{"id":19315,"date":"2025-09-01T08:01:34","date_gmt":"2025-09-01T06:01:34","guid":{"rendered":"https:\/\/www.darda.de\/edge-demolition"},"modified":"2026-04-18T08:46:03","modified_gmt":"2026-04-18T06:46:03","slug":"edge-demolition","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/edge-demolition","title":{"rendered":"Edge demolition"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Edge demolition refers to the local breakout or spalling of edge zones on concrete and natural stone components. In professional concrete demolition, special deconstruction, interior demolition, rock excavation, and natural stone extraction, controlled handling of component edges significantly influences quality, safety, and efficiency. Those who understand and control edge demolition reduce damage to remaining structures, minimize rework, and purposefully steer brittle fracture processes. In practice, tools such as <strong>concrete pulverizers<\/strong>, <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">stone and concrete splitters<\/a><\/strong>, and <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">suitable hydraulic power units<\/a> are central, because the way force is introduced often decides whether an edge remains clean or breaks out unintentionally.<\/p>\n<p>In technical parlance, edge demolition is also described as <em>edge spalling<\/em>, <em>corner breakout<\/em>, or <em>edge chipping<\/em>. The term covers damage at free edges, corners, rebates, and openings where brittle fracture mechanisms dominate.<\/p>\n<h2>Definition: What is meant by edge demolition?<\/h2>\n<p>Edge demolition is the unwanted breakout of material at edges and corners, often accompanied by spalling, cracks, and chipping. Brittle materials such as concrete, masonry, and natural stone are primarily affected. Triggers include local tensile stresses and stress concentrations at changes in geometry, impact and shock loading, uneven load distribution, insufficient edge distances during drilling or splitting operations, and missing or unfavorable reinforcement layout. Edge demolition differs from surface-type damage in that the damage is concentrated in edge zones and often follows weaker matrix or component regions.<\/p>\n<ul>\n<li><strong>Typical indicators:<\/strong> feather-edged chips, wedge-shaped cones at corners, hairline cracks propagating from holes or recesses, and loose fragments along free edges.<\/li>\n<li><strong>Common locations:<\/strong> slab openings, upstands, parapets, rebates, column heads, block edges, and cut-outs near embedded items.<\/li>\n<\/ul>\n<h2>Formation and mechanisms of edge demolition<\/h2>\n<p>Edges are natural notches. Stresses rise there. In brittle materials this leads to spalling when the local tensile strength is exceeded. Causes include, among others:<\/p>\n<ul>\n<li>Notch effect at sharp corners, recesses, drill holes, and edges without a chamfer<\/li>\n<li>Impulsive force introduction (e.g., a jerky grab of a concrete pulverizer or an overly rapid pressure ramp of a hydraulic power pack)<\/li>\n<li>Edge distances too small when placing holes for stone splitting cylinders<\/li>\n<li>Unfavorable reinforcement position and low cover, which promotes breakout cones at the edges<\/li>\n<li>Free edges without counter-support (missing bearing, inadequate shoring, or a poorly sequenced demolition order)<\/li>\n<\/ul>\n<p>As a result, fracture cones, wedge-shaped breakouts, and chipping occur. Especially in controlled deconstruction, these phenomena must be limited to preserve connection faces, fair-faced concrete, load-bearing residual members, or natural stone blocks for further processing.<\/p>\n<p>Crack initiation typically starts at micro-defects and geometric discontinuities. Mixed-mode loading (tension, shear, bending) accelerates crack growth. <em>Pre-weakening<\/em> by scoring, relief cuts, or pre-crushing reduces stress peaks and stabilizes crack paths near edges.<\/p>\n<h2>Edge demolition in concrete demolition and special deconstruction<\/h2>\n<p>In selective deconstruction, edges often need to be preserved: openings are enlarged, components are separated, or surfaces are prepared for new connections. <strong>Concrete pulverizers<\/strong> are suitable for locally crushing concrete in a controlled manner. The key is a metered, stepwise removal of material progressing from the inside toward the edge. Sensitive pressure control via the hydraulic power pack, choosing an appropriate jaw geometry, and a consistent demolition sequence reduce shock impulses and minimize unintended spalling. Combination shears and <a href=\"https:\/\/www.darda.de\/en\/product-overview\/multi-cutters\">Multi Cutters<\/a> separate embedded items and reinforcement to avoid restraint stresses at edges.<\/p>\n<p>Where admissible, preliminary <em>relief cuts<\/em> or light scoring of the surface near the intended separation line can confine breakouts. Pre-exposing and decoupling fixtures reduces unintended load transfer into edge zones.<\/p>\n<h3>Typical scenarios<\/h3>\n<ul>\n<li>Creating ceiling openings: first relief cuts or pre-crushing, then approach the edge with short, controlled jaw bites.<\/li>\n<li>Demolishing upstands and parapets: sequential layer-by-layer removal, shoring of free edge regions, final chamfering.<\/li>\n<li>Selective deconstruction of column heads: expose and cut reinforcement in advance to avoid edge breakout cones.<\/li>\n<li>Wall openings near finishes: isolate finishes and baseboards, introduce backing boards as sacrificial protection along edges.<\/li>\n<li>Joint preparation for new connections: dress the edge to a defined chamfer or radius to reduce notch effects in subsequent loading.<\/li>\n<\/ul>\n<h2>Edge demolition in rock excavation and natural stone extraction<\/h2>\n<p>In rock and natural stone extraction, brittle fracture is used deliberately. <strong>Stone and concrete splitters<\/strong> as well as stone splitting cylinders generate splitting forces in the drill hole. Proximity to a free edge increases the risk of uncontrolled edge breakouts. Therefore, suitable drilling patterns, hole spacing, and minimum edge distances are critical. The splitting direction should take natural bedding, joint systems, and disturbance zones into account. This guides fracture surfaces and defines edges without producing unwanted breakouts.<\/p>\n<h3>Practical hints<\/h3>\n<ul>\n<li>Plan the drilling pattern: uniform spacing, sufficient edge distances; splitting lines parallel to free edges only with a safety margin.<\/li>\n<li>Increase pressure build-up moderately: raise the splitting force step by step; acoustic and visual monitoring of crack propagation.<\/li>\n<li>Pre-break and follow through: release on the inside first, then work toward the edge; after release, rework and chamfer edges if necessary.<\/li>\n<li>Align with geology: where bedding or foliation is present, steer the split parallel to these features to stabilize edges.<\/li>\n<\/ul>\n<h2>Tools and equipment overview &#8211; influence on edges<\/h2>\n<p>Different tools influence edges in different ways. From the perspective of edge demolition, the mode of force introduction is decisive:<\/p>\n<ul>\n<li><strong>Concrete pulverizers<\/strong>: localized crushing with compressive and wedge action; well-dosable, suitable for work near edges with careful handling.<\/li>\n<li><strong>Stone and concrete splitters<\/strong> and stone splitting cylinders: generate internal tensile stresses along the split line; require correct drilling and edge distances.<\/li>\n<li>Combination shears and multi cutters: separate reinforcement, sections, and embedded items to relieve restraint before breaking near edges.<\/li>\n<li>Steel shears: for steel-only cuts; in deconstruction they reduce composite stresses that could promote edge demolition.<\/li>\n<li>Tank cutters: relevant for hollow bodies and vessels; clean cutting sequences can protect surrounding edges.<\/li>\n<li>Hydraulic power packs: adjustable pressure and flow supply enables <em>sensitive<\/em> work at component edges.<\/li>\n<\/ul>\n<p><strong>Selection criteria for edge-sensitive work:<\/strong> jaw geometry and mass inertia, response time of hydraulics, controllability of pressure ramps, and compatibility of tool-flow requirements with the power pack.<\/p>\n<h2>Practice guide: How professionals minimize edge demolition with concrete pulverizers<\/h2>\n<p>A structured procedure reduces edge breakouts and rework:<\/p>\n<ol>\n<li>Preparation: mark the edge, identify visible cracks and voids, shore the member in sections.<\/li>\n<li>Relieve: decouple reinforcement, embedded parts, and adjacent components (cut\/separate) to minimize restraint stresses.<\/li>\n<li>Positioning: place the jaws first in the core, use short strokes, relocate the point of force introduction repeatedly, do not start directly at the free edge.<\/li>\n<li>Pressure control: build pressure in steps, avoid peak loads; heed acoustic cues and material response.<\/li>\n<li>Sequence: work from inside to outside, leave the edge for last; adapt the approach if signs of breakout appear.<\/li>\n<li>Rework: chamfer edges and remove loose pieces to prevent later spalling.<\/li>\n<\/ol>\n<ul>\n<li><strong>Note:<\/strong> brief pauses between cycles dissipate dynamic effects and help prevent cumulative shock at fragile edges.<\/li>\n<\/ul>\n<h2>Fields of application and typical requirements<\/h2>\n<p>Edges play a special role in almost all application areas:<\/p>\n<ul>\n<li>Concrete demolition and special deconstruction: preservation of connection edges, protection of adjacent components, clean separation joints.<\/li>\n<li>Interior demolition and cutting: edge-near openings, cutouts, and grooves without damaging the existing structure.<\/li>\n<li>Rock excavation and tunnel construction: controlled exposure, avoidance of loose flakes at the tunnel face and bench.<\/li>\n<li>Natural stone extraction: dimensionally accurate blocks with defined edges, minimizing scrap.<\/li>\n<li>Special deployments: work in sensitive environments with strict limits on vibration, flying chips, and dust.<\/li>\n<li>Heritage and retrofit contexts: safeguarding historic finishes and maintaining specified edge geometries for later detailing.<\/li>\n<\/ul>\n<h2>Planning, structural analysis, and boundary conditions<\/h2>\n<p>Edge regions require special attention. Before any intervention, supports, load paths, and shoring must be checked. Free edges should be secured against accidental break-off. Where reinforcement stabilizes edges, cutting it beforehand can change fracture paths &#8211; this must be considered in the demolition sequence. Specifications for minimum edge distances, drill diameters, splitting forces, and member thicknesses serve as technical guardrails and must be adapted to the specific site situation. Statements on standards and guidelines can only be general; in case of doubt, project-specific requirements prevail.<\/p>\n<ul>\n<li>Clarify load transfer and temporary states: consider construction stages and redistribution during partial removal.<\/li>\n<li>Define minimum edge distances and hole patterns in a method statement; verify on site before drilling.<\/li>\n<li>Coordinate interfaces: sequence of cutting, splitting, and crushing to avoid unintended restraint.<\/li>\n<li>Plan protection: sacrificial strips, catcher nets, and covers to shield vulnerable edge zones.<\/li>\n<\/ul>\n<h2>Quality assurance and rework<\/h2>\n<p>Edges are evaluated visually and dimensionally. Criteria include straightness, size of spalls, surface quality, and flatness. Where edges remain visible or serve as bearings, tolerances must be observed. Rework includes chamfering, reprofiling with suitable mortars, smoothing, and densifying the edge zone. Documentation through photos, sketches, and inspection records facilitates acceptance and later verification.<\/p>\n<ul>\n<li><strong>Acceptance focus:<\/strong> continuity of the edge line, absence of loose particles, consistent chamfer or radius where specified.<\/li>\n<li><strong>Documentation:<\/strong> define reference photos and checklists; record tool settings for repeatability.<\/li>\n<\/ul>\n<h2>Safety and environmental protection near edge work<\/h2>\n<p>Edge breakouts can lead to falling parts and flying chips. Protective measures include barricades, catch devices, personal protective equipment, dust and noise reduction, and steady, reproducible machine operation. Controlled, stepwise pressure build-up via the hydraulic power pack reduces the risk of shock-like events. Applicable occupational safety rules and local regulations must be observed.<\/p>\n<ul>\n<li>Set up exclusion zones with clear sightlines; use spotters where visibility is restricted.<\/li>\n<li>Employ wet methods or extraction to limit airborne fines near fragile edges.<\/li>\n<\/ul>\n<h2>Typical errors and how to avoid them<\/h2>\n<ol>\n<li>Starting directly at the free edge: better to work from the core toward the edge.<\/li>\n<li>Pressure increased too quickly: increase in small steps, observe material response.<\/li>\n<li>Inadequate shoring: secure and relieve edge regions before intervention.<\/li>\n<li>Incorrect drilling pattern for splitting: choose uniform spacing and sufficient edge distances.<\/li>\n<li>Ignoring reinforcement: expose and cut reinforcement in time to avoid restraint stresses.<\/li>\n<li>No post-treatment: chamfer edges and remove loose material to prevent secondary breakouts.<\/li>\n<li>No test bite on representative material: perform a short trial sequence to calibrate tool settings.<\/li>\n<\/ol>\n<h2>Material and geometry influence<\/h2>\n<p>High strengths, low toughness, and sharp corners favor edge demolition. Chamfers, radii, and targeted preparatory work reduce notch effects. Moisture, temperature, and existing pre-damage (cracks, voids, corrosion) change fracture behavior. In natural stone, bedding and joints influence fracture lines; in concrete, aggregates, matrix, and reinforcement layout play a role.<\/p>\n<ul>\n<li><strong>Edge preparation:<\/strong> introduce small chamfers or radii before major loads act on edges.<\/li>\n<li><strong>Conditioning:<\/strong> assess moisture and temperature where they significantly affect brittleness.<\/li>\n<\/ul>\n<h2>Inspecting and assessing edges<\/h2>\n<p>In practice, simple means are often sufficient: visual inspection, tapping, dimensional checks with straightedge and wedge gauge, and, if necessary, photo documentation. For higher requirements, supplementary tests can be added. These should be selected case by case and should not further damage the edge zone.<\/p>\n<ul>\n<li>Advanced methods where justified: dye penetrant on fine cracks, light microscopy of fracture surfaces, or non-destructive pulse methods to detect hidden delamination near edges.<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Edge demolition refers to the local breakout or spalling of edge zones on concrete and natural stone components. In professional concrete demolition, special deconstruction, interior demolition, rock excavation, and natural stone extraction, controlled handling of component edges significantly influences quality, safety, and efficiency. Those who understand and control edge demolition <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/edge-demolition\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19315","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Edge Demolition in Concrete, Masonry &amp; Stone<\/title>\n<meta name=\"description\" content=\"Prevent edge spalling in concrete and stone with tips on edge demolition \u2713 tools, hole spacing &amp; pressure control.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/edge-demolition\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Edge Demolition in Concrete, Masonry &amp; Stone\" \/>\n<meta property=\"og:description\" content=\"Prevent edge spalling in concrete and stone with tips on edge demolition \u2713 tools, hole spacing &amp; pressure control.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/edge-demolition\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-18T06:46:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/edge-demolition\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/edge-demolition\",\"name\":\"Edge Demolition in Concrete, Masonry & Stone\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-09-01T06:01:34+00:00\",\"dateModified\":\"2026-04-18T06:46:03+00:00\",\"description\":\"Prevent edge spalling in concrete and stone with tips on edge demolition \u2713 tools, hole spacing & pressure control.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/edge-demolition#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/edge-demolition\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/edge-demolition#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Edge demolition\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Edge Demolition in Concrete, Masonry & Stone","description":"Prevent edge spalling in concrete and stone with tips on edge demolition \u2713 tools, hole spacing & pressure control.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/edge-demolition","og_locale":"en_US","og_type":"article","og_title":"Edge Demolition in Concrete, Masonry & Stone","og_description":"Prevent edge spalling in concrete and stone with tips on edge demolition \u2713 tools, hole spacing & pressure control.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/edge-demolition","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-04-18T06:46:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/edge-demolition","url":"https:\/\/www.darda.de\/en\/knowledge\/edge-demolition","name":"Edge Demolition in Concrete, Masonry & Stone","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-09-01T06:01:34+00:00","dateModified":"2026-04-18T06:46:03+00:00","description":"Prevent edge spalling in concrete and stone with tips on edge demolition \u2713 tools, hole spacing & pressure control.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/edge-demolition#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/edge-demolition"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/edge-demolition#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Edge demolition"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19315","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19315"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19315\/revisions"}],"predecessor-version":[{"id":26414,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19315\/revisions\/26414"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19315"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}