{"id":19126,"date":"2025-10-03T13:28:12","date_gmt":"2025-10-03T11:28:12","guid":{"rendered":"https:\/\/www.darda.de\/facade-deconstruction"},"modified":"2026-04-06T17:22:03","modified_gmt":"2026-04-06T15:22:03","slug":"facade-deconstruction","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/facade-deconstruction","title":{"rendered":"Fa\u00e7ade deconstruction"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Fa\u00e7ade deconstruction denotes the professional, selective removal of ventilated rainscreen claddings or directly load-bearing exterior wall constructions of a building. Unlike large-scale demolition, the focus is on the precise dismantling of individual layers, components, and fixings. The aim is to protect the remaining structure, minimize emissions, and separate materials by type. In practice, low-noise, low-vibration, and controllable methods are used, such as mechanical removal with <strong>concrete pulverizers<\/strong> or controlled splitting with <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a>, supplied by suitable <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">compact hydraulic power units<\/a>. These methods are particularly relevant in densely built-up areas, on existing buildings in ongoing use, or for heritage-relevant components. Where required, pre-weakening cuts, temporary supports, and controlled load transfer ensure stability at every stage of the <em>selective demolition<\/em> sequence.<\/p>\n<h2>Definition: What is meant by fa\u00e7ade deconstruction?<\/h2>\n<p>Fa\u00e7ade deconstruction refers to the orderly, layer-by-layer removal of fa\u00e7ade claddings, substructures, insulation, waterproofing, and load-bearing edge components down to the structural wall. The process includes the survey of existing conditions, the planning of protective and safety measures, the selection of suitable dismantling and separation methods, and the separate, source-specific recording of the resulting construction materials. Technically, the spectrum ranges from demountable screw connections and cutting work on metal profiles to the controlled fragmentation of reinforced concrete components. A central role is played by limiting noise, dust, and vibrations &#8211; particularly in <em>concrete demolition and special demolition<\/em> as well as during <em>building gutting and cutting<\/em> in existing structures. Increasingly, a formal <strong>deconstruction plan<\/strong> and a material inventory or digital material passport are prepared to support documentation, circularity, and compliance.<\/p>\n<h2>Overview of fa\u00e7ade systems and material composites<\/h2>\n<p>Modern fa\u00e7ades consist of several functional layers: outer skin (e.g., clinker brick, natural stone, metal cassettes, fiber cement, precast concrete panels), substructure (aluminum or steel profiles, timber), insulation (mineral wool, polystyrene, resol), fastening means (anchors, brackets, dowels), and building-physics layers (air barrier, ventilated cavity). In monolithic and reinforced concrete fa\u00e7ades, balcony parapets, parapets\/cappings, lintels, and precast facing shells are added. For deconstruction this means: composites must be identified, load paths understood, and separation lines defined. Thus, screwed or riveted metal claddings are dismantled, natural stone panels are released or secured, while massive reinforced-concrete edges are divided into manageable segments &#8211; for example by crushing with concrete pulverizers or by <em>low-stress<\/em> splitting using hydraulic wedge splitters. Adhesively bonded systems, intumescent fire barriers, and sealed joints require tailored release strategies, often combining heating, cutting, or stepwise splitting to avoid collateral damage.<\/p>\n<ul>\n<li><strong>Interfaces of materials<\/strong>: note steel-aluminum contact, timber connections, and corrosion or bimetal effects when loosening fixings<\/li>\n<li><strong>Fire and moisture layers<\/strong>: identify cavity barriers, membranes, and sealants that influence sequencing and waste classification<\/li>\n<li><strong>Anchorage patterns<\/strong>: verify bracket spacing, edge distances, and concealed anchors to define safe detachment routes<\/li>\n<\/ul>\n<h2>Planning, structural analysis, and permitting in fa\u00e7ade deconstruction<\/h2>\n<p>Before starting, existing documentation, reinforcements, anchor plans, and any hazardous-material issues must be reviewed. Where documents are missing, systematic openings including rebar detection and material tests help. Deconstruction stages must be organized so that load-bearing capacity and wind load transfer remain temporarily ensured. For interventions in load-bearing edge components, parapets, or bracing panels, a structural analysis is indispensable. Permit and notification requirements depend on the property, the scope of work, and local regulations and should be coordinated with the competent authorities. Clear interfaces to scaffolding, lifting gear, and temporary weather protection reduce disruptions and protect exposed structures.<\/p>\n<h3>Survey of existing conditions and documentation<\/h3>\n<p>A structured documentation includes photo series, layer sequences, types of fixings, joint layouts, and accessibility. This data forms the basis for the choice of the dismantling logic and the subsequent traceability of material flows. Supplementary scanning and detection techniques &#8211; such as cover meters, ferroscan, and thermography &#8211; improve certainty when locating reinforcement and embedded anchors. Where feasible, findings are integrated into a coordinated model or plan set to guide execution and quality control.<\/p>\n<h3>Protective measures and emission reduction<\/h3>\n<p>Dust and noise protection through protective enclosures, extraction, water mist, and optimized cutting and splitting methods is standard. Tools with low vibration and controlled force application &#8211; such as concrete pulverizers and hydraulic wedge splitters &#8211; help to reduce vibrations in the existing structure. Monitoring with calibrated sensors for dust, noise, and vibration thresholds supports compliance with project and neighborhood requirements.<\/p>\n<h3>Risk assessment and monitoring<\/h3>\n<p>Typical risk controls include load tests or proof checks for temporary conditions, exclusion zones with drop protection, and continuous supervision of tie-backs and anchors. A documented response plan for exceedances of noise or vibration, plus clear stop criteria for unexpected findings such as voids or post-tensioning, enhances site safety.<\/p>\n<h2>Methods and tools in fa\u00e7ade deconstruction<\/h2>\n<p>The choice of method depends on material, layer thickness, fastening, accessibility, and the required emission level. Hydraulic and mechanical methods dominate, supplemented by cutting and sawing operations. Cold cutting and diamond technology (wall saws, wire saws, core drills) are combined with jaw-based tools where precise, low-spark separation or pre-weakening is advantageous. Remote-capable carriers and electrically driven power packs support safe, low-emission work in constrained urban environments.<\/p>\n<h3>Mechanical removal with concrete pulverizers<\/h3>\n<p><strong>Concrete pulverizers<\/strong> enable the controlled crushing of reinforced-concrete edges, parapets\/cappings, balcony parapets, or precast facing shells. Advantages include precise force application, low secondary damage, and reduced sparking. Reinforcement is exposed and can subsequently be separated with steel shears or multi cutters. Rotating heads improve positioning, and staged biting from free edges toward supports limits induced stresses. Where required, pre-cutting of stirrups with shears prevents uncontrolled breakout.<\/p>\n<h3>Splitting instead of chiseling: hydraulic wedge splitters<\/h3>\n<p><strong>Hydraulic wedge splitters<\/strong> and stone splitting cylinders generate high, locally limited splitting forces. They are suitable for quietly dividing massive fa\u00e7ade parts, concrete ribs, or natural stone claddings into transportable segments. The method is low-vibration and ideal for sensitive environments and special operations. Efficient application relies on correct borehole diameter and spacing, perpendicular drilling to the surface, and attention to reinforcement layouts to direct the split as intended.<\/p>\n<h3>Cutting and separating metal and composites<\/h3>\n<p>Combination shears, multi cutters, and steel shears are used when steel\/aluminum substructures or reinforcement portions must be cut. With thin sheet metal and cassette panels, clean cut edges can be produced, which facilitates source-separated sorting. Cutting torches are rarely needed in the fa\u00e7ade context but can be useful for attached metal tanks or sheet-metal claddings with large radii. For low-emission work, cold cutting techniques and magnetic-base drills reduce burrs and sparks while maintaining dimensional accuracy at interfaces.<\/p>\n<h3>Hydraulic power packs and energy supply<\/h3>\n<p>Hydraulic power packs provide the required pressures and flow rates for pulverizers, shears, and splitting tools. For inner-city use, compact, low-noise units with sufficient power reserve are advantageous. Well-managed hose routing and ergonomic handling increase work safety. Matching tool flow to pump capacity, using quality quick couplers, and maintaining oil cleanliness and filtration extend service life and keep performance consistent. Electric drive options reduce exhaust emissions in enclosed or sensitive areas.<\/p>\n<h2>Selective deconstruction and source-separated sorting<\/h2>\n<p>Selective deconstruction starts at the surface and progresses to the structural wall. The goal is high-quality recycling. Organized material flows save disposal costs and resources. Clear labeling of containers, covered interim storage, and early coordination with recyclers increase recovery rates and reduce contamination.<\/p>\n<ul>\n<li>Record metal claddings and substructures separately<\/li>\n<li>Separate insulation materials by type (mineral\/organic)<\/li>\n<li>Dismantle fiber cement and coated building materials with low emissions<\/li>\n<li>Separate reinforced concrete into aggregates and reinforcing steel<\/li>\n<li>Release natural stone panels without breakage or split them section by section<\/li>\n<li>Collect fire barriers, membranes, and sealants separately where classification requires it<\/li>\n<\/ul>\n<h2>Application scenarios and fields of use<\/h2>\n<h3>Concrete demolition and special demolition on fa\u00e7ades<\/h3>\n<p>For massive fa\u00e7ades, balcony parapets, and precast elements, a combination of concrete pulverizers and hydraulic wedge splitters is suitable. First, the load-bearing action is reduced, then the structure is crushed in controlled sequences and removed. Where access is limited, sectional removal with pre-drilled splitting lines and compact carriers minimizes crane operations and shortens cycle times.<\/p>\n<h3>Building gutting and cutting<\/h3>\n<p>As part of gutting, attachments, window reveals, parapet sheets, and substructures are separated. Shearing and cutting technology ensures clean cut surfaces and minimizes damage to adjacent components. Sequence planning typically starts with claddings and trims, followed by substructures and fixtures, before addressing structural edges and tie-ins.<\/p>\n<h3>Special operations in sensitive environments<\/h3>\n<p>In hospitals, schools, or occupied office buildings, low vibration and noise levels are crucial. Splitting methods and jaw-based tools are often more robust choices here than percussive or cutoff-wheel methods. Time-windowed work, silencers, and active dust suppression maintain operations alongside ongoing building use.<\/p>\n<h2>Safety at work, ergonomics, and emissions<\/h2>\n<p>Secure anchorage points, drop-zone concepts, and regulated load changes are mandatory. Personal protective equipment, low-dust methods, and the use of extraction or misting systems reduce health risks. Tools with controlled force application and good handling reduce physical strain. Lockout-tagout of building services, edge protection on working platforms, and handling aids for heavy panels further reduce incident potential. Compliance with exposure limits for respirable crystalline silica and noise is supported by method selection and monitored working times.<\/p>\n<h2>Quality assurance and documentation<\/h2>\n<p>Documented work steps, inspection of separation cuts, proof of material flows, and photo logs ensure proper execution. In refurbishments of existing structures, protocols are also the basis for subsequent trades, for example when preparing for new fa\u00e7ade systems. Acceptance criteria should define remaining tolerances at interfaces, surface requirements for bonding or anchoring, and completeness of waste transfer notes and weighbridge tickets.<\/p>\n<h2>Cost-effectiveness and scheduling<\/h2>\n<p>Cost-effective deconstruction is based on realistic cycle times, logically organized phases, and tool selection matched to the material. High productivity is achieved through short setup times, suitable hydraulic power packs, and optimized gripping\/splitting sequences. Parallelization of work fronts, minimized tool changeovers, and just-in-time container logistics reduce idle times and support predictable program durations.<\/p>\n<h2>Practical guide: sequence of work steps<\/h2>\n<ol>\n<li>Existing-condition analysis, clearance measurements, and definition of separation\/cut lines<\/li>\n<li>Establish protective and safety measures<\/li>\n<li>Dismantle visible claddings and attachments<\/li>\n<li>Separate the substructure and remove the insulation<\/li>\n<li>Process massive components with concrete pulverizers and splitting tools<\/li>\n<li>Source-separated collection, interim storage, and removal<\/li>\n<li>Quality control, cleaning, and handover of the exposed structural surfaces<\/li>\n<li>Update documentation and material records, verify interface tolerances<\/li>\n<li>Remove temporary protections as specified and demobilize site equipment<\/li>\n<\/ol>\n<h2>Typical issues and how to avoid them<\/h2>\n<p>Common problems are undetected fixings, concealed utilities, insufficient dust suppression, or uncontrolled fractures. Detailed probes, marking of service zones, the use of low-vibration methods, and removal in small, secured sections minimize risks. <strong>Concrete pulverizers<\/strong> and <strong>hydraulic wedge splitters<\/strong> contribute here because they allow controlled interventions with limited impact on the existing structure. Additional attention is required for adhesively bonded elements, post-tensioned components, and brittle natural stone, where pre-weakening and progressive release reduce the likelihood of sudden failure.<\/p>\n<h2>Sustainability and reuse in fa\u00e7ade deconstruction<\/h2>\n<p>Valuable materials such as aluminum, steel, and copper achieve high recycling rates when collected by type. Mineral materials can be processed into recycled aggregates, and natural stone can be reused or re-cut. Careful sorting already at the dismantling stage increases material recovery and reduces transport. Project-specific targets for reuse, recycling, and embodied carbon can be tracked with documented masses and recovery routes to demonstrate circular outcomes.<\/p>\n<h2>Construction details requiring special care<\/h2>\n<p>Reveals, lintels, parapets, brackets, and balcony connections often have complex anchorages and different material composites. Stepwise approaches with pulverizers and splitting cylinders have proven themselves here: first expose, then separate, and finally remove in manageable pieces without overloading the remaining structure. Thermal break elements, drainage paths, and embedded flashings should be identified early to avoid water ingress and to maintain the integrity of adjacent components.<\/p>\n<h2>Transport logistics and site setup<\/h2>\n<p>Short transport routes, secured lifting points, and a clear outflow of material streams prevent bottlenecks. Mobile hydraulic power packs enable flexible equipment logistics, while modular pulverizer and splitting systems can be adapted to tight access conditions. Segregated containers with weather protection, coordinated crane or hoist slots, and documented dispatch of loads ensure steady throughput and reliable scheduling.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Fa\u00e7ade deconstruction denotes the professional, selective removal of ventilated rainscreen claddings or directly load-bearing exterior wall constructions of a building. Unlike large-scale demolition, the focus is on the precise dismantling of individual layers, components, and fixings. The aim is to protect the remaining structure, minimize emissions, and separate materials by <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/facade-deconstruction\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19126","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Fa\u00e7ade Deconstruction - Guide to Selective Removal<\/title>\n<meta name=\"description\" content=\"Selective methods for fa\u00e7ade deconstruction in buildings \u2713 Low noise &amp; vibration, safety planning, and recycling.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/facade-deconstruction\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Fa\u00e7ade Deconstruction - Guide to Selective Removal\" \/>\n<meta property=\"og:description\" content=\"Selective methods for fa\u00e7ade deconstruction in buildings \u2713 Low noise &amp; vibration, safety planning, and recycling.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/facade-deconstruction\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-06T15:22:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/facade-deconstruction\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/facade-deconstruction\",\"name\":\"Fa\u00e7ade Deconstruction - Guide to Selective Removal\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-10-03T11:28:12+00:00\",\"dateModified\":\"2026-04-06T15:22:03+00:00\",\"description\":\"Selective methods for fa\u00e7ade deconstruction in buildings \u2713 Low noise & vibration, safety planning, and recycling.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/facade-deconstruction#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/facade-deconstruction\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/facade-deconstruction#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Fa\u00e7ade deconstruction\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Fa\u00e7ade Deconstruction - Guide to Selective Removal","description":"Selective methods for fa\u00e7ade deconstruction in buildings \u2713 Low noise & vibration, safety planning, and recycling.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/facade-deconstruction","og_locale":"en_US","og_type":"article","og_title":"Fa\u00e7ade Deconstruction - Guide to Selective Removal","og_description":"Selective methods for fa\u00e7ade deconstruction in buildings \u2713 Low noise & vibration, safety planning, and recycling.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/facade-deconstruction","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-04-06T15:22:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/facade-deconstruction","url":"https:\/\/www.darda.de\/en\/knowledge\/facade-deconstruction","name":"Fa\u00e7ade Deconstruction - Guide to Selective Removal","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-10-03T11:28:12+00:00","dateModified":"2026-04-06T15:22:03+00:00","description":"Selective methods for fa\u00e7ade deconstruction in buildings \u2713 Low noise & vibration, safety planning, and recycling.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/facade-deconstruction#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/facade-deconstruction"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/facade-deconstruction#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Fa\u00e7ade deconstruction"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19126","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19126"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19126\/revisions"}],"predecessor-version":[{"id":26015,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19126\/revisions\/26015"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19126"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}