{"id":19218,"date":"2025-09-17T08:38:01","date_gmt":"2025-09-17T06:38:01","guid":{"rendered":"https:\/\/www.darda.de\/granite-surface"},"modified":"2026-04-11T11:49:02","modified_gmt":"2026-04-11T09:49:02","slug":"granite-surface","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/granite-surface","title":{"rendered":"Granite surface"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>The granite surface not only defines the appearance of a natural stone but also determines its technical suitability for construction, deconstruction, and extraction in the quarry. From high-gloss polished to coarsely textured split, the texture influences grip, water absorption, wear behavior, and performance under load. For practice &#8211; ranging from natural stone extraction through rock excavation and tunnel construction to strip-out, concrete demolition, and special demolition &#8211; knowledge of the granite surface is crucial to align the processing sequence, tool selection, and occupational safety. Hydraulic stone and concrete splitters (for example, <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a>) as well as stone splitting cylinders from Darda GmbH are key aids in this context when granite is to be released in a controlled manner or split into defined formats; for complex composite structures during deconstruction, the use of concrete demolition shears can additionally be advisable. In addition to structural performance, the surface strongly affects maintenance effort, lifecycle costs, and potential for reuse.<\/p>\n<h2>Definition: What is meant by a granite surface?<\/h2>\n<p>A granite surface is the outer layer of a granite shaped by geological origin, structure, and subsequent processing. It encompasses micro- and macrotexture (for example polish, roughness, pore pattern, edges), color and gloss appearance, as well as functional properties such as <em>slip resistance<\/em>, <em>abrasion resistance<\/em>, and <em>frost resistance<\/em>. The surface is created by methods such as sawing, grinding, polishing, thermal flaming, bush hammering, brushing, or mechanical splitting. These methods influence grain exposure, microcracks, and thus the performance of the surface in service and during deconstruction. In technical application, the surface condition determines the suitable gripping or splitting technique, the required force transmission, and safe handling during removal or separation. In practice, the terms surface, finish, and texture are often used synonymously and describe the same interaction of topography, gloss, and functional behavior.<\/p>\n<h2>Types and finishes of granite surfaces<\/h2>\n<p>Granite can be processed into numerous surface qualities. The common types differ significantly in appearance, feel, and technical properties.<\/p>\n<ul>\n<li><strong>Polished<\/strong>: Mirror-smooth, closed surface with high color depth. Low microroughness, therefore easy to clean, but often less grippy when wet. Suitable for representative interior surfaces; in exterior areas only sensible with additional measures.<\/li>\n<li><strong>Fine to honed<\/strong>: Matte to satin, uniform texture, reduced reflection. Balanced ratio of ease of care and grip.<\/li>\n<li><strong>Satin\/Brushed<\/strong>: Velvety feel with fine microroughness. Achieved by brushing after flaming or grinding. Often comfortable to walk on and visually warm.<\/li>\n<li><strong>Flamed<\/strong>: Thermally roughened, crystal-splitting texture with high slip resistance. Typical for exterior pavements, steps, ramps, and weather-exposed surfaces.<\/li>\n<li><strong>Bush-hammered<\/strong>: Pitted, uniformly rough surface produced with bush hammers. Very grippy and robust, with a technical to rustic look.<\/li>\n<li><strong>Split<\/strong>: Natural fracture surface with irregular topography. Produced by controlled mechanical splitting (e.g., with stone splitting cylinders) and characteristic for masonry, bank protection, or rustic pavements.<\/li>\n<li><strong>Sawn<\/strong>: Even, but with fine saw marks. Often used as a starting point for further processing.<\/li>\n<\/ul>\n<p>Selection should consider the interaction of <em>use zone<\/em> (interior or exterior, dry or wet), <em>required slip resistance<\/em>, expected contaminants, and the planned cleaning concept. For exterior traffic areas, structured finishes with defined roughness typically offer robust performance over time.<\/p>\n<h2>Physical characteristics and roughness<\/h2>\n<p>The function of a granite surface strongly depends on its roughness, structure, and grain distribution. With increasing roughness, grip and the surface\u2019s energy absorption increase, while cleaning effort and wear on shoe soles or wheels can also increase.<\/p>\n<ul>\n<li><strong>Roughness profile<\/strong>: Micro- and macroprofile determine slip resistance. Flamed and bush-hammered surfaces provide high grip, polished surfaces are smooth.<\/li>\n<li><strong>Water behavior<\/strong>: Rougher surfaces tend to higher wettability; standing water can affect serviceability. Drainage and joint pattern are decisive.<\/li>\n<li><strong>Wear and scratch sensitivity<\/strong>: Polished surfaces show scratches more clearly; brushed and honed surfaces tend to mask signs of use.<\/li>\n<li><strong>Thermal shock<\/strong>: Thermal methods (flaming) alter near-surface grain bonds. When properly executed, integrity is maintained; improper treatment can promote microcracks.<\/li>\n<\/ul>\n<h3>Assessment and testing<\/h3>\n<ul>\n<li><strong>Roughness metrics<\/strong>: Parameters such as Ra and Rz help qualify microtexture and correlate with cleaning effort and grip.<\/li>\n<li><strong>Slip resistance<\/strong>: Representative on-site tests on mock-ups under dry and wet conditions provide reliable data for the specified use.<\/li>\n<li><strong>Durability under exposure<\/strong>: Frost-deicing cycles, salt exposure, and abrasion tests indicate long-term behavior; edge zones and transitions should be included.<\/li>\n<li><strong>Water management<\/strong>: Surface runoff, joint design, and drainage concepts are verified to limit ponding and contamination accumulation.<\/li>\n<\/ul>\n<h2>Manufacturing and processing methods<\/h2>\n<p>Different processes are used depending on the target surface. The sequence is often multi-stage and adapted to rock type, intended use, and component geometry.<\/p>\n<h3>Mechanical splitting with stone and concrete splitters<\/h3>\n<p>In splitting, granite is separated along natural joints or predetermined hole rows. Hydraulic stone splitting cylinders and stone and concrete splitters from Darda GmbH transmit controlled forces that create a defined fracture surface. The resulting surface is characteristically rough and offers high grip. Typical applications include raw block extraction, size formatting, masonry, and embankment stones. Predrilling pattern, hole spacing, and the orientation to foliation or grain boundaries decisively influence fracture progression and surface quality.<\/p>\n<h3>Thermal flaming<\/h3>\n<p>In flaming, the surface is briefly heated, causing quartz and feldspars at the surface to spall. A grippy, crystalline roughened texture with uniform appearance is created &#8211; ideal for exterior surfaces and steps. Gas flow, nozzle distance, and feed speed must be matched to mineral composition and component thickness to avoid excessive microcracking or gloss variations.<\/p>\n<h3>Bush hammering, pointing, brushing<\/h3>\n<p>Mechanical texturing such as bush hammering or pointing produces defined roughness levels. Subsequent brushing can break edges and create a more pleasant feel without significantly reducing slip resistance. Tool geometry and impact energy determine the pit pattern; consistent passes improve uniformity.<\/p>\n<h3>Grinding and polishing<\/h3>\n<p>Multi-stage grinding refines the surface up to a polish. Polished surfaces are visually brilliant and easy to clean, but require particular attention regarding grip in wet areas. Where required, post-treatments to increase microtexture must be compatible with cleaning and maintenance systems.<\/p>\n<h2>Significance of the granite surface in application areas<\/h2>\n<h3>Natural stone extraction<\/h3>\n<p>During extraction, natural jointing, grain structure, and stress state determine splittability. Stone splitting cylinders and <a href=\"https:\/\/www.darda.de\/en\/product-overview\/rock-splitters\">Rock Splitters<\/a> are used to release raw blocks in a targeted manner and to produce desired surface qualities &#8211; such as split facing surfaces. Directional splitting reduces overbreak, preserves usable surface area, and lowers rework.<\/p>\n<h3>Rock excavation and tunnel construction<\/h3>\n<p>In the rock mass, the surface condition at fracture faces affects stability and water flow. Controlled splitting technology facilitates the release of partial areas without unnecessarily loading surrounding structures. The resulting fracture surfaces must be evaluated with regard to detachment, flying fragments, and profile accuracy. This aligns with established practice in <a href=\"https:\/\/www.darda.de\/en\/applications\/rock-demolition-and-tunnel-construction\">rock demolition and tunnel construction<\/a>. In addition, surface roughness at contacts influences shear resistance and the need for subsequent securing.<\/p>\n<h3>Interior demolition and cutting<\/h3>\n<p>During fit-out and removal works, granite pavements, steps, or fa\u00e7ade panels are frequently encountered. The surface quality influences dismantling: smooth surfaces often require suction or clamping aids, structured surfaces offer more frictional engagement. Composite components with concrete backing can be exposed by selectively releasing the fixings and &#8211; if necessary &#8211; by using concrete demolition shears in the concrete substrate before removing the granite panels undamaged. Minimizing chipping at visible edges often requires protective taping and staged release.<\/p>\n<h3>Concrete demolition and special demolition<\/h3>\n<p>For deconstruction tasks involving concrete components clad with granite, a material-preserving approach is often the goal to enable reuse. A combination of selectively opening the concrete (for example with concrete demolition shears) and prying or splitting at joints can preserve the granite surfaces. Sequencing that limits vibration and impact reduces the risk of crack propagation into finished faces.<\/p>\n<h3>Special applications<\/h3>\n<p>In existing structures, granite surfaces are found on parapets, bridge copings, stair systems, or as massive built-ins. Depending on the integration, stone and concrete splitters are helpful for separation or stress relief, especially where emissions (noise, dust, vibrations) must be limited. In sensitive zones, low-emission techniques and temporary shielding improve occupational and neighbor protection.<\/p>\n<h2>Planning, execution, and quality assurance<\/h2>\n<ul>\n<li><strong>Define requirement profile<\/strong>: Clarify use, loading, slip resistance, maintenance, appearance, and environmental conditions.<\/li>\n<li><strong>Mock-ups<\/strong>: Define representative samples early to set roughness, color effect, and edge appearance.<\/li>\n<li><strong>Edge finishing<\/strong>: Bevels or roundings reduce spalling and injury risk, especially on split edges.<\/li>\n<li><strong>Tolerances and flatness<\/strong>: Adapt flatness and thickness tolerances to the installation or mounting method.<\/li>\n<li><strong>Substrate and fastening<\/strong>: Match base layers, adhesives, anchors, and joints to the surface and the component.<\/li>\n<li><strong>Documentation<\/strong>: Record processing steps, equipment used, and surface properties in a traceable manner.<\/li>\n<li><strong>Slip resistance verification<\/strong>: Specify target values and verify on site under representative wet and dry conditions.<\/li>\n<li><strong>Cleaning and care concept<\/strong>: Define compatible cleaning agents and tools; avoid treatments that close the surface against the functional requirement.<\/li>\n<\/ul>\n<h2>Safety and health protection during processing<\/h2>\n<p>Work on granite surfaces generates mineral dust, noise, and potentially hazardous fragments. Protective measures must be adjusted accordingly. The following notes are general in nature and do not replace a project-specific hazard analysis.<\/p>\n<ol>\n<li><strong>Dust minimization<\/strong>: Prefer wet processing or low-dust methods; provide suitable extraction.<\/li>\n<li><strong>Personal protective equipment<\/strong>: Use eye, hearing, and respiratory protection as well as cut-resistant gloves and safety shoes.<\/li>\n<li><strong>Controlled splitting<\/strong>: Introduce splitting forces in a dosed manner, secure the danger zone, consider potential fragment fly.<\/li>\n<li><strong>Load handling<\/strong>: Flat, smooth surfaces require suitable lifting aids; structured surfaces improve form and frictional engagement.<\/li>\n<li><strong>Environmental\/neighbor protection<\/strong>: Protect neighbors, sensitive components, and infrastructure (utilities, systems) from vibrations, noise, and dust.<\/li>\n<li><strong>Hot work management<\/strong>: For flaming, ensure fire watch, shielding, and permits; protect adjacent materials from heat.<\/li>\n<li><strong>Tool condition<\/strong>: Maintain and inspect tools and hoses; damaged tooling increases risk and degrades surface quality.<\/li>\n<\/ol>\n<h2>Deconstruction, reuse, and repair<\/h2>\n<p>Granite is durable and suitable for reuse. The decisive factor is gentle dismantling that preserves the surface. For backfilled or bonded installations, deconstruction can proceed in two steps: first expose the fixings &#8211; if necessary by selectively opening the adjacent concrete with concrete demolition shears &#8211; and then release or split in a controlled manner. Surfaces can be refurbished by cleaning, light grinding, or brushing; for thermally treated surfaces, re-flaming is possible, observing the rock\u2019s properties. Color and gloss should be blended across repaired and original zones, and edge damage can often be minimized with micro-bevels.<\/p>\n<ul>\n<li><strong>Refurbishment steps<\/strong>: Precleaning, stain-specific treatment, light retexturing where necessary, and sealing only if compatible with the functional requirement.<\/li>\n<li><strong>Cleaning guidance<\/strong>: Use pH-neutral agents for routine cleaning; avoid aggressive chemicals that may etch or roughen the surface.<\/li>\n<li><strong>Inspection<\/strong>: Document existing cracks, inclusions, and prior treatments to select suitable repair methods.<\/li>\n<\/ul>\n<h2>Typical defects and causes<\/h2>\n<ul>\n<li><strong>Scratches and grinding marks<\/strong>: Particularly visible on polished surfaces; caused by hard particles or unsuitable cleaning agents.<\/li>\n<li><strong>Discoloration<\/strong>: Due to moisture ingress, metallic contamination, or unsuitable chemicals; proper cleaning and protective systems prevent this.<\/li>\n<li><strong>Edge spalling<\/strong>: Common with high point loads or missing edge finishing; bevels increase robustness.<\/li>\n<li><strong>Roughening\/Sanding Off<\/strong>: Result of improper thermal treatment or aggressive chemicals; adapted processing reduces the risk.<\/li>\n<li><strong>Non-Uniform Gloss Appearance<\/strong>: Incomplete processing sequence or inhomogeneous structure; consistent process control and final finishing remedy this.<\/li>\n<li><strong>Salt scaling and frost damage<\/strong>: Repeated freeze-thaw with deicing salts can lead to surface loss, especially at edges and thin sections.<\/li>\n<li><strong>Efflorescence and joint staining<\/strong>: Moisture and soluble salts migrate to the surface; controlled drainage and compatible mortars mitigate effects.<\/li>\n<\/ul>\n<h2>Checklist: Selecting the appropriate granite surface<\/h2>\n<ol>\n<li>Define use and loading (interior\/exterior, dry\/wet, barefoot\/shoe).<\/li>\n<li>Determine required grip and maintenance effort.<\/li>\n<li>Specify processing methods and subsequent processes (e.g., flaming, bush hammering, brushing).<\/li>\n<li>Align edges, joint pattern, and fastening systems with the surface.<\/li>\n<li>Consider dismantling and deconstruction concept early; account for the use of stone and concrete splitters or concrete demolition shears.<\/li>\n<li>Review and document mock-ups.<\/li>\n<li>Plan slip resistance verification under realistic conditions.<\/li>\n<li>Set a cleaning and care strategy that matches the selected finish.<\/li>\n<\/ol>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The granite surface not only defines the appearance of a natural stone but also determines its technical suitability for construction, deconstruction, and extraction in the quarry. From high-gloss polished to coarsely textured split, the texture influences grip, water absorption, wear behavior, and performance under load. For practice &#8211; ranging from <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/granite-surface\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19218","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Granite Surface | Finishes for Construction<\/title>\n<meta name=\"description\" content=\"Explore granite surface finishes for construction &amp; deconstruction \u2713 types, slip resistance, tool selection &amp; safety.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/granite-surface\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Granite Surface | Finishes for Construction\" \/>\n<meta property=\"og:description\" content=\"Explore granite surface finishes for construction &amp; deconstruction \u2713 types, slip resistance, tool selection &amp; safety.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/granite-surface\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-11T09:49:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/granite-surface\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/granite-surface\",\"name\":\"Granite Surface | Finishes for Construction\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-09-17T06:38:01+00:00\",\"dateModified\":\"2026-04-11T09:49:02+00:00\",\"description\":\"Explore granite surface finishes for construction & deconstruction \u2713 types, slip resistance, tool selection & safety.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/granite-surface#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/granite-surface\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/granite-surface#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Granite surface\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Granite Surface | Finishes for Construction","description":"Explore granite surface finishes for construction & deconstruction \u2713 types, slip resistance, tool selection & safety.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/granite-surface","og_locale":"en_US","og_type":"article","og_title":"Granite Surface | Finishes for Construction","og_description":"Explore granite surface finishes for construction & deconstruction \u2713 types, slip resistance, tool selection & safety.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/granite-surface","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-04-11T09:49:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/granite-surface","url":"https:\/\/www.darda.de\/en\/knowledge\/granite-surface","name":"Granite Surface | Finishes for Construction","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-09-17T06:38:01+00:00","dateModified":"2026-04-11T09:49:02+00:00","description":"Explore granite surface finishes for construction & deconstruction \u2713 types, slip resistance, tool selection & safety.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/granite-surface#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/granite-surface"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/granite-surface#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Granite surface"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19218","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19218"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19218\/revisions"}],"predecessor-version":[{"id":26181,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19218\/revisions\/26181"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19218"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}