{"id":19212,"date":"2025-09-17T14:51:23","date_gmt":"2025-09-17T12:51:23","guid":{"rendered":"https:\/\/www.darda.de\/glass-door-dismantling"},"modified":"2026-04-11T08:45:03","modified_gmt":"2026-04-11T06:45:03","slug":"glass-door-dismantling","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/glass-door-dismantling","title":{"rendered":"Glass door dismantling"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Glass door dismantling combines precise craftsmanship, safe handling of brittle materials, and careful coordination with adjacent trades. In practice, it often occurs in the context of gutting works, conversions, or special demolition activities. Especially in existing buildings, glass doors meet steel frames, aluminum profiles, concrete pedestals, or masonry reveals &#8211; interfaces where, after removing the glass, fasteners, built-in components, and anchors often have to be released. This is where procedures from selective deconstruction tie in, such as controlled separation and splitting methods, as also used with concrete demolition shear or <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a> from Darda GmbH. The aim is always <strong>fracture-free dismantling<\/strong>, preserving adjacent components, and clean material separation for reuse and recycling. In occupied or sensitive environments, <em>pre-weakening, controlled load transfer, and low-emission execution<\/em> further reduce disruption and secondary damage.<\/p>\n<h2>Definition: What is meant by glass door dismantling?<\/h2>\n<p>Glass door dismantling refers to the professional removal of glass interior doors and exterior glass systems &#8211; such as swing, pivot, and sliding doors made of tempered safety glass (ESG) or laminated safety glass (VSG) &#8211; including the associated fittings, frames, closing systems, and fastenings. The term includes planning (existing-condition survey, risk analysis), securing the work environment, break-safe handling of glass elements, dismantling of the fitting technology, and subsequent work on frames, dowels, anchors, and embedded parts. It also comprises proper packaging, safe transport, and separate collection of material fractions. Depending on project scope, <strong>documentation, permits, and interface coordination<\/strong> with other trades are part of the defined process.<\/p>\n<h2>Planning and preparation: Survey, risk analysis, and interfaces<\/h2>\n<p>Careful preparation determines safety, speed, and quality. First, the glass type (ESG\/VSG), dimensions, door weight, and fitting systems (floor springs, surface-mounted closers, patch fittings, trolleys, floor guides) are recorded. Equally important: the connection situation to frames, reveals, mullion-transom systems, or concrete pedestals. If steel profiles or embedded parts in concrete are expected, subsequent processing of fastenings should be considered &#8211; such as <em>gentle separation and pressing methods<\/em> on metal components or <em>localized, low-vibration concrete processing<\/em>. In strip-out practice, depending on the task, steel shear, multi cutters, or combination shears are used, and &#8211; for selective interventions in concrete &#8211; concrete demolition shear and stone and concrete splitters from Darda GmbH are considered. A <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power unit<\/a> provides the drive power when hydraulic tools are used.<\/p>\n<ul>\n<li><strong>Site survey essentials:<\/strong> Verify access routes, stairwell widths, lift capacities, and temporary storage areas.<\/li>\n<li><strong>Glass identification:<\/strong> Check stamps and edge finishing to distinguish ESG and VSG; record thickness and panel size tolerances.<\/li>\n<li><strong>Services and surroundings:<\/strong> Locate hidden services in reveals, ceilings, and floors; protect adjacent finishes and floor coverings.<\/li>\n<li><strong>Permits and constraints:<\/strong> Clarify work windows in occupied buildings, noise limits, dust containment, and disposal logistics in advance.<\/li>\n<li><strong>Load path and rigging:<\/strong> Define handling points, suction lifter positions, and rack setup before any fastener is released.<\/li>\n<\/ul>\n<h2>Occupational health and safety<\/h2>\n<p>Glass is brittle and breaks without warning. Consistent safeguarding is indispensable and includes third parties moving within the building. Measures must always be planned specifically for the project and aligned with the state of the art.<\/p>\n<ul>\n<li><strong>Barricading and temporary support:<\/strong> Cordon off the work area extensively, tape glass surfaces (to bind fragments), and keep suitable supports ready.<\/li>\n<li><strong>Personal protective equipment:<\/strong> Cut-resistant gloves, eye protection, safety footwear, a helmet and forearm protection if required; dust and noise protection for cutting operations.<\/li>\n<li><strong>Load handling and transport:<\/strong> Tested vacuum lifters, carrying aids, transport racks; observe maximum load capacities.<\/li>\n<li><strong>Hazard prevention:<\/strong> Never release glass unsecured, no point impacts on edges, exercise increased caution with pre-damaged panes; clarify the emergency procedure in advance (controlled setting down, clearing the area).<\/li>\n<li><strong>Team coordination:<\/strong> Define commands and hand signals, nominate a person in charge, and brief all involved before starting work.<\/li>\n<\/ul>\n<h2>Dismantling methods for different glass door systems<\/h2>\n<h3>Hinged and pivot doors (ESG\/VSG) with sidelights and transoms<\/h3>\n<p>For hinged and pivot doors, clamp fittings, corner bearings, and closers are key. First, secure the door leaf as a unit (suckers, taping), then remove cover plates, adjusting screws, and clamps. The glass leaf is released under guidance and placed together onto the transport rack. Sidelights and transoms are handled separately, often via clamping profiles in the reveal. Remaining frame parts or anchors can be targeted later; with surrounding concrete or masonry, <em>selective separation<\/em> of the fastening is advisable to avoid damaging the reveal. Where seals have bonded to glass edges, proceed with <strong>gradual pressure relief<\/strong> and protective spacers to prevent edge chipping.<\/p>\n<h3>Sliding doors and telescopic systems<\/h3>\n<p>With sliding doors, the focus is on trolleys, hangers, and tracks. After relieving the door (wedging\/supporting), remove the cover of the track, release the safety devices on the trolleys, and unhang the glass leaf downward. Floor guides and end-stop dampers follow. Tracks may be concealed in recesses or fastened to concrete columns; with seized anchors, metal parts can often be cut using steel shear or multi cutters. If concrete edges need slight reduction, <strong>concrete demolition shear<\/strong> offers controlled processing in selective strip-out, without generating extensive vibrations. Pay attention to anti-jump devices and end stops that can retain residual loads even after main fasteners are removed.<\/p>\n<h3>Frameless all-glass doors with floor spring<\/h3>\n<p>Here, the floor spring box is crucial. First, secure the door leaf and release it from the patch fittings. Then open the cover of the floor spring, disconnect the spindle, and inspect the box. If the box sits in screed or concrete, expose it carefully; minor removals in the embedment area can be realized in strip-out by <strong>finely metered concrete removal<\/strong>. Depending on edge distances and reinforcement, <em>localized shear jaw strokes<\/em> or <em>splitting wedges<\/em> (stone and concrete splitters) are conceivable to release material in a controlled manner. Protect sealing levels and restore moisture barriers after removal to prevent ingress.<\/p>\n<h2>Step-by-step: Safe removal of a tempered-glass hinged door (ESG)<\/h2>\n<ol>\n<li>Cordon off the work area, tape both sides of the glass surface, apply suction lifters, plan the load path.<\/li>\n<li>Remove covers on fittings, identify adjusting and clamping screws, mark supports\/brackets.<\/li>\n<li>Carefully relieve and unhook the door leaf; transfer it together onto the rack and secure it.<\/li>\n<li>Dismantle fittings, seals, and guides; collect small parts separately.<\/li>\n<li>Check remaining frame or anchors; cut metal anchors with steel shear if required, remove mortar residues.<\/li>\n<li>Package the glass (edge protection, fixation), keep the transport route clear, and secure the load.<\/li>\n<li>Document component condition and label packages with location, dimensions, and glass type.<\/li>\n<\/ol>\n<h2>Material separation, packaging, and transport<\/h2>\n<p>Clean separation facilitates reuse and reduces disposal costs. ESG disintegrates into granules when broken; VSG has an interlayer that requires cutting techniques. Seals, profiles, steel parts, and screws are collected separately. Glass leaves receive edge and surface protection; transport racks are adjusted to the load, and <em>center of gravity and tipping moments<\/em> must be considered. Stairwells and elevators must be checked for load-bearing capacity.<\/p>\n<ul>\n<li><strong>Glass:<\/strong> Separate ESG and VSG; open the VSG interlayer only with appropriate cutting methods.<\/li>\n<li><strong>Metal:<\/strong> Profiles, hinges, fittings separately; for re-profiling, steel shear or combination shears help.<\/li>\n<li><strong>Mineral:<\/strong> Keep mortar, screed residues, and small concrete parts separate.<\/li>\n<li><strong>Traceability:<\/strong> Label fractions and batches to prevent cross-contamination and to support downstream recycling routes.<\/li>\n<\/ul>\n<h2>Handling bonded, potted, or damaged elements<\/h2>\n<p>For bonded profiles, cutting wires, wedges, and tailored separation methods are helpful; thermal methods only with care and in compliance with fire protection requirements. Potted fitting boxes in screed\/concrete are exposed precisely to avoid edge spalling at reveals. <strong>Selective concrete removal<\/strong> with concrete demolition shear or the controlled use of stone and concrete splitters can be advantageous here because loads are introduced in small increments. For pre-damaged glass: add extra safeguards, increase personnel distance, and proceed slowly and symmetrically. When dealing with adhesives and sealants, ensure adequate ventilation and observe product-specific safety data.<\/p>\n<h2>Interfaces with strip-out, concrete demolition, and special demolition<\/h2>\n<p>Glass door dismantling is often part of a larger deconstruction step. After removing the glass, frames, anchors, or brackets remain. In strip-out, metal parts are cut with <em>steel shear<\/em> or <em>multi cutters<\/em>; if anchors are deep in concrete, <em>concrete demolition shear<\/em> is an option for edge-near, controlled removal. If openings need to be created or pedestals selectively reduced, <em>stone and concrete splitters<\/em> are used depending on structural analysis, edge distance, and reinforcement. Hydraulic power packs reliably feed these tools even in confined interiors. The same principles of <strong>low-vibration processing<\/strong> that are common in <a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">concrete demolition and special deconstruction<\/a> help avoid damage to the existing structure and adjacent finishes. Define vibration and dust thresholds with site management to protect sensitive equipment and finishes.<\/p>\n<h2>Quality criteria and documentation<\/h2>\n<p>Quality is evidenced by glass surfaces dismantled without breakage, undamaged edges, clean connection areas, and fully recorded components. Photo documentation before, during, and after dismantling enhances traceability. Important are parts lists of fittings, labeling of glass and profiles (location, dimensions, condition), and notes on special features (existing damage, special fastenings). These documents support reuse and proper disposal.<\/p>\n<ul>\n<li><strong>Acceptance criteria:<\/strong> Break-free rate, intact edge zones, and undamaged surrounding finishes.<\/li>\n<li><strong>Process evidence:<\/strong> Method statements, risk assessments, and inspection records for tools and lifting gear.<\/li>\n<li><strong>Deviation management:<\/strong> Log unexpected fixings, concealed services, and remedial actions taken.<\/li>\n<\/ul>\n<h2>Reuse, recycling, and disposal<\/h2>\n<p>Whether components can be reinstalled depends on their condition, dimensions, and the requirements of the subsequent project. Intact glass leaves with complete fitting technology can often be reused in internal projects. Recycling pathways differ: ESG is treated differently from VSG with interlayer; metals go into the scrap metal cycle, mineral residues are disposed of according to local regulations. Legal requirements vary by region; early coordination with disposal contractors and site management is therefore generally advisable. Clarify acceptance criteria, cleaning requirements, and any need for re-certification before planning reuse.<\/p>\n<h2>Typical mistakes and proven solutions<\/h2>\n<ul>\n<li><strong>Mistake:<\/strong> The door leaf is released before the load is taken up. <strong>Solution:<\/strong> Apply suction lifters and wedges, define teamwork and commands.<\/li>\n<li><strong>Mistake:<\/strong> Striking glass edges to \u201cloosen\u201d them. <strong>Solution:<\/strong> Systematically release clamps, relieve stresses, never work by striking.<\/li>\n<li><strong>Mistake:<\/strong> Wrong sequence for sliding doors (track first). <strong>Solution:<\/strong> First unhang the glass, then dismantle running and guide profiles.<\/li>\n<li><strong>Mistake:<\/strong> Anchors are ripped out of concrete. <strong>Solution:<\/strong> Use metal cutters (steel shear\/multi cutters) or locally reduce concrete with a concrete demolition shear.<\/li>\n<li><strong>Mistake:<\/strong> Missing fragment protection. <strong>Solution:<\/strong> Tape both sides, use protective tarps, maintain minimum distances.<\/li>\n<li><strong>Mistake:<\/strong> Working beneath unsecured transoms or sidelights. <strong>Solution:<\/strong> Secure adjacent panes first or remove them in a defined sequence with temporary supports.<\/li>\n<\/ul>\n<h2>Project organization, schedule, and cost factors<\/h2>\n<p>Effort and timelines are mainly determined by accessibility, door formats, glass type, fitting systems, and required follow-on work on frames and connections. Night or weekend work can be useful to decouple user flows. In ongoing building operations, dust- and noise-reduced methods are advantageous; here, <em>selective separation and splitting methods<\/em> established in strip-out pay off. A clear takt &#8211; remove glass, secure fittings, cut metal, process concrete locally, clean surfaces &#8211; minimizes downtime and improves safety.<\/p>\n<ul>\n<li><strong>Primary cost drivers:<\/strong> Access constraints, glass size and weight, fastening complexity, and scope of post-processing on reveals and substrates.<\/li>\n<li><strong>Schedule interfaces:<\/strong> Lead times for protection works, disposal logistics, and handover to follow-on trades.<\/li>\n<li><strong>Resource planning:<\/strong> Qualified personnel, certified lifting gear, and availability of hydraulic equipment for selective interventions.<\/li>\n<li><strong>Contingencies:<\/strong> Allow buffers for concealed fastenings, seized anchors, or weather-related restrictions on exterior doors.<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Glass door dismantling combines precise craftsmanship, safe handling of brittle materials, and careful coordination with adjacent trades. In practice, it often occurs in the context of gutting works, conversions, or special demolition activities. Especially in existing buildings, glass doors meet steel frames, aluminum profiles, concrete pedestals, or masonry reveals &#8211; <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/glass-door-dismantling\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19212","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Glass Door Dismantling | Removal Methods &amp; Safety<\/title>\n<meta name=\"description\" content=\"Professional glass door dismantling explained \u27a4 safe removal for ESG and VSG, frames and anchors, ready for reuse.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/glass-door-dismantling\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Glass Door Dismantling | Removal Methods &amp; Safety\" \/>\n<meta property=\"og:description\" content=\"Professional glass door dismantling explained \u27a4 safe removal for ESG and VSG, frames and anchors, ready for reuse.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/glass-door-dismantling\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-11T06:45:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/glass-door-dismantling\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/glass-door-dismantling\",\"name\":\"Glass Door Dismantling | Removal Methods & Safety\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-09-17T12:51:23+00:00\",\"dateModified\":\"2026-04-11T06:45:03+00:00\",\"description\":\"Professional glass door dismantling explained \u27a4 safe removal for ESG and VSG, frames and anchors, ready for reuse.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/glass-door-dismantling#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/glass-door-dismantling\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/glass-door-dismantling#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Glass door dismantling\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Glass Door Dismantling | Removal Methods & Safety","description":"Professional glass door dismantling explained \u27a4 safe removal for ESG and VSG, frames and anchors, ready for reuse.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/glass-door-dismantling","og_locale":"en_US","og_type":"article","og_title":"Glass Door Dismantling | Removal Methods & Safety","og_description":"Professional glass door dismantling explained \u27a4 safe removal for ESG and VSG, frames and anchors, ready for reuse.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/glass-door-dismantling","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-04-11T06:45:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/glass-door-dismantling","url":"https:\/\/www.darda.de\/en\/knowledge\/glass-door-dismantling","name":"Glass Door Dismantling | Removal Methods & Safety","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-09-17T12:51:23+00:00","dateModified":"2026-04-11T06:45:03+00:00","description":"Professional glass door dismantling explained \u27a4 safe removal for ESG and VSG, frames and anchors, ready for reuse.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/glass-door-dismantling#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/glass-door-dismantling"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/glass-door-dismantling#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Glass door dismantling"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19212","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19212"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19212\/revisions"}],"predecessor-version":[{"id":26173,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19212\/revisions\/26173"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19212"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}