{"id":19130,"date":"2025-10-03T14:37:06","date_gmt":"2025-10-03T12:37:06","guid":{"rendered":"https:\/\/www.darda.de\/fine-dust-filter"},"modified":"2026-04-06T17:43:05","modified_gmt":"2026-04-06T15:43:05","slug":"fine-dust-filter","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/fine-dust-filter","title":{"rendered":"Fine dust filter"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Fine dust filters are central components for clean working air on construction sites and in factory halls, especially where concrete, stone, or steel is processed and broken down. When using concrete demolition shears, stone and concrete splitting devices, combination shears, or Multi Cutters, different amounts of dust are generated depending on the method-from coarse particles to respirable fine fractions. Targeted filtration technology reduces exposure to respirable crystalline silica, PM10 and PM2.5, protects employees and sensitive environments, and supports predictable, disruption-free work in <a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">concrete demolition and deconstruction<\/a>, in building gutting, in rock excavation and tunnel construction, in natural stone extraction, and in special operations. In sealed areas, coherent concepts combine extraction, airflow control, and monitoring of pressure differentials to secure zone boundaries and document air quality progress.<\/p>\n<h2>Definition: What is meant by a fine dust filter?<\/h2>\n<p>A fine dust filter is a technical component that separates airborne particles in the range of approximately 0.1 to 10 micrometers from an airstream. These include, among others, mineral dusts (e.g., silica-containing concrete and rock dust), metal dusts, and other suspended particles. Fine dust filters are used in <em>air purifiers<\/em>, <em>negative pressure units<\/em>, <em>extraction systems<\/em>, and <em>industrial vacuum cleaners<\/em> as well as <em>exhaust particulate filters<\/em> on combustion engines. In deconstruction settings, multi-stage systems consisting of pre-filters and HEPA filters (e.g., H13\/H14) are often used to reliably capture high dust loads from concrete and masonry processing. The separation performance is typically specified at the <em>most penetrating particle size<\/em> (MPPS, about 0.1-0.3 micrometers) and verified by standardized tests; filter media include glass microfibers and membrane-supported materials designed for high efficiency at low leakage rates.<\/p>\n<h2>How it works and filter types<\/h2>\n<p>Separation takes place through an interplay of physical mechanisms: <em>inertial impaction<\/em> and <em>interception<\/em> for larger particles, <em>diffusion<\/em> (Brownian motion) for ultrafine particles, and the <em>sieving effect<\/em> in fiber media. Modern fine dust filters are predominantly mechanical depth filters, sometimes with electrostatic support. In dust-intensive applications of concrete demolition, multi-stage systems are preferred: robust pre-filters capture coarse loads, followed by highly effective HEPA filters handling the fine fraction. In operation, a stabilizing dust cake can raise initial collection efficiency while increasing differential pressure; electrostatic effects may diminish under high humidity, which is relevant for wet cutting or winter conditions.<\/p>\n<h3>Multi-stage concepts from pre-separation to HEPA filtration<\/h3>\n<p>In practice, pre-filters with high dust holding capacity ahead of a HEPA filter (e.g., classes H13\/H14) are proven. Additionally, activated carbon mats can reduce odors or gas fractions if required. A tight, leak-proof enclosure of the filter medium and reliable sealing in the device mount are crucial to avoid <strong>bypasses<\/strong>. Where loading is extreme, pre-separators (e.g., cyclones) reduce the burden on subsequent stages and stabilize performance over longer shifts.<\/p>\n<ul>\n<li><strong>Stage 1:<\/strong> Pre-separation (spark, chip, and coarse fraction reduction)<\/li>\n<li><strong>Stage 2:<\/strong> High-capacity pre-filter (e.g., ePM10\/ePM2.5 according to ISO 16890)<\/li>\n<li><strong>Stage 3:<\/strong> Final stage with <strong>HEPA H13\/H14<\/strong> for respirable and ultrafine particles<\/li>\n<\/ul>\n<h3>Standards and classifications<\/h3>\n<p>For HEPA filters, classes according to EN 1822 are established (e.g., H13\/H14), while ISO 16890 (e.g., ePM1, ePM2.5) applies to general supply air filters. Dust extractors and industrial vacuum cleaners are often selected according to dust classes L\/M\/H (including EN 60335-2-69). The specific selection depends on dust type, exposure risk, and process control and should follow recognized best practices. HEPA performance is determined at the MPPS and can be validated by scan testing and leak checks; documentation and labeling support traceability and quality assurance on site.<\/p>\n<h2>Importance on the construction site: concrete demolition, building gutting, and rock excavation<\/h2>\n<p>Processing concrete, natural stone, or masonry generates finely dispersed particles, sometimes with silica content. In <strong>concrete demolition and special demolition<\/strong> as well as during <strong>building gutting and cutting<\/strong>, fine dust filters for extraction systems, air purifiers, and negative pressure containment are essential. In enclosed spaces, during tunnel works, or in sensitive existing buildings, they support protective measures and reduce secondary contamination. Clearly separated clean and dirty areas with controlled air routes prevent recirculation into zones with ongoing operations.<\/p>\n<h3>Relation to concrete demolition shears<\/h3>\n<p>Crushing concrete with concrete demolition shears generates fracture dust at the crack line and during material handling. Effective measures include source-capture hoods and flexible capture elements at the points of operation, combined with HEPA-backed dust extractors. Indoors, room air is additionally routed through negative pressure units with HEPA filters to ensure directed airflow and clean air discharge. As a rule of thumb, capture velocities of roughly 0.5-1.0 m\/s near the emission point and minimized hose length with smooth bends improve collection efficiency.<\/p>\n<h3>Relation to stone and concrete splitting devices<\/h3>\n<p>Hydraulic splitting typically produces less freely released fine dust compared to percussive methods. If dust is generated during pre-drilling of wedge holes or during secondary breaking, extraction with suitable filters is advisable. In <em>natural stone extraction<\/em> and in <a href=\"https:\/\/www.darda.de\/en\/applications\/rock-demolition-and-tunnel-construction\">rock demolition and tunnel construction<\/a>, mobile air purifiers with fine dust filters help keep environmental burdens low in work zones. Where abrasive cutting or dry drilling is added, the resulting respirable fraction must be addressed with appropriately rated HEPA final stages.<\/p>\n<h2>Fine dust filters on hydraulic power packs<\/h2>\n<p>Where combustion engines are used to drive <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power units<\/a>, exhaust particulate filters (diesel particulate filters) can reduce soot and fine dust emissions. Crucial factors are proper sizing for the engine, monitored exhaust backpressure, and controlled regeneration. Indoors, in shafts, or in tunnels, the combination of low-emission drives, exhaust particulate filters, and effective room air filtration is particularly relevant. Electrically powered units avoid exhaust fine dust but still require dust management for material-related particles from the demolition processes. Continuous backpressure monitoring with alarms and a regeneration strategy aligned to the duty cycle safeguards performance and engine protection.<\/p>\n<h3>Exhaust particulate filters and room air filters &#8211; two application fields<\/h3>\n<p>Exhaust particulate filters capture particles in the engine\u2019s exhaust stream, while HEPA-backed systems clean ambient air of mineral dusts. In complex projects, both approaches are combined to address sources and surroundings simultaneously. Exhaust routing must be planned to prevent short-circuit flows back into work zones or adjacent intakes.<\/p>\n<h2>Selection criteria for fine dust filters in deconstruction<\/h2>\n<p>Selection is based on dust type, process, air volume flow, and construction environment. Key factors:<\/p>\n<ul>\n<li>Particle collective: PM10\/PM2.5, respirable crystalline silica, metal and mixed dusts<\/li>\n<li>Filter class and collection efficiency (e.g., H13\/H14 for fine particles in sensitive areas)<\/li>\n<li>Airflow capacity and permissible pressure drop of the overall system<\/li>\n<li>Dust holding capacity and service life under high dust load<\/li>\n<li>Tightness of the device mount, sealing edges, and service-friendly, low-dust replacement concepts<\/li>\n<li>Moisture and temperature resistance (water mist, wet cutting, winter construction sites)<\/li>\n<li>Compatibility with source-capture elements on concrete demolition shears or stone and concrete splitting devices<\/li>\n<li>Availability of differential pressure or saturation indicators for condition monitoring<\/li>\n<li>Energy use and controllability (e.g., EC fans, variable speed for demand-based operation)<\/li>\n<li>Acoustic emissions and vibration robustness for use in occupied or sensitive buildings<\/li>\n<li>Mobility, footprint, and ingress protection suitable for rough site conditions<\/li>\n<li>Availability of test certificates and documentation (e.g., EN 1822 scan test reports, maintenance logs)<\/li>\n<\/ul>\n<h2>Best practice: planning, application, and maintenance<\/h2>\n<p>An effective concept combines source capture, airflow management, filtration technology, and safe work procedures. The process begins with an assessment of material, method, and room geometry and relies on measurable, documentable measures. Method statements with defined acceptance criteria (e.g., pressure differentials, air changes, cleanliness checks) help structure execution and quality control.<\/p>\n<h3>Source capture<\/h3>\n<p>Direct extraction hoods, flexible suction nozzles, or protected work windows reduce emissions directly at the point of generation. For concrete demolition shears, pickup points close to the fracture line are effective; for cutting and separation operations, tool guards with suction nozzles help. Water mist can bind particles but must not soak the filters-pre-separators or suitable pre-filters protect the HEPA filter. Keep capture distances short, select adequate hose diameters, and avoid tight bends to preserve flow and limit pressure losses.<\/p>\n<h3>Negative pressure and room air cleaning<\/h3>\n<p>Negative pressure units with H-class filter extract contaminated air in a targeted manner and create directed airflows. Mobile air purifiers complement source control and stabilize the overall level. Sizing is based on room size, process intensity, and control measurements. Air outlets are positioned to prevent any return flow into work or protected areas. Typical planning values include 6-10 air changes per hour in contained rooms and sustained pressure differentials of around 5-15 Pa; continuous manometers or digital sensors support verification.<\/p>\n<h3>Maintenance, replacement intervals, and disposal<\/h3>\n<p>Filters are replaced based on differential pressure, visual inspection, and process load. Low-dust replacement methods (e.g., sealable frames, bag-in\/bag-out) minimize secondary emissions. Used filters must be packed, labeled, and properly disposed of according to their contamination. Personal protective equipment (e.g., appropriate respiratory protection) is mandatory during service. As a practical rule, change filters when pressure drop approaches 2-3 times the clean condition or when integrity is in doubt; never attempt to rejuvenate HEPA media by mechanical cleaning.<\/p>\n<h3>Commissioning, testing, and documentation<\/h3>\n<p>Before and during operation, systematic checks secure performance and traceability:<\/p>\n<ul>\n<li>Leak and seating checks of filter frames and gaskets, with corrective sealing if required<\/li>\n<li>Airflow verification (e.g., flow hood, anemometer) and smoke visualization for airflow direction<\/li>\n<li>HEPA integrity verification as required by project specification (e.g., scan or aerosol challenge)<\/li>\n<li>Logging of differential pressure, operating hours, and filter changes in a site logbook<\/li>\n<\/ul>\n<h2>Occupational safety and health<\/h2>\n<p>Respirable dusts can burden the respiratory tract; silica-containing fine dusts are considered particularly critical. Protection concepts combine technical, organizational, and personal measures. Legal requirements differ by country and project; they should generally be observed and implemented in operating instructions. Exposure assessment by gravimetric sampling or calibrated direct-reading instruments supports risk control and the selection of respiratory protection with adequate assigned protection factors.<\/p>\n<ol>\n<li>Minimize emissions at the source (extraction, water mist, suitable methods)<\/li>\n<li>Direct airflow (negative pressure containment, filtered air discharge)<\/li>\n<li>Use effective fine dust filters (matched to the process and room size)<\/li>\n<li>Monitor and document (e.g., differential pressure, visible dust, spot measurements)<\/li>\n<li>Provide and use protective clothing and respiratory protection<\/li>\n<\/ol>\n<h2>Typical mistakes and how to avoid them<\/h2>\n<ul>\n<li>Unsuitable filter class for respirable crystalline silica: ensure high collection efficiency in sensitive applications<\/li>\n<li>Leaks at sealing edges or poorly mounted filter frames: leads to bypass flows<\/li>\n<li>Air volume flow too low: insufficient to capture emissions<\/li>\n<li>Neglected pre-filters: drastically reduce the service life of the HEPA filter<\/li>\n<li>Wet or sludge-clogged filters due to uncontrolled water mist: use pre-separators and splash-protected pre-filters<\/li>\n<li>Dry cleaning by blowing out with compressed air: resuspends fine dust-avoid<\/li>\n<li>Use of unsuitable household devices: observe required dust classes and tightness<\/li>\n<li>Exclusive reliance on electrostatic-only media in humid conditions: charge decay lowers efficiency<\/li>\n<\/ul>\n<h2>Sustainability and resource conservation<\/h2>\n<p>Optimized pre-filtration extends service life and reduces waste volumes. Properly sized systems operate energy-efficiently because pressure drop remains limited. Targeted airflow management avoids overflows and thus unnecessary air changes. Careful disposal of used filters contributes to environmental protection. Durable housings, reusable frames, and demand-controlled fan operation further reduce resource consumption over the life cycle.<\/p>\n<h2>Practical relevance to products and areas of application<\/h2>\n<p>In <strong>concrete demolition and special demolition<\/strong>, fine dust filters support extraction systems on concrete demolition shears and concrete cutting technology. During <strong>building gutting and cutting<\/strong>, the combination of source capture and negative pressure containment in rooms is proven. In <strong>rock excavation and tunnel construction<\/strong>, mobile air purifiers with H-class filters help stabilize background concentrations. In <strong>natural stone extraction<\/strong>, splitting with stone and concrete splitting devices can be low-dust; during drilling, cutting, and loading, filtration systems ensure clean processes. In <strong>special operations<\/strong>-for example, in sensitive existing buildings or in areas with ongoing operations-tight enclosures and highly effective HEPA filters are essential. Even when using combination shears, steel shears, Multi Cutters, or tank cutters, fine dust can be generated depending on the material processing, which should be captured and reliably retained by appropriate filtration technology. Proper documentation and placement strategies also protect neighboring areas and support transparent project communication.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Fine dust filters are central components for clean working air on construction sites and in factory halls, especially where concrete, stone, or steel is processed and broken down. When using concrete demolition shears, stone and concrete splitting devices, combination shears, or Multi Cutters, different amounts of dust are generated depending <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/fine-dust-filter\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19130","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Fine Dust Filter for Construction &amp; Demolition<\/title>\n<meta name=\"description\" content=\"Discover fine dust filter solutions for construction &amp; industry \u2713 HEPA stages reduce silica, PM10 &amp; PM2.5 exposure.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/fine-dust-filter\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Fine Dust Filter for Construction &amp; Demolition\" \/>\n<meta property=\"og:description\" content=\"Discover fine dust filter solutions for construction &amp; industry \u2713 HEPA stages reduce silica, PM10 &amp; PM2.5 exposure.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/fine-dust-filter\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-06T15:43:05+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/fine-dust-filter\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/fine-dust-filter\",\"name\":\"Fine Dust Filter for Construction & Demolition\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-10-03T12:37:06+00:00\",\"dateModified\":\"2026-04-06T15:43:05+00:00\",\"description\":\"Discover fine dust filter solutions for construction & industry \u2713 HEPA stages reduce silica, PM10 & PM2.5 exposure.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/fine-dust-filter#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/fine-dust-filter\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/fine-dust-filter#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Fine dust filter\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Fine Dust Filter for Construction & Demolition","description":"Discover fine dust filter solutions for construction & industry \u2713 HEPA stages reduce silica, PM10 & PM2.5 exposure.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/fine-dust-filter","og_locale":"en_US","og_type":"article","og_title":"Fine Dust Filter for Construction & Demolition","og_description":"Discover fine dust filter solutions for construction & industry \u2713 HEPA stages reduce silica, PM10 & PM2.5 exposure.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/fine-dust-filter","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-04-06T15:43:05+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/fine-dust-filter","url":"https:\/\/www.darda.de\/en\/knowledge\/fine-dust-filter","name":"Fine Dust Filter for Construction & Demolition","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-10-03T12:37:06+00:00","dateModified":"2026-04-06T15:43:05+00:00","description":"Discover fine dust filter solutions for construction & industry \u2713 HEPA stages reduce silica, PM10 & PM2.5 exposure.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/fine-dust-filter#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/fine-dust-filter"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/fine-dust-filter#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Fine dust filter"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19130","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19130"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19130\/revisions"}],"predecessor-version":[{"id":26019,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19130\/revisions\/26019"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19130"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}