{"id":19331,"date":"2025-08-30T11:07:01","date_gmt":"2025-08-30T09:07:01","guid":{"rendered":"https:\/\/www.darda.de\/crawler-excavator"},"modified":"2026-04-20T16:34:02","modified_gmt":"2026-04-20T14:34:02","slug":"crawler-excavator","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/crawler-excavator","title":{"rendered":"Crawler excavator"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Crawler excavators are key carrier machines in modern demolition, in rock and tunnel construction, and in natural stone extraction. Thanks to their crawler undercarriage, they combine high stability, precise movements, and traction on difficult ground. In combination with hydraulic excavator attachments &#8211; such as concrete demolition shears, <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a>, combination shears, Multi Cutters, steel shears, or tank cutters &#8211; structures can be dismantled in a controlled manner, rock formations can be opened, or natural stone blocks can be gently released. Darda GmbH develops attachments and hydraulic power packs that, together with the crawler excavator, support a <em>low-vibration, controlled, and safe<\/em> working method. When paired correctly, the result is high productivity with predictable breakage behavior, low immissions, and reliable compliance with site constraints in sensitive environments.<\/p>\n<h2>Definition: What is a crawler excavator?<\/h2>\n<p>A crawler excavator is a hydraulically driven earthmoving and demolition machine with a crawler undercarriage. The undercarriage distributes the machine mass over a large contact area and enables work on soft or uneven ground. The upper carriage with boom and stick carries the attachment; slew drive and hydraulics allow sensitive yet powerful movements. Compared to wheeled excavators, crawler excavators score with higher stability and tractive force; they are therefore the preferred carrier machines in concrete demolition and special demolition, in strip-out and cutting, in rock excavation and tunnel construction, in natural stone extraction, and in special operations. Typical carrier classes range from compact units for interior strip-out to heavy machines for primary demolition and rock work; configuration and attachment choice must be aligned with task and environment.<\/p>\n<h2>Design and functioning of a crawler excavator<\/h2>\n<p>A crawler excavator consists of the undercarriage (crawler undercarriage), upper carriage (engine, hydraulics, cab), and the equipment set (boom, stick, quick coupler\/adapter plate). The auxiliary hydraulics provide the attachment with oil flow and pressure. Selecting and correctly parameterizing the hydraulics is critical so that attachments such as concrete demolition shears or rock and concrete splitting devices reach their nominal forces and thermal loads remain under control. Function-critical details include proportional control for fine metering, suitable return paths with low backpressure, and thermal management for continuous operation.<\/p>\n<h3>Crawler undercarriage and stability<\/h3>\n<p>Stability results from track gauge, track length, and machine mass. Wide track shoes reduce ground pressure and improve bearing capacity on soft ground, while narrow, toothed shoes provide more traction on rocky terrain. Working on slopes requires adapted working angles and forward-looking positioning of upper carriage and boom to avoid crossing the tipping line. A dozer blade or support on prepared bearing surfaces can increase stability in demanding cuts, while extendable undercarriages on compact carriers help with access through narrow points and subsequent widening at the work area.<\/p>\n<ul>\n<li><strong>Center of gravity management<\/strong>: counterweight position and boom orientation relative to the load path are decisive for rollover margins.<\/li>\n<li><strong>Contact conditions<\/strong>: mats or steel plates improve load distribution on weak substrates and reduce settlement.<\/li>\n<li><strong>Gradeability<\/strong>: observe maximum slope angles and keep the superstructure aligned with the fall line where possible.<\/li>\n<\/ul>\n<h3>Hydraulics and auxiliary circuits<\/h3>\n<p>Key parameters are <strong>maximum system pressure<\/strong>, <strong>flow rate<\/strong> (L\/min), return line and, if applicable, case drain connection. For high-performance concrete demolition shears, combination shears, and steel shears, a high-throughput, pressure-stable auxiliary circuit with sufficient tank capacity and cooling is important. Rock and concrete splitting devices, especially stone splitting cylinders, can, depending on configuration, be operated via the excavator hydraulics or via separate <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">Darda hydraulic power units<\/a>, which offloads thermal load from the carrier machine and offers advantages indoors. Clean oil, correct filtration, and minimized backpressure in the return are essential to protect motors and valves and to achieve rated cycle times.<\/p>\n<ul>\n<li><strong>Flow and pressure<\/strong>: verify rated flow at working rpm and set relief valves to the attachment\u2019s limits.<\/li>\n<li><strong>Return concept<\/strong>: prefer free-flow returns to tank; avoid restrictive returns that raise case pressure.<\/li>\n<li><strong>Case drain<\/strong>: if required by the tool, route directly to tank with monitored cleanliness.<\/li>\n<li><strong>Thermal reserve<\/strong>: size cooling for ambient conditions and expected duty cycle; monitor oil temperature under load.<\/li>\n<\/ul>\n<h2>Crawler excavator as a carrier machine in concrete demolition and special demolition<\/h2>\n<p>In deconstruction, crawler excavators take on the core tasks: positioning, separating, removing, and sorting. With concrete demolition shears, reinforced concrete can be mechanically crushed in primary and secondary demolition, with reinforcement exposed in the process. Combination shears and Multi Cutters cover mixed materials; steel shears cut structural steel, reinforcement, or beams. Tank cutters enable cold cutting where spark-free requirements apply. Coordinated sequences, short tool changeovers, and clear sorting strategies minimize rework and keep cycle times low, while maintaining structural integrity until planned separation.<\/p>\n<h3>Concrete demolition shears: controlled breaking of reinforced concrete<\/h3>\n<p>Concrete demolition shears act with high closing forces and optimized jaw geometry. Combined with the stability of a crawler excavator, this results in short, safe cycles. Advantages include low vibration, high selectivity between concrete and reinforcement, and reduced risk for adjacent components. For proper sizing, allowable tool mass, oil flow, pressure, and the reach of the equipment must be matched. Rotation function and speed valves improve access and cycle efficiency, particularly in confined geometries and during secondary breaking on the ground.<\/p>\n<ul>\n<li><strong>Carrier match<\/strong>: check lifting chart at maximum outreach with attachment installed, including adapter plate and quick coupler.<\/li>\n<li><strong>Hydraulic sizing<\/strong>: ensure available flow and pressure meet the shear\u2019s nominal requirements over the intended duty cycle.<\/li>\n<li><strong>Jaw and blade concept<\/strong>: select jaw opening, depth, and blade layout according to component thickness and rebar density.<\/li>\n<li><strong>Rotation and control<\/strong>: verify rotation torque and proportional control for precise alignment and low swing loads.<\/li>\n<\/ul>\n<h3>Rock and concrete splitting devices: non-explosive demolition<\/h3>\n<p>Rock and concrete splitting devices &#8211; including stone splitting cylinders &#8211; use wedge and pressure elements to generate controlled crack patterns in rows of boreholes. The crawler excavator handles drilling, positioning, holding, and removing split material. The advantage: very low vibration and minimized secondary damage, which is convincing in sensitive environments such as inner-city areas, existing buildings, or tunnel construction. Hydraulic power packs from Darda GmbH enable autonomous, quiet operation. Typical borehole diameters and embedding depths are defined by the cylinder size; spacing and sequencing determine crack propagation and block geometry.<\/p>\n<ul>\n<li><strong>Drilling pattern<\/strong>: define hole spacing, burden, and edge distances for the required split width and direction.<\/li>\n<li><strong>Sequencing<\/strong>: apply wedges in stages to steer cracks and avoid uncontrolled breakout.<\/li>\n<li><strong>Surface protection<\/strong>: use pads and controlled lifting to prevent spalling along exposed edges.<\/li>\n<\/ul>\n<h2>Use in rock excavation and tunnel construction<\/h2>\n<p>In rock and underground environments, controlled methods are required. Crawler excavators with robust undercarriages and precise equipment use rock and concrete splitting devices to open rock structures along natural planes of weakness. Compared to impact tools, noise and vibration are significantly reduced. In cross passages, niches, or during outfitting, combination shears and Multi Cutters can selectively remove installations and anchor remnants. Using concrete demolition shears in shotcrete areas supports careful exposing without large-scale damage. Ventilation, dust control, and evacuation routes must be planned together with the method to ensure continuous, low-immission progress.<\/p>\n<h2>Natural stone extraction: precision instead of blasting<\/h2>\n<p>In natural stone extraction, block-preserving release is key. Crawler excavators with long reach and sensitive hydraulics combine drilling, splitting, and placing. Stone splitting cylinders create defined separation joints; the crawler excavator moves the recovered blocks with minimal edge breakage. The result is clean separation faces, reduced microcracks, and a higher yield of marketable raw blocks. Orientation along bedding and cleavage planes and gentle handling with soft slings and edge protection further reduce waste and rework.<\/p>\n<h2>Strip-out and cutting in existing structures<\/h2>\n<p>During strip-out, compact crawler excavators play to their strengths in confined buildings. Rubber pads protect sensitive floors, and the small bearing footprint distributes loads. Multi Cutters and combination shears separate installations, door frames, and lightweight elements. Concrete demolition shears take over opening load-bearing components in a defined sequence. Tank cutters enable cold, low-spark cutting of tanks, vessels, and pipelines. Hydraulic power packs from Darda GmbH supply hand-held or tethered tools even where the excavator hydraulics should not be used. Load limits of intermediate slabs, low headroom, and strict dust and noise constraints require precise planning of access routes and work envelopes.<\/p>\n<h2>Safe selection and sizing of attachments<\/h2>\n<p>The suitability of a crawler excavator as a carrier machine results from matching its key parameters to the tool\u2019s requirements. The following points must be checked in comparison:<\/p>\n<ul>\n<li><strong>Allowable tool mass and load moment<\/strong> for the respective boom\/stick configuration<\/li>\n<li><strong>Hydraulic data<\/strong>: available flow rate, working pressure, permissible backpressure, and, if applicable, case drain<\/li>\n<li><strong>Quick coupler\/adapter plate<\/strong>: geometry, locking, depressurized switching<\/li>\n<li><strong>Reach and work envelopes<\/strong>: freedom of movement, tipping line, visibility<\/li>\n<li><strong>Thermal aspects<\/strong>: oil temperature, cooling capacity, continuous vs. intermittent duty<\/li>\n<li><strong>Structural loads<\/strong>: cyclic peak loads during crushing, torsion under lateral loading<\/li>\n<li><strong>Jobsite environment<\/strong>: ground bearing capacity, emission requirements, escape routes<\/li>\n<li><strong>Control quality<\/strong>: proportional functions and fine metering for precise, low-shock tool guidance<\/li>\n<li><strong>Service access<\/strong>: hose routing, guarding, and accessibility for daily inspection and blade changes<\/li>\n<\/ul>\n<h2>Work methodology: efficient deconstruction with a crawler excavator<\/h2>\n<p>A structured sequence increases safety, quality, and productivity. In concrete demolition and special demolition, the following steps have proven effective:<\/p>\n<ol>\n<li>Preparation: load transfer, shoring, strengthening; isolate utilities; delineate work and hazard zones<\/li>\n<li>Drilling\/slotting: define predetermined lines of fracture, set out drilling patterns for rock and concrete splitting devices<\/li>\n<li>Primary separation: use concrete demolition shears to release components; pull off or cut reinforcement in a controlled manner<\/li>\n<li>Secondary demolition: on the ground, reduce fragments to target size with concrete demolition shear or combination shear<\/li>\n<li>Sorting: place steel, concrete, and natural stone separately; use steel shears for thick-walled profiles<\/li>\n<li>Fine cutting\/special operations: tank cutters and Multi Cutters for sensitive separation work<\/li>\n<li>Logistics: haulage logistics, dust suppression and noise reduction measures, continuous adjustment of excavator position for short cycle times<\/li>\n<\/ol>\n<p>Clear communication, continuous monitoring of structural response, and immediate adaptation of the sequence to site conditions maintain safety margins and throughput.<\/p>\n<h2>Maintenance, wear, and operation<\/h2>\n<p>Regular checks increase operational safety. Track tension, undercarriage rollers, and track shoes influence tracking accuracy and wear. On the hydraulics side, filter condition, oil quality, and line tightness are decisive. On the attachments, well-maintained pivot points, cutter blades, and crushing teeth extend service life. Quick couplers must be checked daily for locking and play. Hydraulic power packs from Darda GmbH should be serviced according to the manufacturer\u2019s specifications to ensure constant pressures and temperatures.<\/p>\n<ul>\n<li><strong>Daily<\/strong>: visual inspection for leaks, damage, and loose guards; clean coupling faces; check quick coupler lock indicator.<\/li>\n<li><strong>Weekly<\/strong>: lubricate pivot points as specified; check track tension and roller condition; verify hydraulic oil level.<\/li>\n<li><strong>Periodically<\/strong>: analyze oil for contamination; inspect hoses for abrasion and minimum bend radius; torque-check bolted joints on adapter plates.<\/li>\n<li><strong>Operational<\/strong>: warm up hydraulics before full load; avoid prolonged relief-valve operation to limit heat input.<\/li>\n<\/ul>\n<h2>Sustainability and emissions in operation<\/h2>\n<p>Dust, noise, and vibration are decisive in sensitive settings. Concrete demolition shears and rock and concrete splitting devices operate <em>at low frequency<\/em> and with low vibration; this protects adjacent components and reduces immissions. Water spray systems on boom and tool minimize dust. Using separate hydraulic power packs can reduce noise emissions and the crawler excavator\u2019s energy demand in part-load operation. Additional measures such as idle management, optimized travel paths, and selective methods reduce primary energy use and support environmental targets.<\/p>\n<h2>Legal and organizational notes<\/h2>\n<p>Work with crawler excavators and hydraulic attachments is subject to local regulations on occupational safety, emissions, and permits. In general: deploy qualified operators, assess hazards in advance, verify load-bearing capacities, and define exclusion zones. For non-explosive methods with rock and concrete splitting devices, drilling and splitting plans must be defined on a project-specific basis. Information from Darda GmbH on operating limits, hydraulic parameters, and permitted carrier machines must be observed. Binding information on standards and permits must be obtained for each project. Method statements, documentation of inspections, and acceptance records for critical works provide traceability and facilitate approvals.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Crawler excavators are key carrier machines in modern demolition, in rock and tunnel construction, and in natural stone extraction. Thanks to their crawler undercarriage, they combine high stability, precise movements, and traction on difficult ground. In combination with hydraulic excavator attachments &#8211; such as concrete demolition shears, hydraulic rock and <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/crawler-excavator\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19331","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Crawler Excavator - Demolition, Rock &amp; Tunnel Uses<\/title>\n<meta name=\"description\" content=\"Learn how a tracked hydraulic crawler excavator \u2713 boosts stability, precise demolition &amp; low vibration rock splitting.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/crawler-excavator\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Crawler Excavator - Demolition, Rock &amp; Tunnel Uses\" \/>\n<meta property=\"og:description\" content=\"Learn how a tracked hydraulic crawler excavator \u2713 boosts stability, precise demolition &amp; low vibration rock splitting.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/crawler-excavator\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-20T14:34:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/crawler-excavator\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/crawler-excavator\",\"name\":\"Crawler Excavator - Demolition, Rock & Tunnel Uses\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-08-30T09:07:01+00:00\",\"dateModified\":\"2026-04-20T14:34:02+00:00\",\"description\":\"Learn how a tracked hydraulic crawler excavator \u2713 boosts stability, precise demolition & low vibration rock splitting.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/crawler-excavator#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/crawler-excavator\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/crawler-excavator#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Crawler excavator\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Crawler Excavator - Demolition, Rock & Tunnel Uses","description":"Learn how a tracked hydraulic crawler excavator \u2713 boosts stability, precise demolition & low vibration rock splitting.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/crawler-excavator","og_locale":"en_US","og_type":"article","og_title":"Crawler Excavator - Demolition, Rock & Tunnel Uses","og_description":"Learn how a tracked hydraulic crawler excavator \u2713 boosts stability, precise demolition & low vibration rock splitting.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/crawler-excavator","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-04-20T14:34:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/crawler-excavator","url":"https:\/\/www.darda.de\/en\/knowledge\/crawler-excavator","name":"Crawler Excavator - Demolition, Rock & Tunnel Uses","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-08-30T09:07:01+00:00","dateModified":"2026-04-20T14:34:02+00:00","description":"Learn how a tracked hydraulic crawler excavator \u2713 boosts stability, precise demolition & low vibration rock splitting.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/crawler-excavator#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/crawler-excavator"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/crawler-excavator#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Crawler excavator"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19331","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19331"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19331\/revisions"}],"predecessor-version":[{"id":26475,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19331\/revisions\/26475"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19331"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}