{"id":19258,"date":"2025-09-11T09:07:04","date_gmt":"2025-09-11T07:07:04","guid":{"rendered":"https:\/\/www.darda.de\/wooden-scaffold"},"modified":"2026-04-15T10:58:03","modified_gmt":"2026-04-15T08:58:03","slug":"wooden-scaffold","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/wooden-scaffold","title":{"rendered":"Wooden scaffold"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>A wooden scaffold is a temporary construction made of structural timber that serves as a work and protection platform, a support scaffold, or an auxiliary structure in construction. In the context of deconstruction, refurbishment, and strip-out, it enables safe access, materials handling, and the carrying of loads. In many work scenarios where concrete edges are separated with <strong>concrete demolition shears<\/strong> or components are split open with <em><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">stone and concrete splitters<\/a><\/em>, the wooden scaffold forms the nearby work platform and the protected zone for people and materials.<\/p>\n<p><strong>Timber scaffolding<\/strong> is valued for its adaptability, low dead weight, and ease of modification on heterogeneous existing structures. Especially in selective deconstruction, the combination of <em>low-vibration methods<\/em>, controlled load transfer, and short erection paths supports precise sequences and reduces collateral damage to the building fabric.<\/p>\n<h2>Definition: What is meant by a wooden scaffold?<\/h2>\n<p>A wooden scaffold is understood to be a scaffold assembled from timber beams, posts, ledgers, decks, and bracing, erected temporarily to enable work on structures or to shore components. It includes working scaffolds for fa\u00e7ades, trestle and room scaffolds in interior areas, protective scaffolds against falling objects, as well as support scaffolds (e.g., as formwork carriers or shoring). Unlike modular system scaffolds made of steel or aluminum, a wooden scaffold is often planned project-specifically and built from solid timber, glued laminated timber, or planks; fasteners include nails, screws, clamps, and couplers. Execution follows recognized engineering practice and relevant standards; specific requirements must always be interpreted on a project-specific basis.<\/p>\n<p>Depending on scope and risk, <strong>competent persons<\/strong> prepare drawings, a method statement, and inspection records. The wooden scaffold can be combined with <em>partial system components<\/em> (e.g., anchors, connectors) where this improves safety or efficiency, provided compatibility and capacities are verified.<\/p>\n<ul>\n<li><strong>Typical applications:<\/strong> fa\u00e7ade access on uneven substrates, interior platforms in confined rooms, protective canopies during deconstruction, and <em>temporary shoring<\/em> for component release.<\/li>\n<li><strong>Limitations:<\/strong> moisture-sensitive material behavior, combustibility, and dimensional variability require monitoring and protective measures.<\/li>\n<\/ul>\n<h2>Configuration, components, and load-carrying principles<\/h2>\n<p>A wooden scaffold consists of vertical posts, horizontal ledgers and decks, and diagonal bracing. Loads are transferred through posts and bearings into the ground; horizontal forces are introduced into the structure via wall anchors or tie-backs. Side protection with handrail, mid-rail, and toe board protects the working level; nets or protective canopies mitigate the risk of falling debris during deconstruction.<\/p>\n<p>Key design intents include <strong>continuous load paths<\/strong>, sufficient bearing lengths, and <em>torsional restraint<\/em> of members. Connections are detailed to avoid withdrawal failure and splitting, while tolerances and allowable deflections are coordinated with the planned working methods and equipment.<\/p>\n<ul>\n<li><strong>Anchorage strategy:<\/strong> define tie locations early to avoid clashes with demolition cuts and to ensure redundancy.<\/li>\n<li><strong>Foundation and bedding:<\/strong> assess subsoil capacity and settlement; use sole plates or grillages to distribute loads.<\/li>\n<li><strong>Access and egress:<\/strong> integrate ladders or stair modules with guarded openings and anti-slip transitions.<\/li>\n<\/ul>\n<h2>Planning, load assumptions, and design<\/h2>\n<p>Planning considers self-weight, live loads, transport and erection loads, as well as additional actions from equipment and structural parts. For working levels, load classes (e.g., low to high load classes) and the distribution of point loads from power units or component pieces must be defined. <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">Hydraulic power units<\/a>, hose bundles, and tools such as concrete demolition shears or stone and concrete splitters generate concentrated loads; these are distributed over pads (bundled planks, ledger bridges). Design and stability verifications are performed by competent persons; the aspects mentioned are general in nature and do not replace structural calculations.<\/p>\n<p>Additionally, temporary conditions such as <strong>erection stages<\/strong>, partial dismantling, wind on sheeting or nets, and <em>dynamic effects<\/em> from handling heavy offcuts are considered. Where loads change during the sequence, staged verifications and re-inspections are defined.<\/p>\n<h3>Verification and documentation<\/h3>\n<ul>\n<li>Define load classes, point load magnitudes, and permissible deck utilization in the method statement.<\/li>\n<li>Provide sketches for load-spreading measures (pads, stringers, ledger bridges) including fixation against displacement.<\/li>\n<li>Record wall tie capacities and edge distances; assign identification to critical anchors for re-checks.<\/li>\n<\/ul>\n<h2>Use in concrete demolition and specialized deconstruction<\/h2>\n<p>In concrete demolition, the wooden scaffold serves as a work and protection scaffold along the demolition edge or as an interior platform within floors. When working with <strong>concrete demolition shears<\/strong> or <em>stone and concrete splitters<\/em>, timber scaffolds benefit from the comparatively low vibration levels of these methods compared to impact tools. This improves the stability of the auxiliary structure and reduces the risk of loosening at joints.<\/p>\n<h3>Practical measures<\/h3>\n<ul>\n<li>Double-deck scaffold bays beneath equipment with planks and distribute loads across ledgers.<\/li>\n<li>Secure demolition edges with guard boards, nets, or protective canopies to absorb impact effects and catch falling debris.<\/li>\n<li>Plan material flow: separate work and drop sides and provide clear routes for removing split concrete.<\/li>\n<li>Plan pre-positioned anchors for horizontal forces, for example where shear from shear operations occurs.<\/li>\n<\/ul>\n<ul>\n<li>Coordinate exclusion zones for cutting and splitting operations; mark them visibly on decks and access points.<\/li>\n<li>Protect hoses and hydraulic lines at crossing points with ramp boards and edge guards to prevent pinching and leaks.<\/li>\n<\/ul>\n<h2>Wooden scaffold for strip-out and cutting works<\/h2>\n<p>During strip-out and cutting in existing structures, wooden scaffolds are used as trestle scaffolds, room scaffolds, or platforms. Tools such as multi cutters, steel shears, and combination shears, including the <a href=\"https:\/\/www.darda.de\/en\/product-overview\/combi-shears-hcs8\">Combi-Shears HCS8<\/a>, as well as core drilling and sawing equipment require non-slip, clean decks and controlled debris drop. Hose bundles and hydraulic power packs must be routed to avoid trip hazards, and edges must be fitted with edge guards.<\/p>\n<h3>Load and operations organization<\/h3>\n<ul>\n<li>Mark work areas for power units; distribute point loads via stringers made of squared timber (e.g., as a ledger bridge).<\/li>\n<li>Relieve line loads (water, oil, power) with brackets on the guardrail; protect drip points with drip trays placed on planks.<\/li>\n<li>Secure offcuts and rebar pieces promptly and store them in containers to avoid deck deflection.<\/li>\n<\/ul>\n<ul>\n<li>Manage slurry and cooling water from drilling or sawing with containment at deck level; prevent moisture ingress into timber.<\/li>\n<li>Provide residual current protection and cable management; route leads away from walkways and cutting paths.<\/li>\n<\/ul>\n<h2>Support scaffolds, formwork, and shoring<\/h2>\n<p>As a support scaffold, wooden scaffolds temporarily shore formwork or components. In controlled deconstruction, partial areas can be shored before components are released with <em>concrete demolition shears<\/em> or deliberately weakened by splitting cylinders. Important aspects are continuous load paths, adequate anti-overturning stability, and the avoidance of eccentric load introduction due to asymmetrically split components.<\/p>\n<p>Adjustable jacking points enable controlled load take-up and release. Monitoring for settlement and tilt, for example with telltales or gauges, supports safe stepwise unloading during component removal.<\/p>\n<h2>Special environments: fa\u00e7ade, tunnel, stone<\/h2>\n<p>At fa\u00e7ades of historic buildings, wooden scaffolds are common due to their adaptability. They allow fine adjustments to uneven substrates and sensitive surfaces. In tunnels and rock cavities, timber platforms can serve as work platforms in confined situations for blast preparations, splitting works, or saw cuts; execution must be adapted to environmental loads, moisture, and fire risks.<\/p>\n<h3>Natural stone extraction and special applications<\/h3>\n<p>In natural stone extraction, timber work platforms can be positioned precisely to reach splitting boreholes or operate stone splitting cylinders. Advantages include low self-weight and rapid adaptability. In special applications, for example in heritage-protected areas, a timber-based scaffold solution reduces contact and anchorage points in the existing structure.<\/p>\n<ul>\n<li>Account for ventilation, lighting, and dust control in enclosed spaces; select deck finishes that maintain grip when damp.<\/li>\n<li>Use corrosion-protected fasteners and moisture-tolerant details where water exposure is expected.<\/li>\n<\/ul>\n<h2>Material selection, moisture, and durability<\/h2>\n<p>Load-bearing softwoods are used for posts, ledgers, and decks, with strength class and moisture content matched to the planned service life and environment. Moisture variations affect dimensional stability and load behavior; components must be protected against splash water and damaged timber must be removed from service. Fasteners must be corrosion-protected and matched to the timber quality.<\/p>\n<ul>\n<li><strong>Grading and documentation:<\/strong> use graded structural timber appropriate to the service class; mark critical members for traceability.<\/li>\n<li><strong>Detailing:<\/strong> avoid end-grain bearing without protection; use washers or plates to prevent embedment and crushing.<\/li>\n<li><strong>Protection:<\/strong> implement coverings or drips over sensitive nodes; maintain ventilation gaps to limit moisture accumulation.<\/li>\n<\/ul>\n<h2>Occupational safety, fire protection, and environmental protection<\/h2>\n<p>Workplaces on wooden scaffolds require non-slip decks, side protection, and clear traffic routes. Dust and noise from demolition and cutting works must be minimized, for example through extraction and organized debris drop. Wood is combustible; therefore ignition sources must be controlled, hot works secured, and fire extinguishing media kept available. Legal requirements and company-specific regulations must be applied on a project-specific basis.<\/p>\n<ul>\n<li>Define emergency routes, rescue concepts, and communications for confined or multi-level work areas.<\/li>\n<li>Provide fire watches during and after hot works; protect timber surfaces with non-combustible coverings where sparks occur.<\/li>\n<li>Collect and segregate waste, slurry, and oils; prevent releases to soil and drains with absorbents and trays.<\/li>\n<\/ul>\n<h2>Erection, use, and dismantling<\/h2>\n<p>Erection is carried out in sections with immediate bracing and temporary safeguards. Before commissioning, a visual inspection with documentation is advisable; recurring inspections record settlements, moisture damage, or loose connections. Dismantling is planned to avoid residual loads, restrained components, and suspended loads, especially after the use of <strong>stone and concrete splitters<\/strong>, which can alter local crack patterns.<\/p>\n<h3>Inspection and tagging<\/h3>\n<ul>\n<li>Use a tagging system to indicate inspection status and permissible loads at access points.<\/li>\n<li>Record changes during the sequence (added openings, removed ties) and trigger re-inspections after significant events.<\/li>\n<li>Plan dismantling top-down with maintained bracing; keep exclusion zones until the last elements are secured.<\/li>\n<\/ul>\n<h2>Typical error sources and practical notes<\/h2>\n<ul>\n<li>Underestimated point loads from hydraulic power packs and component remnants; remedy: load distribution plates and stringers.<\/li>\n<li>Missing longitudinal bracing; remedy: diagonals and coupling across deck layers.<\/li>\n<li>Insufficient side protection at demolition edges; remedy: three-part guardrail and safety nets.<\/li>\n<li>Hose and cable clutter; remedy: defined hose routing, hangers on the guardrail, edge guards.<\/li>\n<li>Moisture-induced slip hazard; remedy: drainage, regular cleaning, grippy decks.<\/li>\n<\/ul>\n<ul>\n<li>Poorly fixed pads and bridges; remedy: secure against sliding and uplift, verify bearing against rotation.<\/li>\n<li>Uncoordinated anchor removal; remedy: de-tie only after alternative restraint is in place and documented.<\/li>\n<\/ul>\n<h2>Interfaces to tools and processes<\/h2>\n<p>The choice of working method influences the wooden scaffold. Low-stress methods such as working with <em>concrete demolition shears<\/em> or splitting techniques reduce vibrations and the risk of loosening cracks in the scaffold. Cutting and separating tools (e.g., tank cutters for metal vessels, steel shears for reinforcement) require spark and fire protection, clear exclusion zones, and fire-resistant coverings on timber surfaces.<\/p>\n<p>Operations sequencing is coordinated so that <strong>equipment movements<\/strong> and <em>debris handling<\/em> remain decoupled from access routes. Tool suspension points, hose supports, and spill prevention are integrated into the scaffold layout from the outset to maintain clear working levels and consistent capacity.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A wooden scaffold is a temporary construction made of structural timber that serves as a work and protection platform, a support scaffold, or an auxiliary structure in construction. In the context of deconstruction, refurbishment, and strip-out, it enables safe access, materials handling, and the carrying of loads. In many work <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/wooden-scaffold\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19258","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Wooden Scaffold for Construction &amp; Demolition<\/title>\n<meta name=\"description\" content=\"Guide to wooden scaffold \u2713 for construction and deconstruction, safety, shoring, work platforms and load planning.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/wooden-scaffold\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Wooden Scaffold for Construction &amp; Demolition\" \/>\n<meta property=\"og:description\" content=\"Guide to wooden scaffold \u2713 for construction and deconstruction, safety, shoring, work platforms and load planning.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/wooden-scaffold\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-15T08:58:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/wooden-scaffold\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/wooden-scaffold\",\"name\":\"Wooden Scaffold for Construction & Demolition\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-09-11T07:07:04+00:00\",\"dateModified\":\"2026-04-15T08:58:03+00:00\",\"description\":\"Guide to wooden scaffold \u2713 for construction and deconstruction, safety, shoring, work platforms and load planning.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/wooden-scaffold#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/wooden-scaffold\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/wooden-scaffold#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Wooden scaffold\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Wooden Scaffold for Construction & Demolition","description":"Guide to wooden scaffold \u2713 for construction and deconstruction, safety, shoring, work platforms and load planning.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/wooden-scaffold","og_locale":"en_US","og_type":"article","og_title":"Wooden Scaffold for Construction & Demolition","og_description":"Guide to wooden scaffold \u2713 for construction and deconstruction, safety, shoring, work platforms and load planning.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/wooden-scaffold","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-04-15T08:58:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/wooden-scaffold","url":"https:\/\/www.darda.de\/en\/knowledge\/wooden-scaffold","name":"Wooden Scaffold for Construction & Demolition","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-09-11T07:07:04+00:00","dateModified":"2026-04-15T08:58:03+00:00","description":"Guide to wooden scaffold \u2713 for construction and deconstruction, safety, shoring, work platforms and load planning.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/wooden-scaffold#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/wooden-scaffold"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/wooden-scaffold#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Wooden scaffold"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19258","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19258"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19258\/revisions"}],"predecessor-version":[{"id":26307,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19258\/revisions\/26307"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19258"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}