{"id":19243,"date":"2025-09-13T09:54:58","date_gmt":"2025-09-13T07:54:58","guid":{"rendered":"https:\/\/www.darda.de\/lever-action"},"modified":"2026-04-14T08:30:03","modified_gmt":"2026-04-14T06:30:03","slug":"lever-action","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/lever-action","title":{"rendered":"Lever action"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Lever action is one of the most fundamental principles of mechanics-and at the same time a key design feature of modern tools for deconstruction, rock cutting\/processing, and the separation of construction materials. In hydraulic systems, pressure is converted into force; lever action distributes and multiplies this force in a targeted manner at the tool head. This allows brittle materials such as concrete or natural stone to be split or cut in a controlled way. Especially with concrete demolition shears and <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">stone and concrete splitters<\/a> from Darda GmbH, the design of the lever kinematics determines how effectively and precisely forces reach the cutting and splitting edges-directly relevant for concrete demolition and special demolition, building gutting and concrete cutting, rock breakout and tunnel construction, natural stone extraction, and special demolition. Properly tuned lever mechanics increase energy efficiency, reduce vibration and noise, and improve the reproducibility of results in daily use.<\/p>\n<h2>Definition: What is meant by lever action?<\/h2>\n<p>Lever action refers to the mechanical amplification or reduction of a force via a rigid body mounted about a pivot. The applied force acts along a force arm, the resulting force along a load arm. Crucial are the lengths of the arms and their ratio: the longer the force arm compared to the load arm, the greater the resulting force at the point of application. The decisive quantity is the torque as the product of force and distance to the pivot. In tools with joints, scissors, or multi-link mechanisms, these principles are combined to generate high force at the workpiece from limited available drive power (e.g., hydraulic pressure)-for example at the cutting edge of a concrete demolition shear or at the wedge of a concrete splitter. In essence, torque equals force times lever arm; work conservation dictates the trade-off between path and force, which practical kinematics exploit to deliver high forces precisely where needed.<\/p>\n<h2>Lever action in hydraulic concrete demolition shears and splitting processes<\/h2>\n<p>Concrete demolition shears and stone and concrete splitters use lever action to transfer the force provided by the hydraulic cylinder through joints, pins, and arms to the material. The kinematics determine how the shear builds \u201cprogressively\u201d more cutting or splitting force over its opening stroke. Short load arms at the cutting jaws, robust bearing points, and a favorable force-introduction angle generate high forces at moderate cylinder load. During splitting, lever action is used to drive a wedge evenly into cracks and weak zones; during cutting, it concentrates force along the contact line between jaw and material until concrete cover, reinforcing steel, or natural stone structures give way. As a rule of thumb, the shorter the instantaneous load arm and the closer the jaw alignment to the force line, the higher the usable force at the workpiece.<\/p>\n<h2>Mechanical fundamentals for practical use<\/h2>\n<p>The classical laws of levers describe the balance of moments about a pivot. In practice, they mean:<\/p>\n<ul>\n<li><strong>Long force arm, short load arm:<\/strong> high force gain at the workpiece, short travel on the load side.<\/li>\n<li><strong>Small engagement angle:<\/strong> favorable force flow, fewer lateral loads.<\/li>\n<li><strong>Low friction in joints:<\/strong> more usable force at the cutting or splitting edge.<\/li>\n<li><strong>High stiffness and minimal backlash:<\/strong> a rigid structure prevents elastic deflection and play that would dissipate energy instead of cutting or splitting.<\/li>\n<li><strong>Force-speed trade-off:<\/strong> higher lever ratios increase force but reduce jaw tip speed and travel per cylinder stroke.<\/li>\n<\/ul>\n<h3>Single-arm, two-arm, and compound levers<\/h3>\n<p>Scissor-like tools combine multiple lever stages. The connection of hydraulic cylinder and scissor arms often forms a compound lever: the cylinder acts on a coupling point, which in turn closes the jaws. This amplifies the cylinder force through two moments, increasing the <em>cutting force<\/em> at the jaw. Carefully phased linkages keep the engagement angle small over the decisive stroke range, stabilizing force transmission.<\/p>\n<h2>Lever action in concrete demolition shears: force introduction and jaw geometry<\/h2>\n<p>Concrete demolition shears are designed for the demolition and separation of concrete components. Their lever action depends on several factors:<\/p>\n<ul>\n<li><strong>Bearing arrangement:<\/strong> the distance between pivot and cutting edge defines the load arm; small load arms increase force.<\/li>\n<li><strong>Cylinder coupling point:<\/strong> the farther the drive acts from the jaw pivot, the greater the force arm.<\/li>\n<li><strong>Jaw geometry:<\/strong> toothed or profiled edges focus force and improve penetration into concrete, including areas with reinforcing steel.<\/li>\n<li><strong>Opening stroke:<\/strong> progressively designed kinematics increase force the closer the jaws are to the workpiece.<\/li>\n<li><strong>Frame stiffness:<\/strong> a rigid main frame maintains geometry under load and keeps the lever ratio effective under peak forces.<\/li>\n<\/ul>\n<h3>Application context<\/h3>\n<p>In concrete demolition and special demolition, a strong lever ratio enables controlled fractures along weak points, reducing flying debris, vibrations, and secondary damage to the remaining structure. In building gutting and concrete cutting, lever action is used to separate components cleanly-for example at wall and slab edges-without unnecessarily disturbing the load-bearing composite. In urban retrofits with strict vibration and dust limits, optimized lever kinematics help confine energy input and keep adjacent finishes intact.<\/p>\n<h2>Lever action in stone and concrete splitters<\/h2>\n<p>Stone and concrete splitters often work with wedges or spreading mechanisms. Lever action appears here in two forms:<\/p>\n<ol>\n<li><strong>Internal lever:<\/strong> the hydraulic cylinder drives a wedge that generates greater spreading force via inclined flanks (force translation through wedge angle and low friction).<\/li>\n<li><strong>External lever:<\/strong> the contact points at the borehole or at the component edge form the \u201creaction lever.\u201d Small distances between wedge and bearing produce high forces in the material core.<\/li>\n<li><strong>Support spacing:<\/strong> borehole diameter, pattern, and edge distance act as boundary conditions for the reaction lever and influence crack initiation and direction.<\/li>\n<\/ol>\n<h3>Application context<\/h3>\n<p>In <a href=\"https:\/\/www.darda.de\/en\/applications\/rock-demolition-and-tunnel-construction\">rock breakout and tunnel construction<\/a>, lever action is used to induce predetermined lines of weakness. In natural stone extraction, the right lever design enables precise split patterns with minimal damage to visible faces. In special demolition (e.g., in sensitive areas), mechanical amplification via lever and wedge supports low-vibration removal. Tight clearances and staged preconditioning with small pilot holes can further stabilize crack paths and reduce collateral damage.<\/p>\n<h2>Influencing factors on effective lever ratio<\/h2>\n<ul>\n<li><strong>Geometry:<\/strong> length of arms, force-introduction angle, pivot position.<\/li>\n<li><strong>Friction and bearings:<\/strong> condition of pins, bushings, and sliding surfaces affects transmitted force.<\/li>\n<li><strong>Material contact:<\/strong> roughness, hardness, and existing cracks govern how effectively tips or cutting edges bite.<\/li>\n<li><strong>Hydraulic parameters:<\/strong> working pressure, cylinder stroke, and flow determine the base performance that the lever \u201crefines,\u201d in combination with <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">matched hydraulic power units<\/a>.<\/li>\n<li><strong>Structural stiffness:<\/strong> flexing members effectively lengthen the load arm and reduce peak force at the contact line.<\/li>\n<\/ul>\n<h3>Condition of jaws and wedges<\/h3>\n<p>Worn edges increase the effective load arm because the contact zone becomes wider. Regular dressing of edges keeps lever action efficient and the cut line precise. Replacement of consumable tips and adherence to specified hardness ranges safeguard predictable force transfer and extend intervals between overhauls.<\/p>\n<h2>Estimating the acting forces in practice<\/h2>\n<p>For a pragmatic assessment of lever action, a structured estimate often suffices:<\/p>\n<ol>\n<li>Determine the distance between pivot and point of application on the workpiece (load arm).<\/li>\n<li>Determine the distance between pivot and coupling point of the hydraulic cylinder (force arm).<\/li>\n<li>Evaluate the kinematics over the working stroke: as the engagement angle decreases, the effective force often increases markedly.<\/li>\n<li>Account for friction losses in joints and at contact surfaces.<\/li>\n<li>Check whether the point of attack concentrates force (e.g., edges, openings, existing cracks).<\/li>\n<\/ol>\n<p>Illustrative order of magnitude: with a 50 mm load arm and a 200 mm force arm, a 50 kN cylinder would yield about 200 kN ideally. With typical losses of 15-25 percent from friction and compliance, 150-170 kN at the contact line is realistic, often rising near closure as the engagement angle improves.<\/p>\n<h3>Note on accuracy<\/h3>\n<p>Field calculations are approximations. For critical applications, detailed kinematic diagrams, material data, and measurements are used. All statements are of a general nature. Force progression curves over the opening angle from technical data sheets provide the reference for design and verification.<\/p>\n<h2>Lever action and fields of application: concrete use cases<\/h2>\n<h3>Concrete demolition and special demolition<\/h3>\n<p>Targeted lever ratios help release components segment by segment. Concrete demolition shears use short load arms to cut reinforcing steel or break concrete cover. Stone and concrete splitters create controlled fractures along borehole-guided lines-low in vibration and compatible with the material. Sequenced cuts and splits reduce residual stresses and limit uncontrolled crack propagation.<\/p>\n<h3>Building gutting and concrete cutting<\/h3>\n<p>In selective deconstruction, lever action increases precision at connections, penetrations, and nodes. Small, multi-supported lever mechanisms enable fine force metering so that adjacent components are preserved. Clean separations around MEP penetrations and facade anchors are facilitated by precise force application at optimized angles.<\/p>\n<h3>Rock breakout and tunnel construction<\/h3>\n<p>By choosing smart points of attack (bedding planes, joints), the amplified force meets the least resistance. This allows planning of removal sequences that respect the stability of adjacent zones. Controlled lever application minimizes overbreak and supports consistent advance profiles.<\/p>\n<h3>Natural stone extraction<\/h3>\n<p>Finely metered lever action along the split direction produces straight fracture faces. The resulting surface quality strongly depends on wedge geometry, contact forces, and friction. Bedding orientation, moisture content, and temperature can subtly shift the effective lever response and should be factored in.<\/p>\n<h3>Special demolition<\/h3>\n<p>In sensitive environments, lever action helps achieve the necessary material separation with minimal energy input. This reduces potential impacts on surroundings and existing structures. Heritage structures, hospitals, or laboratories benefit from low-vibration sequences and precisely controlled crack initiation.<\/p>\n<h2>Practical guide: using lever action deliberately<\/h2>\n<ol>\n<li><strong>Select the point of attack:<\/strong> edges, recesses, cracks, or rows of boreholes favor force introduction.<\/li>\n<li><strong>Adjust jaw position:<\/strong> grip as close to the pivot as possible to shorten the load arm.<\/li>\n<li><strong>Optimize engagement angle:<\/strong> work in phases of maximum lever effect (progressive region of the kinematics).<\/li>\n<li><strong>Stabilize contact:<\/strong> slip-resistant seating so the force does not \u201cdissipate\u201d laterally.<\/li>\n<li><strong>Maintain cutting\/splitting edges:<\/strong> sharp, flat faces minimize mechanical loss.<\/li>\n<li><strong>Define crack paths:<\/strong> create pilot notches or bore patterns to guide fractures along intended lines.<\/li>\n<\/ol>\n<h3>Typical error sources<\/h3>\n<ul>\n<li>Excessive distance between jaw\/wedge and pivot\/reaction support.<\/li>\n<li>Lateral attack that causes torsion instead of pure shear or splitting load.<\/li>\n<li>Worn bearings that introduce play and force losses.<\/li>\n<li>Insufficient edge distance in splitting that triggers spalling rather than a clean split.<\/li>\n<\/ul>\n<h2>Maintenance and service life of lever kinematics<\/h2>\n<p>Lever action remains efficient only if joints, pins, and bushings operate within the intended tolerance range. Regular cleaning, lubrication, and inspection prevent play and localized overload. Visual checks of jaw and wedge edges increase the reproducibility of results and reduce required force. Service intervals should be aligned with operating hours and environmental exposure to dust, moisture, and abrasive fines.<\/p>\n<h3>Checkpoints<\/h3>\n<ul>\n<li>Inspect pins\/bushings for wear and ovalization.<\/li>\n<li>Dress jaw edges when they become rounded.<\/li>\n<li>Check hydraulic connections for tightness and pressure stability.<\/li>\n<li>Verify jaw parallelism and symmetry across the stroke to maintain consistent force distribution.<\/li>\n<\/ul>\n<h2>Safety aspects when working with high lever action<\/h2>\n<p>High lever forces require careful work. Secure work areas, verify shoring and supports, observe component behavior, and control energy input. Personal protective equipment is mandatory. Legal and normative requirements must be observed in general; project-specific assessments are carried out by competent persons. Define exclusion zones, avoid pinch points, and use remote operation where feasible; depressurize and lock out hydraulics during maintenance.<\/p>\n<h2>Design trends: progressive kinematics and force progression<\/h2>\n<p>Modern designs use variable coupling points and optimized angles to increase the <em>cutting and splitting force<\/em> along the opening stroke. The result is a progressive force profile: fast approach at low resistance, maximum force at material engagement. For concrete demolition shears, this means better cutting performance on reinforcing steel; for stone and concrete splitters, a predictive crack path. Finite element-optimized link geometries and measured feedback on pressure and angle support higher efficiency and consistency over the service life.<\/p>\n<h2>Lever action as a planning parameter<\/h2>\n<p>Anyone structuring workflows in concrete demolition, building gutting, or stone extraction should consider lever action early: tool selection, points of attack, drilling patterns, sequence of interventions, and expected crack lines are closely interlinked. Consistent planning exploits mechanical amplification where it has the greatest effect-resource-efficient and controlled. Documented force paths, defined boundary conditions, and lessons learned from prior jobs strengthen repeatability and quality assurance.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Lever action is one of the most fundamental principles of mechanics-and at the same time a key design feature of modern tools for deconstruction, rock cutting\/processing, and the separation of construction materials. In hydraulic systems, pressure is converted into force; lever action distributes and multiplies this force in a targeted <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/lever-action\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19243","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Lever Action in Mechanics &amp; Hydraulic Demolition<\/title>\n<meta name=\"description\" content=\"Discover how lever action in mechanics \u2713 powers hydraulic tools for controlled concrete cutting and rock splitting.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/lever-action\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Lever Action in Mechanics &amp; Hydraulic Demolition\" \/>\n<meta property=\"og:description\" content=\"Discover how lever action in mechanics \u2713 powers hydraulic tools for controlled concrete cutting and rock splitting.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/lever-action\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-14T06:30:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/lever-action\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/lever-action\",\"name\":\"Lever Action in Mechanics & Hydraulic Demolition\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-09-13T07:54:58+00:00\",\"dateModified\":\"2026-04-14T06:30:03+00:00\",\"description\":\"Discover how lever action in mechanics \u2713 powers hydraulic tools for controlled concrete cutting and rock splitting.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/lever-action#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/lever-action\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/lever-action#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Lever action\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Lever Action in Mechanics & Hydraulic Demolition","description":"Discover how lever action in mechanics \u2713 powers hydraulic tools for controlled concrete cutting and rock splitting.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/lever-action","og_locale":"en_US","og_type":"article","og_title":"Lever Action in Mechanics & Hydraulic Demolition","og_description":"Discover how lever action in mechanics \u2713 powers hydraulic tools for controlled concrete cutting and rock splitting.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/lever-action","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-04-14T06:30:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/lever-action","url":"https:\/\/www.darda.de\/en\/knowledge\/lever-action","name":"Lever Action in Mechanics & Hydraulic Demolition","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-09-13T07:54:58+00:00","dateModified":"2026-04-14T06:30:03+00:00","description":"Discover how lever action in mechanics \u2713 powers hydraulic tools for controlled concrete cutting and rock splitting.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/lever-action#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/lever-action"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/lever-action#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Lever action"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19243","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19243"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19243\/revisions"}],"predecessor-version":[{"id":26244,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19243\/revisions\/26244"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19243"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}