{"id":19135,"date":"2025-10-02T14:51:13","date_gmt":"2025-10-02T12:51:13","guid":{"rendered":"https:\/\/www.darda.de\/rock-wedge-splitter"},"modified":"2026-04-07T10:21:02","modified_gmt":"2026-04-07T08:21:02","slug":"rock-wedge-splitter","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/rock-wedge-splitter","title":{"rendered":"Rock wedge splitter"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>The rock wedge splitter is a classic tool for the controlled separation of rock. It has been used for centuries in <a href=\"https:\/\/www.darda.de\/en\/applications\/natural-stone-quarrying\">natural stone quarrying<\/a> and still has a firm place in areas such as rock excavation and tunnel construction as well as in special demolition. Modern methods combine the mechanical wedge with hydraulic solutions such as <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a>, or, after the wedge-induced opening, use a concrete pulverizer to reduce loosened blocks to precise dimensions. The goal is <em>precise, low-vibration, and low-emission<\/em> removal that protects structures and the surroundings. Where overbreak must be minimized and adjacent assets preserved, the method enables targeted separation with little ancillary damage.<\/p>\n<h2>Definition: What is meant by a rock wedge splitter?<\/h2>\n<p>A rock wedge splitter is a wedge-shaped tool driven into a prepared borehole or an existing fissure to open rock by inducing tensile stresses. The wedge effect generates a high, locally confined splitting stress perpendicular to the driving force. In practice, wedge sets consisting of one wedge and two counter-wedges (shoes) are often used. By driving the wedge, the counter-wedges pry apart the borehole walls until the rock ruptures along natural planes of weakness, bedding planes, or preplanned separation joints. The method is <strong>controlled, repeatable, and scalable<\/strong>-from a handheld splitting wedge to hydraulic splitting technology with rock splitting cylinders. Compared with percussive breaking, it favors tensile failure and thus achieves clean split surfaces at relatively low energy input and with less propagation of microcracks.<\/p>\n<h2>Operating principle and mode of action of the rock wedge splitter<\/h2>\n<p>The wedge converts an axial driving force into a radial spreading force. Critical factors are wedge angle, friction, and the stiffness of the surrounding rock. With a properly dimensioned borehole diameter and suitable driving force, tensile stresses arise in the rock that exceed its flexural tensile strength. The resulting crack propagation preferentially follows existing discontinuities such as joint systems or bedding. In fine-grained, homogeneous rocks the path is more linear; in anisotropic rocks the wedge orientation must be adapted to the fabric. Adequate lubrication reduces parasitic friction and improves load transfer, while a too-shallow wedge angle can stall the process.<\/p>\n<ul>\n<li><strong>Key parameters:<\/strong> wedge angle matched to rock strength and diameter, clean borehole surface, and sufficient but controlled driving energy<\/li>\n<li><strong>Force introduction:<\/strong> uniform, symmetric loading across the counter-wedges prevents local spalling and misdirected cracks<\/li>\n<li><strong>Crack steering:<\/strong> staged loading and alternating insertion along a line promote straight, predictable fracture fronts<\/li>\n<\/ul>\n<h2>Historical roots and current importance<\/h2>\n<p>From the classical hand wedge through wedge sets with shims to hydraulically assisted systems, wedge technology has evolved. In natural stone extraction it still enables gentle recovery of raw blocks. In tunnel construction and rock removal it is used where vibrations, shock, or noise must be limited. In urban deconstruction projects, the rock wedge splitter can be used as a preparatory step to open massive sections, followed by controlled downsizing with a concrete pulverizer or Multi Cutters. Regulatory frameworks that restrict blasting and high-noise activities further sustain its relevance in densely built environments.<\/p>\n<h2>Types of rock wedges and related systems<\/h2>\n<p>Rock wedges can be distinguished by drive type, installation, and target material. The boundaries to hydraulic splitting tools are fluid, since stone and concrete splitters also operate on the wedge-and-counter-wedge principle. Selection depends on geometry, accessibility, permissible impacts, and the required splitting force.<\/p>\n<h3>Manual wedges and wedge sets<\/h3>\n<ul>\n<li>Hand wedges with or without counter-wedges for small to medium block sizes<\/li>\n<li>Shims to distribute force and protect the borehole wall<\/li>\n<li>Driving with a hammer or sledgehammer<\/li>\n<li>Staggered activation sequence to guide crack fronts along the marked line<\/li>\n<\/ul>\n<h3>Mechanically and hydraulically assisted wedges<\/h3>\n<ul>\n<li>Screw- or clamp-actuated wedges with mechanical advantage<\/li>\n<li>Hydraulic wedge modules (rock splitting cylinders) for high splitting forces at greater depths<\/li>\n<li>Stone and concrete splitters for controlled crack initiation in concrete and natural stone<\/li>\n<li>Pressure staging and basic instrumentation enable reproducible results in sensitive structures<\/li>\n<\/ul>\n<h3>Distinction from concrete pulverizers and shears<\/h3>\n<ul>\n<li>Concrete pulverizers separate by compression and shearing, ideal after a wedge-induced pre-opening<\/li>\n<li>Combination shears, steel shears, and tank cutters are used for reinforcement, steel beams, and vessels<\/li>\n<li>Multi Cutters complement wedge use where materials are mixed<\/li>\n<li>Shears and pulverizers do not initiate tensile splitting and are therefore complementary to the wedge principle<\/li>\n<\/ul>\n<h2>Planning: Borehole pattern, wedge orientation, and sizing<\/h2>\n<p>The quality of the splitting result depends heavily on preparation. A systematically planned borehole pattern enables reproducible results with low energy input. Short pre-tests in a representative area validate spacing, sequence, and driving energy before full execution.<\/p>\n<h3>Borehole diameter and depth<\/h3>\n<ul>\n<li>Diameter matched to the wedge system (typically 18\u201345 mm for hand wedges; larger for hydraulic cylinders)<\/li>\n<li>Borehole depth at least 10\u201315 wedge widths; for large cross-sections, drill in stages<\/li>\n<li>Clean, cleared boreholes reduce friction and increase spreading efficiency<\/li>\n<li>Maintain tight diameter tolerance and good roundness to maximize contact and minimize slip<\/li>\n<li>Ensure perpendicularity and alignment to the intended split plane for predictable crack paths<\/li>\n<\/ul>\n<h3>Pattern and spacing<\/h3>\n<ul>\n<li>Select spacing according to rock strength and desired fracture line<\/li>\n<li>Line or field patterns to steer crack propagation<\/li>\n<li>Pre-drill along edges and corners to avoid spalling<\/li>\n<li>Reduce spacing at terminations, corners, and interfaces with heterogeneous zones<\/li>\n<\/ul>\n<h3>Orientation to rock fabric<\/h3>\n<ul>\n<li>Set wedges parallel to joint sets to exploit lower splitting energies<\/li>\n<li>Bedded rock: wedges transverse to bedding when a defined cross-section is required<\/li>\n<li>Process heterogeneous zones with a tighter pattern and smaller stroke increments if necessary<\/li>\n<li>Record visible discontinuities and use simple field tests to assess anisotropy before finalizing orientation<\/li>\n<\/ul>\n<h2>Work steps: From drilling to block release<\/h2>\n<ol>\n<li>Mark the separation line and define the pattern<\/li>\n<li>Drill holes with suitable diameter and depth, blow out drill cuttings<\/li>\n<li>Insert counter-wedges or protective shoes, introduce the wedge<\/li>\n<li>Drive evenly or apply hydraulic tension in several passes<\/li>\n<li>Observe crack formation, continue along the line<\/li>\n<li>Release the block and perform finishing, e.g., with a concrete pulverizer or rock splitting cylinders<\/li>\n<li>Document pressures, strokes, and sequence; inspect for overbreak and secure all loosened elements<\/li>\n<\/ol>\n<h2>Material behavior: Petrology for the wedge technique<\/h2>\n<p>Splitability depends on compressive and tensile strength, grain structure, porosity, and moisture. Igneous rocks (e.g., granite) require higher forces than sedimentary rocks. Anisotropic rocks favor unwanted deflection of the fracture front. An adapted wedge orientation and a staged approach with smaller stroke increments improve predictability. Water-filled discontinuities can dissipate energy, and seasonal freeze-thaw may precondition rock masses, both of which should be considered during planning.<\/p>\n<h2>Rock wedge splitter in combination with stone and concrete splitters<\/h2>\n<p>Hydraulic stone and concrete splitters transfer the wedge principle into a closed system with high power density. They are suitable where large cross-sections, limited accessibility, or strict emission requirements exist. In practice, combinations are common: <em>pre-opening<\/em> with hand wedges along fine separation lines, followed by controlled re-splitting with rock splitting cylinders to extend the crack front. This yields predictable fracture surfaces that can be further processed effectively with a concrete pulverizer.<\/p>\n<ul>\n<li><strong>Advantages of the staged approach:<\/strong> reduced peak loads on the structure, shorter cycle times per meter of split, and consistent surface quality<\/li>\n<li>Segmented execution enables work in narrow time windows and under strict vibration criteria<\/li>\n<\/ul>\n<h2>Typical application scenarios and use cases<\/h2>\n<h3>Rock excavation and tunnel construction<\/h3>\n<p>In sensitive zones with vibration restrictions, wedge technology is a quiet, low-vibration option for <a href=\"https:\/\/www.darda.de\/en\/applications\/rock-demolition-and-tunnel-construction\">rock demolition and tunnel construction<\/a>. The rock wedge splitter defines the separation joints, hydraulic splitters widen the gaps, and a concrete pulverizer and Multi Cutters handle block sizing. This sequence limits disturbance to surrounding rock mass and support systems.<\/p>\n<h3>Natural stone extraction<\/h3>\n<p>When extracting raw blocks, the rock wedge splitter enables the required block geometry. Rock splitting cylinders are additionally used where larger formats or harder stones must be released economically. Careful orientation to quarry bedding and joint sets maximizes yield and reduces waste.<\/p>\n<h3>Concrete demolition and special demolition<\/h3>\n<p>In massive foundations or overly thick slabs, a wedge-induced pre-opening can facilitate separation. After crack initiation, a concrete pulverizer performs downsizing; steel shears cut reinforcement; tank cutters and combination shears are used where adjacent steel and vessel components are present. The approach helps to keep dust and airborne silica lower than with intensive percussive methods.<\/p>\n<h3>Strip-out and cutting<\/h3>\n<p>In deconstruction of existing buildings, the rock wedge splitter (or wedge principle) can be used to separate elements with low residual stress. Cut edges can be prepared with targeted split lines, reducing the effort of subsequent cutting operations. Defined split planes also improve the quality of interfaces for later reconnection or finishing.<\/p>\n<h2>Benefits, limitations, and selection criteria<\/h2>\n<h3>Benefits<\/h3>\n<ul>\n<li>Low vibration, reduced noise, and low emissions<\/li>\n<li>High precision through plannable split lines<\/li>\n<li>Scalable from hand tool to hydraulic systems<\/li>\n<li>Low flyrock risk and minimal collateral damage to adjacent elements<\/li>\n<\/ul>\n<h3>Limitations<\/h3>\n<ul>\n<li>Highly heterogeneous or heavily reinforced zones require additional tools<\/li>\n<li>High force demand in tough rocks and large cross-sections<\/li>\n<li>Careful drilling preparation is essential<\/li>\n<li>Outcome depends on execution quality and accurate metrology<\/li>\n<\/ul>\n<h3>Selection criteria<\/h3>\n<ul>\n<li>Rock type, fabric, and desired block size<\/li>\n<li>Accessibility, occupational safety, emission requirements<\/li>\n<li>Compatibility with concrete pulverizers, rock splitting cylinders, or shears<\/li>\n<li>Available power sources, logistics, and permitted working windows<\/li>\n<\/ul>\n<h2>Practice: Failure modes and remedies<\/h2>\n<ul>\n<li>Crack propagates uncontrollably: adapt pattern to fabric, change wedge orientation<\/li>\n<li>Wedge \u201csprings back\u201d: clean the borehole, check counter-wedges, optimize wedge angle and lubrication<\/li>\n<li>Insufficient splitting action: increase borehole depth, set multiple wedges in parallel, support hydraulically<\/li>\n<li>Edge breakouts: pre-drill along edges, reduce stroke increments, secure load transfer<\/li>\n<li>Wedge gets stuck: relieve load, use an extractor aid, never strike laterally to free the tool<\/li>\n<li>Borehole ovalization: re-drill with the correct bit and speed; avoid excessive feed pressure that widens the hole<\/li>\n<\/ul>\n<h2>Occupational safety and emissions<\/h2>\n<p>Safety starts with drilling: dust extraction, hearing and eye protection, and hand protection are standard. When driving the wedge, ensure a safe stance, avoid kickback, and monitor the crack front. For hydraulic applications, increase pressure stages gradually and secure the area against unauthorized access. <strong>Always shore or catch loosened blocks<\/strong> before subsequent processing with a concrete pulverizer or shears. Protect against pinch points, route and shield hoses to avoid damage, verify pressure ratings before use, and respect local noise and vibration thresholds.<\/p>\n<h2>Resource efficiency and sustainability<\/h2>\n<p>Wedge technology enables selective deconstruction and exact block sizes. Materials can thus be sorted, reused, or recycled more effectively. The low energy input relative to separation performance has a positive effect on the carbon footprint. In combination with hydraulic stone and concrete splitters, the process chain can be further optimized. Accurate separation improves salvage of facing stone and dimensional pieces, while clear documentation supports downstream recycling and waste classification.<\/p>\n<h2>Maintenance, care, and storage<\/h2>\n<ul>\n<li>Keep wedge faces clean; apply light lubrication to prevent galling<\/li>\n<li>Inspect counter-wedges and protective shoes for damage<\/li>\n<li>Maintain hydraulic components according to the manufacturer\u2019s specifications<\/li>\n<li>Store dry, protect edges, and check sledge striking faces<\/li>\n<li>Check wedge noses and angles for wear; resharpen or replace as required<\/li>\n<li>Inspect hoses, seals, and couplings periodically for leaks and aging<\/li>\n<\/ul>\n<h2>Guide to combining with a concrete pulverizer<\/h2>\n<p>In many projects, the sequence is critical: The rock wedge splitter creates the controlled pre-opening, stone and concrete splitters widen the separation joint, and the concrete pulverizer performs targeted downsizing. This sequence keeps vibrations low, improves dimensional accuracy, and accelerates material haulage.<\/p>\n<ul>\n<li>Define target split planes and borehole patterns first; assign roles for wedge, splitter, and pulverizer<\/li>\n<li>Stage forces to avoid premature crushing; widen only after a continuous crack has formed<\/li>\n<li>Coordinate removal logistics so that freed blocks are stabilized, processed, and evacuated without delays<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The rock wedge splitter is a classic tool for the controlled separation of rock. It has been used for centuries in natural stone quarrying and still has a firm place in areas such as rock excavation and tunnel construction as well as in special demolition. Modern methods combine the mechanical <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/rock-wedge-splitter\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19135","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Rock Wedge Splitter - Quarrying &amp; Tunneling Tool<\/title>\n<meta name=\"description\" content=\"Master precise, low vibration rock splitting with a rock wedge splitter tool \u2713 for quarrying, tunneling &amp; demolition.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/rock-wedge-splitter\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Rock Wedge Splitter - Quarrying &amp; Tunneling Tool\" \/>\n<meta property=\"og:description\" content=\"Master precise, low vibration rock splitting with a rock wedge splitter tool \u2713 for quarrying, tunneling &amp; demolition.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/rock-wedge-splitter\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-07T08:21:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/rock-wedge-splitter\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/rock-wedge-splitter\",\"name\":\"Rock Wedge Splitter - Quarrying & Tunneling Tool\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-10-02T12:51:13+00:00\",\"dateModified\":\"2026-04-07T08:21:02+00:00\",\"description\":\"Master precise, low vibration rock splitting with a rock wedge splitter tool \u2713 for quarrying, tunneling & demolition.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/rock-wedge-splitter#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/rock-wedge-splitter\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/rock-wedge-splitter#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Rock wedge splitter\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Rock Wedge Splitter - Quarrying & Tunneling Tool","description":"Master precise, low vibration rock splitting with a rock wedge splitter tool \u2713 for quarrying, tunneling & demolition.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/rock-wedge-splitter","og_locale":"en_US","og_type":"article","og_title":"Rock Wedge Splitter - Quarrying & Tunneling Tool","og_description":"Master precise, low vibration rock splitting with a rock wedge splitter tool \u2713 for quarrying, tunneling & demolition.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/rock-wedge-splitter","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-04-07T08:21:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/rock-wedge-splitter","url":"https:\/\/www.darda.de\/en\/knowledge\/rock-wedge-splitter","name":"Rock Wedge Splitter - Quarrying & Tunneling Tool","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-10-02T12:51:13+00:00","dateModified":"2026-04-07T08:21:02+00:00","description":"Master precise, low vibration rock splitting with a rock wedge splitter tool \u2713 for quarrying, tunneling & demolition.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/rock-wedge-splitter#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/rock-wedge-splitter"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/rock-wedge-splitter#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Rock wedge splitter"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19135","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19135"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19135\/revisions"}],"predecessor-version":[{"id":26031,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19135\/revisions\/26031"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19135"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}