{"id":19330,"date":"2025-08-30T13:23:04","date_gmt":"2025-08-30T11:23:04","guid":{"rendered":"https:\/\/www.darda.de\/boiler-house-demolition"},"modified":"2026-09-12T19:53:15","modified_gmt":"2026-09-12T17:53:15","slug":"boiler-house-demolition","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/boiler-house-demolition","title":{"rendered":"Boiler house demolition"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Boiler house demolition refers to the orderly deconstruction of buildings and plant components in which steam boilers, hot-water or process heat systems were operated. Such structures are often made of massive reinforced concrete and steel, containing complex piping networks, vessels, chimneys, and machine foundations. Deconstruction requires a structured approach, low-emission methods, and robust logistics &#8211; especially within existing industrial sites or in sensitive neighborhoods. Prior surveys, hazardous substance assessments, and a permit-compliant method statement form the basis for predictable progress with minimized disruption. Tools such as <strong>concrete pulverizers<\/strong> and <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a><\/strong> from Darda GmbH are often used for low-vibration concrete removal and controlled segmentation.<\/p>\n<h2>Definition: What is meant by boiler house demolition?<\/h2>\n<p>Boiler house demolition means the professional, safety-oriented deconstruction of the boiler house building, including the technical equipment within it (boilers, pressure vessels, piping, flue gas ducts, fuel and feedwater systems) as well as the associated foundations and steel structures. The goal is controlled dismantling, <em>single-grade separation<\/em> of material streams, and preparation for recycling. The process includes strip-out and cutting, partial dismantling of load-bearing components, dismantling of steel components, and the final concrete demolition. In practice, a distinction is made between dismantling (releasable connections) and demolition (destruction of the component). Procedure, emission protection, and occupational safety follow generally accepted technical rules and the regulatory requirements at the respective site. Interfaces with utilities and residual media are isolated and documented through clearance measurements and release protocols.<\/p>\n<h2>Structure, components, and typical challenges in the boiler house<\/h2>\n<p>Boiler houses combine massive building structures with densely packed technical equipment. They are characterized by high loads, heavy reinforcement, thick-walled foundation blocks, large openings for utility penetrations, platforms and walkways, as well as add-ons such as chimneys and filter systems. Deconstruction is complicated by limited accessibility, low ceiling load reserves, and parallel operations in adjacent areas. Additional influencing factors include aging structures, corrosion, and possible contamination in linings or insulation that require controlled handling.<\/p>\n<h3>Typical components and materials<\/h3>\n<ul>\n<li>Reinforced concrete: machine foundations, floor slabs, walls, columns, slabs, boiler supports<\/li>\n<li>Steel construction: boiler frameworks, pipe racks, beams, platforms, stairs<\/li>\n<li>Pressure and vessel technology: boilers, feedwater tanks, tanks, flue gas lines<\/li>\n<li>Chimneys: masonry, steel or reinforced concrete, with linings<\/li>\n<li>Insulation and linings: mineral fibers, refractory linings, sealing systems<\/li>\n<li>Electrical and control systems: cable routes, switchgear, instrumentation, control cabinets<\/li>\n<\/ul>\n<h3>Challenges in deconstruction<\/h3>\n<ul>\n<li>Confined workspaces, restricted lifting and transport routes<\/li>\n<li>High reinforcement ratios and massive member thicknesses<\/li>\n<li>Residual energies and media residues (steam, compressed air, condensate) &#8211; isolation and clearance measurements required<\/li>\n<li>Limitations on dust, noise, and vibrations in sensitive environments<\/li>\n<li>Safe sequencing to ensure stability and load transfer at all times<\/li>\n<li>Incomplete or outdated as-built information with hidden embeds or anchors<\/li>\n<li>Handling and disposal of legacy materials from insulation or linings with special protection requirements<\/li>\n<\/ul>\n<h2>Methods and techniques of controlled deconstruction<\/h2>\n<p>Boiler house demolition is carried out step by step from the inside to the outside and from top to bottom. The focus is on controlled separation, sectional dismantling, and a low-emission work approach. Hydraulic tools from Darda GmbH enable effective work in existing buildings where space and load limits determine machine selection. Sequencing, temporary works, and continuous monitoring ensure that stability, emissions, and logistics remain under control at every stage.<\/p>\n<h3>Process concrete components with low vibration<\/h3>\n<p><strong>Concrete pulverizers<\/strong> are ideal for the selective deconstruction of reinforced concrete components: they grip and break elements, cut reinforcement, and produce manageable piece sizes. For massive foundations or heavily reinforced members, <strong>hydraulic splitters<\/strong> as well as <strong>rock wedge splitters<\/strong> are used. Introduced via drill holes, they generate controlled splitting forces and reduce vibrations and secondary damage &#8211; an advantage in the immediate vicinity of vibration-sensitive equipment. Pre-cracking and sectional work reduce tool energy demand and expose reinforcement in a targeted manner to improve downstream recycling.<\/p>\n<h3>Cut steel components<\/h3>\n<p>For beams, pipelines, boiler shells, and frames, hydraulic <strong>steel shears<\/strong>, <strong>combi shears<\/strong>, and <strong>multi cutters<\/strong> are suitable. They work with low sparking and are therefore often the first choice in areas with elevated fire and explosion protection requirements. <strong>Tank cutters<\/strong> assist on shell plates and vessels, especially where defined cut edges are required for safe handling. Cold-cutting methods help maintain emission control and simplify subsequent sorting by cleanly separating material types.<\/p>\n<h3>Chimneys and tall plant components<\/h3>\n<p>Top-down methods are used for tall, slender structures. Segmental removal with concrete pulverizers, supplementary splitting, and the controlled lowering of sections minimize risks. The choice of method depends on material, height, environmental protection, and accessibility. Weather windows, fall protection, exclusion zones, and lifting concepts are integral to method selection and permitting.<\/p>\n<h2>Work steps: from concept to recycling<\/h2>\n<ol>\n<li>Survey of existing conditions: drawings, reinforcement and material identification, media and piping overview, access and load capacities.<\/li>\n<li>Deconstruction concept: sequence, intermediate states, shoring, lifting and transport routes, emergency and fire protection concept.<\/li>\n<li>Strip-out and cutting: expose the load-bearing structure, remove attachments, piping, and insulation.<\/li>\n<li>Dismantling of steel structures and plant components: segmentation with shears and tank cutters, handling of sections.<\/li>\n<li>Concrete demolition: selective removal with concrete pulverizers, splitting operations for massive foundations.<\/li>\n<li>Logistics: interim storage, removal, load distribution, use of cranes or hoisting systems.<\/li>\n<li>Sorting and recycling: steel, non-ferrous metals, concrete debris, linings; documentation of material streams.<\/li>\n<li>Completion: cleaning, flatness of surfaces, where applicable soil probing and clearances.<\/li>\n<li>Monitoring and reporting: vibration and dust measurements, noise management, daily briefings, and permit-to-work checks.<\/li>\n<li>Handover and records: final inspection, as-built documentation, and verified material flow balance.<\/li>\n<\/ol>\n<h2>Safety, emission reduction, and permitting aspects<\/h2>\n<p>Safety takes precedence. The basis is hazard analyses, isolation and clearance measurement concepts, structural verifications, and a coordinated communication and rescue plan. Measures for emission reduction include dust suppression (water mist), noise protection, and <em>low-vibration<\/em> methods. Hydraulic shears and <strong>hydraulic splitters<\/strong> avoid sparking and blasting effects and are therefore suitable for work in sensitive areas. Requirements from occupational safety, environmental, and waste legislation are observed project-specifically; details depend on the site and authorities.<\/p>\n<ul>\n<li>Define exclusion zones, traffic routes, and load limits with clear signage.<\/li>\n<li>Use collective and personal fall protection, edge protection, and safe access systems.<\/li>\n<li>Monitor dust, vibration, and noise; adjust methods and sequencing if thresholds are approached.<\/li>\n<li>Apply permit-to-work systems for hot work, confined spaces, and lifting operations.<\/li>\n<\/ul>\n<h2>Logistics in existing structures: confined spaces, floor load capacity, and removal<\/h2>\n<p>Boiler houses often offer only limited access and lifting options. Handheld, hydraulically operated tools from Darda GmbH enable work from the inside when large carrier machines cannot be used. Central <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power units<\/a><\/strong> supply concrete pulverizers, shears, and splitters via hoses &#8211; this reduces equipment weight in the work area and facilitates use on platforms or intermediate floors. Modular rigging, skates, stair climbers, and compact hoists help to bridge narrow routes while maintaining floor load limits and minimizing interference with adjacent operations.<\/p>\n<h3>Proven measures<\/h3>\n<ul>\n<li>Select segment sizes such that floor load capacities and transport route limits are maintained.<\/li>\n<li>Pre-segmentation: use concrete pulverizers and splitting cylinders to divide components into crane- or manually manageable pieces.<\/li>\n<li>Separate material streams spatially to avoid bottlenecks and promote single-grade purity.<\/li>\n<li>Fire and explosion protection: prioritize low-spark cutting and splitting methods, minimize ignition sources.<\/li>\n<li>Plan one-way traffic, staging areas, and intermediate buffers to maintain steady removal rates.<\/li>\n<li>Where necessary, use local extraction or negative-pressure enclosures for dust control in sensitive zones.<\/li>\n<\/ul>\n<h2>Material separation, recycling, and sustainability<\/h2>\n<p>The quality of material separation determines the recycling rate. Steel can be sent directly for recycling after shearing. Concrete is pre-broken by concrete pulverizers; massive foundations can be divided with <strong>hydraulic splitters<\/strong> into transportable pieces. Processed concrete rubble is often used as recycled construction material. Insulating materials and linings are collected separately and disposed of or recycled according to their properties. A documented material flow balance supports compliance with circular economy targets. Sampling and classification, verification of potential contaminants, and defined grain sizes for recycled aggregates contribute to stable quality and acceptance in subsequent uses.<\/p>\n<h2>Application examples from practice<\/h2>\n<p>In inner-city heating plants with adjacent operations, low-vibration and noise-reduced deconstruction is crucial: <strong>concrete pulverizers<\/strong> for wall and slab panels, splitting cylinders for foundation blocks, and low-spark shears for beams and pipelines. In industrial areas with fire loads, hydraulic cutting methods without flame or arc are advantageous. For the deconstruction of tall chimneys, the combination of sectional removal and controlled lowering has proven effective. In brownfield repowering projects with limited crane access, internal segmentation and controlled lowering via hoisting systems enable safe removal without impacting neighboring facilities.<\/p>\n<h2>Tool selection in boiler house demolition<\/h2>\n<p>The choice of equipment depends on component properties, access, and environmental constraints. The following Darda GmbH product groups are frequently used:<\/p>\n<ul>\n<li><strong>Concrete pulverizers<\/strong>: selective concrete removal, rebar cutting, pre-breaking for recycling<\/li>\n<li><strong>Hydraulic splitters<\/strong> \/ <strong>rock wedge splitters<\/strong>: low-vibration opening of massive components and foundations<\/li>\n<li><strong>Combi shears<\/strong> and <strong>multi cutters<\/strong>: mixed materials, profiles, sheets, pipelines<\/li>\n<li><strong>Steel shears<\/strong> and <strong>tank cutters<\/strong>: beams, boiler shells, vessels, pipelines<\/li>\n<li><strong>Hydraulic power packs<\/strong>: power supply for attachments and handheld tools in interior demolition<\/li>\n<\/ul>\n<h3>Criteria for the decision<\/h3>\n<ul>\n<li>Material and cross-section: member thickness, reinforcement level, steel grades<\/li>\n<li>Accessibility: workspace, contact points, visibility, and guidance<\/li>\n<li>Environmental constraints: noise, dust, vibrations, sparking<\/li>\n<li>Load-bearing capacity and transport: segment weight, lifting equipment, route guidance<\/li>\n<li>Surroundings: neighboring operations, fire protection requirements, proximity to utilities<\/li>\n<li>Operator ergonomics and reach with handheld hydraulic tools<\/li>\n<li>Permitting or client constraints on hot work, lifting windows, and working hours<\/li>\n<\/ul>\n<h2>Areas of application related to the boiler house<\/h2>\n<p>Boiler house demolition touches several fields of Darda GmbH: <strong><a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">concrete demolition and special deconstruction<\/a><\/strong> is at the forefront; <strong>strip-out and cutting<\/strong> describes the controlled separation of pipelines and steelwork; <strong>special operations<\/strong> includes work in tight, sensitive, or hazardous areas with high requirements for emission and fire protection. Depending on the location, interfaces with infrastructure, energy supply, and legacy installations must be taken into account. The approach is adapted to industrial, utility, and urban settings to safeguard operations and comply with site-specific requirements.<\/p>\n<h2>Planning and documentation<\/h2>\n<p>A robust deconstruction concept includes structural considerations for intermediate states, strengthening and shoring measures, utility isolation, emission protection, and waste management. Common are inspection and release protocols for separation points, clearance measurements, material flow evidence, and photo documentation. Legal requirements and permits must be clarified on a project-specific basis; close coordination with the client, specialist planners, and authorities is recommended.<\/p>\n<p>Modern planning tools and transparent documentation improve quality and predictability: survey and modeling (2D plans or point-cloud based models), clash and access checks, method statements with risk assessments, a permit matrix, schedule and lifting plans, and monitoring concepts for dust, vibration, and noise. Structured reporting with checklists and daily site logs supports compliance and traceability through to final acceptance.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Boiler house demolition refers to the orderly deconstruction of buildings and plant components in which steam boilers, hot-water or process heat systems were operated. Such structures are often made of massive reinforced concrete and steel, containing complex piping networks, vessels, chimneys, and machine foundations. Deconstruction requires a structured approach, low-emission <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/boiler-house-demolition\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19330","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Boiler House Demolition - Industrial Methods<\/title>\n<meta name=\"description\" content=\"Expert guidance for industrial boiler house demolition \u2713 safe, low vibration deconstruction, clean cuts &amp; recycling.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/boiler-house-demolition\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Boiler House Demolition - Industrial Methods\" \/>\n<meta property=\"og:description\" content=\"Expert guidance for industrial boiler house demolition \u2713 safe, low vibration deconstruction, clean cuts &amp; recycling.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/boiler-house-demolition\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-12T17:53:15+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/boiler-house-demolition\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/boiler-house-demolition\",\"name\":\"Boiler House Demolition - Industrial Methods\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-08-30T11:23:04+00:00\",\"dateModified\":\"2026-09-12T17:53:15+00:00\",\"description\":\"Expert guidance for industrial boiler house demolition \u2713 safe, low vibration deconstruction, clean cuts & recycling.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/boiler-house-demolition#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/boiler-house-demolition\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/boiler-house-demolition#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Boiler house demolition\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Boiler House Demolition - Industrial Methods","description":"Expert guidance for industrial boiler house demolition \u2713 safe, low vibration deconstruction, clean cuts & recycling.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/boiler-house-demolition","og_locale":"en_US","og_type":"article","og_title":"Boiler House Demolition - Industrial Methods","og_description":"Expert guidance for industrial boiler house demolition \u2713 safe, low vibration deconstruction, clean cuts & recycling.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/boiler-house-demolition","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-09-12T17:53:15+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/boiler-house-demolition","url":"https:\/\/www.darda.de\/en\/knowledge\/boiler-house-demolition","name":"Boiler House Demolition - Industrial Methods","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-08-30T11:23:04+00:00","dateModified":"2026-09-12T17:53:15+00:00","description":"Expert guidance for industrial boiler house demolition \u2713 safe, low vibration deconstruction, clean cuts & recycling.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/boiler-house-demolition#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/boiler-house-demolition"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/boiler-house-demolition#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Boiler house demolition"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19330","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19330"}],"version-history":[{"count":3,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19330\/revisions"}],"predecessor-version":[{"id":29313,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19330\/revisions\/29313"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19330"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}