{"id":19221,"date":"2025-09-16T16:57:18","date_gmt":"2025-09-16T14:57:18","guid":{"rendered":"https:\/\/www.darda.de\/pit-shoring"},"modified":"2026-04-13T14:56:03","modified_gmt":"2026-04-13T12:56:03","slug":"pit-shoring","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/pit-shoring","title":{"rendered":"Pit shoring"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Pit shoring encompasses all temporary or permanent measures to secure excavation pits and shafts. The aim is to control earth and water pressure, create working space, and protect adjacent buildings and utilities. In practice, the shoring often encounters obstacles such as foundation remnants, rock ledges, old utilities, or sheet pile walls. Powerful, precise, and low-vibration tools are used here, such as <strong>concrete demolition shears<\/strong> or <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a><\/strong> by Darda GmbH, which support excavation pit stabilization especially in confined and sensitive environments. In professional practice this is also referred to as <em>excavation support<\/em>, focusing on structural safety, sequence reliability, and minimal impact on the surroundings.<\/p>\n<h2>Definition: What is meant by pit shoring?<\/h2>\n<p>Pit shoring refers to the orderly support and enclosure of an excavation pit with technical systems that take up lateral earth pressure, loads from traffic and buildings, as well as impacts from groundwater and vibrations. The shoring enables the construction of structures below grade &#8211; from utility trenches and basement structures to launch and reception shafts in tunnel construction. It is planned, installed step by step, advanced during excavation, monitored, and finally dismantled in an orderly way or partly left in place as a permanent structure. Designs typically consider ultimate and serviceability limit states, construction stages, and verifiable monitoring plans to control deformation and groundwater effects.<\/p>\n<h2>Types and systems of pit shoring<\/h2>\n<p>The choice of shoring system depends on geology, groundwater, spatial constraints, neighboring buildings, and the construction task. Robust risk and water management as well as deformation limits guide the selection. Common systems are:<\/p>\n<ul>\n<li><strong>Light shoring<\/strong> for utility trenches: trench boxes, slide-rail shoring, strip shoring for short construction times and frequent relocations. Suitable for linear works and high move rates with predictable soil behavior.<\/li>\n<li><strong>Heavy shoring systems<\/strong> for greater depths: sheet pile walls, soldier pile and lagging walls (H-beams with infill), bored pile and diaphragm walls, possibly with anchors or bracing. These systems achieve higher stiffness, reduced deflections, and improved groundwater control where required.<\/li>\n<li><strong>Special methods<\/strong>: shotcrete shells with soil nailing, ground freezing, sealing base slabs by injection or underwater concrete. Useful for complex geometries, narrow sites, or when temporary water cut-off is critical.<\/li>\n<\/ul>\n<h3>Sheet pile shoring<\/h3>\n<p>Formed steel profiles are driven or pressed in and create a tight wall. Advantages include high load-bearing capacity and reusability. Low-vibration installation methods are advantageous in sensitive locations. In water-bearing soils, interlock sealing and staged driving reduce drawdown risk and settlement.<\/p>\n<h3>Soldier pile and lagging wall (Berlin shoring)<\/h3>\n<p>Driven or drilled steel beams with infill layers of timber, steel, or shotcrete. Flexibly adaptable, good for heterogeneous soils. Usable as a temporary or permanent solution. Infill advance should follow excavation closely to limit relaxation of the soil and maintain face stability.<\/p>\n<h3>Bored pile and diaphragm wall<\/h3>\n<p>Walls made of bored piles or as a continuous diaphragm wall, often watertight and stiff. Frequently combined with bracing or tie-back anchoring; often part of the final structure. Construction sequence and joint detailing are decisive for water tightness and deformation control.<\/p>\n<h3>Utility trench shoring<\/h3>\n<p>Trench boxes and slide-rail shoring enable rapid advancement of the shoring as excavation proceeds. They minimize slope failures and secure working space for pipeline construction. Attention to bedding, safe access, and lifting points supports repeatable, fast cycles.<\/p>\n<h2>Geotechnical fundamentals and boundary conditions<\/h2>\n<p>Load assumptions in pit shoring derive from soil type, density, groundwater regime, excavation geometry, and surcharge loads. Soft cohesive soils tend to time-dependent deformations, sandy soils to sudden collapses; groundwater requires filter stability and buoyancy safety. Vibrations can promote settlement. <em>Low-vibration methods<\/em> during excavation and for demolition work around the shoring are therefore often advisable &#8211; here, rock and concrete splitting technology and precise <strong>concrete demolition shears<\/strong> help protect the surroundings. Effective stress, hydraulic gradients, and stiffness of the retention system interact with the excavation sequence; staged excavation with timely bracing or anchoring reduces deflection and limits ground loss.<\/p>\n<h2>History and development of pit shoring<\/h2>\n<p>From timber trench boxes in sewer construction and riveted steel sheets to modern modular systems and deep diaphragm walls: pit shoring has evolved in step with urbanization, mechanical engineering, and geotechnics. Today, combined solutions dominate: tight walls for water control, stiff bracing to limit deformations, and finely tuned construction sequences. In parallel, tooling has advanced &#8211; hydraulic wedge splitters, compact <em><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power units<\/a><\/em>, and versatile cutting and pressing tools by Darda GmbH enable controlled separating and breaking in direct contact with the shoring without jeopardizing its stability. Digitally supported monitoring and modular components further increase repeatability, safety, and sustainability through reuse.<\/p>\n<h2>Workflow: from planning to removal<\/h2>\n<p>A consistent sequence increases safety, quality, and cost-effectiveness:<\/p>\n<ol>\n<li><strong>Investigation and planning<\/strong>: subsoil, contaminated sites, utilities, groundwater; definition of construction stages and a monitoring concept. Establish deformation criteria, alarm thresholds, and hold points before excavation.<\/li>\n<li><strong>Preparations<\/strong>: site setup, traffic management, utility diversions. Provide verified lifting plans, access control, and emergency arrangements for flooding or slope instability.<\/li>\n<li><strong>Installing the shoring<\/strong>: in sections, with continuous checks of alignment and tightness. Document installation parameters and verify wall embedment and interlocks where relevant.<\/li>\n<li><strong>Excavation and bracing<\/strong>: cyclic alternation, advance lagging, activate bracing or anchors. Pre-stress anchors or braces as specified and confirm loads via calibrated gauges where provided.<\/li>\n<li><strong>Interior works<\/strong>: foundation works, underpinning, utility crossings; cut, break, or split obstacles with appropriate tools. Maintain clear exclusion zones and manage arisings and water to keep work fronts safe.<\/li>\n<li><strong>Removal or integration<\/strong>: extract temporary elements, integrate permanent components; backfilling and surface reinstatement. Sequence depropping to avoid rebound and verify as-built conditions for handover.<\/li>\n<\/ol>\n<h2>Tools and methods around the shoring: breaking, cutting, splitting<\/h2>\n<p>Cutting and demolition work is often required in and at the excavation. The choice of suitable tools influences shoring deformations, noise, dust, and jobsite safety. Coordinated method statements and pre-task briefings ensure that cutting forces, support points, and load paths remain controlled at all times.<\/p>\n<h3>Rock removal and reprofiling<\/h3>\n<p>When excavation pits encounter rock ledges or boulders, <strong>rock and concrete splitters<\/strong> and <strong>rock wedge splitters<\/strong> are proven solutions. They generate controlled splitting forces and minimize vibrations &#8211; a benefit near dense development and sensitive shoring elements. Pre-splitting and staged breaking support accurate profiles and reduce overbreak.<\/p>\n<h3>Concrete removal within the shoring<\/h3>\n<p>For exposing and trimming bored pile heads, removing foundation remnants, or creating openings in the shoring, <strong>concrete demolition shears<\/strong> provide precise, low-vibration removal. Reinforcement can be severed with <em>Multi Cutters<\/em>. This keeps neighboring structures and bracing as unaffected as possible and limits dust and secondary chipping.<\/p>\n<h3>Steel beams, bracing, and sheet piles<\/h3>\n<p>For temporary bracing, H-sections, and sheet pile adjustments, <em>steel shears<\/em> and <em>combination shears<\/em> deliver precise cuts. Targeted deconstruction of cross-struts accelerates the construction sequence without overloading the shoring. Load release should be sequenced and verified to prevent sudden redistributions.<\/p>\n<h3>Utilities, tanks, and special operations<\/h3>\n<p>For decommissioned tanks, pipes, or reinforcements in the excavation, <em>tank cutters<\/em> enable controlled separation cuts. In sensitive areas, low-emission hydraulic systems with suitable <strong>hydraulic power packs<\/strong> by Darda GmbH are advisable to minimize exhaust and sparks. Notes on explosion and fire protection are project-specific and must be observed with care. Permit-to-work procedures and gas monitoring are recommended where applicable.<\/p>\n<h2>Application areas at a glance<\/h2>\n<ul>\n<li><strong>Concrete demolition and special deconstruction<\/strong>: selective removal of foundations, pile heads, and underpinning within the shoring using concrete shears and splitting technology. Clean interfaces simplify subsequent reinforcement and casting.<\/li>\n<li><strong>Strip-out and cutting<\/strong>: openings, breakthroughs, and utility crossings in existing excavation walls with Multi Cutters and combination shears. Defined edges and minimal vibration protect anchors and braces.<\/li>\n<li><strong>Rock demolition and tunnel construction<\/strong>: launch and reception shafts, rock exposures by controlled splitting instead of blasting. Reduced vibration and dust benefit urban and sensitive sites.<\/li>\n<li><strong>Natural stone extraction<\/strong>: extracting or adjusting blocks in provisional pits with rock wedge splitters. Controlled crack propagation enhances recovery and quality.<\/li>\n<li><strong>Special operations<\/strong>: work in confined, vibration-sensitive, or water-bearing conditions with precise load control. Compact hydraulics enable tasks between struts and in restricted headroom.<\/li>\n<\/ul>\n<h2>Selection criteria for equipment in pit shoring<\/h2>\n<p>Equipment selection is based on the shoring and environmental constraints:<\/p>\n<ul>\n<li><strong>Space constraints<\/strong>: compact, hand-held tools facilitate work between bracing members.<\/li>\n<li><strong>Vibrations<\/strong>: splitting methods and shears are usually preferable to percussive tools when deformations must be limited.<\/li>\n<li><strong>Emissions<\/strong>: hydraulically driven tools with external power packs support low-emission site organization.<\/li>\n<li><strong>Material mix<\/strong>: a combination of a concrete demolition shear (concrete), Multi Cutter (rebar), and steel shear (profiles) covers typical tasks.<\/li>\n<li><strong>Water management<\/strong>: ensure splash protection and safe placement of power packs outside wet areas.<\/li>\n<li><strong>Cut and break quality<\/strong>: dimensional cuts and defined break edges facilitate subsequent construction steps.<\/li>\n<li><strong>Access and ergonomics<\/strong>: hose routing, tool weight, and working positions influence productivity and safety in cramped excavations.<\/li>\n<li><strong>Compliance and documentation<\/strong>: capability to record pressures, forces, and maintenance status supports QA and regulatory requirements.<\/li>\n<\/ul>\n<h2>Safety and occupational health around the shoring<\/h2>\n<p>Safety is based on planning, suitable work equipment, and disciplined execution. Key aspects include stable shoring elements, safe access, taking loads without unprotected undersupporting, controlled handling of groundwater, and effective measures against dust and noise. Work with cutting and splitting tools requires a clear communication chain, defined work areas, and appropriate personal protective equipment. Isolation of energy sources, secure lifting, pinch-point control, and clean housekeeping are essential. Legal requirements must be checked project-specifically and implemented carefully.<\/p>\n<h2>Logistics, power supply, and hydraulic power packs<\/h2>\n<p>The positioning of <strong>hydraulic power packs<\/strong>, hose routing, and power supply affects progress and safety. Short line routes, well-protected transitions at edges, and clear labeling of lines are recommended. Maintenance intervals, leak checks, and clean operation reduce downtime and environmental impacts. Spill protection, proper storage of consumables, and redundancy for critical pumps increase resilience and minimize disruptions.<\/p>\n<h2>Sustainability: noise, dust, vibrations<\/h2>\n<p>In urban environments, low-emission methods are an essential contribution to environmental protection. <em>Low-vibration splitting technology<\/em>, precise shear cuts, and efficient cutting processes reduce vibrations, noise, and secondary damage. Water-based dust suppression, clean separation of concrete and steel, and short transport routes improve the project\u2019s carbon footprint. Reuse of steel elements where feasible and selective dismantling support circular construction approaches.<\/p>\n<h2>Quality assurance and monitoring<\/h2>\n<p>Deflection measurements on the shoring wall, vibration monitoring, and groundwater control enable early detection of critical states. For cutting and demolition work within the shoring, the following applies: check cut edges, dimensional accuracy of openings, documented clearance of embedded items, and recording of material quantities. Complete documentation supports proof of proper execution. Calibrated instruments, defined acceptance criteria, and trend evaluation of monitoring data underpin timely decisions on sequence adjustments.<\/p>\n<h2>Typical sources of error and practical countermeasures<\/h2>\n<ul>\n<li><strong>Insufficient advancement of the shoring<\/strong>: plan stepwise lagging and immediate activation of bracing.<\/li>\n<li><strong>Uncontrolled vibrations<\/strong>: wherever possible, use splitting technology and shears instead of percussive methods.<\/li>\n<li><strong>Conflicts with embedded items<\/strong>: early locating, trial pits, and selective cutting with Multi Cutters or steel shears.<\/li>\n<li><strong>Water ingress<\/strong>: provide sealing joints, filter stability, and redundant pumping capacity.<\/li>\n<li><strong>Logistics bottlenecks<\/strong>: plan material and equipment circulation tactically; position power packs safely and with good access.<\/li>\n<li><strong>Insufficient monitoring<\/strong>: set clear trigger levels and ensure prompt review of inclinometer, vibration, and water data.<\/li>\n<\/ul>\n<h2>Coordination with adjacent structures<\/h2>\n<p>Settlement-sensitive structures require close coordination and measurable deformation criteria. The combination of stiff shoring systems, controlled excavation, and <strong>low-vibration cutting methods<\/strong> &#8211; for example with concrete demolition shears and rock and concrete splitters by Darda GmbH &#8211; reduces risks to existing buildings and traffic routes. Pre-condition surveys, agreed threshold values, and transparent reporting help align expectations and expedite approvals.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Pit shoring encompasses all temporary or permanent measures to secure excavation pits and shafts. The aim is to control earth and water pressure, create working space, and protect adjacent buildings and utilities. In practice, the shoring often encounters obstacles such as foundation remnants, rock ledges, old utilities, or sheet pile <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/pit-shoring\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19221","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Pit Shoring - Excavation Support Systems<\/title>\n<meta name=\"description\" content=\"Expert guide to excavation pit shoring for trenches and shafts \u2713 systems, low vibration methods, safety and monitoring.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/pit-shoring\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Pit Shoring - Excavation Support Systems\" \/>\n<meta property=\"og:description\" content=\"Expert guide to excavation pit shoring for trenches and shafts \u2713 systems, low vibration methods, safety and monitoring.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/pit-shoring\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-13T12:56:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/pit-shoring\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/pit-shoring\",\"name\":\"Pit Shoring - Excavation Support Systems\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-09-16T14:57:18+00:00\",\"dateModified\":\"2026-04-13T12:56:03+00:00\",\"description\":\"Expert guide to excavation pit shoring for trenches and shafts \u2713 systems, low vibration methods, safety and monitoring.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/pit-shoring#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/pit-shoring\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/pit-shoring#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Pit shoring\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Pit Shoring - Excavation Support Systems","description":"Expert guide to excavation pit shoring for trenches and shafts \u2713 systems, low vibration methods, safety and monitoring.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/pit-shoring","og_locale":"en_US","og_type":"article","og_title":"Pit Shoring - Excavation Support Systems","og_description":"Expert guide to excavation pit shoring for trenches and shafts \u2713 systems, low vibration methods, safety and monitoring.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/pit-shoring","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-04-13T12:56:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/pit-shoring","url":"https:\/\/www.darda.de\/en\/knowledge\/pit-shoring","name":"Pit Shoring - Excavation Support Systems","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-09-16T14:57:18+00:00","dateModified":"2026-04-13T12:56:03+00:00","description":"Expert guide to excavation pit shoring for trenches and shafts \u2713 systems, low vibration methods, safety and monitoring.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/pit-shoring#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/pit-shoring"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/pit-shoring#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Pit shoring"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19221","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19221"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19221\/revisions"}],"predecessor-version":[{"id":26222,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19221\/revisions\/26222"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19221"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}