{"id":19307,"date":"2025-09-04T14:24:38","date_gmt":"2025-09-04T12:24:38","guid":{"rendered":"https:\/\/www.darda.de\/cable-shaft"},"modified":"2026-04-18T13:38:02","modified_gmt":"2026-04-18T11:38:02","slug":"cable-shaft","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/cable-shaft","title":{"rendered":"Cable shaft"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>A cable shaft is a central component of underground infrastructure. It serves the safe accommodation, routing, distribution, and maintenance of power and data lines in cities, industrial plants, transportation structures, and tunnels. From an engineering perspective, the cable shaft combines aspects of civil engineering (underground works) and concrete construction with sophisticated equipment technology. For new construction, refurbishment, or deconstruction, precise, low-vibration methods are required &#8211; especially in confined areas. This is where applications come into play that are implemented with <strong>concrete pulverizers<\/strong> or <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a><\/strong>, as used in concrete demolition, special demolition, or tunnel construction. In practice, cable shafts are also referred to as utility manholes or access chambers, providing durable interfaces for installation and maintenance with minimal impact on surrounding structures.<\/p>\n<h2>Definition: What is meant by a cable shaft?<\/h2>\n<p>A cable shaft is generally understood to be a predominantly underground, permanently accessible structure that accommodates, connects, branches, or makes lines (e.g., power, control cables, fiber optics) accessible for inspection and maintenance. Typical designs consist of precast reinforced concrete elements or cast-in-place concrete; in special cases, polymer-concrete or plastic shafts are used. The shaft is accessible at street level via a cover or frame, features defined cable penetrations, and provides space for splices, reserve cables, and fastening elements. It differs from cable ducts or cable trays in that it serves as a node or pulling point, is often walkable or at least enterable, and is specifically designed for installation and maintenance work. In many regions, terms such as <em>splice chamber<\/em> or <em>utility vault<\/em> are used synonymously, with geometry, load class, and accessibility adapted to the network architecture.<\/p>\n<h2>Structure and components of a cable shaft<\/h2>\n<p>A cable shaft consists of the shaft body, the cover, and the function-relevant fittings. Design and dimensions are based on load assumptions (e.g., traffic areas), on the number and size of the lines to be routed, and on environmental and watertightness requirements. Walk-in versions additionally require steps, platforms, and safe access geometry. In areas with a high groundwater level or hydrostatic pressure, pressure-tight penetrations and sealing systems are used. Where regulatory frameworks require it, load-bearing components and covers are selected according to the applicable load classes and corrosion-exposure categories.<\/p>\n<ul>\n<li>Shaft body: cast-in-place concrete or precast reinforced concrete; alternatively polymer concrete\/plastic in special applications<\/li>\n<li>Cover: frame with cover (load classes according to traffic loads), optionally ventilated<\/li>\n<li>Cable penetrations: core drilling with compression seals, conduits, sleeves<\/li>\n<li>Fittings: splice supports, cable holders, support rails, grounding points<\/li>\n<li>Shaft floor: slope or sump for drainage; drainage connection if applicable<\/li>\n<li>Corrosion protection: concrete cover, coatings, stainless-steel components in aggressive environments<\/li>\n<li>Identification and labeling: durable labels for circuits, splice locations, and routing directions<\/li>\n<li>Monitoring and control: optional sensors for water level, gas accumulation, or unauthorized opening<\/li>\n<\/ul>\n<h2>Planning, construction, and installation<\/h2>\n<p>Planning a cable shaft starts with determining the line requirements, the environmental conditions, and accessibility. Construction method, dimensions, and materials are chosen so that installation, operation, inspection, and later expansion are smooth. Early coordination with utility owners, traffic authorities, and neighboring projects reduces interfaces and rework; digital coordination models support clash detection and future capacity planning.<\/p>\n<h3>Site selection and surveying<\/h3>\n<p>Existing utilities, traffic loads, and geotechnical boundary conditions determine location and depth. In densely built-up areas, compact footprints, clear cable routes, and short pulling lengths are advantageous. Utility mapping, ground-penetrating radar, and precise surveying minimize the risk of clashes and help to position penetrations with the required minimum bend radii.<\/p>\n<h3>Construction in the ground<\/h3>\n<p>The excavation pit is secured, the ground is improved, and the foundation base is prepared to be stable. Precast units are set, or cast-in-place concrete is placed in formwork. Uniform, low-settlement bedding is crucial for the durability of frame and cover. Depending on groundwater and soil conditions, dewatering, frost protection, and compaction control are planned; bearing capacity and level tolerances of seating surfaces are verified before cover installation.<\/p>\n<h3>Installation of penetrations and sealing<\/h3>\n<p>Core drilling and conduits are arranged to ensure minimum bend radii and separate routing of power and data cables. Compression seals ensure watertightness. With groundwater, additional sealing concepts must be provided. Separation of functional areas, earthing concepts, and strain relief are coordinated so that electromagnetic compatibility and corrosion protection are maintained over the service life.<\/p>\n<h3>Cable pulling, splicing work, and documentation<\/h3>\n<p>Cables are pulled in with suitable accessories, strain-relieved, and connected on splice supports. Traceable documentation of occupancy and reserve capacities facilitates operation and expansion. Adherence to permissible pulling forces, lubrication selection, and bend radius control protect cable integrity; systematic labeling and as-built data with georeferencing support long-term asset management.<\/p>\n<h2>Working in existing structures: rehabilitation and deconstruction of cable shafts<\/h2>\n<p>Over a cable shaft\u2019s life cycle, damage may occur due to settlements, traffic loads, chemical attack, or ingress of extraneous water. Rehabilitation and &#8211; if required &#8211; deconstruction demand controlled, material-conserving interventions that protect lines and surroundings. In urban locations and confined excavation pits, <strong>concrete pulverizers<\/strong> are suitable for selective removal of slabs, wall sections, and foundation nibs. In massive, thick-walled areas, <strong>rock and concrete splitters<\/strong> enable low-vibration, precise cracking. Steel inserts and reinforcement can be cut with steel shears or multi-cutters; power is supplied by <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">suitable hydraulic power units<\/a>. Where rock is present or tie-ins into natural stone are required, rock wedge splitters perform controlled splitting with minimal impact on adjacent zones. Prior to intervention, load transfer, traffic impacts, and safeguarding of live systems are assessed; vibration and settlement monitoring may be specified for sensitive surroundings.<\/p>\n<ul>\n<li>Common damage patterns: cracks, spalled edges, leaky penetrations, corroded fittings, deformed cover frames<\/li>\n<li>Rehabilitation approaches: concrete replacement, edge re-profiling, seal replacement, geometry corrections, retrofitting of cable holders<\/li>\n<li>Deconstruction: selective removal in construction phases, separation of concrete and reinforcement for segregated disposal<\/li>\n<li>Application areas: concrete demolition and special demolition in existing structures, strip-out and cutting in the vicinity of buildings and infrastructure<\/li>\n<li>Temporary measures: protection of live cables, interim supports, and environmental controls during works<\/li>\n<li>Monitoring: documentation of crack development, vibration limits, and water ingress during and after intervention<\/li>\n<\/ul>\n<h2>Safety, environmental, and health protection<\/h2>\n<p>Work in a cable shaft takes place in confined, partially deep spaces. Suitable methods that minimize dust, vibration, and noise protect people and the construction environment. Measures are planned project-specifically and follow the applicable rules of practice. Confined-space entry procedures, gas measurements, and rescue concepts are defined in advance and coordinated with all parties involved.<\/p>\n<ul>\n<li>Access and ventilation: adequate ventilation and safe access; shaft areas must be kept clean and slip-resistant<\/li>\n<li>Substances and emissions: dust suppression (e.g., water mist), discharge of wastewater via approved systems<\/li>\n<li>Lifting operations: load guidance in narrow shafts using suitable lifting accessories and clear communication paths<\/li>\n<li>Separation and demolition works: prefer low-vibration methods; perform rebar cutting in a controlled, low-spark manner<\/li>\n<li>Disposal: segregated separation of concrete, steel, and sealing materials facilitates recycling<\/li>\n<li>Confined-space management: continuous gas monitoring, standby personnel, and documented rescue plans<\/li>\n<li>Electrical safety: lockout and tagging of affected circuits; equipotential bonding checks before re-energization<\/li>\n<\/ul>\n<h2>Cable shaft in tunnel and rock environments<\/h2>\n<p>In tunnels, caverns, and rock sections, cable shafts handle the distribution of power and communication lines. Here, rock pressure, moisture, and limited accessibility act together. For recesses and extensions in rock and concrete, <em>splitting methods<\/em> with <strong>rock and concrete splitters<\/strong> as well as rock wedge splitters are suitable, producing controlled split lines and protecting adjacent structures. In <a href=\"https:\/\/www.darda.de\/en\/applications\/rock-demolition-and-tunnel-construction\">rock demolition and tunnel construction<\/a>, low peripheral vibrations and precise geometries are particularly important, for example when tying into segment rings or performing rework on shaft walls. Drainage concepts, corrosion-resistant components, and robust anchorage details mitigate the combined effects of water ingress, load cycles, and dynamic influences.<\/p>\n<h2>Material selection, durability, and sustainability<\/h2>\n<p>Material selection is based on mechanical loading, water exposure, and chemical influences. High-strength, dense concrete, adequate concrete cover, and durable fittings increase service life. During deconstruction and upgrading, selective separation &#8211; for example using concrete pulverizers and steel shears &#8211; supports recycling of concrete and steel. Modular construction with precast elements facilitates replacement and expansion and reduces interventions in existing structures.<\/p>\n<ul>\n<li>Durability boosters: corrosion-resistant reinforcement, high-performance coatings, and robust sealing systems for penetrations and joints<\/li>\n<li>Sustainable choices: low-clinker binders, recycled aggregates, and regionally sourced materials with verified environmental data<\/li>\n<li>Design for adaptability: modular fittings, spare capacity, and replaceable components to extend service life<\/li>\n<\/ul>\n<h2>Typical sources of error and how to avoid them<\/h2>\n<p>Planning and execution errors impair operation and service life. Care in the early phase prevents costly rework.<\/p>\n<ol>\n<li>Insufficient sizing: plan reserves for additional lines; consider future splicing work<\/li>\n<li>Lack of watertightness: systematically seal penetrations and joints; minimize settlement risks<\/li>\n<li>Unsuitable location: consider traffic and maintenance access; design the cover frame for the required loads<\/li>\n<li>Neglected corrosion prevention: sufficient concrete cover, suitable materials for fittings<\/li>\n<li>Poor documentation: continuously maintain occupancy plans, photos, and geodata<\/li>\n<li>Inadequate separation: maintain spatial separation between power and data; prevent electromagnetic interference<\/li>\n<li>Missing earthing and bonding: verify equipotential bonding and lightning protection interfaces<\/li>\n<li>Deficient backfilling: insufficient compaction and improper bedding lead to settlements and frame distortion<\/li>\n<\/ol>\n<h2>Terminology and variants in practice<\/h2>\n<p>Cable shaft, cable pulling shaft, splice shaft, or distribution shaft describe functional variants of a similar structure. Walk-in shafts enable work inside; compact, non-walk-in versions serve primarily as pulling and branching points. In industrial and plant construction, shafts are often part of intermeshed network structures with cable ducts and cable trays. In existing buildings, conversions often require precise cutouts in floor slabs or walls &#8211; here, during <em>strip-out and cutting<\/em>, controlled separation and demolition methods are used, for example with <strong>concrete pulverizers<\/strong>, supported by suitable hydraulic power packs. In special situations &#8211; such as damage remediation after utility failures &#8211; compact, mobile tools that can be guided safely in confined shafts are advantageous. Terminology and detailing vary regionally, but the functional core remains the same: safe access, reliable sealing, and sufficient capacity for current and future lines.<\/p>\n<h2>Construction sequence and quality assurance<\/h2>\n<p>A clearly structured sequence reduces risks and rework: pit shoring, preparation of the foundation base, setting the shaft, proper penetrations, sealing, fittings, cover installation, backfilling, and surface reinstatement. Checks of flatness, watertightness, and cover load class are part of acceptance. Proper documentation is essential for future interventions. Supplementary inspections include torque checks for frame fasteners, visual verification of strain relief, and functional tests of drainage and ventilation.<\/p>\n<ul>\n<li>Leak testing: verification of penetrations and joints under defined water pressure where required<\/li>\n<li>Load verification: conformity of covers and frames with specified load classes in the installed state<\/li>\n<li>As-built records: georeferenced positions, photographic documentation, and labeling schemes<\/li>\n<li>Handover package: maintenance instructions, spare capacity overview, and inspection intervals<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A cable shaft is a central component of underground infrastructure. It serves the safe accommodation, routing, distribution, and maintenance of power and data lines in cities, industrial plants, transportation structures, and tunnels. From an engineering perspective, the cable shaft combines aspects of civil engineering (underground works) and concrete construction with <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/cable-shaft\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19307","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Cable Shaft - Underground Power &amp; Data Lines<\/title>\n<meta name=\"description\" content=\"Your guide to cable shafts in underground utilities \u2713 design, installation &amp; maintenance for power and data access.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/cable-shaft\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Cable Shaft - Underground Power &amp; Data Lines\" \/>\n<meta property=\"og:description\" content=\"Your guide to cable shafts in underground utilities \u2713 design, installation &amp; maintenance for power and data access.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/cable-shaft\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-18T11:38:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/cable-shaft\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/cable-shaft\",\"name\":\"Cable Shaft - Underground Power & Data Lines\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-09-04T12:24:38+00:00\",\"dateModified\":\"2026-04-18T11:38:02+00:00\",\"description\":\"Your guide to cable shafts in underground utilities \u2713 design, installation & maintenance for power and data access.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/cable-shaft#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/cable-shaft\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/cable-shaft#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Cable shaft\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Cable Shaft - Underground Power & Data Lines","description":"Your guide to cable shafts in underground utilities \u2713 design, installation & maintenance for power and data access.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/cable-shaft","og_locale":"en_US","og_type":"article","og_title":"Cable Shaft - Underground Power & Data Lines","og_description":"Your guide to cable shafts in underground utilities \u2713 design, installation & maintenance for power and data access.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/cable-shaft","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-04-18T11:38:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/cable-shaft","url":"https:\/\/www.darda.de\/en\/knowledge\/cable-shaft","name":"Cable Shaft - Underground Power & Data Lines","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-09-04T12:24:38+00:00","dateModified":"2026-04-18T11:38:02+00:00","description":"Your guide to cable shafts in underground utilities \u2713 design, installation & maintenance for power and data access.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/cable-shaft#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/cable-shaft"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/cable-shaft#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Cable shaft"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19307","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19307"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19307\/revisions"}],"predecessor-version":[{"id":26430,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19307\/revisions\/26430"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19307"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}