{"id":19293,"date":"2025-09-08T14:23:32","date_gmt":"2025-09-08T12:23:32","guid":{"rendered":"https:\/\/www.darda.de\/inspection-shaft"},"modified":"2026-04-17T09:22:03","modified_gmt":"2026-04-17T07:22:03","slug":"inspection-shaft","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/inspection-shaft","title":{"rendered":"Inspection shaft"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>An inspection shaft is a central component of the underground infrastructure: it provides walk-in or drive-in access to wastewater, stormwater, and utility pipelines, enables inspections, cleaning, and rehabilitation, and serves as a node in the pipeline network. Across the lifecycle of structures &#8211; from new construction through maintenance to deconstruction &#8211; the inspection shaft plays an important role. When intervening in existing shaft structures, precise, low-vibration, and safe working methods are essential; in practice, hydraulic tools are frequently used for this, such as <em>concrete demolition shears<\/em> or <em><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a><\/em> from Darda GmbH. In international usage, the structure is also referred to as a <em>manhole<\/em> or access shaft, depending on regional terminology and context.<\/p>\n<h2>Definition: What is meant by an inspection shaft?<\/h2>\n<p>An inspection shaft (also revision shaft or control shaft) is a vertical shaft structure that provides access to underground pipelines. It typically consists of shaft rings, a cone or upper section, a shaft cover, and climbing aids. In the lower area lies the channel invert with inlets and outlets, often with a berm. The inspection shaft is used for visual inspection, cleaning (e.g., flushing), measuring and testing, as well as for carrying out rehabilitation or repair work. Depending on the place of use, different traffic loads, sealing requirements, and resistances against chemical and mechanical impacts are required. Design and operation follow recognized rules of technology as well as applicable standards and guidelines and take local constraints into account. Clarity in terminology supports asset documentation and interfaces to inspection reports and rehabilitation planning.<\/p>\n<h2>Function and tasks in the drainage network<\/h2>\n<p>Inspection shafts perform several tasks simultaneously: they allow changes in direction and elevation of pipelines, create control points for camera inspections and measurements, serve as flushing and revision openings, and provide rapid access in the event of incidents. In stormwater management they integrate inlets from roof and surface drainage; in the wastewater sector they ensure access to house connections and collectors. For the operator, <strong>tightness<\/strong>, <strong>occupational safety<\/strong>, accessibility, and durability are crucial. For modifications &#8211; e.g., raising shaft covers to new pavement elevations or replacing damaged rings &#8211; controlled demolition and adaptation work is needed, which can be carried out gently on materials and with low vibration using concrete demolition shears or stone and concrete splitters.<\/p>\n<ul>\n<li>Operational roles: access for CCTV, flushing, blockage removal, and flow measurement<\/li>\n<li>Network geometry: compensation of gradients, bends, and junctions<\/li>\n<li>Emergency response: rapid localization and intervention points<\/li>\n<li>Lifecycle interface: inspection, rehabilitation, and deconstruction logistics<\/li>\n<\/ul>\n<h2>Construction and materials<\/h2>\n<p>Inspection shafts are made of concrete, reinforced concrete, polymer concrete, plastic (e.g., PE\/PP), or &#8211; in existing structures &#8211; also of masonry. Concrete and reinforced-concrete rings are robust and suitable for high traffic loads; plastic shafts are lightweight, corrosion-resistant, and advantageous in groundwater conditions. Polymer concrete combines high strength with good chemical resistance. The choice of material influences installation, sealing concept, rehabilitatability, and deconstruction.<\/p>\n<ul>\n<li>Concrete\/reinforced concrete: high load-bearing capacity, wide range of sizes, thermally stable<\/li>\n<li>Plastic (PE\/PP): low weight, corrosion resistance, favorable for retrofitting, requires uplift protection<\/li>\n<li>Polymer concrete: dimensional accuracy, high compressive strength, smooth hydraulically favorable surfaces<\/li>\n<li>Masonry (legacy): heterogeneous condition, often combined with partial replacement or internal linings<\/li>\n<\/ul>\n<h3>Components and geometry<\/h3>\n<p>Key components include shaft rings, seals, cone\/upper section, cover, step irons or ladder, channel invert, and berms. Geometrically, clear diameters and shaft depths are adapted to the pipeline routing and the required accessibility. The connection of inlets and outlets is made via core drillings or factory-made openings with tested sealing systems.<\/p>\n<ul>\n<li>Geometry parameters: clear diameter, invert level, approach angles, and cover height<\/li>\n<li>Access design: safe spacing of climbing aids, non-slip rungs, and adequate working space<\/li>\n<li>Connections: watertight, deformation-tolerant interfaces to pipe materials and wall penetrations<\/li>\n<\/ul>\n<h3>Tightness and durability<\/h3>\n<p>Durable tightness prevents infiltration and exfiltration. Sealing systems, rigid (monolithic) joints, corrosion-resistant components in the gas space, and a dimensionally stable structure are decisive. In aggressive media (e.g., hydrogen sulfide in wastewater), resistant surfaces or corrosion-inhibiting internal linings are used.<\/p>\n<ul>\n<li>Sealing concept: compatible gaskets, tested wall sleeves, and shaped inverts<\/li>\n<li>Exposure management: abrasion protection in the invert, chemical resistance in gas space and splash zones<\/li>\n<li>Verification: leakage tests and documented acceptance to confirm watertightness<\/li>\n<\/ul>\n<h2>Planning and installation<\/h2>\n<p>Planning considers location, depth, groundwater level, soil parameters, traffic loads, pipeline routing, and accessibility. Installation includes earthworks, shoring, foundation, placing the rings, constructing the channel invert, sealing, and the controlled connection of pipelines. In traffic areas, bearing capacity and settlement verification are as relevant as a permanently load-bearing road buildup around the cover.<\/p>\n<ul>\n<li>Site assessment: utilities survey, stability, and groundwater management<\/li>\n<li>Execution steps: excavation, base preparation, installation of rings and cone, watertight connections<\/li>\n<li>Quality assurance: dimensional checks, sealing verification, and safe access configuration<\/li>\n<\/ul>\n<h3>Special boundary conditions<\/h3>\n<p>In groundwater conditions, uplift protection and tight connections are required. In constrained inner-city locations, construction logistics with small equipment has advantages; <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">compact hydraulic power units<\/a> with handheld tools play a role here. For structures with grandfathered status, interventions must be planned to minimize vibration, noise, and dust.<\/p>\n<ul>\n<li>Confined spaces: compact tools, staged delivery, and low-emission methods<\/li>\n<li>Groundwater: buoyancy checks, sealed penetrations, and monitored pumping<\/li>\n<li>Legacy structures: material testing and selective intervention with minimal impact<\/li>\n<\/ul>\n<h2>Inspection, maintenance, and rehabilitation<\/h2>\n<p>Regular visual inspections, camera inspections, leakage tests, and cleanings ensure functionality. Typical maintenance measures include renewing seals, rehabilitating joints, coating corrosion-prone areas, or replacing individual shaft rings. For localized damage, partial rehabilitation is often economical.<\/p>\n<ul>\n<li>Inspection routines: cleaning &#8211; inspection &#8211; evaluation &#8211; action planning<\/li>\n<li>Rehabilitation toolbox: joint repair, coatings, sectional replacement, and invert reprofiling<\/li>\n<li>Documentation: condition classes, photo\/video evidence, and traceable measures<\/li>\n<\/ul>\n<h3>Tools and methods for existing structures<\/h3>\n<p>When opening penetrations, extracting core pieces, or removing damaged concrete areas, controlled, low-vibration methods are required. <em>Concrete demolition shears<\/em> enable selective removal of concrete, including in reinforced zones. <em>Stone and concrete splitters<\/em> split massive components precisely without impact or blasting effect. Hydraulic power packs from Darda GmbH supply these tools even in confined shafts. For steel installations &#8211; e.g., gratings, ladders, anchors, or reinforcements &#8211; combination shears, multi cutters, or <em>steel shears<\/em> are suitable to perform cuts and separations with low sparking and in a controlled manner.<\/p>\n<ul>\n<li>Selection criteria: material, reinforcement content, vibration tolerance of surroundings, and space<\/li>\n<li>Process control: incremental removal, continuous stability checks, and debris management<\/li>\n<li>Surface prep: cleaning and profiling for subsequent sealing or coating systems<\/li>\n<\/ul>\n<h2>Inspection shaft in concrete demolition and special demolition<\/h2>\n<p>Decommissioned or misaligned shafts often need to be deconstructed or modified. In densely built-up areas, under sensitive buildings, or at critical infrastructure, vibration- and noise-reduced methods are essential. <strong>Stone and concrete splitters<\/strong> enable the controlled breaking of shaft rings or foundations without impairing adjacent pipelines. <strong>Concrete demolition shears<\/strong> downsize concrete components and facilitate clean separation of reinforcement. Such methods fit into the application area of <a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">concrete demolition and deconstruction<\/a> and support safe, precise removal.<\/p>\n<ul>\n<li>Sequence: safeguarding &#8211; selective separation &#8211; downsizing &#8211; removal &#8211; backfilling<\/li>\n<li>Protection goals: maintain pipe integrity, avoid settlement, and limit emissions<\/li>\n<\/ul>\n<h2>Work in existing structures: strip-out and cutting<\/h2>\n<p>When adapting shafts &#8211; for example, for new pipe penetrations, relocating covers, or removing old installations &#8211; clean separation cuts in tight surroundings are required. Combination shears and multi cutters cut steel parts, brackets, or rebar. In combined work steps, concrete is removed with concrete demolition shears, reinforcement is separated, and the surface is prepared for new sealing systems. The result is a targeted intervention with minimal impact on the surroundings, matching the application area of building gutting and cutting.<\/p>\n<ul>\n<li>Typical steps: marking &#8211; cutting &#8211; splitting &#8211; separating steel &#8211; surface finishing<\/li>\n<li>Interface quality: burr-free cuts and defined bonding surfaces for subsequent works<\/li>\n<\/ul>\n<h2>Shafts in rock and tunnel construction<\/h2>\n<p>In rocky subsoil, in tunnel excavation, or when connecting deep pipelines, shafts are often part of a complex construction sequence. Where blasting or heavy equipment is not possible or not desired, <em>rock wedge splitters<\/em> support gentle material break-up. This allows shafts to be constructed or enlarged without endangering the stability of adjacent structures. This approach is established in rock excavation and tunnel construction, especially for work in the immediate vicinity of sensitive infrastructure.<\/p>\n<ul>\n<li>Benefits: targeted crack propagation, low vibration, and high precision<\/li>\n<li>Applications: pilot shafts, enlargement of access points, and connections to existing tunnels<\/li>\n<\/ul>\n<h2>Material selection in comparison<\/h2>\n<p>Concrete and reinforced-concrete shafts excel in load-bearing capacity and temperature resistance; they are suitable for high traffic loads and variable geometries. Plastic shafts score with low weight, good chemical resistance, and easy handling, but require careful uplift protection. Polymer concrete combines dimensional accuracy with high compressive strength and smooth, hydraulically favorable surfaces. Masonry is mainly found in existing structures; rehabilitation concepts here often consider internal linings or partial replacement with prefabricated elements. The deconstruction approach depends on the material: concrete is downsized (e.g., with concrete demolition shears) and reinforcement is separated; plastic is sorted according to the material stream; polymer concrete is directed into suitable recycling pathways.<\/p>\n<ul>\n<li>Decision criteria: loads, groundwater, media, installation logistics, and long-term maintenance<\/li>\n<li>Lifecycle view: durability, rehabilitatability, and recycling routes<\/li>\n<\/ul>\n<h2>Typical challenges and solutions<\/h2>\n<p>Common damage patterns include leakage at joints, corrosion in the gas space, root ingress, shear forces due to settlements, abrasion in the channel invert, and damage to covers. Solutions range from joint injections to linings and partial renewals. For groundwater uplift, safeguards against flotation are necessary. In traffic areas, the load-bearing capacity of the cover, low settlement, and a flush connection to the pavement are central. For interventions in existing structures, methods with low vibration and minimal sparking are advantageous; depending on the material, stone and concrete splitters, concrete demolition shears, and cutting tools for steel components are suitable.<\/p>\n<ul>\n<li>Leakage: repair of joints and penetrations with compatible sealing systems<\/li>\n<li>Corrosion: surface preparation and resistant linings in the gas space<\/li>\n<li>Roots and abrasion: mechanical removal, barriers, and invert hardening<\/li>\n<li>Settlement effects: structural stabilization and accurate cover seating<\/li>\n<\/ul>\n<h2>Measuring and testing tasks in the inspection shaft<\/h2>\n<p>Inspection shafts form the interface for camera inspections, leakage tests, and flow measurements. They enable level measurements and sampling, facilitate condition assessment, and support the planning of rehabilitation measures. Good accessibility &#8211; safe climbing aids, ergonomic spacing, and sufficient working space &#8211; increases the efficiency and safety of these tasks.<\/p>\n<ul>\n<li>Typical measurements: flow, level, pressure head, and sampling for laboratory analysis<\/li>\n<li>Test routines: pre-cleaning, function testing, and traceable documentation<\/li>\n<\/ul>\n<h2>Safety and occupational safety<\/h2>\n<p>Work at and within the shaft requires a careful hazard assessment. This includes ventilation, gas monitoring, fall protection, and an appropriate rescue strategy. Hydraulic tools are to be selected and operated to suit the surroundings: compact dimensions, controllable cutting or splitting forces, and a stable stance. Notes on legal requirements and rules must be observed in general; the specific implementation depends on the project, location, and responsibilities.<\/p>\n<ul>\n<li>Confined space measures: atmospheric testing, ventilation, standby personnel<\/li>\n<li>Fall and entrapment prevention: access control and secured climbing aids<\/li>\n<li>Tool safety: controlled forces, low-sparking separation, and stable positioning<\/li>\n<\/ul>\n<h2>Deconstruction and recycling<\/h2>\n<p>During deconstruction, the shaft structure is dismantled into manageable components. <strong>Concrete demolition shears<\/strong> reduce concrete parts, reinforcement is separated with steel shears or combination shears. <strong>Stone and concrete splitters<\/strong> enable the release of massive rings without damaging adjacent pipelines. Source-separated sorting facilitates the recycling of concrete, steel, and plastics. This approach fits into the application area of concrete demolition and special demolition as well as special operations where particular boundary conditions apply.<\/p>\n<ul>\n<li>Material flows: separate collection of concrete, steel, plastics, and sediments<\/li>\n<li>Site constraints: protection of neighboring structures and controlled transport logistics<\/li>\n<\/ul>\n<h2>Practice-oriented application examples<\/h2>\n<p>Typical situations include raising shaft covers after road resurfacing, replacing damaged rings, creating new inlets, modifying channel inverts for changed hydraulics, or complete deconstruction of decommissioned shafts. In industrial plants, additional accompanying work on metallic installations occurs; for cutting thick steel components, suitable cutting tools such as steel shears or &#8211; in special cases &#8211; <em>cutting torch<\/em> equipment are available. The choice of tool depends on the material, space constraints, and safety requirements.<\/p>\n<ul>\n<li>Adaptations: cover elevation, benching reprofiling, and wall penetrations with sealing<\/li>\n<li>Removals: selective demolition near active utilities with vibration-limited methods<\/li>\n<\/ul>\n<h2>Terminological classification<\/h2>\n<p>The inspection shaft is distinguished from structures such as throttle shafts, pump shafts, or valve chambers in that its primary function is access and revision. Functions can nevertheless overlap, for example when measuring or throttling devices are integrated. For planning, construction, and maintenance, a clear definition of tasks is helpful to properly specify sizing, material selection, and subsequent maintenance &#8211; up to deconstruction methods with concrete demolition shears or stone and concrete splitters. In many regions, the term <em>manhole<\/em> is used synonymously, while the technical function remains identical.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>An inspection shaft is a central component of the underground infrastructure: it provides walk-in or drive-in access to wastewater, stormwater, and utility pipelines, enables inspections, cleaning, and rehabilitation, and serves as a node in the pipeline network. Across the lifecycle of structures &#8211; from new construction through maintenance to deconstruction <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/inspection-shaft\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19293","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Inspection Shaft for Sewer &amp; Stormwater Networks<\/title>\n<meta name=\"description\" content=\"Learn how the inspection shaft enables access to underground wastewater &amp; stormwater pipelines \u2713 functions &amp; safety.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/inspection-shaft\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Inspection Shaft for Sewer &amp; Stormwater Networks\" \/>\n<meta property=\"og:description\" content=\"Learn how the inspection shaft enables access to underground wastewater &amp; stormwater pipelines \u2713 functions &amp; safety.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/inspection-shaft\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-17T07:22:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/inspection-shaft\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/inspection-shaft\",\"name\":\"Inspection Shaft for Sewer & Stormwater Networks\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-09-08T12:23:32+00:00\",\"dateModified\":\"2026-04-17T07:22:03+00:00\",\"description\":\"Learn how the inspection shaft enables access to underground wastewater & stormwater pipelines \u2713 functions & safety.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/inspection-shaft#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/inspection-shaft\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/inspection-shaft#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Inspection shaft\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Inspection Shaft for Sewer & Stormwater Networks","description":"Learn how the inspection shaft enables access to underground wastewater & stormwater pipelines \u2713 functions & safety.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/inspection-shaft","og_locale":"en_US","og_type":"article","og_title":"Inspection Shaft for Sewer & Stormwater Networks","og_description":"Learn how the inspection shaft enables access to underground wastewater & stormwater pipelines \u2713 functions & safety.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/inspection-shaft","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-04-17T07:22:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/inspection-shaft","url":"https:\/\/www.darda.de\/en\/knowledge\/inspection-shaft","name":"Inspection Shaft for Sewer & Stormwater Networks","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-09-08T12:23:32+00:00","dateModified":"2026-04-17T07:22:03+00:00","description":"Learn how the inspection shaft enables access to underground wastewater & stormwater pipelines \u2713 functions & safety.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/inspection-shaft#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/inspection-shaft"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/inspection-shaft#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Inspection shaft"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19293","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19293"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19293\/revisions"}],"predecessor-version":[{"id":26373,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19293\/revisions\/26373"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19293"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}