{"id":19254,"date":"2025-09-11T16:54:36","date_gmt":"2025-09-11T14:54:36","guid":{"rendered":"https:\/\/www.darda.de\/cove-joint"},"modified":"2026-04-15T07:09:02","modified_gmt":"2026-04-15T05:09:02","slug":"cove-joint","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/cove-joint","title":{"rendered":"Cove joint"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>The cove joint is an unobtrusive yet effective detail on structures, components, and workpieces: a concave rounding or recessed cove that relieves inner corners, channels water, protects surfaces, or enables a defined crack or separation path. In the context of deconstruction, concrete demolition, rock cutting\/processing, and natural stone processing, the cove joint plays a dual role &#8211; both as <em>damage-mitigating shaping<\/em> on existing edges and as a <strong>targeted predetermined breaking point<\/strong> for controlled separation. The term therefore directly relates to the working methods and tools of Darda GmbH, such as concrete crushers, rock and concrete splitters, rock splitting cylinders, and, additionally, combination shears, multi cutters, steel shears, or tank cutters in the respective fields of application.<\/p>\n<p>In design and craft terminology, the cove joint is also known as a concave radius or scotia profile and must not be confused with a chamfer. Its technical value lies in lowering stress concentrations and guiding media and forces along predictable paths, which is why it is deliberately used in deconstruction planning and in preparatory cuts for controlled separation.<\/p>\n<h2>Definition: What is a cove joint?<\/h2>\n<p>A cove joint is understood to be a concave rounding on the inside of a corner, joint, or connection. It is used in mineral building materials (concrete, mortar, natural stone) as well as in metal construction (e.g., around fillet welds). Functionally, the cove joint reduces notch stresses, avoids sharp geometric breaks, and drains water; aesthetically, it serves as profiling, for example on natural stone edges. In repair and waterproofing, the cove joint is often executed as a wedge-free cove at wall-to-floor junctions to guide sealing layers without sharp kinks. In deconstruction, the cove joint &#8211; or a narrow, concave-acting groove &#8211; is used as a <em>relief cut<\/em> to prepare separation operations and to prevent edge spalling.<\/p>\n<ul>\n<li><strong>Key characteristics:<\/strong> concave geometry, continuous radius or groove, defined depth and width, clean transition to adjacent surfaces.<\/li>\n<li><strong>Do not confuse with:<\/strong> a chamfer (bevel) that creates a straight, not a concave, transition.<\/li>\n<\/ul>\n<h2>Application fields of the cove joint in demolition, deconstruction, and rock processing<\/h2>\n<p>Professionals encounter the cove joint in almost all areas &#8211; from concrete demolition and special deconstruction through strip-out and cutting to rock demolition and tunnel construction as well as natural stone extraction. Depending on the objective, it is produced as a protective radius, as a drainage cove, or as a defined groove for a subsequent separation process.<\/p>\n<p>In practice, the cove joint serves as a protective edge design, as a waterproofing aid, and as a guiding geometry for controlled fracture mechanics. It is chosen wherever edge integrity, predictable separation, and reduced peripheral damage are priorities.<\/p>\n<h3>Concrete demolition and special deconstruction<\/h3>\n<p>In load-bearing components (column heads, brackets, plinth\/base areas), a formed cove joint reduces local notch effects. At the same time, planned demolition can proceed along this cove. <a href=\"https:\/\/www.darda.de\/en\/product-overview\/concrete-crushers\">Concrete crushers for controlled removal<\/a> with their concave jaw geometry enable a <em>nibbling<\/em> removal that creates a cove joint before larger chunks are detached. <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">Rock and concrete splitters for guided splitting<\/a> or rock splitting cylinders work on the borehole splitting principle; a preceding cove groove can serve as a guide line here to stabilize the split path and avoid spalling on adjacent components.<\/p>\n<p>Where reinforcement is present near the edge, the cove is dimensioned to maintain the concrete cover. This approach improves durability and reduces rework by minimizing unintended crack branching and aggregate breakout at the edge.<\/p>\n<h3>Strip-out and cutting<\/h3>\n<p>In strip-out, the cove joint is often understood as a narrow groove that exposes cable or conduit runs and softens break edges at component junctions. Combination shears and multi cutters with suitable jaw shapes can remove concrete cover in edge zones so that a small cove base is formed. This makes subsequent sawing, separating, or crushing work more precise by reducing uncontrolled edge break-offs.<\/p>\n<p>Selective cove grooves also support tracing embedded services and define later cut lines with high positional accuracy, which shortens cutting times and lowers the risk of collateral damage.<\/p>\n<h3>Rock demolition and tunnel construction<\/h3>\n<p>In tunnel construction, the cove joint often denotes the concave formation at invert or wall junctions &#8211; for reasons of water guidance and to protect waterproofing layers. With controlled rock removal, a cove-like, pre-drawn groove (e.g., by scoring or slotting) can support fracture guidance before rock and concrete splitters are used. The defining cove acts like a minor pre-crack geometry with a steering function.<\/p>\n<p>Such geometries help to set defined drainage paths and maintain the integrity of liners and membranes during sequential excavation stages.<\/p>\n<h3>Natural stone extraction<\/h3>\n<p>In natural stone extraction, the cove joint is used both as a functional protective rounding on raw blocks and as a decorative profile in the final finish. When advancing separation planes, a fine cove groove can serve as an orientation line; rock splitting cylinders absorb the stresses along this line in a controlled manner, improving the quality of the separation surface.<\/p>\n<p>Depending on bedding and anisotropy, the radius and groove depth are adapted to avoid flaking along weak planes and to achieve visually consistent profiles.<\/p>\n<h3>Special use<\/h3>\n<p>In metal deconstruction &#8211; such as when cutting vessels and tanks &#8211; the <em>cove joint<\/em> is relevant in the sense of an existing <em>fillet weld joint<\/em>. <a href=\"https:\/\/www.darda.de\/en\/product-overview\/steel-shears\">Steel shears<\/a> and tank cutters often work in the immediate vicinity of such geometries. The concave transitions of the weld influence force flow and cut guidance; clean processing close to the fillet weld minimizes unwanted crack propagation in the remaining component.<\/p>\n<h2>Function and technical effect of the cove joint<\/h2>\n<p>The effect of the cove joint can be distilled into two scenarios:<\/p>\n<ul>\n<li><strong>Relieving cove joint:<\/strong> A radius at the inner corner reduces stress peaks, protects edges from spalling, and allows sealing layers to be guided without folds.<\/li>\n<li><strong>Cove joint as a predetermined breaking point:<\/strong> A narrow, cove-like groove concentrates the separation energy where cutting, splitting, or crushing with concrete crushers will later occur. This produces predictable fracture patterns with less peripheral damage.<\/li>\n<\/ul>\n<p>In concrete construction, the cove formation influences the interaction with reinforcement layers: sufficient concrete cover must be maintained, and at the same time cove joints must not unduly weaken the load-bearing behavior. In practice, the depth is therefore chosen judiciously and matched to the component\u2019s function.<\/p>\n<p>From a mechanics perspective, the concave shape lowers geometric discontinuities and thereby reduces stress intensification. Conversely, a purposeful groove raises local energy density at the intended separation line, improving crack initiation control and directional stability.<\/p>\n<h2>Fabrication of cove joints: methods and tools<\/h2>\n<p>Depending on the material, component thickness, and objective, different methods are suitable. In deconstruction environments, a combination of low-emission, low-vibration, and well-controllable tools has proven effective.<\/p>\n<h3>Typical methods<\/h3>\n<ul>\n<li><strong>Milling and grinding:<\/strong> Produces clean, uniform cove radii and is suitable for waterproofing details.<\/li>\n<li><strong>Cutting and slotting\/scoring:<\/strong> Thin, cove-like grooves for separation preparation or to guide subsequent steps.<\/li>\n<li><strong>Crunching with concrete crushers:<\/strong> Stepwise removal in the edge area enables a quickly produced cove joint with minimal peripheral damage.<\/li>\n<li><strong>Splitting with rock and concrete splitters:<\/strong> A prior cove groove stabilizes the split path; borehole spacing can be aligned to the cove.<\/li>\n<li><strong>Chiseling:<\/strong> Local formation of small coves where access or equipment use is restricted.<\/li>\n<\/ul>\n<h3>Tool reference<\/h3>\n<ul>\n<li><strong>Concrete crushers:<\/strong> The concave jaw geometry supports creating a cove joint at edges before larger pieces are released.<\/li>\n<li><strong>Rock and concrete splitters as well as rock splitting cylinders:<\/strong> After scoring as a cove groove, the splitting impulse produces a controlled separation along the desired line.<\/li>\n<li><strong>Combination shears and multi cutters:<\/strong> Selective removal in confined areas; useful for producing small cove bases that facilitate subsequent steps.<\/li>\n<li><strong>Steel shears and tank cutters:<\/strong> Around fillet welds on steel structures, the existing cove-like geometry influences cut guidance and residual load-bearing capacity.<\/li>\n<li><strong>Hydraulic power packs:<\/strong> Supply hydraulic crushers, shears, and splitters with the required power; a constant pressure profile increases the reproducibility of the cove formation.<\/li>\n<\/ul>\n<h3>Execution tolerances and sequencing<\/h3>\n<p>Uniform geometry is decisive. Typical tolerances in practice aim for consistent radius or groove depth over the entire run, clean transitions at starts and stops, and an even surface without chatter marks. Sequencing favors dust-reduced edge preparation first, then primary separation, and finally finishing passes to achieve the specified cove profile.<\/p>\n<h2>Sizing, radii, and execution details<\/h2>\n<p>The sizing of a cove joint is determined by function, material, and loading. In general:<\/p>\n<ul>\n<li>For waterproofing junctions, smooth radii are advantageous so that coatings seat without voids.<\/li>\n<li>As a predetermined breaking groove, a small depth often suffices; more important is a clear guide line and uniform geometry.<\/li>\n<li>The concrete cover over reinforcement must not be undercut; interventions must be coordinated with design and structural analysis.<\/li>\n<li>In natural stone, the cove formation depends on rock type, bedding, and the desired profile.<\/li>\n<\/ul>\n<p>Indicative practice values are frequently modest: waterproofing coves often use a continuous radius in the low centimeter range, while relief grooves for separation may be only a few millimeters deep yet continuous and sharply defined. Dimensional specifications follow recognized engineering practice and project-specific requirements. For safety-relevant components, a technical review of the cove formation and the resulting stress conditions is advisable.<\/p>\n<h2>Cove joints in waterproofing and repair<\/h2>\n<p>At plinths and wall-to-floor junctions, a cove joint prevents sealing layers from being sharply kinked. Mineral mortar systems or polymer-modified fillers are applied to form an even radius. Adhesive, clean substrates and sufficient tie-in to adjacent surfaces are important. When deconstructing adjacent components, a previously produced cove joint protects the waterproofing layer from mechanical damage.<\/p>\n<ul>\n<li><strong>Material compatibility:<\/strong> Choose systems that bond to mineral substrates and are suitable for the intended waterproofing chemistry.<\/li>\n<li><strong>Surface finish:<\/strong> A smooth, closed surface reduces pinholes and improves coating continuity.<\/li>\n<\/ul>\n<h3>Work steps in practice<\/h3>\n<ol>\n<li>Prepare the substrate (clean, remove loose material, ensure pull-off strength).<\/li>\n<li>Form the cove by milling, grinding, or troweling &#8211; depending on function.<\/li>\n<li>Check geometry (uniform radius, sufficient depth\/width, protection of concrete cover).<\/li>\n<li>Carry out further work (sealing, coating, splitting or crushing) guided along the cove joint.<\/li>\n<li>Document the execution quality and as-built dimensions where relevant to subsequent works.<\/li>\n<\/ol>\n<h2>Quality assurance and testing<\/h2>\n<p>A properly executed cove joint shows a uniform, crack-free geometry without gravel pockets or voids. In the deconstruction context, it is additionally checked whether the cove guides the separation processes as planned. For waterproofing, key aspects are keying into the substrate and continuous, gap-free coating. Documentation by visual inspection, dimensional checks, and &#8211; if required &#8211; simple pull-off or hammer tests in non-critical areas is common.<\/p>\n<ul>\n<li><strong>Acceptance aids:<\/strong> radius gauges, straightedges, and feeler gauges for groove depth consistency.<\/li>\n<li><strong>Optional checks:<\/strong> adhesion tests for troweled coves and leakage tests for sealed junctions.<\/li>\n<\/ul>\n<h2>Occupational safety, environment, and health<\/h2>\n<p>Producing cove joints can cause dust, noise, and vibrations. Where possible, low-dust methods, extraction, or water spray should be used. Personal protective equipment (respiratory, hearing, hand, and eye protection) is mandatory. When working near fillet welds in metal construction (e.g., tank systems), hazards from residues, gases, or ignition sources require special attention; corresponding permits and protection concepts are required beforehand. Hydraulic systems must be secured on the pressure side; leakage checks on the hydraulic power pack reduce environmental risks.<\/p>\n<ul>\n<li>Observe limits for respirable crystalline silica and use effective capture at source or wet methods.<\/li>\n<li>Manage slurry and wastewater from wet cutting to prevent uncontrolled discharge.<\/li>\n<li>Plan ergonomics and vibration exposure by selecting tools and limiting trigger times.<\/li>\n<\/ul>\n<h2>Typical errors and how to avoid them<\/h2>\n<ul>\n<li>Overly deep coves without structural coordination: load reserves can be unduly reduced.<\/li>\n<li>Unclean, interrupted geometry: leads to uncontrolled fracture patterns or leaks.<\/li>\n<li>Damaged reinforcement: corrosion risk and reduced load-bearing capacity &#8211; avoid by limiting cove depth and guiding tools precisely.<\/li>\n<li>Missing substrate preparation: weak bond when cove joints are produced by troweling.<\/li>\n<li>Insufficient emission control: dust exposure and impaired visibility; implement countermeasures consistently.<\/li>\n<li>Insufficient curing of mineral coves: shrinkage cracks and poor coating adhesion.<\/li>\n<\/ul>\n<h2>Practical examples from the fields of application<\/h2>\n<h3>Concrete demolition at base areas<\/h3>\n<p>Before removing an earth-retaining wall, a cove joint is formed on the inside corner. Concrete crushers then remove sections step by step without destroying the waterproofing layer. The cove serves as a buffer zone and a visual guide line.<\/p>\n<h3>Separation on a reinforced concrete slab<\/h3>\n<p>A narrow cove groove marks the later separation line. Rock and concrete splitters absorb the stress along this groove; the fracture proceeds in a controlled manner, and adjacent components remain undamaged.<\/p>\n<h3>Rock rounding in the tunnel<\/h3>\n<p>At invert junctions, a concave cove with sufficient depth is formed so that drainage and waterproofing can be guided without voids. If required, a preceding scoring is carried out to steer removal with splitting cylinders.<\/p>\n<h3>Natural stone profiling<\/h3>\n<p>On visible edges, a cove joint is ground as a decorative profile. When detaching the raw slab, small cove grooves ensure smoothly running separation faces and reduce waste.<\/p>\n<h3>Strip-out edge protection in refurbishment<\/h3>\n<p>During selective dismantling in existing buildings, a shallow cove groove at junctions limits edge spalling before track sawing. Subsequent cutting proceeds along the groove with high accuracy, preserving adjacent finishes and services.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The cove joint is an unobtrusive yet effective detail on structures, components, and workpieces: a concave rounding or recessed cove that relieves inner corners, channels water, protects surfaces, or enables a defined crack or separation path. In the context of deconstruction, concrete demolition, rock cutting\/processing, and natural stone processing, the <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/cove-joint\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19254","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Cove Joint in Concrete, Waterproofing &amp; Demolition<\/title>\n<meta name=\"description\" content=\"Guide to the cove joint in construction, rock work, and demolition \u27a4 stress relief, waterproofing, and fracture control.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/cove-joint\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Cove Joint in Concrete, Waterproofing &amp; Demolition\" \/>\n<meta property=\"og:description\" content=\"Guide to the cove joint in construction, rock work, and demolition \u27a4 stress relief, waterproofing, and fracture control.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/cove-joint\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-15T05:09:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"11 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/cove-joint\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/cove-joint\",\"name\":\"Cove Joint in Concrete, Waterproofing & Demolition\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-09-11T14:54:36+00:00\",\"dateModified\":\"2026-04-15T05:09:02+00:00\",\"description\":\"Guide to the cove joint in construction, rock work, and demolition \u27a4 stress relief, waterproofing, and fracture control.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/cove-joint#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/cove-joint\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/cove-joint#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Cove joint\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Cove Joint in Concrete, Waterproofing & Demolition","description":"Guide to the cove joint in construction, rock work, and demolition \u27a4 stress relief, waterproofing, and fracture control.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/cove-joint","og_locale":"en_US","og_type":"article","og_title":"Cove Joint in Concrete, Waterproofing & Demolition","og_description":"Guide to the cove joint in construction, rock work, and demolition \u27a4 stress relief, waterproofing, and fracture control.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/cove-joint","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-04-15T05:09:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"11 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/cove-joint","url":"https:\/\/www.darda.de\/en\/knowledge\/cove-joint","name":"Cove Joint in Concrete, Waterproofing & Demolition","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-09-11T14:54:36+00:00","dateModified":"2026-04-15T05:09:02+00:00","description":"Guide to the cove joint in construction, rock work, and demolition \u27a4 stress relief, waterproofing, and fracture control.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/cove-joint#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/cove-joint"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/cove-joint#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Cove joint"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19254","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19254"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19254\/revisions"}],"predecessor-version":[{"id":26295,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19254\/revisions\/26295"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19254"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}