{"id":19181,"date":"2025-09-23T10:47:22","date_gmt":"2025-09-23T08:47:22","guid":{"rendered":"https:\/\/www.darda.de\/used-scaffolding"},"modified":"2026-04-09T07:51:03","modified_gmt":"2026-04-09T05:51:03","slug":"used-scaffolding","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/used-scaffolding","title":{"rendered":"Used scaffolding"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Used scaffolding is a cost-effective and functional solution for many deconstruction and refurbishment projects to create safe workplaces at height. Especially in selective concrete demolition, during gutting works, or when cutting building components, work and protection scaffolds provide access to concrete slabs, beams, wall panels, and steel members. In practice, compact, hand-held hydraulic tools are frequently used &#8211; for example a <strong>portable demolition shear<\/strong> or a <strong>hydraulic wedge splitter<\/strong> by Darda GmbH &#8211; which allow for low emissions and controlled interventions. This article combines fundamental knowledge about used scaffolding with hands-on guidance for applications in deconstruction environments. In many markets, used scaffolding is also referred to as <em>pre-owned scaffold systems<\/em> and is valued for its proven robustness, short lead times, and favorable environmental balance.<\/p>\n<h2>Definition: What is meant by used scaffolding?<\/h2>\n<p>Used scaffolding refers to a previously deployed, reusable scaffold system (e.g., modular or fa\u00e7ade scaffold) made of steel or aluminum that, after proper inspection, is used again for temporary workplaces, access, or protective functions. The elements of used scaffolding (standards, ledgers, diagonals, decks, toe boards, guardrails, brackets, anchors, and couplers) are combined in accordance with the system to safely take up defined loads and transfer them into the structure or the foundation. Quality, conformity with applicable standards, and a documented visual and functional inspection are key criteria prior to re-use. In practice, this includes proof of system compatibility, traceable identification marks, and evidence that wear parts meet the minimum thickness and straightness criteria.<\/p>\n<h2>Technical fundamentals and system types<\/h2>\n<p>Used scaffolding is predominantly provided as system scaffolding (modular or frame scaffolding) or as tube-and-coupler scaffolding. The selection depends on geometry, load requirements, and constraints on the construction site. Modular scaffolding is suitable for irregular layouts, courtyards, or technical installations thanks to its flexible grid. Frame scaffolding is economical for linear fa\u00e7ade sections with recurring heights. Tube-and-coupler solutions offer maximum adaptability, for example to existing buildings with many projections. Beyond the primary structure, the choice of <em>deck material<\/em> (steel, aluminum, or timber-based) influences slip resistance, load capacity, and indoor dust behavior; anti-lift protection and secure locking mechanisms are essential for all deck types.<\/p>\n<h2>The role of used scaffolding in concrete demolition and special deconstruction<\/h2>\n<p>In deconstruction, scaffolds serve as work, protection, and material platforms. They provide access to components for controlled separation and splitting operations, reduce travel times, and enable ergonomic work. With hand-held hydraulic methods &#8211; such as using a <strong>portable demolition shear<\/strong> at slab edges or a <strong>hydraulic wedge splitter<\/strong> on thick wall panels &#8211; the low vibrations and precise force control of the tools are advantageous: the dynamic additional loads on decks and frames remain low, which simplifies the load planning for the scaffold. These use cases align with <a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">concrete demolition and special deconstruction<\/a> practices. Where components are weakened before removal, tie-in design, debris retention, and sequencing should be coordinated so that load paths within the scaffold remain predictable at every stage.<\/p>\n<h3>Typical fields of application<\/h3>\n<ul>\n<li>Gutting and cutting: work stands at floor slabs, beams, and parapets for separating concrete panels, masonry, or embedded components.<\/li>\n<li>Concrete demolition and special deconstruction: protective scaffolds with catch platforms and protective roofs for controlled deconstruction of fa\u00e7ades and parapets.<\/li>\n<li>Special use: temporary stages or passages in existing buildings, for example where access is restricted or in sensitive interior areas.<\/li>\n<li>Rock excavation and tunnel construction: service platforms at portals, shafts, or adits for surveying, drilling, and splitting work.<\/li>\n<li>Natural stone extraction and restoration: work scaffolds at natural stone fa\u00e7ades or support structures for gentle restoration steps.<\/li>\n<li>Bridge and balcony refurbishment: bracket solutions and narrow-bay setups for edge removal, bearing replacement, and controlled component lowering.<\/li>\n<\/ul>\n<h2>Planning: load classes, width classes, and load assumptions<\/h2>\n<p>Careful planning considers imposed loads, self-weight, wind, and possible additional loads due to material storage and equipment. Classification by load and width classes with defined surface loads and point loads is common. For work with hydraulic tools, the following points are relevant:<\/p>\n<ul>\n<li><strong>Imposed loads:<\/strong> self-weight of the tool, material storage, personnel loads. Hand-held <em>portable demolition shear<\/em> and <em>hydraulic wedge splitter<\/em> generate low dynamic effects, which supports structural design.<\/li>\n<li><strong>Bearing base:<\/strong> distribution via screw jacks, base plates, or load-spreading beams. In interiors on slabs, always check reserve capacity and bearing points.<\/li>\n<li><strong>Anchoring:<\/strong> system-compliant anchoring into load-bearing structural elements, coordinated with geometry and deconstruction sequence.<\/li>\n<li><strong>Edge bays:<\/strong> brackets and outriggers for component access, including sufficient deck widths and guardrail systems.<\/li>\n<li><strong>Environmental actions:<\/strong> account for wind on nets, sheeting, and protective roofs; verify uplift and sliding at transitions and openings.<\/li>\n<li><strong>Operational scenarios:<\/strong> consider worst-case simultaneous loads from personnel, tools, and intermediate debris storage; limit point loads via pallets or load-spreading plates.<\/li>\n<\/ul>\n<h2>Quality features when purchasing used scaffolding<\/h2>\n<p>The cost-effectiveness of used scaffolding stands or falls with the condition of the components and system compatibility. The focus is on:<\/p>\n<ul>\n<li><strong>System consistency:<\/strong> consistent component mix, clear manufacturer identification, no critical mixtures of incompatible systems.<\/li>\n<li><strong>Condition:<\/strong> no cracked weld seams, no plastic deformations, acceptable corrosion, intact locks and couplers, grippy decks.<\/li>\n<li><strong>Documentation:<\/strong> available item lists, inspection reports, verifications of load capacity and permissible use.<\/li>\n<li><strong>Completeness:<\/strong> sufficient number of diagonals, guardrails, toe boards, brackets, stair or ladder access components.<\/li>\n<li><strong>Retrofit capability:<\/strong> procurable spare and add-on parts for special geometries or protective requirements.<\/li>\n<li><strong>Traceability:<\/strong> component coding and legible markings enable targeted replacement and inspection scheduling across the service life.<\/li>\n<\/ul>\n<h2>Interfaces to hydraulic demolition tools<\/h2>\n<p>Used scaffolding is often used in combination with hydraulic equipment. Thoughtful interface planning increases efficiency and safety:<\/p>\n<ul>\n<li><strong>Hydraulic power pack:<\/strong> set up at ground level or on load-capable levels with low vibration; choose <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">compact hydraulic power units<\/a> appropriate to the tool and site. Route hose runs to avoid trip hazards; provide edge protection.<\/li>\n<li><strong>Tool weight:<\/strong> hand-held <em>portable demolition shear<\/em> and <em>hydraulic wedge splitter<\/em> are comparatively light and facilitate work on narrow deck bays.<\/li>\n<li><strong>Emissions:<\/strong> low vibrations and finely controllable force transmission protect scaffold nodes and decks. Plan dust suppression and noise reduction measures through appropriate working methods and protective equipment.<\/li>\n<li><strong>Material flow:<\/strong> secure demolition debris section by section and lower it in a controlled manner; use catch platforms or protective roofs as complementary measures.<\/li>\n<li><strong>Hose management:<\/strong> protect pressurized lines against sharp edges, provide strain relief at couplings, and define fixed hose corridors with visual markings.<\/li>\n<li><strong>Energy and ventilation:<\/strong> verify sufficient power supply and ventilation for hydraulic units indoors; manage heat and oil mist with localized extraction where necessary.<\/li>\n<\/ul>\n<h2>Safety, inspection, and operation<\/h2>\n<p>Safe use of used scaffolding is based on proper assembly, inspection, and briefing. In general:<\/p>\n<ol>\n<li>Have the scaffold inspected and released by a competent person before use; mark the release.<\/li>\n<li>Keep decks free of debris; route hose and cable runs tidily; ensure complete fall protection.<\/li>\n<li>Organize cutting, separation, and splitting work so that no impermissible impact loads occur; plan catch measures.<\/li>\n<li>Document changes to the assembly; re-inspect after modifications.<\/li>\n<li>Define exclusion zones and lifting routes; coordinate debris handling with the deconstruction sequence.<\/li>\n<li>Use appropriate personal protective equipment and verify access routes remain unobstructed during all phases.<\/li>\n<\/ol>\n<h3>Typical hazards and countermeasures<\/h3>\n<ul>\n<li><strong>Edges and lines:<\/strong> hose protection, fixed guide points, visual marking.<\/li>\n<li><strong>Edge fall:<\/strong> double guardrails, toe boards, and, if necessary, nets and tarpaulins as additional protection.<\/li>\n<li><strong>Overload:<\/strong> limit material buffers, distribute point loads, place loads on brackets only in accordance with the system.<\/li>\n<li><strong>Falling objects:<\/strong> catch decks, debris nets, and controlled lowering methods; prohibit stacking near guardrails.<\/li>\n<li><strong>Electrical hazards:<\/strong> maintain clearance to live parts; inspect cables and connectors; use residual current protection devices where applicable.<\/li>\n<\/ul>\n<h2>Assembly, logistics, and adaptation in existing structures<\/h2>\n<p>For deconstruction with limited space or in sensitive interior areas, logistics and the adaptability of the scaffold are crucial:<\/p>\n<ul>\n<li><strong>Providing small grids:<\/strong> modular scaffolds with fine spacing help bypass installations, shafts, and existing fit-out.<\/li>\n<li><strong>Transport within the building:<\/strong> shorter standards, lightweight decks, and demountable stairs facilitate material flow via stairwells.<\/li>\n<li><strong>Temporary passages:<\/strong> protective roofs and tunnels made of scaffolding secure traffic routes during the removal of demolition debris.<\/li>\n<li><strong>Conversion during operation:<\/strong> plan phase-by-phase adaptations with verified intermediate states; use temporary bracing when removing ties.<\/li>\n<\/ul>\n<h2>Substrates and foundations<\/h2>\n<p>Stability depends significantly on the bearing support. On non-load-bearing or unknown substrates, loads should be introduced via large-area spreaders (e.g., squared timber, steel beams). On upper floors, clarify reserve capacity, bearing areas, and slab penetrations in advance. For core drilling or openings prepared with a <strong>portable demolition shear<\/strong>, consider the influence on anchorage zones. Settlement and deflection should be monitored at critical points; adjustable bases require sufficient screw engagement and protection against unintended loosening.<\/p>\n<h2>Protective scaffolds and temporary enclosures<\/h2>\n<p>When cutting, splitting, and pulling components, protective measures such as catch platforms, dust protection walls, or a protective enclosure may be required. These reduce emissions and protect adjacent areas. Indoors, tight deck closures, tarpaulins, and toe boards support clean material removal. Where external exposure is present, weather protection sheeting and sealed interfaces at fa\u00e7ade transitions reduce draught-driven dust propagation and improve noise mitigation.<\/p>\n<h2>Cost-effectiveness, sustainability, and life cycle<\/h2>\n<p>Used scaffolding extends the service life of existing components and reduces resource consumption. A good mix of frequently needed lengths, brackets, and access components improves utilization. The durable combination with hand-held hydraulic methods &#8211; such as a <em>hydraulic wedge splitter<\/em> or a <em>portable demolition shear<\/em> &#8211; enables sectional, controlled interventions that can streamline logistics and protective measures. From a sustainability perspective, refurbishment of components, standardized inspection intervals, and clear documentation of reuse cycles contribute to lower embodied carbon and predictable life-cycle costs.<\/p>\n<h2>Typical damage patterns and repair<\/h2>\n<p>With used scaffolding, wear on decks, corrosion on couplers, and notches on tubes occur frequently. Cracks at weld seams, excessive deck deflection, or deformed ledgers are exclusion criteria. Permissible repairs are carried out according to the manufacturer\u2019s specifications and documented. Components without clear identification should not be used in load-bearing areas. Gauge checks for tube diameter and straightness, as well as function tests of locking mechanisms, help to separate repairable parts from rejects in a reproducible manner.<\/p>\n<h2>Practical examples for combining scaffolding and hydraulic hand demolition<\/h2>\n<ul>\n<li><strong>Edge demolition at slab edges:<\/strong> work scaffold with an inner toe board; component sections are released with a <em>portable demolition shear<\/em> and lowered via chute.<\/li>\n<li><strong>Wall opening in shear panels:<\/strong> mark the cutting line in advance; install splitting boreholes; separate with a <em>hydraulic wedge splitter<\/em>; install a safety net below the working zone.<\/li>\n<li><strong>Reinforced concrete parapet:<\/strong> scaffold bracket with increased width class; short hose runs to the hydraulic power pack; limited material buffer, regular removal.<\/li>\n<li><strong>Beam-end repair in existing structures:<\/strong> narrow-bay bracket scaffold; pre-weakening with hydraulic splitting; controlled detachment and immediate debris removal to maintain bay capacity.<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Used scaffolding is a cost-effective and functional solution for many deconstruction and refurbishment projects to create safe workplaces at height. Especially in selective concrete demolition, during gutting works, or when cutting building components, work and protection scaffolds provide access to concrete slabs, beams, wall panels, and steel members. In practice, <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/used-scaffolding\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19181","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Used Scaffolding for Refurbishment &amp; Demolition<\/title>\n<meta name=\"description\" content=\"Guide to used scaffolding in deconstruction - secondhand systems, safe access \u2713 load planning, low-vibration tools.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/used-scaffolding\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Used Scaffolding for Refurbishment &amp; Demolition\" \/>\n<meta property=\"og:description\" content=\"Guide to used scaffolding in deconstruction - secondhand systems, safe access \u2713 load planning, low-vibration tools.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/used-scaffolding\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-09T05:51:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/used-scaffolding\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/used-scaffolding\",\"name\":\"Used Scaffolding for Refurbishment & Demolition\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-09-23T08:47:22+00:00\",\"dateModified\":\"2026-04-09T05:51:03+00:00\",\"description\":\"Guide to used scaffolding in deconstruction - secondhand systems, safe access \u2713 load planning, low-vibration tools.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/used-scaffolding#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/used-scaffolding\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/used-scaffolding#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Used scaffolding\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Used Scaffolding for Refurbishment & Demolition","description":"Guide to used scaffolding in deconstruction - secondhand systems, safe access \u2713 load planning, low-vibration tools.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/used-scaffolding","og_locale":"en_US","og_type":"article","og_title":"Used Scaffolding for Refurbishment & Demolition","og_description":"Guide to used scaffolding in deconstruction - secondhand systems, safe access \u2713 load planning, low-vibration tools.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/used-scaffolding","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-04-09T05:51:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/used-scaffolding","url":"https:\/\/www.darda.de\/en\/knowledge\/used-scaffolding","name":"Used Scaffolding for Refurbishment & Demolition","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-09-23T08:47:22+00:00","dateModified":"2026-04-09T05:51:03+00:00","description":"Guide to used scaffolding in deconstruction - secondhand systems, safe access \u2713 load planning, low-vibration tools.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/used-scaffolding#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/used-scaffolding"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/used-scaffolding#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Used scaffolding"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19181","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19181"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19181\/revisions"}],"predecessor-version":[{"id":26097,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19181\/revisions\/26097"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19181"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}