{"id":19328,"date":"2025-08-30T15:07:16","date_gmt":"2025-08-30T13:07:16","guid":{"rendered":"https:\/\/www.darda.de\/core-extraction"},"modified":"2026-04-20T12:43:05","modified_gmt":"2026-04-20T10:43:05","slug":"core-extraction","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/core-extraction","title":{"rendered":"Core extraction"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Core extraction is a central method in structural diagnostics, controlled deconstruction, and geology. Cylindrical samples are taken from concrete, masonry, or rock to test material properties, locate embedded components, or create targeted openings. In practice, it often forms the basis for low-vibration workflows, for example in combination with <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a><\/strong> or for subsequent separation work with a <strong>concrete pulverizer<\/strong>. Precise sampling enables planned interventions, minimizes risks, and allows downstream processes in concrete demolition, building gutting, and rock engineering to be carried out in a coordinated manner. When embedded in a structured method statement and compliant with local requirements, coring supports predictable schedules, quality assurance, and cost control.<\/p>\n<h2>Definition: What is meant by core extraction?<\/h2>\n<p>Core extraction refers to the <em>targeted and documented recovery of cylindrical drill cores<\/em> from mineral building materials or rock, typically using diamond core bits. The core sample is removed, preserved, and prepared for testing or analysis. The resulting core hole can be used functionally\u2014for sampling, for service routing, as a starting point for hydraulic splitting, or for controlled enlargement with cutting or pressing tools. In everyday language it is often equated with core drilling; technically, however, it explicitly denotes the sampling process including securing and documentation of the core. Clear identification, chain-of-custody rules, and moisture control preserve the evidential value of the specimen.<\/p>\n<h2>Role of core extraction in deconstruction and structural diagnostics<\/h2>\n<p>Core extraction provides reliable information on the condition of concrete and natural stone while simultaneously creating precise core holes for subsequent work. In <strong>concrete demolition and special demolition<\/strong>, it enables assessment of compressive strength, microstructure, carbonation or chloride content, and exploration of reinforcement layouts. These findings influence the choice of the next tool\u2014for example, deciding between a <strong>concrete pulverizer<\/strong>, <strong>rock and concrete splitters<\/strong>, or cutting methods. In <strong>building gutting and cutting<\/strong> (see <a href=\"https:\/\/www.darda.de\/en\/applications\/core-removal-and-cutting\">core removal and cutting<\/a>), core extraction creates defined openings and starting points to segment building components into transportable pieces in a controlled manner. In <strong>rock excavation and tunnel construction<\/strong> as well as <strong>natural stone extraction<\/strong>, it serves geological characterization and the planning of split patterns. In <strong>special demolition<\/strong> with stringent requirements for emission control and low vibration, core extraction supports a safe, traceable approach. Complementary non-destructive locating techniques, such as cover meters or radar, can be combined with selective coring to verify assumptions and reduce rework.<\/p>\n<h2>Process: From drilling plan to specimen preparation<\/h2>\n<p>The quality of core extraction depends on systematic preparation and clean execution. Typical steps include:<\/p>\n<ul>\n<li><strong>Objective definition:<\/strong> Define test purpose and requirements (e.g., strength, chloride, thin section, petrographic analysis, visual inspection).<\/li>\n<li><strong>Locating and clearance:<\/strong> Detect reinforcement, utilities, and critical inserts; consider edge distances and member thicknesses.<\/li>\n<li><strong>Drilling method:<\/strong> Select wet or dry drilling, core diameter and depth; fixation via stand or guide.<\/li>\n<li><strong>Recovery and securing:<\/strong> Grip the core, labeling, moisture and edge protection; proper transport.<\/li>\n<li><strong>Documentation:<\/strong> Location, depth, orientation, water inflow, penetration rate, anomalies, and photo documentation.<\/li>\n<li><strong>Preparation:<\/strong> Cutting test specimens, producing plane-parallel ends, conditioning for tests.<\/li>\n<li><strong>Permits and coordination:<\/strong> Obtain access permits and align time windows with building operation or site logistics to minimize disruption.<\/li>\n<li><strong>Restoration and sealing:<\/strong> Where required, reinstate openings with suitable sleeves or repair mortars and ensure watertight sealing.<\/li>\n<\/ul>\n<h2>Tools and boundary conditions for core extraction<\/h2>\n<p>The choice of equipment is guided by material, structural condition, and objectives. Diamond core bits with matched segment design and cooling ensure <em>dimensionally accurate<\/em> sampling. While wet drilling reduces tool wear and binds fine dust, dry drilling is suitable for sensitive areas with restricted water use. The drilling stand ensures perpendicularity and precision. In heavily reinforced concrete, detecting the rebar layout is essential to limit core loss and equipment load. Depending on downstream processes, diameters are selected so that the core hole is usable <strong>for hydraulic wedge splitter<\/strong> or serves as a defined starter opening for subsequent separation tools. Stable feeds and consistent rotation avoid chipping and glazing of segments, improving repeatability.<\/p>\n<ul>\n<li><strong>Bit and bond selection:<\/strong> Match segment hardness and diamond concentration to aggregate hardness and expected reinforcement contact.<\/li>\n<li><strong>Machine parameters:<\/strong> Set spindle speed, feed rate, and downforce to the diameter and depth to maintain straightness.<\/li>\n<li><strong>Cooling and extraction:<\/strong> Ensure sufficient water flow or effective dust extraction with filters suited to mineral dust.<\/li>\n<\/ul>\n<h2>Core extraction as the basis for hydraulic splitting<\/h2>\n<p>For low-vibration methods in deconstruction and natural stone extraction, precisely fitting core holes are crucial. Core extraction produces such holes at exactly defined positions and in reproducible quality. Hydraulic <strong>rock and concrete splitters<\/strong>\u2014including <strong>rock wedge splitter<\/strong>\u2014use these core holes to introduce controlled tensile and splitting forces into the component. This results in fine cracks along calculated split patterns. The need for additional cuts decreases, and noise as well as vibration remain low. Especially in sensitive zones, for example in <strong>special demolition<\/strong> or <strong>tunnel construction<\/strong>, this combination is a robust option to loosen components gently and then remove them. Hole spacing, insertion depth, and the sequence of press cycles are planned in advance to manage crack propagation and maintain residual stability until removal.<\/p>\n<h2>After core extraction: Enlarging openings and separating components<\/h2>\n<p>Once the core sample has been removed, different subsequent steps are taken depending on the objective. In <strong>building gutting and cutting<\/strong> as well as in <strong>concrete demolition<\/strong>, openings are often enlarged in a controlled manner or components are separated in sections. A <strong>concrete pulverizer<\/strong> breaks edges and reduces cross-sections without sparks. <strong>Combination shears<\/strong> combine pressing and cutting operations on heterogeneous components. <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/multi-cutters\">Multi Cutters<\/a><\/strong> and <strong>steel shear<\/strong> cut exposed reinforcement, sections, or inserts. The required hydraulic power is supplied by <strong>hydraulic power pack<\/strong> that sequentially power different tools in a coordinated workflow. This creates a continuous, plannable process from sampling to segmented dismantling. Edge protection, shoring where necessary, and dust or slurry containment maintain safe conditions during enlargement.<\/p>\n<h2>Quality assurance: Tests on the core sample and evaluation<\/h2>\n<p>The significance of core extraction stands and falls with specimen integrity. Typical tests include compressive and splitting tensile strength, bulk density, water absorption, carbonation depth, chloride profile, microscopic microstructure analysis, and visual assessment of cracks, pores, and binders. For rock cores, petrographic description, discontinuities, strength, and degree of weathering are relevant. With clean documentation and unambiguous assignment of core sections, material zones can be delineated, which facilitates planning of split lines and jaw attack points. Results flow directly into the choice of <em>borehole spacing<\/em>, tool geometries, and load transfer during deconstruction. Consistent specimen preparation, conditioning, and statistical evaluation increase result reliability and allow confident decisions for subsequent work steps.<\/p>\n<h2>Planning in the context of application areas<\/h2>\n<h3>Concrete demolition and special demolition<\/h3>\n<p>Core extraction provides certainty on concrete grades, microstructure, and reinforcement layouts. This enables efficient and safe arrangement of separation cuts, jaw attack points, and split patterns. For thick components, a grid of core holes leads to controlled weakening before the <strong>concrete pulverizer<\/strong> breaks the remaining webs. Sequencing considers temporary support and permissible vibration to protect adjacent structures.<\/p>\n<h3>Building gutting and cutting<\/h3>\n<p>For service penetrations, anchor points, or starter openings, core extraction is a precise first step. Downstream, <strong>combination shears<\/strong> and <strong>Multi Cutters<\/strong> separate inserts while openings are gradually enlarged. In vibration or moisture sensitive environments, low-emission techniques and stepwise enlargement reduce collateral impact.<\/p>\n<h3>Rock excavation and tunnel construction<\/h3>\n<p>Drill cores provide geological information on strength, stratification, and jointing. From this, splitting strategies and borehole spacing are derived to deploy <strong>rock and concrete splitters<\/strong> efficiently\u2014with benefits for noise and vibration control. Orientation of discontinuities and observed weathering guide placement of wedges and alignment of split planes.<\/p>\n<h3>Natural stone extraction<\/h3>\n<p>Core extraction helps assess the quality and homogeneity of raw blocks. Core holes can serve directly as starting points for a <strong>rock wedge splitter<\/strong> to create separation planes along natural weaknesses. This increases predictability of block geometry and improves yield in subsequent processing.<\/p>\n<h3>Special demolition<\/h3>\n<p>In areas with increased requirements for dust, noise, and vibration control, the combination of core extraction, hydraulic splitting, and shear-based breaking enables a particularly controlled approach. Monitoring and documentation of emissions and vibrations underpin compliance in sensitive surroundings.<\/p>\n<h2>Technical details: Diameter, depth, and edge distances<\/h2>\n<p>The choice of core diameter is based on the test objective and planned reuse of the core hole. For test cores, diameters are selected to ensure adequate statistical confidence. If wedge splitters are to be used, system specifications are decisive; common diameters range from the lower centimeter range to the mid tens of millimeters. Drilling depth is oriented to the component thickness and the target depth for specimens or splitting. Edge distances consider reinforcement cover, risk of cracking, and the load-carrying function of remaining webs. Where cores are clustered, minimum web thicknesses between holes and to edges are maintained to avoid premature failure.<\/p>\n<h2>Wet and dry drilling, water and dust management<\/h2>\n<p>Wet drilling reduces tool wear and binds fine dust. The resulting water-slurry mixture is collected and disposed of in a controlled manner. Dry drilling is used where moisture must be avoided; effective dust extraction and personal protective equipment are then particularly important. Regardless of the method, a steady feed improves core quality and minimizes edge spalling. Closed-circuit slurry collectors or certified dust extraction with appropriate filtration improve cleanliness and help protect health.<\/p>\n<h2>Interfaces to hydraulic tools and power packs<\/h2>\n<p>After core extraction, the openings are often used immediately. A <strong>hydraulic power pack<\/strong> then supplies matching tools such as a <strong>concrete pulverizer<\/strong>, <strong>combination shears<\/strong>, <strong>Multi Cutters<\/strong>, and a <strong>steel shear<\/strong>. For targeted breaking of massive cross-sections, <strong>rock and concrete splitters<\/strong> as well as a <strong>rock wedge splitter<\/strong> are placed in prepared core holes. For metallic inserts or tanks, depending on the task, a <strong>steel shear<\/strong> or a <strong>tank cutter<\/strong> is used for defined separation cuts. Quick-change couplings, pressure monitoring, and coordinated hose routing streamline the sequence and reduce setup times.<\/p>\n<h2>Occupational safety and environmental protection<\/h2>\n<p>Safe core extraction considers secure fixation of the drilling equipment, fall protection, hearing and eye protection, and low-dust or low-slurry work. Fluids and drill cuttings are collected in a controlled manner. In sensitive environments, low-emission methods and the combination of core sampling and hydraulic splitting are advantageous. Good accessibility, clear communication, and separation of sampling and demolition areas increase safety. Additional measures include lockout of identified utilities, slip prevention when using water, and defined buffer zones for flying fragments.<\/p>\n<h2>Common sources of error and how to avoid them<\/h2>\n<ul>\n<li><strong>Insufficient locating:<\/strong> Unexpected reinforcement or utilities lead to core loss or damage. Scan in advance and adjust drilling points.<\/li>\n<li><strong>Incorrect tool choice:<\/strong> Inappropriate segment design or cooling reduces core quality. Match the tool to the material and drilling depth.<\/li>\n<li><strong>Unfavorable edge distances:<\/strong> Avoid spalling and cracks by observing minimum distances and the load-carrying function.<\/li>\n<li><strong>Lack of documentation:<\/strong> Without complete traceability, tests lose significance. Consistently label location and strata.<\/li>\n<li><strong>Unplanned downstream processes:<\/strong> Align core holes early with later use by wedge splitters or shears.<\/li>\n<li><strong>Overheating of the bit:<\/strong> Insufficient cooling or excessive feed can glaze segments and skew results. Adjust parameters and water flow.<\/li>\n<li><strong>Poor stand anchoring:<\/strong> Inadequate fixation causes ovalized holes and misalignment. Use suitable anchors and verify perpendicularity.<\/li>\n<\/ul>\n<h2>Documentation and evaluation for the process chain<\/h2>\n<p>Robust documentation includes drilling point location, depth, diameter, water inflow, special observations, photos, and unambiguous assignment of core sections. Test reports are linked with plans and the intended demolition or splitting concept. In this way, <em>drilling patterns<\/em>, split lines, <strong>concrete pulverizer<\/strong> attack faces, and cutting paths can be coordinated. Integration with digital plans or models and clear metadata for laboratory processing shorten feedback loops and improve decision quality.<\/p>\n<h2>Normative and organizational aspects<\/h2>\n<p>Recognized rules of technology and applicable standards govern planning, sampling, and testing. These define, among other things, requirements for sampling, specimen preparation, and result evaluation. The specific implementation must be planned project-specifically. Organizationally, a clear division of roles between sampling, testing, and deconstruction execution is sensible so that results immediately inform the selection of <strong>rock and concrete splitters<\/strong>, a <strong>concrete pulverizer<\/strong>, and complementary tools. Qualification of personnel, method statements, and acceptance criteria create a transparent framework from planning to handover.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Core extraction is a central method in structural diagnostics, controlled deconstruction, and geology. Cylindrical samples are taken from concrete, masonry, or rock to test material properties, locate embedded components, or create targeted openings. In practice, it often forms the basis for low-vibration workflows, for example in combination with hydraulic rock <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/core-extraction\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19328","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Core Extraction - Concrete Testing &amp; Rock Drilling<\/title>\n<meta name=\"description\" content=\"Guide to core extraction in construction and geology, drilling cylindrical cores for testing &amp; low-vibration demolition.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/core-extraction\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Core Extraction - Concrete Testing &amp; Rock Drilling\" \/>\n<meta property=\"og:description\" content=\"Guide to core extraction in construction and geology, drilling cylindrical cores for testing &amp; low-vibration demolition.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/core-extraction\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-20T10:43:05+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/core-extraction\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/core-extraction\",\"name\":\"Core Extraction - Concrete Testing & Rock Drilling\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-08-30T13:07:16+00:00\",\"dateModified\":\"2026-04-20T10:43:05+00:00\",\"description\":\"Guide to core extraction in construction and geology, drilling cylindrical cores for testing & low-vibration demolition.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/core-extraction#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/core-extraction\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/core-extraction#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Core extraction\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Core Extraction - Concrete Testing & Rock Drilling","description":"Guide to core extraction in construction and geology, drilling cylindrical cores for testing & low-vibration demolition.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/core-extraction","og_locale":"en_US","og_type":"article","og_title":"Core Extraction - Concrete Testing & Rock Drilling","og_description":"Guide to core extraction in construction and geology, drilling cylindrical cores for testing & low-vibration demolition.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/core-extraction","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-04-20T10:43:05+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/core-extraction","url":"https:\/\/www.darda.de\/en\/knowledge\/core-extraction","name":"Core Extraction - Concrete Testing & Rock Drilling","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-08-30T13:07:16+00:00","dateModified":"2026-04-20T10:43:05+00:00","description":"Guide to core extraction in construction and geology, drilling cylindrical cores for testing & low-vibration demolition.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/core-extraction#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/core-extraction"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/core-extraction#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Core extraction"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19328","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19328"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19328\/revisions"}],"predecessor-version":[{"id":26467,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19328\/revisions\/26467"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19328"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}