{"id":19278,"date":"2025-09-09T11:27:46","date_gmt":"2025-09-09T09:27:46","guid":{"rendered":"https:\/\/www.darda.de\/hydraulic-splitter"},"modified":"2026-04-16T14:56:02","modified_gmt":"2026-04-16T12:56:02","slug":"hydraulic-splitter","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/hydraulic-splitter","title":{"rendered":"Hydraulic splitter"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>A hydraulic splitter is a low-vibration splitting technique that breaks rock and concrete in a controlled manner. The method uses hydraulic energy to drive a wedge set into a borehole, thereby generating targeted tensile stresses within the material. In professional demolition, rock excavation, tunnel construction, and natural stone extraction, this method is a quiet, precise alternative to impact or blasting methods. In combination with products from Darda GmbH &#8211; such as <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a>, rock splitting cylinders, concrete pulverizers, and matching <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power units<\/a> &#8211; structures, foundations, and rock formations can be processed in a planned, selective, and low-emission manner. With thorough planning and an adapted drilling pattern, splitting operations remain predictable and minimize collateral impacts on adjacent assets and installations.<\/p>\n<h2>Definition: What Is Meant by a Hydraulic Splitter?<\/h2>\n<p>A hydraulic splitter is a splitting tool that uses a hydraulic drive to press a wedge set (wedge and counter-wedges) into a predrilled hole. The resulting radial forces cause the brittle material to crack along zones of weakness or predefined borehole grids. The result is controlled fracture surfaces with a low level of vibration, protecting adjacent components, installations, and sensitive existing structures. This technique is a core principle of modern rock and concrete splitters and rock splitting cylinders from Darda GmbH and is often used in conjunction with concrete pulverizers for post-processing. In contrast to impact tools, the action is predominantly tensile and quasi-static, which helps keep noise, dust, and vibration at a consistently low level.<\/p>\n<h2>Operating Principle and Design<\/h2>\n<p>The hydraulic splitter works on the principle of wedge-shaped force amplification. A compact cylinder drives a central wedge between two counter-wedges seated in the borehole. The wedge expands transversely to the insertion direction and generates high tensile stresses that split the material. The splitting process proceeds in cycles: insert, tension to force setpoint, hold for crack initiation, and depressurize for repositioning.<\/p>\n<h3>Key Components<\/h3>\n<ul>\n<li>Splitting cylinder with hydraulic drive<\/li>\n<li>Central wedge and counter-wedges (wedge set) for defined expansion<\/li>\n<li>Adapters for borehole diameter and depth<\/li>\n<li>Hydraulic hose lines with protection and couplings<\/li>\n<li>Hydraulic power packs for pressure and flow supply<\/li>\n<\/ul>\n<p>The sizing of the wedge set depends on borehole diameter, depth, and material strength. For reinforced concrete, a two-stage approach is often chosen: pre-splitting with the splitter, secondary breaking and rebar separation with concrete pulverizers or steel shears. For uniform progress, wedges, adapters, and drilling parameters must be matched to each other to avoid jamming or underutilization of available force.<\/p>\n<h3>Indicative Parameter Ranges<\/h3>\n<ul>\n<li><strong>Borehole diameter:<\/strong> approx. 30 to 50 mm for compact systems; larger diameters for massive sections<\/li>\n<li><strong>Borehole depth:<\/strong> typically 8 to 12 times the diameter; increase for thick components and tough rock<\/li>\n<li><strong>Wedge stroke per cycle:<\/strong> short strokes for tight grids, larger strokes for coarse fragmentation<\/li>\n<li><strong>Splitting force:<\/strong> from hundreds of kilonewtons up to several meganewtons depending on tool size<\/li>\n<\/ul>\n<h2>Technical Fundamentals and Mechanics of Wedge Splitting<\/h2>\n<p>Splitting is based on generating tensile stresses in a predominantly compression-resistant, brittle medium. While impact methods initiate microscopic cracks in an undirected manner, the hydraulic splitter guides crack propagation via the drilling pattern. The crack front moves from the borehole radially in the direction of least material resistance until a fracture plane forms. In concrete, aggregate, moisture, reinforcement, and component geometry influence the splitting line; in natural stone, joint systems, bedding, and grain bonding play a role. In fracture mechanics terms, the opening mode (Mode I) dominates, which favors clean fracture surfaces and limits transmission of vibration to adjacent structures.<\/p>\n<h3>Drilling Pattern and Crack Control<\/h3>\n<ul>\n<li>Select borehole diameter and depth to match the wedge set<\/li>\n<li>Plan spacings so cracks converge (<em>borehole grid<\/em>)<\/li>\n<li>Observe edge distances to protect edges and component connections<\/li>\n<li>Guide cracks specifically toward breakout openings, saw cuts, or weakened sections<\/li>\n<\/ul>\n<p>For massive components, a combination of wedge splitting and saw cuts can be expedient to control crack propagation and size fragments to the desired shape. Predefined relief notches or core holes at desired break lines further stabilize the fracture path and reduce stray cracking.<\/p>\n<h2>Fields of Application: From Concrete Demolition to Natural Stone Extraction<\/h2>\n<p>Hydraulic splitters are used wherever precise, low-vibration separations are required and blasting, pneumatic breakers, or powder-actuated tools are excluded for technical, organizational, or permitting reasons.<\/p>\n<ul>\n<li><strong>Concrete demolition and special deconstruction:<\/strong> Pre-splitting of foundations, abutments, piers, and walls. Selective separation of components with minimal impact on adjacent use.<\/li>\n<li><strong>Strip-out and cutting:<\/strong> Interior demolition in existing buildings, hospital and laboratory environments, heritage conservation. After wedge splitting, concrete pulverizers take over controlled secondary breaking and exposure of reinforcement.<\/li>\n<li><strong>Rock excavation and tunnel construction:<\/strong> Removal of overbreak, crown stabilizations, invert elevations, enlargements in confined tunnel face areas. Splitting technology reduces vibration and facilitates stabilization work; see <a href=\"https:\/\/www.darda.de\/en\/applications\/rock-demolition-and-tunnel-construction\">rock demolition and tunnel construction<\/a> for typical applications.<\/li>\n<li><strong>Natural stone extraction:<\/strong> Detaching blocks along natural joints or predrilled separation seams. Gentle extraction with minimal loss of usable material.<\/li>\n<li><strong>Special applications:<\/strong> Work in explosion-sensitive zones, in facilities with protection requirements, underwater or at height, where low weight and modular technology are required.<\/li>\n<\/ul>\n<p>In urban settings and near sensitive operations, the low-noise and low-vibration profile simplifies coordination with stakeholders and streamlines permitting workflows.<\/p>\n<h2>Linkage with Products and Workflows of Darda GmbH<\/h2>\n<p>The hydraulic splitter forms the first step of controlled separation. In proven practice, pre-splitting is complemented by additional tools:<\/p>\n<ul>\n<li><strong>Rock and concrete splitters \/ rock splitting cylinders:<\/strong> bring the wedge technique into the borehole and generate the split.<\/li>\n<li><strong>Concrete pulverizers and combi-shears:<\/strong> further downsize the pre-split material, separate concrete slabs, and expose reinforcement.<\/li>\n<li><strong>Steel shears and multi cutters:<\/strong> cut exposed reinforcing bars, sections, and embedded components.<\/li>\n<li><strong>Tank cutters:<\/strong> in industrial deconstruction, when tank shells or plant parts must be cut after concrete structure removal.<\/li>\n<li><strong>Hydraulic power packs:<\/strong> supply all connected tools with the required pressure and flow, enabling a coordinated, mobile system.<\/li>\n<\/ul>\n<p>This chain of pre-splitting, secondary breaking, and cutting increases process reliability, reduces noise and dust emissions, and delivers clean separation surfaces for haul-off. Coordinating interfaces, such as uniform couplings and matching operating pressures, shortens setup times and reduces the risk of mismatches.<\/p>\n<h2>Planning: Selection Criteria and Sizing<\/h2>\n<p>Several factors are decisive when choosing a hydraulic splitter and designing the drilling pattern. The goal is a reproducible, material-appropriate split with minimal side effects on the surroundings.<\/p>\n<ol>\n<li><strong>Material characteristics:<\/strong> compressive strength, degree of reinforcement, joint systems, moisture, frost.<\/li>\n<li><strong>Component geometry:<\/strong> cross-section, embedment, edge distances, defined fracture lines.<\/li>\n<li><strong>Drilling technology:<\/strong> available equipment, drilling diameter and depth, dust removal.<\/li>\n<li><strong>Performance data:<\/strong> required spreading force, wedge stroke, cycle rate.<\/li>\n<li><strong>Hydraulic supply:<\/strong> pressure, flow rate, hose lengths, energy source.<\/li>\n<li><strong>Boundary conditions:<\/strong> noise, vibration, accessibility, ventilation, fire protection.<\/li>\n<\/ol>\n<p>In reinforced concrete, an iterative approach is recommended: test area, assess crack propagation, adjust hole spacings and splitting sequence. <em>Preparation and drilling pattern<\/em> largely determine efficiency and fracture pattern.<\/p>\n<h3>Practical Sizing Hints<\/h3>\n<ul>\n<li>Begin with a pilot grid and adapt spacing by observed crack coalescence<\/li>\n<li>Keep edge distances at least 3 to 5 times the borehole diameter where feasible<\/li>\n<li>With dense reinforcement, reduce spacing and increase borehole depth in stages<\/li>\n<li>Sequence splitting from free edges toward restraints to control fragment release<\/li>\n<\/ul>\n<h2>Occupational Safety and Organizational Measures<\/h2>\n<p>Splitting with a hydraulic wedge requires a safe working environment. The following are generally advisable:<\/p>\n<ul>\n<li>Cordon off the hazard zone; secure spalling and drop zones<\/li>\n<li>Clean boreholes; insert and align the wedge set correctly<\/li>\n<li>Couple hydraulic lines unpressurized; use kink and abrasion protection<\/li>\n<li>Personal protective equipment: eye, hearing, hand, and foot protection<\/li>\n<li>Plan load cases: shoring, propping, controlled release of components<\/li>\n<li>Depressurize the system before tool changes; monitor pressure gauges during operation<\/li>\n<\/ul>\n<p>Legal requirements regarding occupational safety, noise, and vibration must be observed depending on location; relevant documentation should be reviewed on a project-specific basis. Pressure equipment must be inspected regularly, and operators must be trained. In confined spaces, ensure adequate ventilation and establish clear communication and signaling rules.<\/p>\n<h2>Hydraulic Power Packs: Energy and Control<\/h2>\n<p>The performance of a hydraulic splitter depends on stable pressure supply and suitable flow rate. Hydraulic power packs from Darda GmbH are designed for mobile applications and provide the necessary energy efficiently.<\/p>\n<h3>Sizing of the Supply<\/h3>\n<ul>\n<li>Select working pressure to match the wedge set; take safety valves into account<\/li>\n<li>Dimension flow rate to achieve cycle times and productivity<\/li>\n<li>Hose management for low pressure losses and safe routing<\/li>\n<li>Start-stop strategies to reduce emissions and fuel demand<\/li>\n<\/ul>\n<p>Responsive control helps avoid breakage noise, material jumps, and uncontrolled crack paths. For combined use with concrete pulverizers and shears, compatible power packs simplify tool changes. Where site constraints require particularly low noise or emissions, electric or hybrid power supply concepts can be advantageous if compatible with tool specifications.<\/p>\n<h2>Sequences in Deconstruction: Interaction with Concrete Pulverizers<\/h2>\n<p>In practice, the hydraulic splitter is often combined with concrete pulverizers. After the wedge has pre-split the component, pulverizers grip at the fracture line, downsize slabs, and expose reinforcement. This reduces holding forces, makes fragments manageable, and allows clean separation by material type.<\/p>\n<h3>Typical Process Sequence<\/h3>\n<ol>\n<li>Set the drilling pattern, position wedges, and split in a controlled manner<\/li>\n<li>Secondary break and size fragments with concrete pulverizers<\/li>\n<li>Cut reinforcement with steel shears or multi cutters<\/li>\n<li>Haul-off and recycling by material fractions<\/li>\n<\/ol>\n<p>This sequence is suitable for foundations, walls, slabs, bridge parapets, and massive machine foundations, as well as for removing rock noses in excavation pits. Where required, pre-sawing of notches further guides the crack line and improves fragment geometry.<\/p>\n<h2>Quality, Maintenance, and Service Life<\/h2>\n<p>Regular care increases availability and the accuracy of the splitting process.<\/p>\n<ul>\n<li>Inspect the wedge set, clean wear surfaces, and lightly lubricate<\/li>\n<li>Check hydraulic oil level and quality; observe filter intervals<\/li>\n<li>Inspect couplings, hoses, and protective spirals<\/li>\n<li>Ensure borehole quality: clean, within tolerance, free of slurry<\/li>\n<li>Regrind or replace wedges if burr formation or scoring is evident; renew seals as needed<\/li>\n<\/ul>\n<p>A well-maintained wedge set reduces friction losses, improves spreading action, and lowers the thermal load on the hydraulics. Documenting maintenance actions supports consistent performance over the tool&#8217;s service life.<\/p>\n<h2>Emissions, Protecting the Surroundings, and Sustainability<\/h2>\n<p>The hydraulic splitter operates with low vibration and noise. This is advantageous in densely built-up areas, sensitive facilities, or night work. Fewer secondary damages mean less rework. In combination with selective downsizing by concrete pulverizers, the recycling rate increases because concrete and steel can be cleanly separated. Water-suppressed drilling and targeted dust extraction help maintain air quality and protect sensitive equipment in the vicinity.<\/p>\n<h2>Economic Aspects and Project Organization<\/h2>\n<p>Cost-effectiveness depends on drilling performance, splitting efficiency, material handling, and logistics. A well-planned drilling pattern, the right choice of wedge set and hydraulic power pack, and short haul routes reduce downtime. For larger cross-sections, a two-stage approach &#8211; pre-splitting with the wedge, secondary breaking with the concrete pulverizer &#8211; can significantly shorten total time. Coordinated sequencing with waste separation and transport windows further stabilizes schedules and costs.<\/p>\n<h2>Distinction from Alternative Methods<\/h2>\n<p>Compared to hydraulic presses with flat rams, breaker hammers, or sawing technology, the splitter offers a favorable combination of low vibration, compact equipment, and high splitting force. Blasting techniques achieve high power densities but require special permits and safety zones. Sawing delivers precise cut joints but is laborious with massive cross-sections or heavy reinforcement. Often, the <strong>combined use<\/strong> of wedge splitting, sawing, and concrete pulverizers leads to the optimal solution. The key selection criteria are structural sensitivity, permissible emissions, geometry, and required production rate.<\/p>\n<h2>Practical Guidance for Typical Materials<\/h2>\n<h3>Reinforced Concrete<\/h3>\n<ul>\n<li>Position boreholes to bypass reinforcement where possible<\/li>\n<li>With dense rebar mats: tighter grid and multi-stage splitting<\/li>\n<li>After pre-splitting: use a concrete pulverizer or steel shear to cut reinforcement<\/li>\n<\/ul>\n<h3>Mass Concrete Without Reinforcement<\/h3>\n<ul>\n<li>Larger grids are possible; crack propagation is more uniform<\/li>\n<li>Split fragments to manageable sizes for haul-off<\/li>\n<\/ul>\n<h3>Natural Stone<\/h3>\n<ul>\n<li>Read and utilize joint systems; choose generous edge distances<\/li>\n<li>For tough rock: smaller borehole spacing and deeper splitting<\/li>\n<\/ul>\n<h3>Troubleshooting Hints<\/h3>\n<ul>\n<li>If cracks stall, reduce spacing locally or deepen adjacent boreholes<\/li>\n<li>Reposition the wedge set by a small offset and repeat the cycle to reinitiate propagation<\/li>\n<li>Use guiding cuts or core holes at target break lines to steer the fracture<\/li>\n<\/ul>\n<h2>Documentation and Quality Assurance<\/h2>\n<p>Photo documentation of drilling patterns and records of pressure, flow rate, cycle times, and breakage results support optimization. From the interaction of splitter, concrete pulverizers, and hydraulic power packs, empirical values emerge that can be transferred to subsequent projects. Systematic logging of drilling meters per shift, average hole spacing, fragment sizes, and rework share enables benchmarking and continuous improvement.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A hydraulic splitter is a low-vibration splitting technique that breaks rock and concrete in a controlled manner. The method uses hydraulic energy to drive a wedge set into a borehole, thereby generating targeted tensile stresses within the material. In professional demolition, rock excavation, tunnel construction, and natural stone extraction, this <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/hydraulic-splitter\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19278","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Hydraulic Splitter for Rock &amp; Concrete Demolition<\/title>\n<meta name=\"description\" content=\"Quiet, low-vibration rock and concrete splitting with a hydraulic splitter \u2713 Precise, non-explosive demolition.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/hydraulic-splitter\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Hydraulic Splitter for Rock &amp; Concrete Demolition\" \/>\n<meta property=\"og:description\" content=\"Quiet, low-vibration rock and concrete splitting with a hydraulic splitter \u2713 Precise, non-explosive demolition.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/hydraulic-splitter\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-16T12:56:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/hydraulic-splitter\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/hydraulic-splitter\",\"name\":\"Hydraulic Splitter for Rock & Concrete Demolition\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-09-09T09:27:46+00:00\",\"dateModified\":\"2026-04-16T12:56:02+00:00\",\"description\":\"Quiet, low-vibration rock and concrete splitting with a hydraulic splitter \u2713 Precise, non-explosive demolition.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/hydraulic-splitter#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/hydraulic-splitter\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/hydraulic-splitter#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Hydraulic splitter\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Hydraulic Splitter for Rock & Concrete Demolition","description":"Quiet, low-vibration rock and concrete splitting with a hydraulic splitter \u2713 Precise, non-explosive demolition.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/hydraulic-splitter","og_locale":"en_US","og_type":"article","og_title":"Hydraulic Splitter for Rock & Concrete Demolition","og_description":"Quiet, low-vibration rock and concrete splitting with a hydraulic splitter \u2713 Precise, non-explosive demolition.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/hydraulic-splitter","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-04-16T12:56:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/hydraulic-splitter","url":"https:\/\/www.darda.de\/en\/knowledge\/hydraulic-splitter","name":"Hydraulic Splitter for Rock & Concrete Demolition","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-09-09T09:27:46+00:00","dateModified":"2026-04-16T12:56:02+00:00","description":"Quiet, low-vibration rock and concrete splitting with a hydraulic splitter \u2713 Precise, non-explosive demolition.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/hydraulic-splitter#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/hydraulic-splitter"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/hydraulic-splitter#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Hydraulic splitter"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19278","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19278"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19278\/revisions"}],"predecessor-version":[{"id":26351,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19278\/revisions\/26351"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19278"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}