{"id":19340,"date":"2025-08-27T11:36:07","date_gmt":"2025-08-27T09:36:07","guid":{"rendered":"https:\/\/www.darda.de\/sewage-sludge-incineration"},"modified":"2026-09-12T19:53:16","modified_gmt":"2026-09-12T17:53:16","slug":"sewage-sludge-incineration","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/sewage-sludge-incineration","title":{"rendered":"Sewage sludge incineration"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Sewage sludge incineration is a central component of modern wastewater treatment and the circular economy. It combines thermal treatment with energy recovery and provides the basis for the recovery of phosphorus from ashes. For planning, construction, modification, and deconstruction of the associated structures and plant components, precise, low-vibration, and material-appropriate tools play an important role &#8211; especially where reinforced concrete, masonry, and complex steel structures are worked on in confined spaces. In these environments, tools such as <strong>concrete demolition shears<\/strong> and <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">stone and concrete splitters<\/a><\/strong> from Darda GmbH are used in projects, for example in building gutting, selective deconstruction, or in modification work on operating plants. The objective is targeted intervention with minimal collateral effects on the surrounding structure, plant availability, and emissions.<\/p>\n<h2>Definition: What is meant by sewage sludge incineration?<\/h2>\n<p>Sewage sludge incineration refers to the thermal treatment of dewatered and often pre-dried sewage sludge from municipal or industrial wastewater treatment plants. The objectives are hygienic stabilization, reduction of volume and mass, energy utilization of the calorific value, and the provision of ashes for downstream phosphorus recovery. In practice, the dry solids content typically reaches around 20 to 30 percent after mechanical dewatering and approximately 65 to 90 percent after drying. Furnace temperatures generally range from about 850 to 950 degrees Celsius to ensure complete burnout and reliable pathogen destruction. Technically, fluidized-bed and grate firing systems are primarily used, complemented by drying, flue gas cleaning, and ash logistics. A distinction is made between mono-incineration (sewage sludge only) and co-incineration (e.g., in cement or power plants). Mono-incineration provides defined ash streams that facilitate phosphorus recovery, whereas co-incineration can dilute or mix ash qualities. The built infrastructure includes bunkers, silos, boiler and filter houses, chimneys, pipelines, tanks, and extensive reinforced concrete foundations.<\/p>\n<h2>Process technology and plant components of sewage sludge incineration<\/h2>\n<p>The typical process path ranges from mechanical dewatering (centrifuge, belt press) through drying (belt, drum, or low-temperature drying) to incineration. In fluidized-bed furnaces, the dried sludge is converted homogeneously; on grate furnaces, drying, devolatilization, and burnout occur sequentially. Heat is recovered via waste heat boilers and deployed for steam generation or power production; residual heat can serve low-temperature consumers. Flue gas cleaning combines cyclones, fabric filters, activated carbon and lime dosing, as well as SNCR\/SCR for NOx reduction. The resulting sewage sludge ash is collected in silos or big bags and prepared for phosphorus recovery. From a construction and deconstruction point of view, three material groups shape the work: <em>reinforced concrete<\/em> (foundations, walls, shafts), <em>steel<\/em> (structures, silos, pipe racks), and <em>refractory linings<\/em> (boilers, reactors). Depending on the life-cycle phase &#8211; new build, modification, expansion, or decommissioning &#8211; different separation and demolition methods are required.<\/p>\n<h3>Operating parameters and energy integration<\/h3>\n<p>Design and construction benefit from stable operating windows and clear interfaces. Typical considerations include:<\/p>\n<ul>\n<li><strong>Fuel quality and throughput:<\/strong> variability of dry solids content, calorific value, and ash content with appropriate buffer capacity in bunkers and silos.<\/li>\n<li><strong>Thermal integration:<\/strong> routing of steam, condensate, and heat recovery loops with allowances for expansion, maintenance access, and vibration decoupling.<\/li>\n<li><strong>Maintainability:<\/strong> access openings, lifting points, and modular assemblies to shorten outages during inspections and refractory relinings.<\/li>\n<\/ul>\n<h2>Selective deconstruction and modification in operating plants<\/h2>\n<p>Modifications in existing plants often take place under confined space conditions, with running auxiliary systems and strict emission and occupational safety requirements. For gutting works and adjustments to concrete walls, foundations, or channels, low-vibration methods are preferred to limit vibrations and secondary damage. <strong>Concrete demolition shears<\/strong> enable the controlled removal of reinforced concrete, the exposure of reinforcement, and the deconstruction of openings. <strong>Stone and concrete splitters<\/strong> are suitable for low-vibration splitting of thick components when separation cuts are limited or vibrations must be minimized. In combination with <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power packs<\/a> from Darda GmbH, these tools are used in <em>concrete demolition and special demolition<\/em> as well as in <em>building gutting and cutting<\/em> &#8211; for example, when expanding dryer halls, deconstructing sludge channels, or opening foundation bodies for new plant technology. Hot work permits, spark minimization, and selective dust capture frequently define the work sequence and tool choice.<\/p>\n<h2>Materials and assemblies in incineration plants: implications for processing<\/h2>\n<p>Incineration and flue gas cleaning systems combine different materials that each require specific measures. Reinforced concrete in bunkers and foundations is often heavily reinforced and may range from medium to high strength classes; here, <strong>concrete demolition shears<\/strong> support selective removal and clean cutting of exposed reinforcement with suitable blades. Refractory materials are brittle and can be detached section by section; splitting technology can help overcome bond strengths without loading adjacent structures and insulation systems. For steel components such as silos, pipe racks, or filter frameworks, <em><a href=\"https:\/\/www.darda.de\/en\/product-overview\/steel-shears\">steel shears<\/a><\/em>, <em>combination shears<\/em>, and <em>Multi Cutters<\/em> are used to cut profiles, plates, and mixed assemblies. For vessels, tanks, and pipelines, <em>tank cutters<\/em> are suitable &#8211; especially when controlled, low-spark cuts are required.<\/p>\n<h2>Phosphorus recovery and ash logistics: construction implications<\/h2>\n<p>Legal requirements for phosphorus recovery increasingly lead to modifications or additions in ash logistics and storage. New silos, dosing stations, and conveying lines require openings in existing walls, foundation adjustments, and pipe penetrations. Often, pinpoint interventions are necessary to avoid affecting the existing structural system and ongoing processes. <strong>Stone and concrete splitters<\/strong> can prepare openings in massive components without large-scale vibrations, while <strong>concrete demolition shears<\/strong> cleanly finish edges and penetrations. On the steel side, <em>steel shears<\/em> and <em>Multi Cutters<\/em> support the integration of new routes or the deconstruction of old pipeline ways.<\/p>\n<h3>Construction measures for ash handling<\/h3>\n<ul>\n<li><strong>Dust and wear:<\/strong> abrasion-resistant linings and sealed transfer points with maintainable inspection hatches.<\/li>\n<li><strong>Explosion protection:<\/strong> zoning, earthing, explosion vents, and suitable dust extraction for fine, dry ash.<\/li>\n<li><strong>Silo integration:<\/strong> foundations with load transfer verification, settlement control, and vibration-isolated discharge equipment.<\/li>\n<\/ul>\n<h2>Planning steps for selective deconstruction in sewage sludge incineration plants<\/h2>\n<p>A structured sequence improves safety, schedule adherence, and result quality. A typical approach follows clear, verifiable steps:<\/p>\n<ol>\n<li>Existing-condition survey: structural diagnostics, material and reinforcement mapping, location of utilities, fire protection and explosion protection assessment.\n<ul>\n<li>Use of non-destructive testing where appropriate (e.g., reinforcement detection, wall thickness checks) with documented test points.<\/li>\n<li>Verification of as-built against current process and automation interfaces.<\/li>\n<\/ul>\n<\/li>\n<li>Separation concept: definition of cut lines and split zones, load re-routing, safeguards, and sequencing.\n<ul>\n<li>Temporary supports, shoring, and vibration limits for sensitive equipment and ducts.<\/li>\n<li>Clear removal sizes and piece weights for controlled lifting and transport.<\/li>\n<\/ul>\n<\/li>\n<li>Selection of methods: combination of <strong>concrete demolition shears<\/strong>, <strong>stone and concrete splitters<\/strong>, <em>steel shears<\/em>, <em>combination shears<\/em>, <em>tank cutters<\/em>, and complementary methods.\n<ul>\n<li>Criteria include component geometry, reinforcement density, access, emissions, and spark control.<\/li>\n<\/ul>\n<\/li>\n<li>Dust and emissions management: extraction, wetting, enclosures; protection of the running process equipment.\n<ul>\n<li>Negative-pressure zones at sensitive areas and capture near the source with suitable filter stages.<\/li>\n<\/ul>\n<\/li>\n<li>Logistics and dismantling concept: piece weights, lifting equipment, removal routes, sorting into mineral and metallic fractions.\n<ul>\n<li>Defined staging areas, rigging plans, and transport windows coordinated with operations.<\/li>\n<\/ul>\n<\/li>\n<li>Documentation and quality assurance: evidence of separation joints, reinforcement exposure, residual wall thicknesses, and surface qualities.\n<ul>\n<li>Photographic records, measurement logs, and acceptance criteria for interfaces to new plant components.<\/li>\n<\/ul>\n<\/li>\n<\/ol>\n<h2>Construction in existing structures: safety, emissions, and legal aspects<\/h2>\n<p>Work on incineration plants is subject to strict requirements. These include regulations on hazardous substances, fire and explosion protection, emissions, noise, and waste and verification law. In practice, a hazard analysis with coordinated protective measures is essential: gas testing of vessels, inerting, grounding of conductive parts, and access permits. Lockout-tagout, confined space procedures, and hot work controls are standard prerequisites. Information on limits, permits, and responsibilities is always to be understood in general terms; concrete obligations arise from the applicable regulations and the stipulations of the competent authorities.<\/p>\n<h2>Typical applications for concrete demolition shears and stone and concrete splitters<\/h2>\n<p>The range extends from small-scale openings to the dismantling of massive components:<\/p>\n<ul>\n<li>Opening sludge channels, shafts, and foundations in drying and conveying lines.<\/li>\n<li>Selective deconstruction of impact walls, column heads, and machine foundations in the boiler and filter house.<\/li>\n<li>Removing inserts and concrete haunches in bunkers and silos, including reinforcement exposure.<\/li>\n<li>Preparing openings for new pipe routes, cable routes, or inspection openings.<\/li>\n<li>Reducing component thicknesses prior to controlled cutting of steel components with <em>steel shears<\/em> or <em>Multi Cutters<\/em>.<\/li>\n<li>Retrofitting chimney and stack footings, including targeted removal of deteriorated reinforcement zones.<\/li>\n<li>Adapting silo hoppers and discharge cones to new ash conveying geometries with low-vibration splitting.<\/li>\n<\/ul>\n<h2>Special deployments: confined spaces, sensitive environments, ongoing operation<\/h2>\n<p>In sewage sludge incineration plants, work in shafts, channels, and intermediate floors is common. Where limited space, restricted load-bearing capacity, and sensitive adjacent trades coincide, compact, powerful tools with precise controllability are required. The hydraulic power packs from Darda GmbH enable on-site supply, while the tools &#8211; including <strong>concrete demolition shears<\/strong> and <strong>stone and concrete splitters<\/strong> &#8211; allow precise interventions with low vibrations. In areas with elevated fire risk or residual material adhesions, low-spark methods and consistent clearances are crucial. Coordinated sequencing with operations reduces downtime and shields critical equipment from dust and vibration.<\/p>\n<h3>Tool selection criteria in confined spaces<\/h3>\n<ul>\n<li><strong>Reach and head geometry:<\/strong> access to reinforcement and edges without overcutting.<\/li>\n<li><strong>Weight and footprint:<\/strong> compatibility with temporary platforms and limited floor loads.<\/li>\n<li><strong>Cutting and splitting force:<\/strong> sufficient reserve for heavily reinforced sections and dense aggregates.<\/li>\n<li><strong>Hydraulic layout:<\/strong> hose routing and coupling position to avoid trip hazards and snagging points.<\/li>\n<li><strong>Emission profile:<\/strong> preference for low-spark and low-dust operation where hot work is restricted.<\/li>\n<\/ul>\n<h2>Application areas at a glance<\/h2>\n<p>The requirements from sewage sludge incineration combine several application areas of Darda GmbH:<\/p>\n<ul>\n<li><strong>Concrete demolition and special demolition:<\/strong> boiler house foundations, bunker walls, filter house slabs.<\/li>\n<li><strong>Building gutting and cutting:<\/strong> openings for conveying equipment, adaptations in drying halls, pipeline penetrations.<\/li>\n<li><strong>Rock excavation and tunnel construction:<\/strong> relevant for new access or underground expansions, e.g., for utility tunnels or shafts.<\/li>\n<li><strong>Natural stone extraction:<\/strong> indirectly relevant for material supply and for geologically driven excavation support.<\/li>\n<li><strong>Special deployment:<\/strong> work in tight, sensitive areas with high requirements for vibration and dust minimization.<\/li>\n<\/ul>\n<h2>Mono-incineration, co-incineration, and hybrid concepts<\/h2>\n<p>Mono-incineration plants are designed for consistent fuel properties and offer clear ash streams for phosphorus recovery. Co-incineration uses existing kilns in cement or power plants; in construction terms, tasks arise mainly in sludge reception, drying, and dosing. Hybrid concepts combine drying with decentralized utilization or centralized ash treatment. For construction practice, this implies differing interventions: from small, precise adjustments (gutting, openings) to complete deconstruction or expansion &#8211; each with suitable tools such as <strong>concrete demolition shears<\/strong> and <strong>stone and concrete splitters<\/strong>, supplemented by <em>steel shears<\/em>, <em>combination shears<\/em>, <em>Multi Cutters<\/em>, and <em>tank cutters<\/em>. Interface planning should reflect feed variability, redundancy needs, and the required ash quality for downstream recovery processes.<\/p>\n<h2>Practical tips for low-dust and low-vibration work<\/h2>\n<p>Sites in thermal sewage sludge incineration benefit from clear, simple measures that safeguard plant availability:<\/p>\n<ul>\n<li>Dust management: dust extraction, localized wetting, negative pressure maintenance in areas with sensitive equipment.<\/li>\n<li>Limiting vibrations: splitting technology instead of impact work, moderate use of separation cuts, step-by-step execution.<\/li>\n<li>Protection of adjacent trades: coverings, vibration monitoring, exclusion zones, and defined transport routes.<\/li>\n<li>Material separation: separate collection of mineral residues and metal fractions for proper disposal or recycling.<\/li>\n<li>Energy and hydraulics: sufficient supply capacity for continuous tool performance of Darda GmbH\u2019s hydraulic power packs.<\/li>\n<li>Water management: collection and treatment of process water from wetting and cleaning to prevent secondary contamination.<\/li>\n<\/ul>\n<h2>Importance for energy efficiency and the circular economy<\/h2>\n<p>Sewage sludge incineration supplies process heat and electricity and produces ashes that can potentially replace phosphorus sources. The structural quality of foundations, routing, and storage structures directly influences efficiency and availability. Precise demolition and adjustment work &#8211; e.g., with <strong>concrete demolition shears<\/strong> and <strong>stone and concrete splitters<\/strong> &#8211; reduces collateral damage, shortens downtime, and facilitates the installation of new units. In many projects, careful selection of low-vibration methods can shorten shutdowns and improve start-up curves of modified equipment. In this way, appropriate methods support controlled material separation and operational safety; any resource or emission effect must be documented for the project. Reliable phosphorus recovery depends on the selected treatment route and acceptance criteria from defined ash streams.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Sewage sludge incineration is a central component of modern wastewater treatment and the circular economy. It combines thermal treatment with energy recovery and provides the basis for the recovery of phosphorus from ashes. For planning, construction, modification, and deconstruction of the associated structures and plant components, precise, low-vibration, and material-appropriate <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/sewage-sludge-incineration\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19340","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Sewage Sludge Incineration | Wastewater Treatment<\/title>\n<meta name=\"description\" content=\"Explore sewage sludge incineration for wastewater treatment \u2713 energy recovery, flue-gas cleaning and phosphorus-ready ash.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/sewage-sludge-incineration\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Sewage Sludge Incineration | Wastewater Treatment\" \/>\n<meta property=\"og:description\" content=\"Explore sewage sludge incineration for wastewater treatment \u2713 energy recovery, flue-gas cleaning and phosphorus-ready ash.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/sewage-sludge-incineration\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-12T17:53:16+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/sewage-sludge-incineration\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/sewage-sludge-incineration\",\"name\":\"Sewage Sludge Incineration | Wastewater Treatment\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-08-27T09:36:07+00:00\",\"dateModified\":\"2026-09-12T17:53:16+00:00\",\"description\":\"Explore sewage sludge incineration for wastewater treatment \u2713 energy recovery, flue-gas cleaning and phosphorus-ready ash.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/sewage-sludge-incineration#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/sewage-sludge-incineration\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/sewage-sludge-incineration#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Sewage sludge incineration\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Sewage Sludge Incineration | Wastewater Treatment","description":"Explore sewage sludge incineration for wastewater treatment \u2713 energy recovery, flue-gas cleaning and phosphorus-ready ash.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/sewage-sludge-incineration","og_locale":"en_US","og_type":"article","og_title":"Sewage Sludge Incineration | Wastewater Treatment","og_description":"Explore sewage sludge incineration for wastewater treatment \u2713 energy recovery, flue-gas cleaning and phosphorus-ready ash.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/sewage-sludge-incineration","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-09-12T17:53:16+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/sewage-sludge-incineration","url":"https:\/\/www.darda.de\/en\/knowledge\/sewage-sludge-incineration","name":"Sewage Sludge Incineration | Wastewater Treatment","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-08-27T09:36:07+00:00","dateModified":"2026-09-12T17:53:16+00:00","description":"Explore sewage sludge incineration for wastewater treatment \u2713 energy recovery, flue-gas cleaning and phosphorus-ready ash.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/sewage-sludge-incineration#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/sewage-sludge-incineration"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/sewage-sludge-incineration#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Sewage sludge incineration"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19340","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19340"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19340\/revisions"}],"predecessor-version":[{"id":29107,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19340\/revisions\/29107"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19340"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}