combination with spacer strips, chafe points on the tool body and cylinder are prevented. Edge protectors at contact surfaces further distribute loads and help maintain clearance to moving parts.<\/p>\n<h2>Selection criteria: bend radius, pressure, medium, and environment<\/h2>\n<p>The technical design considers both the properties of the hose line and the operating environment. A systematic approach prevents wrong decisions and increases tool availability.<\/p>\n<ul>\n<li>Bend radius: Compliance with the minimum bend radius under static and dynamic conditions<\/li>\n<li>Pressure and pulsation: Suitability for working pressure, pressure peaks, and load cycles<\/li>\n<li>Medium: Compatibility with hydraulic oil, possible additives, or contamination<\/li>\n<li>Temperature range: Resistance to cold, heat, and heat input at the tool<\/li>\n<li>Abrasion and cut protection: Degree of protection against sharp-edged reinforcement, rock, debris<\/li>\n<li>Installation space: Availability for safe deflections without forced tight radii<\/li>\n<li>Maintenance access: Visibility and accessibility for inspection and cleaning<\/li>\n<li>Weight and handling: Ergonomics for manual guidance and reduced user fatigue<\/li>\n<li>Standards and documentation: Compliance with applicable specifications and clear identification<\/li>\n<\/ul>\n<h2>Application areas: requirements for kink protection<\/h2>\n<p>The requirements vary depending on the task and the construction site environment. Kink protection must always be considered in the overall context of the tool, hydraulic power pack, and working method. Durable solutions favor low lifecycle costs by preventing repeated micro-damage along the same routing.<\/p>\n<h3>Concrete demolition and special deconstruction<\/h3>\n<p>During deconstruction, sharp-edged fracture edges and reinforcing steel act on the lines. A combined concept of wire-spring kink protection at the fittings and robust spiral protection along the hose lengths has proven itself. Concrete demolition shears produce recurring movements, which is why generous loop routing without tripping hazards is essential. Additional spacers at guide points keep bundles clear of pinch zones during jaw movement.<\/p>\n<h3>Strip-out and cutting<\/h3>\n<p>In buildings with narrow traffic routes, short bend radii and frequent maneuvering are typical. Bend radius limiters at couplings and light textile jackets make it easier to guide the lines without impairing flexibility. Color markings on the first bend support consistent, repeatable routing after tool changes.<\/p>\n<h3>Rock excavation and tunnel construction<\/h3>\n<p>Dust, moisture, and rough rock increase abrasion. Spiral protectors with high abrasion resistance and corrosion-resistant components are advantageous. Routing hoses away from contours with torsional loads reduces twisting during tool rotation. Where impact is expected, double-layer spirals and reinforced clamps improve service life.<\/p>\n<h3>Natural stone extraction<\/h3>\n<p>When using splitting cylinders and rock and concrete splitters, long line runs are common. Hose guides with intermediate supports and clearly defined deflection points prevent sagging and ground contact. Visible markings on the hose help identify kink zones. Clearly separated supply and return lines reduce cross-chafing on extended runs.<\/p>\n<h3>Special applications<\/h3>\n<p>For atypical tasks with difficult access, modular protection solutions are helpful: retrofittable bend radius limiters, segmented spirals, and temporary supports. The priority is safe guidance and quick visual inspection. Short trial movements under low pressure validate the routing before full-load operation.<\/p>\n<h2>Practical guide: routing and installation of kink protection<\/h2>\n<p>Professional installation ensures that kink protection performs its function permanently and does not hinder tool movements. Structured routing yields repeatable results across shifts and reduces setup time.<\/p>\n<ol>\n<li>Check the line: Inspect the hose for damage, aging, and correct length.<\/li>\n<li>Identify hazard points: Mark transitions, edge contacts, tight deflections.<\/li>\n<li>Select kink protection: Define a combination of spring, spiral, or textile protection depending on the load.<\/li>\n<li>Assembly at the connection: Place wire-spring kink protection over the fitting without tension.<\/li>\n<li>Add longitudinal protection: Route spiral protectors or sleeves over the stressed zones.<\/li>\n<li>Secure guidance: Position hose clamps so that sufficient play remains for movements.<\/li>\n<li>Function test: Move the tool through the full range of motion, checking for wrinkling and contact points.<\/li>\n<li>Readjust: Mitigate contact points, increase radii, adjust clamp positions.<\/li>\n<li>Thermal check: Ensure minimum distances to hot surfaces and shield where necessary.<\/li>\n<\/ol>\n<h3>Recommendations for hydraulic power packs<\/h3>\n<ul>\n<li>Arrange outlets on the <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power units<\/a> so that the first bend forms broadly and without constraint.<\/li>\n<li>Provide strain relief at couplings to reduce micro-movements at the fitting.<\/li>\n<li>Mark line routes and keep them separate from traffic routes.<\/li>\n<li>Ensure protection from hot surfaces and exhaust gases.<\/li>\n<li>Use swivel elements where regular rotation is required to minimize torsion in the hose.<\/li>\n<\/ul>\n<h2>Inspection, maintenance, and replacement criteria<\/h2>\n<p>Regular visual and functional checks prevent unplanned downtime. Anomalies should be documented early and rectified. Predictive inspection intervals aligned with operating hours and load cycles improve planning reliability.<\/p>\n<ul>\n<li>Signs of kinking: Flattened bends, wrinkling, permanent deformation<\/li>\n<li>Surface damage: Chafe marks, exposed braid, cracks<\/li>\n<li>Performance indicators: Heating, pressure loss, delayed tool movement<\/li>\n<li>Protection components: Broken spiral segments, shifted springs, loosened clamps<\/li>\n<li>Material changes: Discoloration, blistering, or hardening of the cover layer<\/li>\n<li>Replacement: In case of structural damage or repeated exceedance of bend radius limits<\/li>\n<\/ul>\n<h3>Documentation<\/h3>\n<p>Inspection intervals, findings, and measures performed should be recorded traceably. This facilitates assessment of the remaining service life and planning of spare parts. Clear hose identification and routing photos support consistency after maintenance or tool changes.<\/p>\n<h2>Failure patterns and root cause analysis<\/h2>\n<p>Understanding typical damage patterns facilitates targeted remediation.<\/p>\n<ul>\n<li>Cross-section constriction: Often caused by too tight a radius; remedy with bend radius limiter<\/li>\n<li>Crack formation in the inner layer: Combination of bending and pulsation; remedy through a longer bend and spring<\/li>\n<li>Local abrasion: Contact with edges; remedy with spiral protection and modified routing<\/li>\n<li>Leakage at the fitting: Micro-movements; remedy with strain relief and rigid support<\/li>\n<li>Torsion damage: Twisted routing; remedy with twist-free guidance and markings<\/li>\n<li>Blistering or delamination: Thermal overload; remedy with heat shielding and increased distance<\/li>\n<\/ul>\n<h2>Impact on performance, service life, and safety<\/h2>\n<p>Kink protection stabilizes flow conditions and reduces pressure losses. The tool operates more predictably, switching times remain constant, and thermal loads decrease. At the same time, the service life of hose lines is extended, reducing downtime and material consumption. <strong>Occupational safety<\/strong> is increased because leakages and uncontrolled hose kickbacks occur less frequently. Stable pressure conditions also support energy-efficient operation of the hydraulic system.<\/p>\n<h2>Kink protection for concrete demolition shears: key focal points<\/h2>\n<p>Concrete demolition shears move in the rhythm of opening and closing, often in contact with reinforcing steel. The first hose bend on the shear body should be broad and free of interfering edges. A combination of a spring at the fitting and abrasion-resistant spiral protection along the highly loaded zones is sensible. Hose bundles must be routed so that no crushing occurs between fixed and moving parts. Where possible, guides should keep the first bend outside the jaw closing range to avoid recurring micro-kinks.<\/p>\n<h2>Kink protection for rock and concrete splitters<\/h2>\n<p>Rock and concrete splitters and their splitting cylinders are frequently moved and also operated close to the ground. Hoses must not be misused as carrying aids. Generous bend radii away from the power pack, intermediate supports, and visible protective wraps prevent kink points. For long lines, an orderly bundling with defined deflection points is recommended. Protective sleeves with high contrast improve visibility on uneven terrain.<\/p>\n<h2>Transport, storage, and preparation of hose lines<\/h2>\n<p>Handling outside of operation also determines service life. Incorrect coiling or setting down creates permanent kinks.<\/p>\n<ul>\n<li>Coil in large bends, never below the minimum bend radius<\/li>\n<li>No sharp edges, no crushing due to load securing<\/li>\n<li>Store dry, UV-protected, and without tension<\/li>\n<li>Before use, perform a visual inspection, align and secure protection components<\/li>\n<li>Use suitable reels or saddles to avoid tight, set-inducing windings<\/li>\n<\/ul>\n<h2>Organizational aspects and safe working practices<\/h2>\n<p>Coordinated hose management increases availability and safety. Operating instructions, training, and regular inspections support the safe condition of the systems. Legal requirements may vary depending on the country of use and application; general safety rules and recognized technical standards must be observed. Short, recurring briefings on routing principles reinforce safe practice on changing sites.<\/p>\n<h2>Sustainability and resource conservation<\/h2>\n<p>Fewer hose failures mean less oil loss, less waste, and a longer useful life of components. Kink protection is therefore an effective lever for resource-conserving operation, especially with hydraulic tools with high load cycle counts. Durable protection components and preventive routing also cut transport and disposal volumes over the equipment lifecycle.<\/p>\n<h2>Checklist: quick overview for the construction site<\/h2>\n<ul>\n<li>Know and comply with the minimum bend radius<\/li>\n<li>Secure critical transitions with springs or bend radius limiters<\/li>\n<li>Equip abrasion zones with spiral protection<\/li>\n<li>Route line paths clearly, sure-footed, and free of torsion<\/li>\n<li>Maintain distance to hot surfaces and shield where needed<\/li>\n<li>Inspect regularly, document, and act immediately in case of damage<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Kink protection refers to measures and components that prevent excessive kinking of hoses, lines, or cables. In demolition and splitting technology, kink protection prevents malfunctions, leakages, and premature wear. Especially with hydraulically operated tools such as concrete demolition shears and rock and concrete splitters that are moved, set down, and <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/kink-protection\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19344","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Kink Protection for Hydraulic Hoses &amp; Cables<\/title>\n<meta name=\"description\" content=\"Safeguard hydraulic hoses with kink protection \u2713 prevent leaks, extend service life &amp; boost safety for demolition tools.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/kink-protection\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Kink Protection for Hydraulic Hoses &amp; Cables\" \/>\n<meta property=\"og:description\" content=\"Safeguard hydraulic hoses with kink protection \u2713 prevent leaks, extend service life &amp; boost safety for demolition tools.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/kink-protection\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-21T15:54:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"11 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/kink-protection\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/kink-protection\",\"name\":\"Kink Protection for Hydraulic Hoses & Cables\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-08-27T11:59:18+00:00\",\"dateModified\":\"2026-04-21T15:54:03+00:00\",\"description\":\"Safeguard hydraulic hoses with kink protection \u2713 prevent leaks, extend service life & boost safety for demolition tools.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/kink-protection#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/kink-protection\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/kink-protection#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Kink protection\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Kink Protection for Hydraulic Hoses & Cables","description":"Safeguard hydraulic hoses with kink protection \u2713 prevent leaks, extend service life & boost safety for demolition tools.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/kink-protection","og_locale":"en_US","og_type":"article","og_title":"Kink Protection for Hydraulic Hoses & Cables","og_description":"Safeguard hydraulic hoses with kink protection \u2713 prevent leaks, extend service life & boost safety for demolition tools.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/kink-protection","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-04-21T15:54:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"11 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/kink-protection","url":"https:\/\/www.darda.de\/en\/knowledge\/kink-protection","name":"Kink Protection for Hydraulic Hoses & Cables","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-08-27T11:59:18+00:00","dateModified":"2026-04-21T15:54:03+00:00","description":"Safeguard hydraulic hoses with kink protection \u2713 prevent leaks, extend service life & boost safety for demolition tools.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/kink-protection#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/kink-protection"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/kink-protection#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Kink protection"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19344","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19344"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19344\/revisions"}],"predecessor-version":[{"id":26518,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19344\/revisions\/26518"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19344"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}