{"id":19201,"date":"2025-09-20T09:58:13","date_gmt":"2025-09-20T07:58:13","guid":{"rendered":"https:\/\/www.darda.de\/overall-structural-analysis"},"modified":"2026-04-10T14:17:02","modified_gmt":"2026-04-10T12:17:02","slug":"overall-structural-analysis","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/overall-structural-analysis","title":{"rendered":"Overall structural analysis"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Overall structural analysis describes the interaction of all load-bearing components, connections, and foundations of a structure throughout its entire life cycle &#8211; from new construction to conversion, deconstruction, and demolition. In the context of <a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">concrete demolition and special deconstruction<\/a>, overall structural analysis is the central frame of reference for planning, execution, and supervision. Tools such as concrete pulverizers or <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic wedge splitters for stone and concrete<\/a> enable gradual, low-vibration work; what always matters is how each intervention affects load transfer, stability, and the deformation behavior of the overall system. The objective is the verifiable preservation of robustness and serviceability at every step, with clear margins and defined intervention thresholds. Up-to-date as-built surveys, 3D scans, and structured documentation enhance planning quality and reduce uncertainty.<\/p>\n<h2>Definition: What is meant by overall structural analysis?<\/h2>\n<p>Overall structural analysis refers to the holistic consideration of the load-bearing capacity and serviceability of a structure in all relevant states: permanent (final state), temporary (construction and conversion phases), and accidental (e.g., impact, fire, local damage). It includes the determination and transmission of loads &#8211; self-weight, imposed loads, wind, snow, temperature, vibrations &#8211; through components such as slabs, beams, walls, and columns down into the foundations and the subsoil. In deconstruction practice, overall structural analysis means that every removal, every cut, and every splitting operation is understood as a system change and is safeguarded computationally, conceptually, and practically.<\/p>\n<ul>\n<li><strong>Limit states and criteria:<\/strong> Verification in the ultimate and serviceability limit states, including robustness and progressive collapse prevention.<\/li>\n<li><strong>Interfaces:<\/strong> Interaction with geotechnical conditions, temporary works, construction logistics, and occupational safety measures.<\/li>\n<li><strong>Uncertainty management:<\/strong> Conservative modeling where information is incomplete; calibration with test openings and monitoring data.<\/li>\n<\/ul>\n<h2>Fundamentals and operating principles of overall structural analysis in existing structures and deconstruction<\/h2>\n<p>In existing structures, load-bearing systems often behave more complexly than in the planning model: subsequent openings, composite effects, crack patterns, and usage history shape load transfer. Deconstruction steps change these paths even further &#8211; load-bearing walls are weakened, columns are laterally loaded, and support conditions are loosened. <strong>Step-by-step, controlled procedures<\/strong> are therefore essential. Concrete pulverizers allow the sequential removal of reinforced concrete components with low vibration; hydraulic wedge splitters for stone and concrete generate targeted cracks along the desired lines. In both cases, the temporary equilibrium state must be ensured: shoring, catch\/transfer systems, and tension ties take over loads until a new stable state is reached. Overall structural analysis provides the guardrails: permissible load redistribution, stability reserves, deformation limits, and sequences of interventions. A risk-based approach establishes hold points, fallback options, and stop criteria for each stage, ensuring that temporary states remain demonstrably safe.<\/p>\n<h2>Load types, load paths, and stability<\/h2>\n<p>Every structure is in equilibrium between applied loads and resisting structural mechanisms. In deconstruction, load paths change as soon as components are partially or completely removed. Key aspects:<\/p>\n<ul>\n<li><strong>Permanent loads:<\/strong> Self-weight, attachments, superimposed loads; with selective removal, self-weight and support reactions change.<\/li>\n<li><strong>Imposed and assembly actions:<\/strong> Machines, intermediate storage, transport loads; the positioning of <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power packs<\/a> and the loads from excavator grapples, concrete pulverizers, and hydraulic wedge splitters must be considered.<\/li>\n<li><strong>Dynamic actions:<\/strong> Vibrations from conventional breaker hammers can propagate cracks; the use of concrete pulverizers and hydraulic wedge splitters reduces these, which benefits system stability.<\/li>\n<li><strong>Stability issues:<\/strong> Buckling, local bulging, and overturning become critical in temporary states. Slender columns, isolated wall panels, or newly freed steel beams require bracing.<\/li>\n<\/ul>\n<h3>Identifying and controlling load redistribution<\/h3>\n<p>A planned deconstruction step may only proceed if the resulting redistribution is controlled. Notable indicators are crack progression, unforeseen deformations, and rising securing forces. Measurement points and joint markers support control.<\/p>\n<ul>\n<li><strong>Instrumentation:<\/strong> Settlement points, inclinometers, strain gauges on ties and props, load cells in shoring heads, and crack width gauges.<\/li>\n<li><strong>Survey and scanning:<\/strong> Periodic total station measurements or laser scans to capture deflection and rotation trends.<\/li>\n<li><strong>Trigger values:<\/strong> Predefined thresholds for displacement and force; exceedance leads to immediate stabilization and re-assessment.<\/li>\n<\/ul>\n<p><em>Second-order effects (P-Delta), construction tolerances, and initial imperfections<\/em> are accounted for in the checks for temporary states, particularly where members are slender or bracing lengths increase.<\/p>\n<h2>Construction stages, sequences, and temporary safeguards<\/h2>\n<p>Safe deconstruction follows a sequence that preserves load paths or redirects them in an orderly manner. Typical measures:<\/p>\n<ul>\n<li><strong>Shoring and catching:<\/strong> Needling, shoring props, transfer beams; install before the first intervention.<\/li>\n<li><strong>Partial unloading:<\/strong> Prior separation of non-load-bearing loads (build-ups, installations) to create reserves in the overall structural analysis.<\/li>\n<li><strong>Cut routing:<\/strong> Cuts are arranged to create short-term simple spans rather than cantilevers; concrete pulverizers open shear paths in a controlled manner.<\/li>\n<li><strong>Staging:<\/strong> Small deconstruction steps with immediate stabilization; hydraulic wedge splitters enable finely dosed stages in massive cross-sections.<\/li>\n<\/ul>\n<h3>Temporary design checks<\/h3>\n<p>Specific assumptions apply to construction stages: reduced partial safety factors, limited duration of use, additional securing elements. The verifications follow recognized engineering practice and are continuously validated with monitoring data. Where beneficial, <em>proof load tests or trial sections<\/em> are used to calibrate assumptions and confirm residual capacity before proceeding.<\/p>\n<p><strong>Method statements, hold points, and sign-offs<\/strong> ensure that each stage begins only after prerequisites are met: shoring preloads are set, monitoring is active, and exclusion zones are established. Toolbox briefings anchor the sequence and stop criteria in site routines.<\/p>\n<h2>Influence of demolition methods on the overall structural analysis<\/h2>\n<p>The choice of method determines vibration levels, crack propagation, edge spalling, and thus reserves in the structure.<\/p>\n<h3>Concrete pulverizers<\/h3>\n<p>Concrete pulverizers engage at the component edge or at pre-formed openings. Advantages for overall structural analysis are the <em>low vibration level<\/em>, the <em>locally confined force transmission<\/em>, and the ability to expose reinforcement. Risks include unintended prying of slab edges and removing load-bearing webs. Countermeasures: short bite lengths, symmetrical sequence, immediate intermediate shoring.<\/p>\n<h3>Hydraulic wedge splitters for stone and concrete<\/h3>\n<p>Hydraulic splitting creates targeted crack lines in concrete or rock. Structurally relevant is the direction of the splitting forces: it is chosen so that compression zones are preserved and tension zones are released in a controlled way. The method is particularly suitable for massive components, foundations, and rock because it operates <strong>with low noise and low vibration<\/strong>, thereby preserving the residual load-bearing capacity of adjacent components.<\/p>\n<h3>Combination shears and multi cutters<\/h3>\n<p>These tools combine crushing, squeezing, and cutting. They allow switching between the concrete and steel portions of a cross-section without changing tools. Structurally relevant is the sequence: first relieve, then cut load-bearing reinforcement, so that no unintended tension redirections occur.<\/p>\n<h3>Steel shears<\/h3>\n<p>When separating steel components, there is a risk of overturning and oscillation. Load-free areas are cut first; load-bearing elements only with load capture and controlled load transfer. Cut locations are chosen so that remaining pieces are safely supported.<\/p>\n<h3>Rock splitting cylinders in rock demolition and tunneling<\/h3>\n<p>In rock, load transfer follows natural stratification, joints, and friction. Splitting cylinders exploit these structures without introducing shock waves. This preserves the stability of adjacent cavities and reduces the risk of subsequent rockfall in tunnel and adit construction.<\/p>\n<h3>Tank cutters in industrial deconstruction<\/h3>\n<p>When segmenting vessels and shells, the focus is on shell stability and overturning moments. Segmentation is performed with safeguards against buckling and collapse; openings are placed so that membrane forces are not shed abruptly.<\/p>\n<p>Selection of the method also reflects <em>site constraints<\/em> such as noise curfews, dust control targets, and proximity to sensitive uses, which influence allowable vibration and temporary stability margins.<\/p>\n<h2>Material and system specifics<\/h2>\n<p>Material, cross-section, and composite behavior shape overall structural analysis and the deconstruction methodology.<\/p>\n<ul>\n<li><strong>Reinforced concrete:<\/strong> Composite of concrete and reinforcement; when removing with pulverizers, identify reinforcement routing and cut tension ties only after unloading.<\/li>\n<li><strong>Prestressed concrete:<\/strong> Prestressing forces govern the crack pattern. Before any cut: determine the location and force level of tendons, depressurize in a controlled manner, and provide sufficient load capture.<\/li>\n<li><strong>Masonry:<\/strong> Compression-dominated, sensitive to tension. Low-vibration splitting preserves bonds; horizontal safeguards (needles) are often required.<\/li>\n<li><strong>Steel structures:<\/strong> Stability governs. Provide temporary bracing before separating members or nodes.<\/li>\n<li><strong>Rock and natural stone:<\/strong> Consider anisotropy; align splitting forces along joints to achieve controlled fracture surfaces.<\/li>\n<li><strong>Composite and hybrid systems:<\/strong> Steel-concrete composite, encased columns, or composite decks require staged separation and checks for residual composite action.<\/li>\n<li><strong>Foundations and subsoil interaction:<\/strong> Local unloading or cutting can alter settlement behavior; global and differential settlement must be tracked.<\/li>\n<\/ul>\n<h2>Application in areas of use<\/h2>\n<p>The principles of overall structural analysis are reflected in the typical fields of application.<\/p>\n<h3>Concrete demolition and special demolition<\/h3>\n<p>Selective deconstruction with concrete pulverizers favors the residual stability of adjacent components. Splitters are advantageous where vibrations must be minimized or massive foundations are to be released in stages. Sequencing is aligned with temporary support capacities and permissible redistributions.<\/p>\n<h3>Building gutting and cutting<\/h3>\n<p>When opening slabs and walls, load paths are deliberately altered. Core drilling and pulverizer cuts are combined to dose actions and avoid edge breakouts. Service rerouting, dust control, and staged propping patterns are coordinated with structural hold points.<\/p>\n<h3>Rock excavation and tunnel construction<\/h3>\n<p>Splitting cylinders and stone splitters support low-vibration excavation and cross-section enlargements. The overall structural analysis of the cavities requires close monitoring of deformations and controlled securing. Convergence measurements and face stability checks complement support classes.<\/p>\n<h3>Natural stone extraction<\/h3>\n<p>Targeted splitting along natural bedding reduces waste and preserves block stability. Low vibration levels protect adjacent quarries. Defined split lines improve yield and handling safety.<\/p>\n<h3>Special applications<\/h3>\n<p>In sensitive environments &#8211; for example near critical infrastructure &#8211; hydraulic splitting minimizes risks to the overall structural analysis of neighboring structures. Protective measures and threshold-based monitoring are coordinated in advance with stakeholders.<\/p>\n<h2>Planning, verification, and monitoring<\/h2>\n<p>A robust concept combines calculation, empirical knowledge, and control.<\/p>\n<ol>\n<li><strong>Survey of the existing structure:<\/strong> Drawings, probes, reinforcement location, material properties, ground conditions.<\/li>\n<li><strong>Modeling of construction stages:<\/strong> Stepwise system changes, temporary safeguards, load redistribution.<\/li>\n<li><strong>Method selection:<\/strong> Concrete pulverizers and hydraulic wedge splitters where low vibration and controlled removal enhance system stability.<\/li>\n<li><strong>Verification:<\/strong> Load-bearing capacity, serviceability, and stability for each step; consideration of assembly and transport loads.<\/li>\n<li><strong>Monitoring and warning concept:<\/strong> Settlements, deflections, crack widths, securing forces; intervention thresholds and stop criteria.<\/li>\n<li><strong>Documentation:<\/strong> Ongoing adjustment of sequences based on measurements and findings.<\/li>\n<li><strong>Interfaces and communication:<\/strong> Responsibilities, information routes, and decision hierarchies for rapid response at hold points.<\/li>\n<li><strong>Post-measure review:<\/strong> Lessons learned and data archiving to refine methods and models for subsequent stages.<\/li>\n<\/ol>\n<h2>Practical guidelines for safe intervention in the overall structural analysis<\/h2>\n<ul>\n<li>Expose only as much structure as can be immediately worked on and subsequently secured.<\/li>\n<li>Execute interventions symmetrically and in small stages; use concrete pulverizers with short bite lengths.<\/li>\n<li>Orient splitting forces to avoid cantilevers and preserve compression zones.<\/li>\n<li>Close separating cuts only after load redistribution and load capture; expose reinforcement and cut it deliberately.<\/li>\n<li>Account for equipment surcharge and gripping forces in the assembly state in calculations.<\/li>\n<li>Monitor readings closely; if deviations occur, adjust the sequence and install additional safeguards.<\/li>\n<li>Define exclusion zones, lifting paths, and emergency routes; coordinate with monitoring to avoid interference.<\/li>\n<li>Consider environmental and weather influences on temporary works, including temperature gradients and wind exposure.<\/li>\n<\/ul>\n<h2>Occupational safety, environment, and construction-phase constraints<\/h2>\n<p>Structural safety and occupational safety are inseparable. Low-vibration methods reduce risks for personnel and the surroundings, mitigate noise and dust, and protect adjacent structures. Temporary safeguards are designed for unintended loads; exclusion zones and lifting equipment are included in the structural checks for the construction stages. Statements are generally made in accordance with recognized engineering practice and do not replace project-specific verification.<\/p>\n<ul>\n<li><strong>Procedures:<\/strong> Permit-to-work, lockout-tagout for services, and coordinated lifting plans.<\/li>\n<li><strong>Substances and emissions:<\/strong> Dust, noise, and slurry management aligned with method choice and monitoring concept.<\/li>\n<li><strong>Access and logistics:<\/strong> Safe equipment positioning and verified bearing capacity of working platforms.<\/li>\n<\/ul>\n<h2>Resource conservation and quality in deconstruction<\/h2>\n<p>Precise, controlled removal preserves material quality for reuse and recycling. The fewer uncontrolled fractures occur, the higher the yield of recoverable components. Concrete pulverizers and hydraulic wedge splitters support this approach by creating defined fracture lines and respecting the overall structural analysis of adjacent components. Structured material separation and traceable documentation enable high recycling rates and quality-assured recovery.<\/p>\n<ul>\n<li><strong>Selective dismantling:<\/strong> Early segregation of materials and protection of reusable elements through low-vibration techniques.<\/li>\n<li><strong>Documentation:<\/strong> Recording of removal sequences and component provenance for downstream processing and compliance.<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Overall structural analysis describes the interaction of all load-bearing components, connections, and foundations of a structure throughout its entire life cycle &#8211; from new construction to conversion, deconstruction, and demolition. In the context of concrete demolition and special deconstruction, overall structural analysis is the central frame of reference for planning, <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/overall-structural-analysis\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19201","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Overall Structural Analysis for Deconstruction<\/title>\n<meta name=\"description\" content=\"Understand overall structural analysis in structural engineering \u2713 safe demolition planning, load paths, stability checks.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/overall-structural-analysis\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Overall Structural Analysis for Deconstruction\" \/>\n<meta property=\"og:description\" content=\"Understand overall structural analysis in structural engineering \u2713 safe demolition planning, load paths, stability checks.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/overall-structural-analysis\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-10T12:17:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/overall-structural-analysis\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/overall-structural-analysis\",\"name\":\"Overall Structural Analysis for Deconstruction\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-09-20T07:58:13+00:00\",\"dateModified\":\"2026-04-10T12:17:02+00:00\",\"description\":\"Understand overall structural analysis in structural engineering \u2713 safe demolition planning, load paths, stability checks.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/overall-structural-analysis#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/overall-structural-analysis\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/overall-structural-analysis#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Overall structural analysis\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Overall Structural Analysis for Deconstruction","description":"Understand overall structural analysis in structural engineering \u2713 safe demolition planning, load paths, stability checks.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/overall-structural-analysis","og_locale":"en_US","og_type":"article","og_title":"Overall Structural Analysis for Deconstruction","og_description":"Understand overall structural analysis in structural engineering \u2713 safe demolition planning, load paths, stability checks.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/overall-structural-analysis","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-04-10T12:17:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/overall-structural-analysis","url":"https:\/\/www.darda.de\/en\/knowledge\/overall-structural-analysis","name":"Overall Structural Analysis for Deconstruction","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-09-20T07:58:13+00:00","dateModified":"2026-04-10T12:17:02+00:00","description":"Understand overall structural analysis in structural engineering \u2713 safe demolition planning, load paths, stability checks.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/overall-structural-analysis#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/overall-structural-analysis"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/overall-structural-analysis#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Overall structural analysis"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19201","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19201"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19201\/revisions"}],"predecessor-version":[{"id":26159,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19201\/revisions\/26159"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19201"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}