{"id":19128,"date":"2025-10-03T10:36:34","date_gmt":"2025-10-03T08:36:34","guid":{"rendered":"https:\/\/www.darda.de\/fine-dust"},"modified":"2026-04-06T16:55:03","modified_gmt":"2026-04-06T14:55:03","slug":"fine-dust","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/fine-dust","title":{"rendered":"Fine dust"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Fine dust is generated during numerous activities in concrete demolition, strip-out, rock excavation and tunnel construction, as well as in natural stone extraction. In these fields of application, proper handling of dust plays a central role in occupational safety, environmental compatibility, and execution quality. Hydraulic tools from Darda GmbH &#8211; such as concrete demolition shears or <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a> &#8211; are often used where precise, controlled, and ideally lower-dust methods are required. The topic encompasses technical terminology, mechanisms of dust generation on construction sites, exposure pathways, and practicable reduction strategies for particulate matter. The following overview classifies the term fine dust in technical terms, describes generation mechanisms at the workplace, and presents proven measures to reduce particle exposure across typical site scenarios.<\/p>\n<h2>Definition: What is meant by fine dust?<\/h2>\n<p>Fine dust refers to airborne particles with a small aerodynamic diameter. A common categorization is PM10 (particles \u2264 10 \u00b5m), PM2.5 (\u2264 2.5 \u00b5m), and ultrafine particles (often &lt; 0.1 \u00b5m). In construction practice, mineral dusts from concrete, mortar, brick, and natural stone are relevant, often containing quartz (respirable crystalline silica). The particles are generated by crushing, milling, grinding, sawing, drilling, breaking, and mechanical abrasion. The smaller the particles, the longer they remain suspended in the air and the deeper they can penetrate into the respiratory tract.<\/p>\n<ul>\n<li><strong>Thoracic and respirable fractions:<\/strong> PM10 reaches the lower respiratory tract, while PM2.5 and the respirable fraction can penetrate to the alveoli; ultrafine particles may translocate further within the body.<\/li>\n<li><strong>Material composition:<\/strong> Mineral matrix, quartz content, additives, and surface moisture influence particle formation, agglomeration, and deposition behavior.<\/li>\n<\/ul>\n<p>Fine dust is therefore not only a matter of cleanliness but a key aspect of occupational hygiene and environmental protection.<\/p>\n<h2>Generation of fine dust in concrete demolition, strip-out and rock excavation<\/h2>\n<p>When processing mineral construction materials, particles are generated through crack propagation, aggregate fracture, and friction wear. Particularly dust-intensive are abrasive methods with a high proportion of cutting or grinding. Hydraulic separating and splitting methods &#8211; such as with concrete demolition shears or rock and concrete splitters &#8211; create fracture surfaces through controlled introduction of pressure. Compared to continuous abrasive processes, this can generate <em>relatively<\/em> less fine dust, because the material is preferentially separated into larger fragments. The actual dust load nevertheless depends on many factors: material (e.g., concrete strength, reinforcement ratio), moisture, tool geometry, contact pressure, working speed, and boundary conditions such as ventilation or enclosure.<\/p>\n<ul>\n<li><strong>Process energy and contact time:<\/strong> Higher energy density and prolonged tool contact generally increase abrasion and the share of PM2.5.<\/li>\n<li><strong>Moisture and temperature:<\/strong> Surface moisture binds dust at the source; very dry, warm conditions favor re-entrainment.<\/li>\n<li><strong>Containment and airflow:<\/strong> Enclosures without targeted extraction can trap dust and elevate local concentrations.<\/li>\n<\/ul>\n<h2>Particle sizes, material properties and health aspects<\/h2>\n<p>Particle size determines residence time in the air and deposition in the respiratory tract. Coarse splinters settle quickly, while PM10 and especially PM2.5 remain airborne longer. Concrete and natural stone release mineral particles when fractured and crushed; contained quartz fractions can increase occupational health relevance. Dust exposures should therefore be minimized in principle &#8211; through method selection, technical and organizational measures, and personal protective equipment. Statements on permissible limit values are based on the applicable legal requirements and recognized rules of practice; they must be assessed on a project-specific basis.<\/p>\n<p>From a prevention perspective, <em>avoidance at the source<\/em> takes priority, followed by near-source capture and organizational controls. PPE complements &#8211; but does not replace &#8211; these measures.<\/p>\n<h3>Concrete demolition shears and rock and concrete splitters in the context of dust generation<\/h3>\n<p>Concrete demolition shears grip the component and crush it using high, locally introduced compressive forces. Rock and concrete splitters expand previously created drilled holes or apply splitting wedges to initiate controlled cracks. Both approaches promote fracture rather than abrasion. As a result, the release of very fine particles can be reduced, while coarser fragments are removed in a targeted manner. Additionally, dust generation can be further reduced by wetting surfaces, minimizing drop heights when placing material down, and using well-considered sequences (split first, then separate). Where feasible, pre-cracking and controlled fragment handling reduce secondary breakage and the formation of fines.<\/p>\n<h2>Fine dust in Darda GmbH application areas<\/h2>\n<h3>Concrete demolition and special demolition<\/h3>\n<p>In selective deconstruction, dust emissions occur at separating points, when removing components, and during secondary breaking. Concrete demolition shears support step-by-step, controlled removal, thereby limiting dust sources locally. When loosening slabs, foundations, or walls, pre-cracking with shears can prepare subsequent processing with less abrasion. <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">Hydraulic power units<\/a> provide the required energy, while measures such as local dust extraction, water wetting, and enclosure further reduce emissions. Sequenced work packages and short transport routes help keep resuspension low.<\/p>\n<h3>Strip-out and cutting<\/h3>\n<p>In interior spaces, the residence time of fine dust is increased. Therefore, point-source extraction, negative pressure containment in work areas, and strict separation of clean and dirty zones are crucial. When selectively removing concrete webs or chasing, prioritizing splitting or shear operations can reduce the amount of dust-intensive cutting. Metallic inserts can be separated with shears; this typically produces less mineral fine dust, though other emissions may occur that must be considered separately. Air cleaners with suitable filters, monitored pressure regimes, and controlled waste handling complete the setup.<\/p>\n<h3>Rock excavation and tunnel construction<\/h3>\n<p>In rock, rock type, grain bonding, and moisture determine dust behavior. In projects focused on <a href=\"https:\/\/www.darda.de\/en\/applications\/rock-demolition-and-tunnel-construction\">rock demolition and tunnel construction<\/a>, limited volume and airflow affect dust distribution. Rock splitting cylinders and rock and concrete splitters create controlled crack patterns in the rock mass and can limit dust peaks such as those that occur during intensive impact work. At the same time, powerful ventilation, near-source dust extraction, and clean material logistics are indispensable. Orientation of airflow to avoid recirculation and blind spots measurably improves exposure profiles.<\/p>\n<h3>Natural stone extraction<\/h3>\n<p>In the extraction and shaping of natural stone, dust is primarily released during sawing, grinding, and sorting. Splitting along natural or predefined discontinuities can reduce fine dust generation compared to abrasive cutting processes. Decisive are adapted process chains that favor fracture and minimize fines, supplemented by wet operating modes and low-dust transport routes. Storage, screening, and loading should be managed to avoid unnecessary drop heights and re-entrainment.<\/p>\n<h3>Special application<\/h3>\n<p>In sensitive environments &#8211; such as occupied buildings, industrial facilities, or protected surroundings &#8211; dust control is particularly important. There, work with concrete demolition shears and splitters is often combined with enclosures, air cleaning (e.g., with suitable filters), and close-meshed monitoring to limit emissions and protect neighboring areas. Coordinated time windows and buffer zones reduce nuisance and facilitate verification.<\/p>\n<h2>Measures to reduce fine dust on the construction site<\/h2>\n<p>Effective dust management combines method selection, technology, organization, and personal protective measures. The specific combination is planned and monitored on a project-specific basis.<\/p>\n<ul>\n<li><strong>Method selection and sequence:<\/strong> Generate fracture where possible (e.g., concrete demolition shears, rock and concrete splitters) and minimize abrasive processing; pre-crack components, then separate in a targeted manner.<\/li>\n<li><strong>Wet processing:<\/strong> Water wetting at the point of generation binds particles. Water quantity, droplet size, and point of application must be adapted to the material and method.<\/li>\n<li><strong>Point extraction:<\/strong> Near-source capture with suitable filtration (e.g., for fine mineral dusts) and sufficient volumetric flow.<\/li>\n<li><strong>Encapsulation and enclosure:<\/strong> Dust-tight partitions, airlocks, and negative pressure reduce spread &#8211; especially during strip-out.<\/li>\n<li><strong>Ventilation:<\/strong> Targeted airflow, adequate air exchange, and avoidance of backflows improve air quality, for example in tunnel construction.<\/li>\n<li><strong>Cleanliness and logistics:<\/strong> Wet clean instead of dry sweeping, no compressed air for blow-off, low-dust conveying and drop systems, short routes.<\/li>\n<li><strong>Tool and process parameters:<\/strong> Adapted pressure, feed, and gripping positions on concrete demolition shears; controlled split widths and cycles during splitting &#8211; to avoid unnecessary fine comminution.<\/li>\n<li><strong>Maintenance:<\/strong> Maintain seals, cutting edges, and bearings; operate hydraulic power packs cleanly to preserve efficiency and process stability.<\/li>\n<li><strong>Organization and PPE:<\/strong> Zone work areas, limit exposure times, provide suitable respirators and use them correctly; refresh training regularly.<\/li>\n<li><strong>Monitoring and documentation:<\/strong> Plan measurements, define reference values, log results, and adjust measures as needed.<\/li>\n<li><strong>Quality assurance:<\/strong> Commission controls with trial runs, smoke tests, and flow checks verify capture efficiency before full-scale work begins.<\/li>\n<li><strong>Material handling:<\/strong> Cover skips and transfer points, minimize drop heights, and dampen surfaces to prevent re-entrainment.<\/li>\n<\/ul>\n<h2>Measurement, assessment and documentation of dust exposure<\/h2>\n<p>For a reliable assessment, PM10\/PM2.5, respirable dusts, and material-typical components are considered depending on the task. In addition to gravimetric methods, portable particle counters can be used for trend observation. Important are representative measuring points, suitable measurement times (including peak loads), and interpretation of the values with respect to applicable requirements. Clear documentation supports verification for clients and authorities as well as the continuous improvement of processes.<\/p>\n<ul>\n<li><strong>Strategy:<\/strong> Combine task-based short-term measurements with longer background and end-of-shift values to capture variability.<\/li>\n<li><strong>Data quality:<\/strong> Calibrate instruments, use blanks and field duplicates where appropriate, and record metadata such as weather, process steps, and controls applied.<\/li>\n<li><strong>Feedback loop:<\/strong> Use results to fine-tune capture points, water supply, and process parameters; verify improvements with follow-up tests.<\/li>\n<\/ul>\n<h2>Environmental protection: emissions, deposition and water balance<\/h2>\n<p>Fine dust leaves the construction site as diffuse emissions or settles on surfaces and vegetation. Measures such as windbreaks, closed containers, dampened routes, and gentle handling techniques reduce spread. Water-based processes require controlled collection and treatment of the resulting water to retain sediments and fines. Careful planning avoids secondary inputs into soil and water bodies. Where process water is reused, attention to sediment load, pH, and recycling cycles prevents unwanted carryover.<\/p>\n<h2>Planning, occupational safety and communication<\/h2>\n<p>A low-dust approach begins with a hazard analysis and suitable work planning. The structure, materials, weather, neighborhood, and working times are taken into account. Communication with stakeholders &#8211; client, residents, users &#8211; supports acceptance. Legal requirements must be carefully reviewed in each project; binding information is provided by the responsible institutions. Operationally, the rule is: <em>Plan, execute, measure, adjust<\/em>.<\/p>\n<ul>\n<li><strong>Planning deliverables:<\/strong> Method statements, ventilation and extraction layouts, emergency procedures, and measurement plans aligned with the work sequence.<\/li>\n<li><strong>Roles and interfaces:<\/strong> Define responsibilities for dust control, maintenance, and monitoring to ensure continuous functionality.<\/li>\n<\/ul>\n<h2>Material and tool influence on dust formation<\/h2>\n<h3>Concrete quality and reinforcement<\/h3>\n<p>High-strength concrete fractures more brittlely and can generate finer particles under unfavorable parameters. Concrete demolition shears can be positioned so that cracks run purposefully through the concrete while reinforcement is separated or exposed. This reduces rework with abrasive methods. Adjusting jaw openings and bite sequences further optimizes fragment sizes.<\/p>\n<h3>Rock types and moisture<\/h3>\n<p>Weakly bonded rocks generate more dust under friction than tough-brittle rocks. Material moisture has a dust-binding effect. During splitting or crushing, targeted humidification can dampen particle formation. In stratified rock, orienting cracks with bedding can lower the need for follow-up abrasion.<\/p>\n<h3>Tool geometry and process control<\/h3>\n<p>Cutting edges, shear jaws, pressure stages, and holding positions influence crack paths and fragment size. Calm process control with moderate speeds and controlled pressure favors large fragments and reduces abrasion. Regular inspection of wear patterns keeps performance predictable and helps avoid unintended fine comminution.<\/p>\n<h2>Practical examples: low-dust approach for typical tasks<\/h2>\n<h3>Column demolition in existing structures<\/h3>\n<ol>\n<li>Enclose the work area, create negative pressure, position near-source extraction.<\/li>\n<li>Pre-crack the column with a concrete demolition shear, expose the reinforcement.<\/li>\n<li>Separate the reinforcement, place fragments down wet and transport them with low dust.<\/li>\n<li>Wet clean, check measurements, adjust measures.<\/li>\n<li>Document results and lessons learned to optimize subsequent work sections.<\/li>\n<\/ol>\n<h3>Foundation splitting prior to disposal<\/h3>\n<ol>\n<li>Set drilled holes according to plan and insert rock or concrete splitters.<\/li>\n<li>Split in a controlled manner to produce manageable blocks.<\/li>\n<li>Moisten fracture surfaces, secure edges, use low-dust logistics.<\/li>\n<li>Wet clean the area, bind dust deposits.<\/li>\n<li>Verify fragment sizing versus disposal requirements and adapt the pattern if needed.<\/li>\n<\/ol>\n<h3>Breakout window in the tunnel<\/h3>\n<ol>\n<li>Plan airflow, size extraction and ventilation.<\/li>\n<li>Pre-crack with shear or splitters, reduce abrasion-intensive steps.<\/li>\n<li>Remove material quickly, cover dust sources, control drip water.<\/li>\n<li>Control measurement and visual inspection, update documentation.<\/li>\n<li>Re-balance airflow after geometry changes to maintain target capture velocities.<\/li>\n<\/ol>\n<h2>Maintenance and operation of hydraulic power packs in dusty environments<\/h2>\n<p>Low-dust construction sites benefit from reliably operating power packs and tools. Filters, coolers, and air paths must be protected from excessive contamination; keeping quick coupling connections clean reduces ingress into the hydraulic system. A well-maintained condition helps concrete demolition shears and rock and concrete splitters to work reproducibly and avoid unnecessary fine comminution.<\/p>\n<ul>\n<li><strong>Protective measures:<\/strong> Use suitable pre-filters and covers, clean radiator fins, and check intake paths for blockage.<\/li>\n<li><strong>Intervals and records:<\/strong> Follow defined service intervals and keep maintenance logs to ensure stable performance.<\/li>\n<li><strong>Operational hygiene:<\/strong> Designate clean service zones and use caps for hoses and ports to prevent dirt entry.<\/li>\n<\/ul>\n<h2>Limits of dust prevention and realistic expectations<\/h2>\n<p>Fine dust cannot be completely avoided when processing concrete and rock. The goal is <strong>minimized exposure<\/strong> through smart method selection, consistent technology, and attentive execution. Tools such as concrete demolition shears and rock and concrete splitters can contribute as building blocks in an overall solution to limit fine dust generation &#8211; the effectiveness, however, is always determined by the interplay of all measures and the boundary conditions. Transparent planning, measurement-based adjustments, and continuous improvement ensure that targets remain realistic and achievable over the entire project duration.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Fine dust is generated during numerous activities in concrete demolition, strip-out, rock excavation and tunnel construction, as well as in natural stone extraction. In these fields of application, proper handling of dust plays a central role in occupational safety, environmental compatibility, and execution quality. Hydraulic tools from Darda GmbH &#8211; <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/fine-dust\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19128","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Fine Dust Control in Construction &amp; Demolition<\/title>\n<meta name=\"description\" content=\"Practical guide to fine dust in concrete and rock \u2713 cut exposure with splitting methods, wet control &amp; ventilation.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/fine-dust\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Fine Dust Control in Construction &amp; Demolition\" \/>\n<meta property=\"og:description\" content=\"Practical guide to fine dust in concrete and rock \u2713 cut exposure with splitting methods, wet control &amp; ventilation.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/fine-dust\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-06T14:55:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"11 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/fine-dust\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/fine-dust\",\"name\":\"Fine Dust Control in Construction & Demolition\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-10-03T08:36:34+00:00\",\"dateModified\":\"2026-04-06T14:55:03+00:00\",\"description\":\"Practical guide to fine dust in concrete and rock \u2713 cut exposure with splitting methods, wet control & ventilation.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/fine-dust#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/fine-dust\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/fine-dust#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Fine dust\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Fine Dust Control in Construction & Demolition","description":"Practical guide to fine dust in concrete and rock \u2713 cut exposure with splitting methods, wet control & ventilation.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/fine-dust","og_locale":"en_US","og_type":"article","og_title":"Fine Dust Control in Construction & Demolition","og_description":"Practical guide to fine dust in concrete and rock \u2713 cut exposure with splitting methods, wet control & ventilation.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/fine-dust","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-04-06T14:55:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"11 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/fine-dust","url":"https:\/\/www.darda.de\/en\/knowledge\/fine-dust","name":"Fine Dust Control in Construction & Demolition","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-10-03T08:36:34+00:00","dateModified":"2026-04-06T14:55:03+00:00","description":"Practical guide to fine dust in concrete and rock \u2713 cut exposure with splitting methods, wet control & ventilation.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/fine-dust#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/fine-dust"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/fine-dust#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Fine dust"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19128","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19128"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19128\/revisions"}],"predecessor-version":[{"id":26013,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19128\/revisions\/26013"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19128"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}