{"id":19139,"date":"2025-10-01T15:18:44","date_gmt":"2025-10-01T13:18:44","guid":{"rendered":"https:\/\/www.darda.de\/rock-stabilization-system"},"modified":"2026-04-07T07:56:02","modified_gmt":"2026-04-07T05:56:02","slug":"rock-stabilization-system","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/rock-stabilization-system","title":{"rendered":"Rock stabilization system"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>A rock stabilization system comprises all measures by which unstable rock sections, steep slopes, and tunnel contours are stabilized permanently or temporarily. It protects people, infrastructure, and structures from rockfall, rock slides, landslides, and erosion. In practice, the spectrum ranges from rock anchors, nailing, and shotcrete to nets and barriers, up to the controlled removal of loose sections. Especially where vibrations must be avoided or space is limited, <strong>hydraulic wedge splitters<\/strong> and <em>splitter cylinders<\/em> are used for precise, blasting-free work. In the context of expanded slope stabilizations, <strong>concrete pulverizers<\/strong> are also frequently used, for example to remove damaged concrete facings or to expose anchor heads. In geohazard mitigation and rock slope stabilization, solutions are typically designed for the required service life and performance class while minimizing emissions and avoiding unnecessary interventions.<\/p>\n<h2>Definition: What is meant by a rock stabilization system?<\/h2>\n<p>Rock stabilization system refers to the entirety of geotechnical, structural, and organizational measures for the <em>stabilization of rock and rocky slopes<\/em>. The goal is to achieve or restore a structurally stable condition by limiting movements along joints and bedding planes, transferring forces into load-bearing zones, and intercepting rockfall. Typical methods include rock anchors and nails, shotcrete, rock and wire-rope nets, rockfall protection fences, drainage, nailing, and the targeted removal of loose zones &#8211; often with low vibration levels by means of hydraulic splitting. A robust concept addresses both ultimate and serviceability limit states, considers kinematics of blocks and wedges, and accounts for construction and operational phases. Rock stabilization system is used in <strong>rock excavation and tunnel construction<\/strong>, in <strong>natural stone extraction<\/strong>, in <strong>concrete demolition and special deconstruction<\/strong>, as well as in <strong>special operations<\/strong> such as slope stabilization along transportation routes.<\/p>\n<h2>Measures and methods of rock stabilization systems<\/h2>\n<p>The choice of method depends on geology, hazard, structural condition, and boundary conditions such as vibration or noise control. In practice, measures are often combined according to the remove &#8211; retain &#8211; contain principle to achieve redundancy and resilience.<\/p>\n<h3>Mechanical stabilization measures<\/h3>\n<ul>\n<li>Rock anchors and nailing: transferring tensile and shear forces into load-bearing zones; head areas may be formed with plates and concrete facings that are selectively dismantled with <strong>concrete pulverizers<\/strong> during rehabilitations. Corrosion protection, grouting quality, and verifiable load transfer are essential.<\/li>\n<li>Systems of anchors, lattice girders, and shotcrete: near-surface distribution of forces; suitable for profile stabilization in tunnel heading. Fiber-reinforced shotcrete and staged application improve early support.<\/li>\n<li>Facings and crown walls: structural additions for slope stabilization; deconstruction work often with hydraulic shears. Integration with drainage and controlled outlets prevents pore-pressure buildup.<\/li>\n<\/ul>\n<h3>Surface stabilization and rockfall protection<\/h3>\n<ul>\n<li>Rock and wire-rope nets: close-fitting surface protection to prevent smaller detachments. Proper edge anchoring, overlap, and tensioning determine performance.<\/li>\n<li>Rockfall protection barriers: linear protection of uphill slopes along transportation routes. Energy class and post spacing are dimensioned to design impact energies and expected block sizes.<\/li>\n<li>Erosion control and revegetation: reduction of near-surface weathering and washout. Biotechnical measures complement mechanical stabilization and improve long-term landscape integration.<\/li>\n<\/ul>\n<h3>Drainage and stress redistribution<\/h3>\n<ul>\n<li>Drainage and <em>relief boreholes<\/em>: reduction of weaknesses caused by pore-water pressure. Horizontal drains and weep holes support long-term pressure relief.<\/li>\n<li>Controlled removal of wedges and overhangs: stress redistribution through <em>targeted removal<\/em>; here, <strong>hydraulic wedge splitters<\/strong> and <em>splitter cylinders<\/em> are helpful when blasting is unsuitable. Sequenced removal and intermediate securing reduce residual risks.<\/li>\n<\/ul>\n<h3>Contouring and deconstruction<\/h3>\n<ul>\n<li>Removal of loose or damaged rock: low-vibration hydraulic splitting; re-profiling for large-area stabilization. Accurate contouring reduces shotcrete thicknesses and material consumption.<\/li>\n<li>Deconstruction of concrete facings or anchor heads: selective removal with <strong>concrete pulverizers<\/strong>; cutting reinforcement with <em>steel shears<\/em> or <em>Multi Cutters<\/em>. Clean exposure improves inspection and enables durable re-anchoring.<\/li>\n<\/ul>\n<h2>Geotechnical assessment and planning<\/h2>\n<p>A structurally stable solution is based on systematic investigation and a robust stabilization concept.<\/p>\n<ol>\n<li>Survey of existing conditions: geology, joint systems, stratification, degree of weathering, water ingress, freeze-thaw effects. Remote sensing, photogrammetry, and 3D models support accurate mapping and volume assessments.<\/li>\n<li>Hazard analysis: rockfall and rock slide scenarios, slope stability, impact on structures and traffic. Determination of block sizes, trajectories, and energies forms the basis for barrier selection and setback distances.<\/li>\n<li>Design and concept: selection of anchors, nets, shotcrete, drainage, and removal areas; specification of safety factors. Recognized rock mass classification and verified design assumptions increase transparency.<\/li>\n<li>Construction sequencing: accessibility, <em>fall protection<\/em>, traffic routing, emissions, material logistics, and the use of suitable hydraulic tools. Temporary measures, exclusion zones, and weather windows are defined to maintain safety.<\/li>\n<li>Monitoring: measurement and control concept for construction and operation, e.g., crack and displacement measurements, anchor tests. Digital documentation and threshold-based alarms enable timely intervention.<\/li>\n<\/ol>\n<h2>Rock stabilization systems in typical application areas<\/h2>\n<h3>Rock excavation and tunnel construction<\/h3>\n<p>In tunnel heading, shotcrete, lattice girders, and anchors secure the <em>tunnel face<\/em> and the excavation profile. During slope cutbacks, unstable wedges are removed prior to installing nets. In areas with vibration limits, <strong>hydraulic splitting<\/strong> with <em><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a><\/em> enables the precise removal of individual blocks. Subsequent contouring and exposing of anchor heads is often carried out with <strong>concrete pulverizers<\/strong>. Pre-cutting and controlled sequencing minimize overbreak and facilitate accurate final profiles.<\/p>\n<h3>Concrete demolition and special deconstruction<\/h3>\n<p>In rehabilitations of facings, retaining walls, and anchor head areas, selective, controlled deconstruction is required. <strong>Concrete pulverizers<\/strong> enable the removal of damaged concrete layers, while <em>steel shears<\/em> cut reinforcement. Where rock and concrete interact, <em>splitter cylinders<\/em> bridge the transition from the massive structure to the adjoining rock. Low-dust techniques, targeted water application, and contained work zones improve environmental compliance.<\/p>\n<h3>Strip-out and cutting<\/h3>\n<p>To gain access to rock sections behind structural elements, components must be stripped out. After exposure, <em>hydraulic wedge splitters<\/em> take over the gentle removal of loose rock. <strong>Concrete pulverizers<\/strong> assist in deconstructing the remaining concrete residues on the rock surface. Carefully planned interfaces between strip-out, drilling, splitting, and securing shorten cycle times.<\/p>\n<h3>Natural stone extraction<\/h3>\n<p>In quarries, rock stabilization system is interlinked with extraction: benching, drainage, and controlled release along natural joints. Hydraulic splitting enables <em>blasting-free<\/em> extraction of individual blocks, as well as the removal of hazardous overhangs prior to loading. Bench geometry, working berms, and haul road protection are coordinated with stabilization to maintain safe operations.<\/p>\n<h3>Special operations<\/h3>\n<p>In sensitive areas such as protected zones, densely built environments, or along critical utilities, low-vibration methods are required. Here, <em>hydraulic wedge splitters<\/em> support the selective removal of rock. Cutting and shearing tools such as <em>combination shears<\/em>, <em>Multi Cutters<\/em>, or <em>tank cutters<\/em> can play a role in peripheral tasks (e.g., when removing attached steel parts). Work windows, noise constraints, and settlement control are integrated into the method statement.<\/p>\n<h2>Equipment and tools related to rock stabilization systems<\/h2>\n<ul>\n<li><strong>Hydraulic wedge splitters<\/strong> and <em>splitter cylinders<\/em>: for controlled, low-vibration release and re-profiling of rock, for relieving protruding blocks, and for preparing mesh and anchor areas. Suitable for confined spaces and sensitive surroundings.<\/li>\n<li><strong>Concrete pulverizers<\/strong>: for selective deconstruction of facings, edge protections, shotcrete excess, and anchor head areas; create clean bearing surfaces. High crushing force and precise jaw control improve productivity and surface quality.<\/li>\n<li><em>Hydraulic power packs<\/em>: power supply for mobile splitting and shearing tools under confined conditions. Choice of electric or low-emission power sources supports site-specific emission limits.<\/li>\n<li><em>Combination shears<\/em> and <em>Multi Cutters<\/em>: cutting metal parts, wire ropes, and profiles, e.g., when adjusting nets or removing installed components. Interchangeable jaw sets increase versatility.<\/li>\n<li><em>Steel shears<\/em>: cutting reinforcement and structural steel in the context of concrete finishing on rock faces. Accurate cuts support clean terminations and safe removal.<\/li>\n<li><em>Tank cutters<\/em>: specialist cutting in the peripheral area of stabilization measures when metallic tanks or pipelines in the work environment must be deconstructed. Controlled cold-cutting techniques reduce ignition risks.<\/li>\n<\/ul>\n<h2>Execution, safety, and quality assurance<\/h2>\n<h3>Occupational safety and logistics<\/h3>\n<ul>\n<li>Fall and rockfall protection: work platforms, catch fences, protective canopies, personal protective equipment. Defined exclusion zones and tool retention systems prevent secondary hazards.<\/li>\n<li>Equipment use: stable setup, safe hose routing, adequate ventilation for underground work. Remote operation where feasible increases distance to the hazard source.<\/li>\n<li>Emissions control: <em>dust suppression<\/em> by watering, limitation of noise and vibrations; hydraulic splitting typically reduces vibrations. Waste handling, sediment control, and spill prevention are integrated into the logistics plan.<\/li>\n<\/ul>\n<h3>Quality testing and monitoring<\/h3>\n<ul>\n<li>Verification of anchors: proof load tests, injection checks, documentation of displacements. Acceptance criteria and traceable records ensure reproducibility.<\/li>\n<li>Inspection of nets and barriers: fastening points, overlaps, edge terminations. Periodic retensioning and maintenance plans sustain performance over the life cycle.<\/li>\n<li>Geometry and surface: profile accuracy, roughness for shotcrete bond; contours achievable with <strong>concrete pulverizers<\/strong> facilitate subsequent buildup. Reference surfaces and as-built surveys improve quality control.<\/li>\n<li>Monitoring: surveying, crack and displacement measurements, visual inspections after heavy rainfall or freeze-thaw periods. Thresholds and trigger action response plans guide interventions.<\/li>\n<\/ul>\n<h2>Typical root causes of errors and prevention<\/h2>\n<ul>\n<li>Insufficient drainage: pore-water pressure remains high; provide drainage early and keep it functional.<\/li>\n<li>Lack of coordination of measures: nets without sufficient edge anchoring or anchors without surface protection; design systems as a unit.<\/li>\n<li>Uncontrolled removal: excessive interventions weaken the fabric; therefore, prefer incremental, <em>controlled splitting<\/em>.<\/li>\n<li>Poor substrate preparation: smooth or contaminated surfaces impair bond; careful cleaning and profiling, e.g., with <strong>concrete pulverizers<\/strong>.<\/li>\n<li>Inadequate corrosion protection: missing sheaths or damaged coatings reduce durability; specify and verify protective systems consistently.<\/li>\n<\/ul>\n<h2>Sustainability, environment, and emissions<\/h2>\n<p>Beyond structural stability, rock stabilization system increasingly pursues environmental objectives: minimizing interventions, preserving the landscape, and reducing emissions. Low-vibration methods such as hydraulic splitting help to comply with vibration limits and protect surrounding structures. Where possible, mineral materials are kept in the cycle, for example by reusing removed rock as fill material. Electric or hybrid <em>hydraulic power packs<\/em>, targeted water management, and biodiversity-oriented revegetation further reduce the environmental footprint.<\/p>\n<h2>Project organization and cost-effectiveness<\/h2>\n<p>Cost-effective rock stabilization system results from clear phase planning, suitable equipment, and consistent quality assurance. Short cycle times, safe access, and well-thought-out material flows reduce downtime. The targeted use of <strong>hydraulic wedge splitters<\/strong> for preparatory work and of <strong>concrete pulverizers<\/strong> for selective deconstruction reduces rework and increases execution safety. Early procurement, coordinated interfaces between trades, and digital documentation enhance predictability. Applicable technical standards and regulatory requirements must be observed; statements herein are always general in nature and do not replace project-specific verification.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A rock stabilization system comprises all measures by which unstable rock sections, steep slopes, and tunnel contours are stabilized permanently or temporarily. It protects people, infrastructure, and structures from rockfall, rock slides, landslides, and erosion. In practice, the spectrum ranges from rock anchors, nailing, and shotcrete to nets and barriers, <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/rock-stabilization-system\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19139","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Rock Stabilization System | Geotechnical Methods<\/title>\n<meta name=\"description\" content=\"Geotechnical safety for slopes &amp; tunnels \u2713 a rock stabilization system with anchors, nets and low vibration splitting.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/rock-stabilization-system\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Rock Stabilization System | Geotechnical Methods\" \/>\n<meta property=\"og:description\" content=\"Geotechnical safety for slopes &amp; tunnels \u2713 a rock stabilization system with anchors, nets and low vibration splitting.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/rock-stabilization-system\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-07T05:56:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/rock-stabilization-system\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/rock-stabilization-system\",\"name\":\"Rock Stabilization System | Geotechnical Methods\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-10-01T13:18:44+00:00\",\"dateModified\":\"2026-04-07T05:56:02+00:00\",\"description\":\"Geotechnical safety for slopes & tunnels \u2713 a rock stabilization system with anchors, nets and low vibration splitting.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/rock-stabilization-system#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/rock-stabilization-system\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/rock-stabilization-system#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Rock stabilization system\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Rock Stabilization System | Geotechnical Methods","description":"Geotechnical safety for slopes & tunnels \u2713 a rock stabilization system with anchors, nets and low vibration splitting.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/rock-stabilization-system","og_locale":"en_US","og_type":"article","og_title":"Rock Stabilization System | Geotechnical Methods","og_description":"Geotechnical safety for slopes & tunnels \u2713 a rock stabilization system with anchors, nets and low vibration splitting.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/rock-stabilization-system","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-04-07T05:56:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/rock-stabilization-system","url":"https:\/\/www.darda.de\/en\/knowledge\/rock-stabilization-system","name":"Rock Stabilization System | Geotechnical Methods","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-10-01T13:18:44+00:00","dateModified":"2026-04-07T05:56:02+00:00","description":"Geotechnical safety for slopes & tunnels \u2713 a rock stabilization system with anchors, nets and low vibration splitting.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/rock-stabilization-system#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/rock-stabilization-system"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/rock-stabilization-system#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Rock stabilization system"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19139","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19139"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19139\/revisions"}],"predecessor-version":[{"id":26023,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19139\/revisions\/26023"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19139"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}