{"id":19304,"date":"2025-09-05T09:16:54","date_gmt":"2025-09-05T07:16:54","guid":{"rendered":"https:\/\/www.darda.de\/jumbo-tunnel-excavation"},"modified":"2026-04-17T16:34:02","modified_gmt":"2026-04-17T14:34:02","slug":"jumbo-tunnel-excavation","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/jumbo-tunnel-excavation","title":{"rendered":"Jumbo tunnel excavation"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Jumbo tunnel excavation describes tunnel advancement with drill jumbos (<em>jumbo<\/em>) using the conventional drill-and-blast method. It is used wherever rock mass, geometry, or framework conditions do not permit full-face mechanized excavation with shield or hard-rock machines, or where flexibility, sequential advance, and adaptable support systems are required. In this context, hydraulic handheld tools and attachments play a complementary role &#8211; for example, for reprofiling, controlled rock breakout, support preparation, or during modification and refurbishment. Products such as rock and concrete splitters, concrete demolition shears, combination shears, steel shears, multi cutters, rock splitting cylinders, as well as suitable hydraulic power packs from Darda GmbH are used in specific work steps without replacing the fundamental advance with drill jumbos. In practice, this hybrid approach enables reliable adherence to geotechnical constraints such as vibration limits, air overpressure, and permissible emissions in ventilation-sensitive sections while maintaining cycle stability.<\/p>\n<h2>Definition: What is meant by jumbo tunnel excavation?<\/h2>\n<p>Jumbo tunnel excavation refers to stepwise tunnel advance with one or more drill jumbos that prepare the blast-hole pattern at the tunnel face. The advance typically proceeds in cycles: drilling, charging, blasting, ventilation, mucking, post-processing (scaling, reprofiling), support installation (shotcrete, rock bolts, lattice girders) and, where applicable, interior fit-out. The method is highly adaptable &#8211; geometry, drill pattern, explosive concept, and support measures are continuously aligned with geological and geotechnical conditions (e.g., per the RMR or Q-system). Jumbo tunnel excavation is used in rock as well as in heterogeneous zones where pre-support measures such as injections, pipe canopies, or heavier support are required. When conditions change, the cycle can be rapidly adjusted by modifying burden and spacing, charge distribution, or support intensity to maintain profile quality and safety margins.<\/p>\n<h2>Advance cycle: from drilling to support<\/h2>\n<p>The typical cycle in jumbo tunnel excavation starts with surveying and alignment of the drill jumbo. After creating the drill-hole grid, charging and firing take place with defined delays. After the ventilation phase, the excavated material is mucked out. Loose components are then removed (<em>scaling<\/em>) and the primary support is installed &#8211; usually by shotcrete (wet- or dry-spray), combined with rock bolts, mesh, and, where appropriate, lattice girders. This cyclical workflow enables flexible cycle times that adapt to geology, cross-section, and logistics. Clear handover criteria between cycle steps, standardized work sequences, and consistent documentation help reduce idle times and rework.<\/p>\n<h3>Drill pattern, cut, and perimeter<\/h3>\n<p>The drill pattern differentiates core, cut, and perimeter holes. The goal is a defined cavity cut with minimal over- or underbreak. Parameters such as hole length, diameter, staging, and spacing are tuned to the strength, layering, and jointing of the rock mass. Precise drill-pattern planning minimizes rework and the need for secondary measures, stabilizing the cycle time. Techniques such as <em>smooth blasting<\/em> and <em>contour blasting<\/em> improve perimeter quality and support early-age shotcrete bond, thereby enhancing long-term lining performance.<\/p>\n<h3>Blasting technology, vibrations, and boundary conditions<\/h3>\n<p>Blasting technology relies on staggered firing sequences, tailored charge densities, and decoupled charges to control break quality and vibrations. In sensitive environments (e.g., densely built-up surroundings), additional mitigation measures are used. Where blasting is temporarily or permanently restricted, alternative methods are employed, such as hydraulic splitting with rock and concrete splitters or selective removal of concrete components with concrete demolition shears. Compliance with defined peak particle velocity and air overpressure limits, blast-fume management, and data-backed vibration forecasting are standard practice in demanding settings.<\/p>\n<h2>Machines and equipment in jumbo tunnel excavation<\/h2>\n<p>The core includes drill jumbos with one to three booms, surveying and navigation systems, charging equipment, scrapers or wheeled\/tracked vehicles for mucking, shotcrete machines, ventilation fans, and power supply\/compressed air supply. Additionally, hydraulic tools are used for special tasks: they serve reprofiling, gentle separation of oversize pieces, removal of shotcrete in refurbishment sections, and cutting reinforcement or support elements. Darda GmbH provides application-specific tools and matching hydraulic power packs that work with low vibration levels and controlled effect, particularly in confined, ventilation-sensitive areas. Where feasible, electric or low-emission drives and dust suppression systems are integrated to reduce exposure and improve air quality in the heading.<\/p>\n<h3>Hydraulic power packs as the energy source<\/h3>\n<p>Hydraulic power packs deliver the required drive power for mobile splitters, concrete demolition shears, combination shears, steel shears, and multi cutters. Inside the tunnel, a compact, robust design with reliable cooling, easy transport, and safe hose routing is essential. A well-matched power-pack\/tool combination supports efficient cycle times, especially during special operations or in maintenance and refurbishment phases. Features such as quick-coupling systems, load monitoring, and energy-efficient drives contribute to predictable performance with a low emission footprint.<\/p>\n<h2>Application context: rock breakout and tunnel construction<\/h2>\n<p>In the environment of jumbo tunnel excavation, tasks frequently arise where Darda GmbH hydraulic tools play to their strengths. These include reducing oversize after blasting, precise adjustment of the excavation profile, opening cross passages, creating niches, as well as deconstruction and refurbishment of existing concrete components in connection areas, shafts, and caverns. Additional context is provided in <a href=\"https:\/\/www.darda.de\/en\/applications\/rock-demolition-and-tunnel-construction\">rock demolition in tunnel construction<\/a>. Further typical interfaces include pilot headings, enlargements, and transitions to or from station and cavern excavations where careful adaptation of the support system is required.<\/p>\n<h3>Rock and concrete splitters in tunnel face finishing<\/h3>\n<p><strong>Rock and concrete splitters<\/strong> as well as rock splitting cylinders are used to break down oversize boulders after mucking without additional blasting. This is particularly advantageous in areas with strict vibration or noise limits. The controlled splitting action enables pinpoint separation at the tunnel face, at the invert, or in the crown and reduces damage along the alignment caused by impact loads. Where necessary, pre-splitting can be used to define crack propagation and protect the designed contour.<\/p>\n<h3>Concrete demolition shears in fit-out, modification, and refurbishment<\/h3>\n<p><strong>Concrete demolition shears<\/strong> are used to remove shotcrete overbuild, deconstruct defective cast-in-place sections, and open breakthroughs and niches. During refurbishment, they enable selective removal of deteriorated concrete layers without excessively stressing adjacent structures. In combination with combination shears or steel shears, reinforcement and support ribs can be cleanly separated. This targeted approach improves rebar exposure quality and reduces subsequent surface treatment requirements.<\/p>\n<h2>Use cases along the life cycle<\/h2>\n<p>Jumbo tunnel excavation is linked to several practical use cases in which tools from Darda GmbH are used as a complement:<\/p>\n<ul>\n<li>Rock breakout and tunnel construction: splitting oversize, profile reprofiling, cross passages, support preparation.<\/li>\n<li>Concrete demolition and special demolition: deconstruction of inner linings, foundations, invert reinforcements, portal areas.<\/li>\n<li>Strip-out and cutting: opening shafts, cable ducting and niches during fit-out phases.<\/li>\n<li>Special operation: work under vibration constraints, near sensitive structures, or with restricted blasting windows.<\/li>\n<li>Natural stone extraction: transferable splitting technology for extraction and block-breaking tasks, for example in portal and access areas.<\/li>\n<li>Interface works at stations, caverns, and portals where constrained access and strict emission limits favor low-vibration tools.<\/li>\n<\/ul>\n<h2>Reprofiling and secondary breakage<\/h2>\n<p>Even with a precise drill pattern, over- or underbreak cannot be fully avoided. Instead of additional blasting cycles, secondary breakage is often performed. Hydraulic tools enable controlled removal and edge finishing. Rock and concrete splitters provide defined crack propagation, while concrete demolition shears enable selective removal of shotcrete layers. This supports compliance with profile tolerances and reduces the extent of corrective shotcreting and bolting.<\/p>\n<h3>Combination shears, steel shears, and multi cutters<\/h3>\n<p>Combination shears combine crushing and cutting tasks in one tool and are suitable when concrete and steel must be separated in a single pass. Steel shears handle cutting of support ribs, steel sections, and temporary auxiliary structures. Multi cutters are used for cutting pipes, conduits, and thin-walled steel sections. In this way, support adjustments and deconstruction can be efficiently integrated into the advance workflow. Consistent tool selection based on section thickness and material grade helps maintain predictable progress.<\/p>\n<h2>Quality assurance, geotechnical engineering, and documentation<\/h2>\n<p>The quality of jumbo tunnel excavation depends on continuous observation and documentation: geological mapping at the tunnel face, convergence measurements, records of support performance, and visual checks of break quality. Digital surveying and profile scans support reproducible reprofiling. Where minor protrusions exist, concrete demolition shears and splitters help achieve a sharp profile without impairing the support condition. Standardized acceptance criteria, tolerance classes, and photo or scan documentation create traceability and inform subsequent design verifications.<\/p>\n<h3>Environmental and occupational safety<\/h3>\n<p>Dust, noise, vibrations, and blast fumes are key aspects of occupational safety and environmental protection in jumbo tunnel excavation. Measures such as effective ventilation, dust suppression, and low vibration levels are central. Depending on planning, hydraulic tools with controlled, low-frequency action can help reduce emissions. Legal requirements and regulatory conditions are project-specific and should generally be observed and reviewed regularly. Particular attention is paid to respirable crystalline silica exposure, safe explosive handling, and ergonomics in confined work areas.<\/p>\n<h2>Interfaces with launch, reception, and enlargement caverns<\/h2>\n<p>Jumbo tunnel excavation often interfaces with launch and reception shafts, connection structures, stations, or caverns. In these zones, modifications and local adjustments to support elements are common. Concrete demolition shears, combination shears, and steel shears enable selective adjustments to concrete and steel components, while rock and concrete splitters support gentle opening of hard rock edges. Smooth transitions between different excavation and support regimes reduce stress concentrations and facilitate accurate final lining geometry.<\/p>\n<h2>Planning, sequencing, and logistics<\/h2>\n<p>Productivity arises from coordinated cycle planning: drilling performance, charging\/blasting windows, ventilation times, haulage logistics, support performance, and rework must interlock. An integrated logistics concept considers material flows, energy supply, traffic routing, and emergency routes. Hydraulic power packs and compact tools can be planned for use in off-cycle periods so they do not interfere with primary processes. This increases utilization of idle times and shortens critical paths. Approaches such as takt planning, buffer management, and clear shift interfaces stabilize throughput even under variable ground conditions.<\/p>\n<h2>Refurbishment, modification, and deconstruction in the tunnel<\/h2>\n<p>Over a tunnel\u2019s life cycle, refurbishment and modifications are common. Here, <strong>concrete demolition and special demolition<\/strong> move into focus: removing shotcrete, renewing drainage, retrofitting niches or cross passages, replacing support elements. Tools from Darda GmbH &#8211; especially concrete demolition shears, combination shears, and multi cutters &#8211; support selective, low-emission work on existing structures. For deconstruction of massive components, rock and concrete splitters as well as rock splitting cylinders can be used in a targeted manner. Planning aligned with operational constraints and traffic or service windows ensures that refurbishment activities do not disrupt core excavation or operations.<\/p>\n<h3>Special operation under sensitive boundary conditions<\/h3>\n<p>Neighboring constraints, night work, low overburden, or vibration-sensitive installations demand special methods. Hydraulic splitting and cutting are options to reduce vibrations. Steel shears and multi cutters help with fast, controlled removal of steel and composite components. Tank cutters can be used in underground ancillary facilities or caverns with thin-walled vessels and shells when safe dismantling is required. Suitable lighting, remote operation where feasible, and clear exclusion zones contribute to risk reduction in these scenarios.<\/p>\n<h2>Practice-oriented use cases in jumbo tunnel excavation<\/h2>\n<p>Typical situations where complementary hydraulic tools make sense alongside drill-and-blast include:<\/p>\n<ul>\n<li>Reduction of oversize in the excavated material using rock and concrete splitters to stabilize haulage logistics.<\/li>\n<li>Profile reprofiling at crown, bench, and invert with concrete demolition shears to remove shotcrete and protrusions in a controlled manner.<\/li>\n<li>Opening cross passages and niches during fit-out with combination shears and steel shears to cut reinforcement and support elements.<\/li>\n<li>Refurbishing damaged concrete areas in existing tubes under ongoing ventilation, with a focus on low emissions.<\/li>\n<li>Selective deconstruction of temporary auxiliary structures with multi cutters and steel shears so as not to impede cycle progress.<\/li>\n<li>Local adjustment of support density around openings and interfaces, combining splitting and cutting to protect adjacent structures.<\/li>\n<\/ul>\n<h2>Outlook: automation and integration<\/h2>\n<p>Automation in jumbo tunnel excavation is advancing &#8211; from drill-pattern navigation and digital documentation to robot-assisted support. Complementary hydraulic tools are increasingly integrated into this process chain: through clearly defined interfaces, modular hydraulic power packs, and ergonomic, low-emission applications. In this way, quality, occupational safety, and cycle stability can be improved in the long term. Data-driven planning, remote diagnostics, and standardized interfaces between equipment and documentation platforms support reproducible outcomes and continuous improvement across project phases.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Jumbo tunnel excavation describes tunnel advancement with drill jumbos (jumbo) using the conventional drill-and-blast method. It is used wherever rock mass, geometry, or framework conditions do not permit full-face mechanized excavation with shield or hard-rock machines, or where flexibility, sequential advance, and adaptable support systems are required. In this context, <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/jumbo-tunnel-excavation\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19304","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Jumbo Tunnel Excavation - Drill &amp; Blast Tunneling<\/title>\n<meta name=\"description\" content=\"Drill-and-blast tunneling with drill jumbos - Jumbo tunnel excavation \u27a4 cycles, support &amp; low-vibration methods.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/jumbo-tunnel-excavation\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Jumbo Tunnel Excavation - Drill &amp; Blast Tunneling\" \/>\n<meta property=\"og:description\" content=\"Drill-and-blast tunneling with drill jumbos - Jumbo tunnel excavation \u27a4 cycles, support &amp; low-vibration methods.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/jumbo-tunnel-excavation\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-17T14:34:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/jumbo-tunnel-excavation\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/jumbo-tunnel-excavation\",\"name\":\"Jumbo Tunnel Excavation - Drill & Blast Tunneling\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-09-05T07:16:54+00:00\",\"dateModified\":\"2026-04-17T14:34:02+00:00\",\"description\":\"Drill-and-blast tunneling with drill jumbos - Jumbo tunnel excavation \u27a4 cycles, support & low-vibration methods.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/jumbo-tunnel-excavation#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/jumbo-tunnel-excavation\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/jumbo-tunnel-excavation#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Jumbo tunnel excavation\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Jumbo Tunnel Excavation - Drill & Blast Tunneling","description":"Drill-and-blast tunneling with drill jumbos - Jumbo tunnel excavation \u27a4 cycles, support & low-vibration methods.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/jumbo-tunnel-excavation","og_locale":"en_US","og_type":"article","og_title":"Jumbo Tunnel Excavation - Drill & Blast Tunneling","og_description":"Drill-and-blast tunneling with drill jumbos - Jumbo tunnel excavation \u27a4 cycles, support & low-vibration methods.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/jumbo-tunnel-excavation","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-04-17T14:34:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/jumbo-tunnel-excavation","url":"https:\/\/www.darda.de\/en\/knowledge\/jumbo-tunnel-excavation","name":"Jumbo Tunnel Excavation - Drill & Blast Tunneling","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-09-05T07:16:54+00:00","dateModified":"2026-04-17T14:34:02+00:00","description":"Drill-and-blast tunneling with drill jumbos - Jumbo tunnel excavation \u27a4 cycles, support & low-vibration methods.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/jumbo-tunnel-excavation#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/jumbo-tunnel-excavation"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/jumbo-tunnel-excavation#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Jumbo tunnel excavation"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19304","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19304"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19304\/revisions"}],"predecessor-version":[{"id":26402,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19304\/revisions\/26402"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19304"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}