{"id":19333,"date":"2025-08-29T15:54:46","date_gmt":"2025-08-29T13:54:46","guid":{"rendered":"https:\/\/www.darda.de\/pavement-bedding"},"modified":"2026-04-20T15:47:03","modified_gmt":"2026-04-20T13:47:03","slug":"pavement-bedding","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/pavement-bedding","title":{"rendered":"Pavement bedding"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Pavement bedding is an unbound layer of gravel or crushed stone used in civil and structural engineering as a load-bearing, draining, and capillary-breaking layer. It contributes to uniform <strong>load transfer<\/strong>, drainage, and frost protection. In deconstruction and <strong>demolition works<\/strong> as well as when rebuilding surfaces, the condition of the pavement bedding significantly influences the process and the quality of the outcome. Where concrete components are selectively released or crushed, for example with <strong>concrete pulverizers<\/strong> or with <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a>, the underlying pavement bedding often determines the stability of the working area, the fracture propagation, and the clean separation of material fractions.<\/p>\n<p>Pavement bedding is also referred to as a <em>bedding layer<\/em>, <em>leveling layer<\/em>, or <em>unbound granular layer<\/em>. Its temporary and permanent functions should be assessed separately, as construction phase loads and moisture regimes may differ from the service state.<\/p>\n<h2>Definition: What is meant by pavement bedding?<\/h2>\n<p>Pavement bedding refers to an unbound bedding or leveling layer made of naturally rounded gravel or crushed rock (chippings) with a defined gradation. It typically lies beneath slabs, foundations, paving, pipelines, cable routes, roadways, or track systems. The main functions are <strong>load distribution<\/strong>, <strong>drainage<\/strong>, and capillary break as well as leveling irregularities. It is to be distinguished from bearing layers of higher stiffness (e.g., <strong>gravel base layer<\/strong>) and special frost-protection layers; depending on the construction task, however, these functions can overlap or be combined in a single layer.<\/p>\n<ul>\n<li><strong>Not a subbase replacement:<\/strong> Compared with a base or subbase, bedding is typically thinner and less stiff, prioritizing permeability and bedding contact.<\/li>\n<li><strong>Interface management:<\/strong> Separation layers or <strong>geotextile<\/strong>s can be required to prevent fines migration and to maintain filter stability.<\/li>\n<\/ul>\n<h2>Basics: composition, material, and function<\/h2>\n<p>Pavement bedding consists of mineral aggregates with a suitable grading curve that achieves the required properties. For effective drainage and capillary break, a low fines content is advantageous; for load transfer and shape stability, a well-graded particle distribution is relevant. Common size ranges &#8211; depending on use and thickness &#8211; are roughly 2-32 mm or 16-32 mm; other gradations are also common depending on the project. The thickness of the layer depends on loading, subgrade, and frost depth. In utility trenches, the pavement bedding additionally serves as pipe surround and to bed sensitive components in the correct position.<\/p>\n<ul>\n<li><strong>Open-graded mixes:<\/strong> Promote high permeability and capillary break, but require careful placement to avoid segregation.<\/li>\n<li><strong>Well-graded mixes:<\/strong> Provide better interlock and shape stability, with moderate permeability depending on fines content.<\/li>\n<li><strong>Aggregate origin:<\/strong> Crushed aggregates increase interlock; rounded aggregates improve ease of placement and compaction.<\/li>\n<\/ul>\n<h3>Material parameters and performance characteristics<\/h3>\n<p>Key parameters include particle shape and strength, grading curve, water permeability, frost and abrasion resistance, compactability, and load-bearing capacity. Excessive fines can reduce water permeability and promote capillary water movement; overly coarse, uniform aggregates can yield under load. In practice, compaction is controlled using appropriate procedures; bearing capacity tests (e.g., standard load or density tests) support quality assurance.<\/p>\n<ul>\n<li><strong>Indicative tests:<\/strong> sieve analysis, water permeability testing, density and moisture control, plate bearing or dynamic plate load tests, and frost susceptibility assessment.<\/li>\n<li><strong>Execution controls:<\/strong> surface evenness, layer thickness checks, and observation of segregation or pumping under trial loads.<\/li>\n<\/ul>\n<h2>Importance of pavement bedding in concrete demolition and special demolition<\/h2>\n<p>In demolition operations, pavement bedding acts as a buffer and separation layer between concrete components and the subgrade. When a <strong>floor slab<\/strong> is selectively broken with <strong>concrete pulverizers<\/strong>, the storage condition, thickness, and moisture content of the pavement bedding influence the fracture behavior and the stability of remaining slab sections. A uniform, adequately compacted bedding reduces uncontrolled settlements and helps prevent edge break-offs. When splitting massive <strong>foundation<\/strong>s with stone and <strong>concrete splitter<\/strong> devices, the support conditions are crucial: if a void-rich or uneven bedding is present, it promotes unforeseen crack paths; a uniform bedding supports targeted crack guidance.<\/p>\n<ul>\n<li><strong>Practical measures:<\/strong> pre-level the support, bridge local voids with packing plates or chippings, limit uncontrolled slab uplift with defined supports, and condition moisture if dust or capillary action becomes critical.<\/li>\n<li><strong>Risk control:<\/strong> verify bedding continuity at openings and penetrations, where stiffness jumps often trigger unintended fractures.<\/li>\n<\/ul>\n<h3>Clean material separation and recyclability<\/h3>\n<p>For subsequent processing, the separation of concrete rubble and bedding material is essential. When components are broken on the pavement bedding, mixing can occur. A controlled approach &#8211; such as releasing larger pieces with <a href=\"https:\/\/www.darda.de\/en\/product-overview\/concrete-crushers\">selective concrete crushers for deconstruction<\/a> or targeted splitting on site &#8211; reduces the ingress of fines and improves the recyclability of both fractions. <em>The less mixing, the easier the sorting and the more stable the quality parameters of the recovered construction materials.<\/em><\/p>\n<ul>\n<li><strong>Process tips:<\/strong> limit drop heights, provide interim collection areas, screen coarse fractions early, and remove reinforcing steel with magnetic separation before final screening.<\/li>\n<\/ul>\n<h3>Stability and emissions<\/h3>\n<p>Pavement bedding has a damping effect and can reduce vibrations. When using stone and <strong>concrete splitter<\/strong> devices, vibration and <strong>noise emission<\/strong> are generally low, which is advantageous in sensitive environments. Dust emissions are possible with dry beddings; targeted wetting of the work zone can help, provided the site\u2019s water management is respected.<\/p>\n<p>Where constraints apply, establish trigger values for vibration and dust, monitor with portable instruments, and adapt sequence or equipment settings to remain within agreed limits.<\/p>\n<h2>Pavement bedding in building gutting and cutting<\/h2>\n<p>In existing buildings, a capillary-breaking pavement bedding often lies beneath <strong>floor slab<\/strong>s. When opening utility trenches or performing <strong>core drilling<\/strong> and <strong>separation cut<\/strong>s, care must be taken not to loosen the bedding excessively and not to damage <strong>geotextile<\/strong>s or separation layers. If the slab is removed in sections with <strong>concrete pulverizers<\/strong>, the bedding beneath can serve as a temporary working plane. At the same time, verify whether utilities run within the bedding. During subsequent reinstatement, compaction must be carried out in layers and be appropriate to the material to avoid later settlements under new components.<\/p>\n<ul>\n<li><strong>Checks before cutting:<\/strong> locate utilities by records and trial pits, supplement with non-destructive methods where needed, and mark safe stand zones.<\/li>\n<li><strong>Temporary works:<\/strong> protect exposed bedding with sheeting or geotextile to prevent fines wash-in and rutting.<\/li>\n<\/ul>\n<h3>Joints, edges, and interfaces<\/h3>\n<p>Edge zones and bearing edges are particularly sensitive. Where slabs connect to <strong>foundation<\/strong>s, walls, or shafts, the pavement bedding may be washed out or unevenly compacted. Before crushing with <strong>concrete pulverizers<\/strong> or splitting, these areas should be probed and, if necessary, stabilized or supplemented in advance so that fracture edges do not tear out and adjacent components remain undamaged.<\/p>\n<ul>\n<li><strong>Pre-stabilization options:<\/strong> add chippings, compact in thin lifts, install edge shims, or place separation strips to protect adjacent components.<\/li>\n<\/ul>\n<h2>Pavement bedding in rock excavation and tunnel construction<\/h2>\n<p>In <strong>tunnel construction<\/strong> and heading, gravel or crushed stone is used as a working plane, <strong>drainage layer<\/strong>, or track bed. In <strong>rock excavation<\/strong> and when splitting with stone and <strong>concrete splitter<\/strong>s or rock wedge cylinders, a load-bearing, permeable bedding serves as a safe base for equipment and material handling. Water management is especially important in underground areas: a functioning drainage system relieves excavations, keeps access routes passable, and protects the subgrade from softening. <strong>hydraulic power pack<\/strong>s are placed on flat, load-bearing surfaces; the pavement bedding can fulfill this function provided bearing capacity and settlement behavior are verified.<\/p>\n<p>Practical arrangements include cross falls toward sumps, filter-stable transitions at drains, and routine reshaping of the working plane to avoid ponding and rutting.<\/p>\n<h2>Pavement bedding in natural stone extraction<\/h2>\n<p>For storing and buffering natural stone blocks, mineral beddings are often used to avoid point loads, channel water, and facilitate handling. A well-leveled, stable pavement bedding reduces the risk of edge break-offs and makes it easier to safely pick up and set down heavy units. Where rock is pre-split or worked with stone and <strong>concrete splitter<\/strong>s, a clean, low-fines bedding supports material purity on site.<\/p>\n<ul>\n<li><strong>Operational tips:<\/strong> maintain consistent contact pads, avoid contamination with clay, and refresh the top layer when raveling or fines accumulation reduces drainage.<\/li>\n<\/ul>\n<h2>Planning, investigation, and quality assurance<\/h2>\n<p>Before intervening in load-bearing surfaces, it is advisable to investigate the layer sequence and bedding thickness. Probing provides indications of existing separation layers, <strong>geotextile<\/strong> fleeces, moisture conditions, and homogeneity. Dimensioning is based on existing and future loads. Tests of compaction and load-bearing capacity are useful where the bedding is used as a working or permanent plane. <strong>The goal is a sufficiently stiff, well-draining, and uniformly load-bearing layer.<\/strong><\/p>\n<ul>\n<li><strong>Investigation scope:<\/strong> trial pits or cores, sampling for grading and fines, field density checks, permeability observations after rainfall or wetting, and documentation of interfaces to adjacent structures.<\/li>\n<li><strong>Design considerations:<\/strong> target bearing class, frost index, traffic or equipment loading, and drainage strategy including discharge paths.<\/li>\n<\/ul>\n<h3>Compaction and water management<\/h3>\n<p>Compaction is performed in layers and appropriate to the material. Bedding that is too wet is difficult to compact and loses bearing capacity; bedding that is too dry can segregate during placement. Adjusted water management and protection against the ingress of fines secure the function as a drainage and capillary-breaking layer. <strong>Geotextile<\/strong> separation layers prevent mixing with cohesive subgrades.<\/p>\n<ol>\n<li>Place material in thin, even lifts.<\/li>\n<li>Pre-level without excessive blade whipping that could segregate the top fraction.<\/li>\n<li>Compact with suitable equipment until target density or stiffness is achieved.<\/li>\n<li>Verify with spot tests and correct local soft spots immediately.<\/li>\n<li>Shape the surface with gentle falls toward intended drains.<\/li>\n<\/ol>\n<ul>\n<li><strong>Acceptance hints:<\/strong> consistent visual texture without laminations, no pumping under foot, measured stiffness or density within specified tolerance, and maintained permeability at the surface.<\/li>\n<\/ul>\n<h2>Deconstruction, removal, and reinstatement of pavement bedding<\/h2>\n<p>During deconstruction, the pavement bedding should be excavated as material-pure as possible so that it can be reused or properly recycled. Foreign materials &#8211; such as <strong>concrete debris<\/strong>, rebar fragments, or wood &#8211; should be removed beforehand. Depending on material quality and project requirements, the processed pavement bedding can be used again as an unbound layer. Requirements for environmental compatibility and suitability must be verified for the specific project. During reinstatement, the layer thickness should be staged and compaction demonstrably executed to achieve the required stiffness.<\/p>\n<ul>\n<li><strong>Reuse checks:<\/strong> confirm grading, fines content, deleterious constituents, and moisture; screen if necessary and verify performance with spot tests before re-laying.<\/li>\n<li><strong>Traceability:<\/strong> document source, processing steps, and test results to support conformity and later audits.<\/li>\n<\/ul>\n<h3>Occupational safety and emissions<\/h3>\n<p>Handling dry aggregates produces dust, and compaction work generates vibrations. Good <strong>construction logistics<\/strong>, short transport routes, suitable wetting, and appropriate equipment allocation reduce emissions. When crushing concrete on pavement bedding, protective measures against dust and fragments must be provided; the situation on site must be assessed.<\/p>\n<ul>\n<li><strong>Controls:<\/strong> timed wetting with low-additive water, edge protection mats at impact zones, designated walkways to limit tracking, and personal protective equipment appropriate to noise and dust levels.<\/li>\n<\/ul>\n<h2>Typical challenges and practical approaches<\/h2>\n<p>Inhomogeneous bedding thicknesses lead to uneven support. Before targeted splitting or gripping with <strong>concrete pulverizers<\/strong>, the support should be checked and leveled if necessary. Fine-rich beddings can trap water; here, restoring drainage capability through appropriate material selection and layer thicknesses is important. Moist or softened areas must be relieved and temporarily stabilized before heavy components are moved or crushed. Where separation fleeces exist, careful working preserves the filter function and prevents fines from being washed into the subgrade.<\/p>\n<ul>\n<li><strong>Variable stiffness:<\/strong> bridge with temporary plates, recompact soft bays, or replace localized weak material.<\/li>\n<li><strong>Water accumulation:<\/strong> open temporary drains, introduce coarser top-up material, and protect inflow points.<\/li>\n<li><strong>Contamination:<\/strong> remove cohesive inclusions and re-establish a clean top layer to restore drainage and sorting quality.<\/li>\n<\/ul>\n<h2>Terminology and classification within the layer structure<\/h2>\n<p>Pavement bedding is part of the unbound package of layers between the load-bearing subgrade (formation level) and the component. Depending on the project, it can take on the functions of a leveling, drainage, or frost-protection layer or be combined with a base layer. For deconstruction, this means: the layer\u2019s location and function must be known before work begins to avoid damage and to work material-pure. In application areas such as <strong>concrete demolition<\/strong> and special demolition, building gutting and cutting, <strong>rock excavation<\/strong> and <strong>tunnel construction<\/strong>, or <strong>natural stone<\/strong> extraction, a professionally constructed and treated pavement bedding supports safe, precise, and material-efficient execution &#8211; especially when targeted releasing with stone and <strong>concrete splitter<\/strong> devices and when selective crushing with <strong>concrete pulverizers<\/strong>.<\/p>\n<p>In technical communication, the terms bedding layer, leveling layer, and unbound granular layer are often used synonymously; the decisive aspect is the defined function within the layer system and the interaction with adjacent layers.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Pavement bedding is an unbound layer of gravel or crushed stone used in civil and structural engineering as a load-bearing, draining, and capillary-breaking layer. It contributes to uniform load transfer, drainage, and frost protection. In deconstruction and demolition works as well as when rebuilding surfaces, the condition of the pavement <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/pavement-bedding\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19333","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Pavement Bedding - Unbound Gravel Layer<\/title>\n<meta name=\"description\" content=\"Discover pavement bedding in civil engineering \u2713 load transfer, drainage &amp; frost protection for precise demolition.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/pavement-bedding\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Pavement Bedding - Unbound Gravel Layer\" \/>\n<meta property=\"og:description\" content=\"Discover pavement bedding in civil engineering \u2713 load transfer, drainage &amp; frost protection for precise demolition.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/pavement-bedding\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-20T13:47:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/pavement-bedding\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/pavement-bedding\",\"name\":\"Pavement Bedding - Unbound Gravel Layer\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-08-29T13:54:46+00:00\",\"dateModified\":\"2026-04-20T13:47:03+00:00\",\"description\":\"Discover pavement bedding in civil engineering \u2713 load transfer, drainage & frost protection for precise demolition.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/pavement-bedding#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/pavement-bedding\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/pavement-bedding#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Pavement bedding\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Pavement Bedding - Unbound Gravel Layer","description":"Discover pavement bedding in civil engineering \u2713 load transfer, drainage & frost protection for precise demolition.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/pavement-bedding","og_locale":"en_US","og_type":"article","og_title":"Pavement Bedding - Unbound Gravel Layer","og_description":"Discover pavement bedding in civil engineering \u2713 load transfer, drainage & frost protection for precise demolition.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/pavement-bedding","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-04-20T13:47:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/pavement-bedding","url":"https:\/\/www.darda.de\/en\/knowledge\/pavement-bedding","name":"Pavement Bedding - Unbound Gravel Layer","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-08-29T13:54:46+00:00","dateModified":"2026-04-20T13:47:03+00:00","description":"Discover pavement bedding in civil engineering \u2713 load transfer, drainage & frost protection for precise demolition.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/pavement-bedding#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/pavement-bedding"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/pavement-bedding#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Pavement bedding"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19333","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19333"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19333\/revisions"}],"predecessor-version":[{"id":26473,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19333\/revisions\/26473"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19333"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}