{"id":19314,"date":"2025-09-01T16:13:52","date_gmt":"2025-09-01T14:13:52","guid":{"rendered":"https:\/\/www.darda.de\/sewer-cut"},"modified":"2026-04-18T14:24:03","modified_gmt":"2026-04-18T12:24:03","slug":"sewer-cut","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/sewer-cut","title":{"rendered":"Sewer cut"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>The term <strong>sewer cut<\/strong> describes the targeted opening, widening, or creation of a narrow trench in existing structures, traffic surfaces, or natural ground in order to lay, repair, or document utilities, sewer lines, or cable routes. In existing structures, the sewer cut often involves concrete slabs, reinforced concrete floors, foundation zones, or asphalt build-ups. In these situations, selective demolition and splitting methods are used, in which tools such as <a href=\"https:\/\/www.darda.de\/en\/product-overview\/concrete-crushers\">concrete crushers<\/a> and <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a> from Darda GmbH play a central role due to their controlled, low-vibration mode of operation. Clean interfaces, limited disturbance to adjacent elements, and verifiable geometry are key characteristics of a professionally executed sewer cut.<\/p>\n<h2>Definition: What is meant by a sewer cut?<\/h2>\n<p>Sewer cut refers to the construction or deconstruction measure of linearly separating and locally opening an existing surface or building structure to make a sewer or utility shaft accessible, to create a new utility corridor, or to investigate cross-sections and bearings. Depending on the task, the sewer cut includes saw-cutting and removal of surface layers, breaking and reducing concrete and masonry zones, splitting rock or massive concrete bodies, as well as securing the resulting trench. In urban environments, the focus is often on low-vibration methods with low noise and dust generation to protect the neighborhood and sensitive existing structures.<\/p>\n<ul>\n<li><strong>Typical objectives:<\/strong> Access for tie-ins and house connections, exposure for condition assessment, creation of new routes for utilities, and preparation for rehabilitation measures.<\/li>\n<li><strong>Deliverables:<\/strong> Defined widths and depths, stable trench faces, and documented conditions of surfaces and subsoil for subsequent construction stages.<\/li>\n<\/ul>\n<h2>Function and fields of application of the sewer cut<\/h2>\n<p>The sewer cut serves the new construction and conversion of sewers, site servicing, repair of defective utilities, troubleshooting and locating in existing stock, as well as the deconstruction of redundant sewer sections. It connects civil engineering, concrete demolition, and strip-out: asphalt and concrete layers are opened, reinforced concrete is selectively reduced, reinforcement and built-in components are separated, and the ground is exposed for utility routing. Where blasting or large hydraulic breakers are excluded for structural or urban reasons, concrete crushers and rock and concrete splitters from Darda GmbH enable precise interventions with high dimensional control and limited vibrations-such as opening manhole heads, notching out foundation ribs, or creating slender utility trenches in densely built areas. The result is targeted intervention with minimized collateral damage and predictable progress.<\/p>\n<h2>Areas of use: From concrete demolition to rock<\/h2>\n<p>Sewer cuts occur at different project phases and tie into several areas of use:<\/p>\n<ul>\n<li><strong><a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">Concrete demolition and specialized deconstruction<\/a>:<\/strong> Opening concrete floors and slabs for utility routing, demolition of shaft walls, deconstruction of channels in existing buildings and industrial facilities; precise removal preserves adjacent finishes and built-ins.<\/li>\n<li><strong>Strip-out and cutting:<\/strong> Selective removal of concrete webs, parapets, and foundation ribs for new utility corridors in interior works and refurbishments, including staged cuts in confined spaces.<\/li>\n<li><strong>Rock demolition and tunneling:<\/strong> Narrow trenches or widenings in rocky subsoil, produced with low vibration by rock and concrete splitters, with controlled advance and minimal overbreak.<\/li>\n<li><strong>Natural stone extraction:<\/strong> Targeted splitting of hard rock along routes that pass through exposed bedrock to open the corridor without large-scale blasting.<\/li>\n<li><strong>Special operations:<\/strong> Work under confined or sensitive conditions, for example in hospitals, laboratories, listed structures, or near vibration-sensitive equipment, with tailored dust and noise control.<\/li>\n<\/ul>\n<h2>Typical sequence of a sewer cut in existing stock<\/h2>\n<ol>\n<li><strong>Pre-investigation and locating:<\/strong> Collection of as-built drawings, utility locating, trial pits, assessment of subsoil, groundwater, and the load-bearing behavior of adjacent structural elements. If required, non-destructive testing and gas measurements are included.<\/li>\n<li><strong>Planning the cut alignment:<\/strong> Defining width, depth, route alignment, construction stages, and shoring; selection of the method (cutting, crusher, splitting, drilling). Interfaces with traffic management and building operations are coordinated.<\/li>\n<li><strong>Opening the surface:<\/strong> Saw cuts in asphalt and concrete, followed by lifting out the panels; in reinforced concrete, selective nibbling with concrete crushers. Edge protection and debris control are implemented.<\/li>\n<li><strong>Removal and extraction:<\/strong> Reducing load-bearing areas in clearly defined segments; separating reinforcement with steel shears or Multi Cutters; securing the trench. Material is sorted at source for recycling.<\/li>\n<li><strong>Excavation support and dewatering:<\/strong> Temporary shoring, and if necessary sump pumps and filtration devices to ensure dry work spaces. Monitoring of trench stability and water inflow is continuous.<\/li>\n<li><strong>Utility installation or rehabilitation:<\/strong> Laying, connecting, or replacing pipes and shafts; control of gradient and elevations. Bedding and pipe zone are executed to specification.<\/li>\n<li><strong>Backfilling and closure:<\/strong> Layered placement of backfill material, compaction, restoration of the surface, and joint sealing. Final acceptance includes geometry checks and documentation.<\/li>\n<\/ol>\n<h2>Tools and methods for precise sewer cuts<\/h2>\n<h3>Concrete crushers in selective deconstruction<\/h3>\n<p>Concrete crushers from Darda GmbH enable controlled nibbling of reinforced concrete with minimal edge damage. They are suitable for creating openings along a defined sewer cut alignment, exposing reinforcement, and removing built-ins (e.g., inlets, supports). Through step-by-step reduction, cross-sections can be maintained with precision, which is especially important in existing slabs and tight shaft areas. Their targeted force application supports low-emission work phases and repeatable results.<\/p>\n<h3>Rock and concrete splitters in soil and rock<\/h3>\n<p>Rock and concrete splitters generate splitting forces in the drill hole and separate massive components or rock bodies without impact and without explosives. They are advantageous for sewer cuts in sensitive zones where vibrations and noise must be minimized. Typical applications include widenings in a rock trench, opening thick foundation zones, or controlled releasing of block stones in the utility trench. The method preserves surrounding fabric and reduces the risk of settlement-induced damage.<\/p>\n<h3>Hydraulic power packs as the power source<\/h3>\n<p>Hydraulic power packs from Darda GmbH supply concrete crushers, splitters, and other hydraulic attachments. A harmonized hydraulic supply supports constant working speed, reduces downtime, and enables reproducible results, particularly in repetitive work along long routes. Flow- and pressure-stable operation improves tool efficiency and process reliability.<\/p>\n<h3>Combination shears, Multi Cutters, and steel shears<\/h3>\n<p>Reinforcing steels, reinforcements, and cast-iron or steel pipes frequently occur during a sewer cut. Combination shears and steel shears cut metallic built-ins, while Multi Cutters can be used for different material combinations (metal, plastic, composite). This allows residual lines and reinforcement to be cleanly separated before continuing the trench. Defined cutting sequences reduce sparks and protect adjacent installations.<\/p>\n<h2>Subsoil, water, and shoring in the sewer cut<\/h2>\n<p>The bearing capacity and behavior of the subsoil significantly influence the sewer cut. In cohesive soils, trench walls often stand steeper, while sands and gravels tend to run in. At high groundwater levels, dewatering and filtration measures must be provided. Temporary shoring secures the trench walls, protects the workforce, and prevents settlements at adjacent structures. Low-vibration methods such as splitting or crusher-based demolition reduce the risk of crack formation in neighboring structures. Soil classification, surcharge loads, and traffic-induced vibrations are factored into shoring design and monitoring.<\/p>\n<h2>Quality, dimensional accuracy, and documentation<\/h2>\n<p>A precise sewer cut follows defined widths, depths, and gradients. Dimensional checks are carried out with leveling instruments and lasers; accompanying photo documentation and logs ensure traceability. During deconstruction, the material flow is documented to increase recycling rates and keep disposal routes transparent. Clean cut edges, controlled fracture surfaces, and a targeted sequence of cutting, reducing, and splitting support quality assurance. Checklists, hold points, and as-built records create verifiable compliance with specifications.<\/p>\n<h2>Minimizing emissions: vibration, noise, and dust<\/h2>\n<p>Emissions must be limited especially in inner-city areas. Compared with percussive methods, concrete crushers and rock and concrete splitters cause lower vibrations. In addition, dust-binding measures such as water mist, localized extraction, and a coordinated work sequence help. Careful planning of working hours can further reduce noise exposure. Enclosures, negative-pressure zones, and equipment selection with low sound power levels complement the mitigation strategy.<\/p>\n<h2>Occupational safety and organizational aspects<\/h2>\n<p>Safe sewer cuts require protected work areas, suitable personal protective equipment, clear communication paths, and continuous monitoring of trench walls. Barricading and traffic routing must be planned at an early stage. Notes on protective measures and permissible work practices are always to be understood in general terms and do not replace an individual hazard analysis. Where confined-space conditions or hazardous atmospheres are possible, gas monitoring, rescue concepts, and training are integral to the method statement.<\/p>\n<h2>Alternative methods and distinctions<\/h2>\n<p>In addition to the classic sewer cut, trenchless techniques (e.g., guided drilling, relining) are used when surfaces are not to be opened. Nevertheless, sewer cuts remain indispensable, for example for tie-ins, house connections, spot exposures, rehabilitation work on shafts, or investigative cuts. In reinforced concrete and natural stone, the material, component thickness, and environment determine whether cutting, crusher-based demolition, splitting, or a combination provides the best solution. The selection prioritizes structural safety, access constraints, and lifecycle performance of the restored surface.<\/p>\n<h2>Material flow, disposal, and recycling<\/h2>\n<p>Sewer cuts generate mineral fractions (concrete, masonry, asphalt) as well as metal constituents from reinforcement or pipelines. Separate collection facilitates recycling into recycled construction material (RC material) or returning material to base layers. Cleanly separated material streams improve recovery and reduce disposal costs. Suitable testing and disposal routes must be provided for potentially contaminated materials. Waste documentation, transport logistics, and acceptance criteria at recycling facilities are defined before work starts.<\/p>\n<h2>Avoiding common sources of error<\/h2>\n<ul>\n<li><em>Insufficient locating:<\/em> Undetected utilities lead to delays and risks.<\/li>\n<li><em>Missing shoring:<\/em> Underestimated ground conditions can lead to collapses and settlements.<\/li>\n<li><em>Unclear load transfer:<\/em> Interventions in load-bearing components without a structural concept endanger the existing structure.<\/li>\n<li><em>Uncoordinated material flow:<\/em> Mixed demolition fractions complicate recycling and documentation.<\/li>\n<li><em>Excessive vibrations:<\/em> Incorrect methods or tools increase the potential for damage; concrete crushers and splitters have a mitigating effect here.<\/li>\n<li><em>Inadequate groundwater management:<\/em> Missing dewatering or filtration concepts jeopardize stability and cleanliness of the work area.<\/li>\n<\/ul>\n<h2>Practice-oriented selection of equipment<\/h2>\n<p>The choice of equipment depends on component thickness, degree of reinforcement, space constraints, and environmental requirements. Concrete crushers are predestined for selective openings in reinforced concrete with controlled force application. Rock and concrete splitters offer advantages for massive cross-sections and in rock when vibrations must be limited. Hydraulic power packs ensure constant energy supply, while steel shears and Multi Cutters efficiently separate built-ins and utilities. Availability, access routes, and disposal logistics complete the decision matrix.<\/p>\n<h2>Planning steps for an economical sewer cut<\/h2>\n<ol>\n<li>As-built survey and utility locating, including trial pits at critical points. Results are recorded and reconciled with existing plans.<\/li>\n<li>Definition of route alignment, cut widths and depths, and construction stages. Interfaces with structures, traffic, and operations are considered.<\/li>\n<li>Method selection with a focus on vibrations, emissions, and dimensional accuracy. Tooling, power supply, and sequence are determined.<\/li>\n<li>Definition of shoring and dewatering measures and the logistics for haulage and recycling. Access, storage, and interim protection are planned.<\/li>\n<li>Coordination with neighbors and organization of closures as well as supply chains. Permits, inspection hold points, and communication channels are fixed.<\/li>\n<\/ol>\n<h2>Conclusion on the sewer cut as a precise civil engineering and deconstruction method<\/h2>\n<p>The sewer cut is a multifaceted method at the interface of civil engineering, concrete demolition, and utility construction. Its quality determines schedule reliability, costs, and the durability of the subsequent utility works. Tools from Darda GmbH such as concrete crushers and rock and concrete splitters support precise, low-emission, and reproducible results-especially where dimensional accuracy, low vibrations, and controlled interventions in existing structures are required. Careful planning, suitable methods, and consistent documentation are decisive for technical success and cost efficiency.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The term sewer cut describes the targeted opening, widening, or creation of a narrow trench in existing structures, traffic surfaces, or natural ground in order to lay, repair, or document utilities, sewer lines, or cable routes. In existing structures, the sewer cut often involves concrete slabs, reinforced concrete floors, foundation <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/sewer-cut\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19314","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Sewer Cut - Civil Engineering Utility Trench<\/title>\n<meta name=\"description\" content=\"Learn how a sewer cut enables precise utility trenching with low vibration &amp; noise \u2713 ideal for urban civil engineering.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/sewer-cut\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Sewer Cut - Civil Engineering Utility Trench\" \/>\n<meta property=\"og:description\" content=\"Learn how a sewer cut enables precise utility trenching with low vibration &amp; noise \u2713 ideal for urban civil engineering.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/sewer-cut\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-18T12:24:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/sewer-cut\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/sewer-cut\",\"name\":\"Sewer Cut - Civil Engineering Utility Trench\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-09-01T14:13:52+00:00\",\"dateModified\":\"2026-04-18T12:24:03+00:00\",\"description\":\"Learn how a sewer cut enables precise utility trenching with low vibration & noise \u2713 ideal for urban civil engineering.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/sewer-cut#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/sewer-cut\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/sewer-cut#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Sewer cut\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Sewer Cut - Civil Engineering Utility Trench","description":"Learn how a sewer cut enables precise utility trenching with low vibration & noise \u2713 ideal for urban civil engineering.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/sewer-cut","og_locale":"en_US","og_type":"article","og_title":"Sewer Cut - Civil Engineering Utility Trench","og_description":"Learn how a sewer cut enables precise utility trenching with low vibration & noise \u2713 ideal for urban civil engineering.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/sewer-cut","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-04-18T12:24:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/sewer-cut","url":"https:\/\/www.darda.de\/en\/knowledge\/sewer-cut","name":"Sewer Cut - Civil Engineering Utility Trench","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-09-01T14:13:52+00:00","dateModified":"2026-04-18T12:24:03+00:00","description":"Learn how a sewer cut enables precise utility trenching with low vibration & noise \u2713 ideal for urban civil engineering.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/sewer-cut#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/sewer-cut"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/sewer-cut#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Sewer cut"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19314","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19314"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19314\/revisions"}],"predecessor-version":[{"id":26432,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19314\/revisions\/26432"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19314"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}