{"id":19259,"date":"2025-09-11T10:42:21","date_gmt":"2025-09-11T08:42:21","guid":{"rendered":"https:\/\/www.darda.de\/wood-protection"},"modified":"2026-04-15T13:27:02","modified_gmt":"2026-04-15T11:27:02","slug":"wood-protection","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/wood-protection","title":{"rendered":"Wood protection"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Wood protection comprises preventive and accompanying measures used to protect timber components against moisture, biological attack, mechanical overload, and thermal effects. In existing buildings, during refurbishment works, selective deconstruction, and building gutting, wood protection is particularly demanding: wood is often closely interconnected with concrete, masonry, steel, or composite layers. Interventions such as concrete demolition and cutting or separation operations must be planned so that load-bearing and preservable timber components remain undamaged, their function is maintained, and no new risks arise. Tools and methods from concrete demolition &#8211; such as a concrete demolition shear or a concrete splitter from Darda GmbH &#8211; can contribute to this if they are applied with low vibration levels, in a controlled manner, and with attention to moisture and dust management. A structured sequence, clear responsibilities, and on-site quality checks significantly reduce avoidable defects and follow-up costs.<\/p>\n<h2>Definition: What is meant by wood protection?<\/h2>\n<p>Wood protection refers to the interaction of <em>constructive<\/em>, <em>organizational<\/em> and &#8211; where required &#8211; <em>material<\/em> measures that preserve the serviceability and durability of wood. The aim is to prevent damage caused by moisture, wood-destroying fungi, insects, UV radiation, abrasion, fire and heat exposure, as well as by vibrations or impact load. In practice, effective wood protection starts with planning (keeping moisture away, detailing correctly), continues through the construction phase (clean drying and dust control), and extends to gentle procedures during deconstruction and repairs. Chemical wood preservatives are only one building block and are used in a targeted and economical manner &#8211; depending on the place of use and exposure. Priority is given to design solutions and process control that keep timber dry, clean, and mechanically protected over the entire life cycle.<\/p>\n<h2>Wood protection in existing buildings and deconstruction: relevance for concrete works<\/h2>\n<p>In mixed constructions, for example timber beam floor slabs with cast-in-place concrete topping or timber columns in concrete connections, different material properties meet. When removing concrete, the choice of method directly affects adjacent timber components. <strong>Low-vibration<\/strong> approaches such as controlled splitting of concrete with a concrete splitter or targeted \u201cbiting\u201d with a concrete demolition shear reduce crack formation in timber joints, avoid loosening of dowels, and prevent the ingress of capillary water and alkaline concrete dust into wood surfaces. Differences in stiffness and damping between timber and mineral building materials make vibration control and directed force application essential to maintain joint integrity and prevent long-term moisture accumulation at interfaces.<\/p>\n<h2>Structural wood protection: avoid moisture, control details<\/h2>\n<p>The most effective wood protection remains constructive. The goal is to keep wood permanently dry or to allow it to dry quickly. This applies to new planning as well as to refurbishment works and deconstruction. Attention to end-grain protection, capillary breaks, ventilation, and properly drained interfaces prevents repeated wetting and reduces the need for subsequent chemical measures.<\/p>\n<h3>Principles for planning and execution<\/h3>\n<ul>\n<li>Limit splash water zones; provide drip edges and coverings.<\/li>\n<li>Plan capillary-breaking layers and distance to mineral, damp components.<\/li>\n<li>Choose vapor-permeable build-ups so that trapped moisture can dry out.<\/li>\n<li>Design connection details so that no standing water occurs (e.g., plinths, balcony connections, parapets).<\/li>\n<li>Provide mechanical protection layers where concrete demolition, sawing, or separation or cutting operations take place adjacent to wood.<\/li>\n<li>Protect end-grain and interfaces with defined sealing or separating layers; avoid direct contact with alkaline materials.<\/li>\n<li>Ensure replaceable and inspectable details (removable coverings, accessible joint areas) for condition monitoring.<\/li>\n<\/ul>\n<h3>Structural wood protection in the deconstruction environment<\/h3>\n<ul>\n<li>Before work begins, cover wood surfaces dust-tight; use moisture- and alkali-resistant protective sheeting.<\/li>\n<li>Select a removal sequence that takes wood out of the load path before vibrations act.<\/li>\n<li>Take precautions against <em>moisture ingress<\/em> from cooling cuts, wet drilling, or wet cutting.<\/li>\n<li>Define moisture thresholds and control intervals; install temporary ventilation routes to accelerate drying.<\/li>\n<\/ul>\n<h2>Preserving timber components during concrete demolition<\/h2>\n<p>Where wood is to be preserved or later reused, methods with low vibration levels, minimal sparking, and controlled force transmission are advantageous. A concrete demolition shear and a concrete splitter from Darda GmbH enable targeted release of concrete components without introducing large-area oscillations into adjacent timber structures. Coordinated pre-cutting, force decoupling, and edge protection reduce splintering, compression marks, and fiber tear-out on visible or load-relevant timber areas.<\/p>\n<h3>Practical guidelines<\/h3>\n<ol>\n<li>Preliminary investigation: measure wood moisture, expose connections, document weaknesses.<\/li>\n<li>Load release: install temporary shoring props, reroute load paths.<\/li>\n<li>Pre-cutting and exposing: separate reinforcing steel with a steel shear or Multi Cutters before load is transferred to timber components.<\/li>\n<li>Remove concrete in a controlled manner: apply splitting cylinders step by step, use the concrete demolition shear section by section.<\/li>\n<li>Dust and moisture management: remove alkaline concrete fines from wood surfaces immediately; minimize moisture ingress.<\/li>\n<li>Monitor vibration and temperature near sensitive joints; adapt tool parameters to material response.<\/li>\n<li>Protect edges and coatings with shock-absorbing interlayers; define test areas to validate the procedure.<\/li>\n<\/ol>\n<h2>Timber-concrete composite: separate, preserve, repair<\/h2>\n<p>Timber-concrete composite slabs are common in existing buildings. If topping layers have to be removed or openings created, <strong>local, controlled interventions<\/strong> reduce the risk of cracking, crushing, and fiber tear-out in the wood. A concrete demolition shear allows precise edge nipping; a concrete splitter enables internal break-up of the concrete with limited edge damage. Afterwards, wood surfaces can be cleaned gently, loose mortar residues removed, and vapor diffusion capability restored. Where composite connectors are maintained, assess shear transfer and re-establish moisture and alkali barriers to prevent delayed damage.<\/p>\n<h3>Points requiring special care<\/h3>\n<ul>\n<li>Identify composite connectors (screws, dowels) early and release them in a targeted manner.<\/li>\n<li>Separate reinforcement and embedded parts with a steel shear to remove tensile forces from timber-concrete composites.<\/li>\n<li>Consider moisture buffers: remove coverings in good time to allow the wood to dry.<\/li>\n<li>Avoid impact on end-grain zones; use fine, staged cuts and protective spacers at transitions.<\/li>\n<\/ul>\n<h2>Building gutting and cutting: fire protection and thermal effects<\/h2>\n<p>Wood reacts sensitively to sparks and localized heat inputs. For separation work near wood, a cold, low-spark approach is recommended. Combination shears, Multi Cutters, steel shear and &#8211; in special operations &#8211; cutting torch are selected and guided so that <em>heat and ignition sources<\/em> are minimized. Heat shields and protective mats prevent charring or scorching, especially on concealed timber components behind claddings. Exhausting fumes, monitoring surface temperatures, and using non-combustible barriers complement the protective concept.<\/p>\n<h3>Protective measures before and during separation work<\/h3>\n<ul>\n<li>Organize a fire watch and post-work inspection, especially in cavities and joints.<\/li>\n<li>Minimize embers and spark flight with fire-resistant coverings and barriers.<\/li>\n<li>Position the hydraulic power pack so that waste heat does not affect wood surfaces.<\/li>\n<li>Provide suitable extinguishing agents and verify accessibility of escape and inspection routes.<\/li>\n<\/ul>\n<h2>Biological wood protection: moisture, fungi, insects<\/h2>\n<p>Wood damage usually arises via the moisture pathway. During deconstruction and concrete processing, temporary moisture sources (wet cuts, leaks, weather exposure) may occur. It is crucial to keep these short and ensure drying. If there are signs of mold, brown rot, white rot, or insects (e.g., house longhorn, anobiids), coordinated, professional measures are required. Identification, assessment of the extent, and documentation of exposure classes provide the basis for selecting proportionate countermeasures.<\/p>\n<h3>Typical signs of infestation<\/h3>\n<ul>\n<li>Bore dust, feeding tunnels, exit holes on wood surfaces.<\/li>\n<li>Cubic cracking patterns, discoloration, musty odor.<\/li>\n<li>Soft, fibrous zones or loss of load-bearing capacity.<\/li>\n<li>Activity indicators such as fresh frass or noise in quiet conditions.<\/li>\n<\/ul>\n<h3>Procedure in the intervention environment<\/h3>\n<ul>\n<li>Eliminate moisture sources; monitor wood moisture.<\/li>\n<li>Clean with low dust; treat contaminated areas separately.<\/li>\n<li>Apply material-based measures only in a targeted and compliant manner; be especially careful in interior spaces.<\/li>\n<li>Seal off work zones, remove contaminated dust with HEPA filtration, and dispose of waste in accordance with requirements.<\/li>\n<\/ul>\n<h2>Surfaces, coatings, and temporary protection<\/h2>\n<p>Protect adjacent wood surfaces before separation and demolition works: mechanically robust coverings, vapor-permeable protective layers, and shock-absorbing interlayers preserve edges and coatings. After the intervention, remove alkaline residues of concrete dust to avoid chemical reactions and discoloration. Where required, suitable paints or stains can restore surface protection; ensure compatibility with existing systems. Use pH-neutral cleaning methods, carry out adhesion tests for repairs, and define maintenance intervals for re-treatment in high-wear areas.<\/p>\n<h2>Dust and moisture management in conjunction with concrete<\/h2>\n<p>Concrete dust is alkaline and can attack wood surfaces. Effective dust extraction at a concrete demolition shear or during splitting as well as guided fracture formation reduce ingress. Moisture from cooling or wet cuts should not penetrate into the wood. Barriers, controlled run-off, and a planned drying process are part of an effective wood protection concept. Negative pressure with suitable filtration and sealed transfer paths helps to keep sensitive timber zones clean.<\/p>\n<h3>Proven measures<\/h3>\n<ul>\n<li>Work in sections; remove dust and slurry immediately.<\/li>\n<li>Do not soak wood surfaces; clean pointwise and in a controlled dose.<\/li>\n<li>Document subsequent wood moisture measurements and support them with ventilation measures.<\/li>\n<li>Define target moisture contents for handover and verify with repeat measurements at fixed reference points.<\/li>\n<\/ul>\n<h2>Inspection, diagnosis, and documentation<\/h2>\n<p>Before the start and after completion of interventions, a systematic condition assessment of the timber components is recommended. This includes visual inspection, wood moisture measurement, spot strength indications, and checking of connections. Where relevant, employ non-destructive methods such as resistance measurement, borescope inspection of cavities, and careful exposure of joint details for reliable evaluation.<\/p>\n<h3>Documentation contents<\/h3>\n<ul>\n<li>Initial condition with photos and moisture values.<\/li>\n<li>Methods used and sequence (e.g., splitting, nipping, cutting).<\/li>\n<li>Protective measures and aftercare (cleaning, covering, coating).<\/li>\n<li>Final condition and recommendations for monitoring.<\/li>\n<li>Measurement locations, times, and equipment used to ensure traceability.<\/li>\n<\/ul>\n<h2>Sustainability and reuse<\/h2>\n<p>Gentle wood protection during deconstruction and building gutting facilitates the reuse of components and strengthens the circular economy. Preserved timber cross-sections can be processed, separated by material type, and used materially. Low vibration levels methods &#8211; such as using a concrete splitter or a concrete demolition shear &#8211; support clean construction waste separation without avoidable damage and contribute to recycling. Clear labeling, contamination-free dismantling, and documentation of provenance and properties improve the chances of high-quality reuse.<\/p>\n<h2>Fields of application and practical relevance<\/h2>\n<p>Wood protection issues arise especially in the following areas of application:<\/p>\n<ul>\n<li><strong><a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">Concrete demolition and special deconstruction<\/a><\/strong>: separating composite constructions, protecting historic timber structures.<\/li>\n<li><strong>Building gutting and cutting<\/strong>: low-spark methods near wood, protection of exposed finishes.<\/li>\n<li><strong>Rock excavation and tunnel construction<\/strong>: temporarily protect edge zones of formwork or timber support elements.<\/li>\n<li><strong>Natural stone extraction<\/strong>: protect timber infrastructure, e.g., dunnage and transport racks.<\/li>\n<li><strong>Special operations<\/strong>: work in sensitive areas with increased fire protection or emissions requirements.<\/li>\n<\/ul>\n<h2>Legal and technical notes<\/h2>\n<p>Wood protection measures should follow the recognized rules of technology, relevant standards, and official requirements. This applies in particular to the use of wood preservatives in interior spaces, to biologically contaminated surfaces, and to fire protection and occupational safety during separation works. Requirements may vary regionally; project-specific coordination with specialist planning and &#8211; with the responsible authorities where necessary &#8211; is recommended and does not replace case-by-case advice. Waste management, handling of alkaline slurry, and ventilation concepts should be aligned with applicable regulations.<\/p>\n<h2>Tools at a glance: proper use in favor of wood protection<\/h2>\n<p>The following tools from Darda GmbH &#8211; each depending on the task and environment &#8211; are suitable and, when applied carefully, can help protect adjacent timber components:<\/p>\n<ul>\n<li><strong>Concrete demolition shear<\/strong>: pinpoint nipping, reduced vibrations, controlled edge processing.<\/li>\n<li><strong>Concrete splitter<\/strong> (incl. <em>stone splitting cylinders<\/em>): internal break-up of concrete, minimal vibration input.<\/li>\n<li><strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">Hydraulic power pack<\/a><\/strong>: constant energy supply; positioning outside sensitive timber zones reduces heat and noise input.<\/li>\n<li><strong>Combination shears<\/strong> and <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/multi-cutters\">Multi Cutters<\/a><\/strong>: flexible separation work in mixed construction, guide with low sparks.<\/li>\n<li><strong>Steel shear<\/strong>: cut reinforcing steel to remove tensile forces from timber-concrete composites.<\/li>\n<li><strong>Cutting torch<\/strong>: for special operations where thermally sensitive timber surroundings require particular shielding.<\/li>\n<\/ul>\n<h2>Best practices for construction and deconstruction<\/h2>\n<p>A practical wood protection concept combines technology, organization, and quality assurance. Clearly defined acceptance criteria for moisture, cleanliness, and surface integrity ensure that preserved timber remains serviceable and ready for subsequent construction phases or reuse.<\/p>\n<h3>Checklist<\/h3>\n<ul>\n<li>Pre-assessment of wood moisture and load reserves.<\/li>\n<li>Protection and covering concept for adjacent wood surfaces.<\/li>\n<li>Selection of low-vibration methods (concrete demolition shear, concrete splitter) with a coordinated sequence.<\/li>\n<li>Dust and moisture control with continuous cleaning and dust extraction.<\/li>\n<li>Heat management during separation works, fire watch, and post-inspection.<\/li>\n<li>Documentation and monitoring until a stable equilibrium moisture content is reached.<\/li>\n<li>Defined hold points for intermediate inspections and corrective actions where thresholds are exceeded.<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Wood protection comprises preventive and accompanying measures used to protect timber components against moisture, biological attack, mechanical overload, and thermal effects. In existing buildings, during refurbishment works, selective deconstruction, and building gutting, wood protection is particularly demanding: wood is often closely interconnected with concrete, masonry, steel, or composite layers. Interventions <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/wood-protection\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19259","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Wood Protection in Construction &amp; Deconstruction<\/title>\n<meta name=\"description\" content=\"Practical wood protection for timber \u2713 prevent moisture, fungi, fire &amp; damage from low vibration concrete work.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/wood-protection\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Wood Protection in Construction &amp; Deconstruction\" \/>\n<meta property=\"og:description\" content=\"Practical wood protection for timber \u2713 prevent moisture, fungi, fire &amp; damage from low vibration concrete work.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/wood-protection\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-15T11:27:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/wood-protection\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/wood-protection\",\"name\":\"Wood Protection in Construction & Deconstruction\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-09-11T08:42:21+00:00\",\"dateModified\":\"2026-04-15T11:27:02+00:00\",\"description\":\"Practical wood protection for timber \u2713 prevent moisture, fungi, fire & damage from low vibration concrete work.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/wood-protection#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/wood-protection\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/wood-protection#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Wood protection\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Wood Protection in Construction & Deconstruction","description":"Practical wood protection for timber \u2713 prevent moisture, fungi, fire & damage from low vibration concrete work.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/wood-protection","og_locale":"en_US","og_type":"article","og_title":"Wood Protection in Construction & Deconstruction","og_description":"Practical wood protection for timber \u2713 prevent moisture, fungi, fire & damage from low vibration concrete work.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/wood-protection","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-04-15T11:27:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/wood-protection","url":"https:\/\/www.darda.de\/en\/knowledge\/wood-protection","name":"Wood Protection in Construction & Deconstruction","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-09-11T08:42:21+00:00","dateModified":"2026-04-15T11:27:02+00:00","description":"Practical wood protection for timber \u2713 prevent moisture, fungi, fire & damage from low vibration concrete work.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/wood-protection#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/wood-protection"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/wood-protection#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Wood protection"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19259","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19259"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19259\/revisions"}],"predecessor-version":[{"id":26311,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19259\/revisions\/26311"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19259"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}