{"id":19239,"date":"2025-09-13T11:34:43","date_gmt":"2025-09-13T09:34:43","guid":{"rendered":"https:\/\/www.darda.de\/hand-tool"},"modified":"2026-04-14T09:59:02","modified_gmt":"2026-04-14T07:59:02","slug":"hand-tool","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/hand-tool","title":{"rendered":"Hand tool"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Hand tools form the foundation of many activities on construction sites, in quarries, and in deconstruction projects. From the simple chisel to the heavy pry bar, manual tools enable precise, controlled work &#8211; whether exposing reinforcement, creating separation cuts, or finishing cut edges. In combination with hydraulic devices from Darda GmbH such as concrete demolition shears or <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">stone and concrete hydraulic splitters<\/a>, an effective tool chain is created that sensibly combines rough separation work and fine detail work. In this way, concrete, masonry, and natural stone can be processed efficiently, safely, and in a material-appropriate manner. Well-matched manual and hydraulic steps also support low-dust techniques and reduce rework in sensitive surroundings.<\/p>\n<h2>Definition: What is meant by hand tools?<\/h2>\n<p>Hand tools refer to non-powered tools that are operated exclusively by muscle force. This includes striking, cutting, levering, clamping, and measuring tools. In the practice of concrete demolition, building gutting, and natural stone extraction, hand tools serve preparation (e.g., scribing, marking, pre-scoring), supporting mechanical or hydraulic processes (e.g., wedging, regripping, relieving), and rework (deburring, cleaning edges, smoothing surfaces). Hand tools thus differ from hand-held but powered devices: these are, for example, driven by hydraulic power packs and develop high, reproducible forces; hand tools, on the other hand, rely on <em>manual control<\/em>, tactile feedback, and pinpoint force application. Clear terminology and correct tool selection are basic prerequisites for reproducible quality in controlled demolition.<\/p>\n<h2>Role of hand tools in interaction with concrete demolition shears and stone and concrete splitters<\/h2>\n<p>In controlled demolition, hand tools and Darda GmbH hydraulic separation or splitting devices work in a complementary way. Concrete demolition shears and <a href=\"https:\/\/www.darda.de\/en\/product-overview\/concrete-crushers\">concrete crushers<\/a> take over powerful breaking, crushing, and separating of concrete and reinforced concrete. Stone and concrete splitters generate defined crack lines in brittle materials, often after drilling boreholes. Hand tools help to prepare, accompany, and follow up these processes: set markings, pre-score edges, set wedges, remove loose pieces, expose reinforcement, sort concrete debris, and secure transport routes. Precise, hand-guided work increases the quality of the separation line, reduces uncontrolled spalling, and supports low vibration levels &#8211; a particular advantage in building gutting, special deconstruction, and tunnel construction.<\/p>\n<h3>Why sequencing matters<\/h3>\n<ul>\n<li><strong>Preparation quality:<\/strong> Accurate marking and pre-scoring guide cracks and shears, reducing stray fractures.<\/li>\n<li><strong>Process stability:<\/strong> Clean kerfs and relieved bearing points lower the risk of jamming and tool wear.<\/li>\n<li><strong>Safety margin:<\/strong> Controlled removal of restraints improves predictability when loads are transferred.<\/li>\n<\/ul>\n<h2>Typical hand tools in deconstruction and natural stone extraction<\/h2>\n<p>The choice of the right hand tool depends on the material, the component geometry, and the planned method (cutting, splitting, chiseling, levering). Frequently used are:<\/p>\n<ul>\n<li><strong>Striking tools:<\/strong> club hammer, sledgehammer, engineer\u2019s hammer for chisel work and targeted setting of wedges.<\/li>\n<li><strong>Chisels:<\/strong> flat, pointed, joint, and fan chisels for removing concrete residues, opening joints, and creating intended break lines.<\/li>\n<li><strong>Levering and prying tools:<\/strong> pry bars, crowbars, bolt and nail bars for controlled loosening, lifting, and repositioning of component fragments.<\/li>\n<li><strong>Cutting and separating tools:<\/strong> hand saws and manual tin snips for thin-walled materials; around metallic installations often the preparatory step for hydraulic steel shears or tank cutters from Darda GmbH.<\/li>\n<li><strong>Clamping and gripping tools:<\/strong> pliers, clamps, screw clamps for fixing, holding, or relieving during separation.<\/li>\n<li><strong>Marking and measuring means:<\/strong> scriber, layout pencil, straightedge, square, measuring tape for precise work preparation, especially before splitting or shear use.<\/li>\n<li><strong>Special variants:<\/strong> non-sparking striking tools for hazardous atmospheres and insulated handles for electrical separation tasks when required by risk assessment.<\/li>\n<\/ul>\n<h2>Working methods: cutting, splitting, chiseling, and gripping<\/h2>\n<p>Each method follows a specific material logic and influences subsequent work with hydraulic devices from Darda GmbH:<\/p>\n<ul>\n<li><strong>Cutting:<\/strong> Fine separation lines in plaster or screed layers reduce edge chipping before concrete demolition shears approach load-bearing components.<\/li>\n<li><strong>Splitting:<\/strong> Simple hand wedges or wedge\/feather combinations structure surfaces and facilitate the application of stone and concrete splitters to predrilled holes.<\/li>\n<li><strong>Chiseling:<\/strong> Joint chisels create clean lead-in edges; pointed chisels create initial notches that guide cracks during splitting.<\/li>\n<li><strong>Gripping and levering:<\/strong> Pry bars release interlocks and minimize restraint &#8211; important for positioning concrete demolition shears in a controlled manner and guiding loads.<\/li>\n<\/ul>\n<h3>Interaction tips<\/h3>\n<ul>\n<li>Align tool action with natural planes of weakness and reinforcement layout.<\/li>\n<li>Alternate between relieving and separating steps to keep components stable yet responsive.<\/li>\n<li>Keep visual control of crack fronts and stop lines to avoid collateral damage.<\/li>\n<\/ul>\n<h2>Materials: concrete, reinforced concrete, masonry, and natural stone<\/h2>\n<p>Fracture mechanics differ significantly:<\/p>\n<ul>\n<li><strong>Concrete and reinforced concrete:<\/strong> The cement matrix is brittle, the reinforcement is ductile. Hand tools are often used to reduce concrete cover and make reinforcement visible before concrete demolition shears grip reinforcement and concrete together. Localized removal around stirrups or anchorage zones improves shear access and cut quality.<\/li>\n<li><strong>Masonry:<\/strong> Bed and head joints allow targeted loosening with joint chisels. Pre-scoring reduces unwanted crack propagation before larger sections are separated with hydraulic force. Historic masonry may require gentler striking energies and wider chisels to preserve adjacent fabric.<\/li>\n<li><strong>Natural stone:<\/strong> Anisotropy (bedding, joints) determines crack propagation. Marking, setting anchor points, and wedging facilitate the use of stone splitting cylinders or stone and concrete splitters. Reading grain direction and existing discontinuities is essential for predictable block release.<\/li>\n<\/ul>\n<h2>Practice in concrete demolition and special deconstruction<\/h2>\n<p>In sensitive environments (hospitals, inner-city locations, listed buildings), controlled, low-emission work is paramount. A proven sequence is:<\/p>\n<ol>\n<li><strong>Work preparation:<\/strong> visual inspection, marking of cut and splitting lines, defining the sequence, release of work areas.<\/li>\n<li><strong>Pre-work by hand:<\/strong> score joints, loosen cover layers, locate reinforcement, clean contact surfaces for concrete demolition shears.<\/li>\n<li><strong>Hydraulic main separation:<\/strong> use concrete demolition shears for breaking and separating or stone and concrete splitters for controlled crack development.<\/li>\n<li><strong>Rework:<\/strong> chisel edges, remove loose components, make transport pieces manageable, sort by construction materials.<\/li>\n<\/ol>\n<p>This combination minimizes noise, vibrations, and uncontrolled fractures &#8211; particularly important for building gutting and cutting as well as in special operations. Documenting cut plans and actual separation lines improves repeatability in multi-bay projects.<\/p>\n<h2>Rock excavation and tunnel construction: fine control of crack propagation<\/h2>\n<p>In rock, scribing, setting wedges, and preparatory chiseling can influence stress states. Hand tools support the defined formation of crack lines so that stone and concrete splitters deploy their force along predetermined paths. The result is smoother fracture surfaces, less overbreak, and a more predictable removal &#8211; an advantage for cross-section enlargements, connection niches, and lining works in tunnel heading. Additional attention to confinement and advance drainage reduces unforeseen rock bursts during splitting.<\/p>\n<h2>Natural stone extraction: from the bench to the raw slab<\/h2>\n<p>Extracting natural stone requires a feel for bedding and joint systems. Chisels and wedges structure the surface, mark the later separation plane, and initiate detachment of the block. Stone splitting cylinders or stone and concrete splitters then take over the volumetric separation. Hand tools remain essential for wedging off, reworking edges, and preparing transportable formats. Clean bearing and rolling paths shorten handling times and decrease edge damage.<\/p>\n<h2>Interaction with hydraulic power packs and additional cutting and shearing tools<\/h2>\n<p>Hydraulic power packs provide pressure for concrete demolition shears, combination shears, multi cutters, steel shears, and tank cutters from Darda GmbH. These <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">compact hydraulic power units<\/a> are used in this process chain to create safe bearing surfaces, keep kerfs clear, and stabilize components. This helps avoid crushing, improves cut quality, and reduces tool wear on hydraulic devices. Hose routing, kink protection, and sufficient slack at the workface should be planned so that manual operations remain unhindered and safe.<\/p>\n<h2>Safety and ergonomics<\/h2>\n<p>Working with hand tools requires prudent procedures. General notes:<\/p>\n<ul>\n<li><strong>Personal protective equipment:<\/strong> safety glasses, gloves, hearing protection, and appropriate safety footwear.<\/li>\n<li><strong>Vibration and noise reduction:<\/strong> dose striking energy, use tools with intact striking faces, use water-bound dust suppression if necessary.<\/li>\n<li><strong>Body protection:<\/strong> use lever forces efficiently, align the body axis behind the tool, secure standing surfaces.<\/li>\n<li><strong>Safe guidance:<\/strong> always seat wedges fully, guide chisels with suitable holders, avoid pinch points.<\/li>\n<li><strong>Exclusion zones:<\/strong> define danger areas for flying fragments and moving loads during splitting and shearing.<\/li>\n<li><strong>Compatibility:<\/strong> ensure manual tools do not introduce burrs or notches at interfaces with hydraulic jaws and blades.<\/li>\n<\/ul>\n<p>Legal requirements and local regulations must be observed in general; occupational health and safety recommendations should be reviewed on a project-specific basis. Briefing routines and stop rules for crack propagation support situational decisions at the face.<\/p>\n<h2>Quality features and selection of hand tools<\/h2>\n<p>Important criteria are the hardness and toughness of the steel, edge stability, striking face geometry, corrosion protection, and ergonomic grip design. For chisels, clean grinds and defined cutting angles are essential. Pry bars should have robust, non-slip contact faces. For tools used in contact with concrete demolition shears or stone and concrete splitters, flat, burr-free edges are important to avoid damage to components and to the hydraulic tools. If applicable, observe standard conformity and material certificates that document suitability for construction site conditions.<\/p>\n<h2>Maintenance, care, and service life<\/h2>\n<p>Regular inspection prevents failures:<\/p>\n<ul>\n<li>Regrind and deburr cutting edges; re-dress or discard mushroomed striking heads.<\/li>\n<li>Check handles and grips (wood for cracks, assemblies for tight fit). Replace damaged handles immediately.<\/li>\n<li>Cleanliness: remove cement residues and abrasion; apply light oiling against corrosion.<\/li>\n<li>Identification: clearly mark tool sizes and intended use to prevent misuse.<\/li>\n<li>Storage: keep tools dry, separated by type, and protected from impact to maintain edge integrity.<\/li>\n<\/ul>\n<h2>Work organization and process planning<\/h2>\n<p>Good results arise from a coordinated chain of surveying, marking, preparation, and separation. Hand tools take on the <strong>fine work<\/strong> at the separation line, while concrete demolition shears and stone and concrete splitters perform the main work. A clear sequence reduces changeover times, increases safety, and improves the surface quality of fracture or cut edges. Defined interfaces between trades and early logistics planning for debris and reusable elements further stabilize cycle times.<\/p>\n<h2>Special applications: confined spaces, sensitive areas, and special materials<\/h2>\n<p>In confined spaces, on hard-to-reach components, or on sensitive surfaces, hand-guided steps are often indispensable. By measured chiseling, controlled wedging, and gentle levering, components can be released without affecting adjacent areas. Afterwards, combination shears, steel shears, or tank cutters from Darda GmbH can be applied in a targeted manner to separate installations, beams, or sheet metal structures &#8211; the manual prework ensures accessibility and reduces unwanted deformation. Additional measures such as surface protection, low-dust techniques, and point extraction enhance results in refurbishment and conversion projects.<\/p>\n<h2>Competence building and further training<\/h2>\n<p>Safe and efficient work with hand tools is based on practice and methodical training. This includes reading components (cracks, joints, reinforcement), identifying materials, correct tool guidance, and understanding the working principles of concrete demolition shears and stone and concrete splitters. Project teams benefit from clear roles, agreements, and regular exchange of experience on the construction site. Short on-site trainings and documented method statements strengthen consistency across shifts and locations.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Hand tools form the foundation of many activities on construction sites, in quarries, and in deconstruction projects. From the simple chisel to the heavy pry bar, manual tools enable precise, controlled work &#8211; whether exposing reinforcement, creating separation cuts, or finishing cut edges. In combination with hydraulic devices from Darda <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/hand-tool\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19239","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Hand Tool for Concrete, Masonry &amp; Stone Demolition<\/title>\n<meta name=\"description\" content=\"Guide to hand tool use in construction &amp; demolition \u2713 prepare, split, chisel &amp; finish with precision and low impact.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/hand-tool\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Hand Tool for Concrete, Masonry &amp; Stone Demolition\" \/>\n<meta property=\"og:description\" content=\"Guide to hand tool use in construction &amp; demolition \u2713 prepare, split, chisel &amp; finish with precision and low impact.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/hand-tool\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-14T07:59:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/hand-tool\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/hand-tool\",\"name\":\"Hand Tool for Concrete, Masonry & Stone Demolition\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-09-13T09:34:43+00:00\",\"dateModified\":\"2026-04-14T07:59:02+00:00\",\"description\":\"Guide to hand tool use in construction & demolition \u2713 prepare, split, chisel & finish with precision and low impact.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/hand-tool#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/hand-tool\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/hand-tool#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Hand tool\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Hand Tool for Concrete, Masonry & Stone Demolition","description":"Guide to hand tool use in construction & demolition \u2713 prepare, split, chisel & finish with precision and low impact.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/hand-tool","og_locale":"en_US","og_type":"article","og_title":"Hand Tool for Concrete, Masonry & Stone Demolition","og_description":"Guide to hand tool use in construction & demolition \u2713 prepare, split, chisel & finish with precision and low impact.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/hand-tool","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-04-14T07:59:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/hand-tool","url":"https:\/\/www.darda.de\/en\/knowledge\/hand-tool","name":"Hand Tool for Concrete, Masonry & Stone Demolition","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-09-13T09:34:43+00:00","dateModified":"2026-04-14T07:59:02+00:00","description":"Guide to hand tool use in construction & demolition \u2713 prepare, split, chisel & finish with precision and low impact.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/hand-tool#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/hand-tool"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/hand-tool#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Hand tool"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19239","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19239"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19239\/revisions"}],"predecessor-version":[{"id":26262,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19239\/revisions\/26262"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19239"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}