{"id":19119,"date":"2025-10-06T12:19:37","date_gmt":"2025-10-06T10:19:37","guid":{"rendered":"https:\/\/www.darda.de\/drop-weight"},"modified":"2026-04-06T09:06:02","modified_gmt":"2026-04-06T07:06:02","slug":"drop-weight","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/drop-weight","title":{"rendered":"Drop weight"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>The drop weight denotes a mass that is released from a defined height to introduce <em>impact energy<\/em> into a component, a construction material, or the subsoil upon impact. In demolition, deconstruction, and geotechnical engineering, this principle is used to crush, loosen, compact, or test. For projects in which tools from Darda GmbH such as <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a> or concrete demolition shears are used, understanding drop weights is central: it influences the choice of method, the assessment of vibrations, and the safety on the construction site. In practice, the term is also used for falling-weight hammers in dynamic compaction and test devices.<\/p>\n<h2>Definition: What is meant by a drop weight?<\/h2>\n<p>A drop weight is a <strong>defined mass<\/strong> that falls from a specified height under the influence of gravity and generates <strong>impact energy<\/strong> (energy input in joules) upon impact. The key parameters are mass (kg), drop height (m), impact face (shape and material of the striking face), and the properties of the target medium (concrete, masonry, rock, asphalt, soil). In practice, the drop weight is used for dynamic loading &#8211; for example with wrecking balls, drop hammers, compaction devices, or testing devices. In deconstruction it is often complemented or replaced by <em>static<\/em> methods, for instance by stone and concrete splitters or concrete demolition shears from Darda GmbH, when precision, low vibration levels, and controlled crack propagation are required. Additional descriptors in literature include falling-weight, impact hammer, and dynamic compaction weight, all describing the same physical principle.<\/p>\n<h2>Physical fundamentals and key figures of the drop weight<\/h2>\n<p>The governing quantity of a drop weight is the potential energy that becomes effective as kinetic energy at impact: E = m \u00b7 g \u00b7 h. Here, m is the mass, g is gravitational acceleration (~9.81 m\/s\u00b2), and h is the drop height. The larger the mass and drop height, the higher the impact energy. Equally important is the <em>momentum<\/em> p = m \u00b7 v with v = \u221a(2 \u00b7 g \u00b7 h), which, together with impact duration, determines the peak force. Short contact times produce high peak forces and vibrations &#8211; relevant for adjacent elements and sensitive environments.<\/p>\n<ul>\n<li><strong>Contact mechanics:<\/strong> The impact face geometry and hardness influence the contact time and the force peak via the coefficient of restitution.<\/li>\n<li><strong>Damping and boundary conditions:<\/strong> Layer build-up, joints, and support conditions affect energy transmission and vibration propagation.<\/li>\n<li><strong>Practical simplification:<\/strong> Air resistance is negligible for typical construction heights; energy losses arise mainly from plastic deformation and damping in the target medium.<\/li>\n<\/ul>\n<h2>Effect on concrete and rock: fracture mechanisms and crack formation<\/h2>\n<p>Concrete and natural stone respond in a brittle manner to <strong>dynamic loads<\/strong>. High loading rates can increase apparent strength (DIF effect), but also lead to <em>uncontrolled crack formation<\/em>, spalling, and flying fragments. With point impacts, shock cones and shear stresses form; with planar impacts, compressive crushing near the strike point dominates. In rock, drop weights frequently cause near-surface shattering, but less often deep, targeted separation joints. Reinforcement restrains crack opening and can redirect fracture planes; moisture and temperature further influence crack propagation and fragment size.<\/p>\n<h3>Distinction from static methods<\/h3>\n<p>Static methods &#8211; such as stone and concrete splitters or concrete demolition shears from Darda GmbH &#8211; apply controlled, slowly increasing forces. Cracks can be initiated and guided along desired lines. This reduces vibrations, noise emission, and secondary damage to adjacent elements. Drop weights, by contrast, are suitable for coarse fragmentation where environmental constraints and the structure allow. Sequenced use is common: initial loosening by impact, followed by targeted separation with static tools.<\/p>\n<h2>Practice in deconstruction: application fields and limits<\/h2>\n<p>The usefulness of a drop weight depends on project goals, surroundings, and the structural system. In tight, sensitive areas, precise, low vibration levels methods usually predominate; with free working space and low sensitivity, a drop weight can accelerate rough work.<\/p>\n<ul>\n<li><a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">Concrete demolition and special deconstruction<\/a>: Drop weights can initiate fractures in massive elements, but can only separate reinforcement to a limited extent; for selective separation and crushing, concrete demolition shears or combi shears are more appropriate.<\/li>\n<li>Strip-out and cutting: In buildings with continued use or closely routed infrastructure, impacts are usually unsuitable. Static splitting technology, Multi Cutters, and steel shears work more controllably.<\/li>\n<li>Rock demolition and tunnel construction: Near-surface loosening is possible but associated with vibrations. For targeted separation joints and minimal transmission, stone splitting cylinders and stone and concrete splitters are suitable.<\/li>\n<li>Natural stone extraction: A drop weight often breaks uncontrollably and reduces block quality; controlled splitting preserves the geometry and value of raw blocks.<\/li>\n<li>Special use: For preparatory rough work outdoors, a drop weight can loosen material before concrete demolition shears, tank cutters, or steel shears perform targeted separation.<\/li>\n<\/ul>\n<p>Permitting, protection of adjacent assets, and logistics (lifting equipment, access, disposal routes) set practical limits on the use of drop weights and often favor static alternatives.<\/p>\n<h2>Selection criteria for drop weights in construction practice<\/h2>\n<p>Prior to any use, load paths, element build-up, and environmental sensitivity must be evaluated. Key criteria:<\/p>\n<ul>\n<li>Mass and drop height: Higher values increase energy and momentum; the environmental load (vibrations) rises accordingly.<\/li>\n<li>Striking face: Broad contact reduces peak forces but decreases penetration depth; hard, small faces increase local destruction.<\/li>\n<li>Target material: Strength, toughness, reinforcement ratio, moisture content, and member thickness influence the fracture pattern.<\/li>\n<li>Edge distances: Small distances to columns, walls, and edges increase the risk of damage outside the target zone.<\/li>\n<li>Accessibility and guidance: Cranes, booms, or guides determine repeat accuracy and safety.<\/li>\n<li>Environmental requirements: Limit values for vibrations, noise, and dust influence method selection.<\/li>\n<li>Repetition rate and sequence: Series of lighter blows can control crack growth better than a single heavy impact.<\/li>\n<\/ul>\n<h2>Comparison: drop weight versus splitting and shear technology<\/h2>\n<p>The choice between dynamic impact and static force application depends on the project. Typical trade-offs:<\/p>\n<ul>\n<li>Precision: Static methods (stone and concrete splitters, concrete demolition shears) enable defined separation lines; drop weights tend to produce dispersed fractures.<\/li>\n<li>Vibrations: Impacts generate oscillations and can load adjacent elements; static methods work with low vibration levels.<\/li>\n<li>Speed: Drop weights are fast for coarse fragmentation with free working space; static methods are fast for selective separations.<\/li>\n<li>Noise control: Impacts are loud; power units with appropriate tools are quieter.<\/li>\n<li>Reinforcement and inserts: Shears, combi shears, or <a href=\"https:\/\/www.darda.de\/en\/product-overview\/steel-shears\">steel shears<\/a> cut reinforcement precisely; drop weights tear but do not cut cleanly.<\/li>\n<li>Rework and waste selectivity: Static methods reduce rework and facilitate sorting, whereas impact fragmentation often increases mixed debris.<\/li>\n<\/ul>\n<h2>Safety and protective measures<\/h2>\n<p>Occupational safety has top priority. In general:<\/p>\n<ul>\n<li>Hazard area: Generously cordon off drop zone and rebound areas, keep lines of sight clear.<\/li>\n<li>Guidance and rigging: Safe rigging, redundant safeguards, controlled guidance of the weight.<\/li>\n<li>Subsoil and support: Verify load-bearing capacity of the subsoil; avoid unintended settlements.<\/li>\n<li>Dust and fragment protection: Shields, targeted wetting, personal protective equipment.<\/li>\n<li>Ground vibration monitoring: In sensitive environments, measure and document vibrations.<\/li>\n<li>Remote operation: Where feasible, use remote control to increase distance to the hazard zone.<\/li>\n<li>Legal framework: Observe local regulations, standards, and permits; the information here is general and does not replace case-by-case verification.<\/li>\n<\/ul>\n<h2>Measurement and testing procedures with a drop weight<\/h2>\n<p>In construction practice, drop weights also serve the <strong>diagnosis<\/strong> of load-bearing capacities and stiffnesses:<\/p>\n<ul>\n<li>Lightweight drop weight device (LFWD): Assessment of near-surface compaction of layers.<\/li>\n<li>Falling-Weight Deflectometer (FWD): Determination of the deflection of pavements to assess load-bearing capacity.<\/li>\n<li>Material testing: Test hammers and drop hammer tests for toughness and impact resistance of brittle building materials.<\/li>\n<li>Data quality: Calibrated sensors, time stamps, and site references improve comparability and traceability.<\/li>\n<\/ul>\n<p>The results support the choice of the appropriate demolition or separation method: High stiffness and densely reinforced concrete often argue for controlled splitting or shears; areas with low stiffness and pre-damage can potentially be loosened with lower impacts.<\/p>\n<h2>Energy estimation: simple examples<\/h2>\n<ol>\n<li>200 kg from 2 m: E \u2248 200 \u00b7 9.81 \u00b7 2 \u2248 3,900 J (3.9 kJ) &#8211; suitable for light impacts, limited penetration depth.<\/li>\n<li>500 kg from 5 m: E \u2248 24.5 kJ &#8211; pronounced surface destruction, high vibrations.<\/li>\n<li>1,000 kg from 3 m: E \u2248 29.4 kJ &#8211; high momentum; protection and exclusion areas should be expanded accordingly.<\/li>\n<li>50 kg from 1 m: E \u2248 490 J &#8211; typical order of magnitude for small testing devices and sensitive environments.<\/li>\n<\/ol>\n<p><em>Practical note:<\/em> Not only the energy, but also the contact time and the shape of the striking face determine the peak forces. Smaller, harder impact heads increase local destruction but also flying fragments. Guided drops and consistent release heights improve repeatability.<\/p>\n<h2>Planning in combination with tools from Darda GmbH<\/h2>\n<p>In projects that combine tools from Darda GmbH, the drop weight is often treated as a <strong>planning parameter<\/strong> &#8211; not necessarily as a means actually used. Typical approaches:<\/p>\n<ul>\n<li>Pre-fracturing vs. controlled demolition: Coarse impacts can loosen massive blocks; for defined separation cuts, concrete demolition shears or Multi Cutters take over.<\/li>\n<li>Splitting instead of striking: Where vibrations, noise, or flying fragments must be avoided, stone and concrete splitters guide the fracture along desired lines, supported by a power unit.<\/li>\n<li>Steel and tank separations: For reinforcement, sections, or tank shells, <a href=\"https:\/\/www.darda.de\/en\/product-overview\/steel-shears\">steel shears<\/a> and tank cutters are more precise than impacts; this reduces collateral damage and rework.<\/li>\n<li>Special deconstruction: In structurally critical sections or interior areas, dynamic loads should be avoided; static tools enable phased, material-preserving progress.<\/li>\n<\/ul>\n<p>Hybrid strategies coordinate impact energy, static splitting, and cutting in stages to meet project targets, quality requirements, and environmental constraints.<\/p>\n<h2>Effects on surroundings and structure<\/h2>\n<p>Drop weights generate vibrations, airborne sound, and often visibly flying debris. This affects construction site organization and permitting:<\/p>\n<ul>\n<li>Vibrations: Can activate cracks or loosen elements; monitoring and consideration of limit values are advisable.<\/li>\n<li>Noise: Impact noise is impulsive and widely audible; plan time windows and noise control.<\/li>\n<li>Dust: Point-impact destruction releases fine particles; provide wetting and shielding.<\/li>\n<li>Material separation: Reinforcement often remains as effective bridges; shears should be planned as a follow-up step.<\/li>\n<li>Sensitive assets: Pay attention to equipment, facades, heritage elements, and buried utilities that can be affected by impulse loads.<\/li>\n<\/ul>\n<h2>Decision aid: choose the method in a targeted way<\/h2>\n<p>A robust methodology combines assessment of building data with boundary conditions of the surroundings:<\/p>\n<ul>\n<li>If precision, low vibration levels, and defined cracks are required: prefer static splitting technology and concrete demolition shears.<\/li>\n<li>If there is ample free space and vibrations are tolerable: evaluate drop weights for coarse breakup, and plan follow-up separations.<\/li>\n<li>For steel and composite: Impacts rarely separate cleanly &#8211; plan for shears and cutting tools.<\/li>\n<li>For high-value natural stone: Avoid drop weights to prevent loss of value due to uncontrolled cracks.<\/li>\n<\/ul>\n<p>Method selection should be documented with assumptions on energy input, protection measures, and the intended sequence of tools to streamline approvals and execution.<\/p>\n<h2>Practical details: guidance, repeatability, documentation<\/h2>\n<p>For reproducible outcomes, defined heights, guided drop paths, and documented impact sequences are helpful. <strong>Clean documentation<\/strong> (energy, number of blows, observed cracks) facilitates fine planning of follow-up work with tools from Darda GmbH.<\/p>\n<ul>\n<li>Record mass, release height, impact face, and guiding method.<\/li>\n<li>Note environmental observations (noise, dust, peak particle velocity) and protective measures in place.<\/li>\n<li>Photograph crack patterns and component responses after defined impact counts.<\/li>\n<\/ul>\n<h3>Calibration and control<\/h3>\n<p>Regular checks of the mass, the rigging, and the guide increase safety. For measurement applications with drop weights (e.g., compaction testing), reliable, regulated measurement chains are crucial. Periodic calibration with traceable standards and documented inspections support consistent results.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The drop weight denotes a mass that is released from a defined height to introduce impact energy into a component, a construction material, or the subsoil upon impact. In demolition, deconstruction, and geotechnical engineering, this principle is used to crush, loosen, compact, or test. For projects in which tools from <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/drop-weight\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19119","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Drop Weight in Construction, Demolition &amp; Testing<\/title>\n<meta name=\"description\" content=\"Understand drop weight impact energy in demolition and geotechnical engineering \u2713 physics, safety, method selection.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/drop-weight\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Drop Weight in Construction, Demolition &amp; Testing\" \/>\n<meta property=\"og:description\" content=\"Understand drop weight impact energy in demolition and geotechnical engineering \u2713 physics, safety, method selection.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/drop-weight\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-06T07:06:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/drop-weight\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/drop-weight\",\"name\":\"Drop Weight in Construction, Demolition & Testing\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-10-06T10:19:37+00:00\",\"dateModified\":\"2026-04-06T07:06:02+00:00\",\"description\":\"Understand drop weight impact energy in demolition and geotechnical engineering \u2713 physics, safety, method selection.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/drop-weight#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/drop-weight\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/drop-weight#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Drop weight\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Drop Weight in Construction, Demolition & Testing","description":"Understand drop weight impact energy in demolition and geotechnical engineering \u2713 physics, safety, method selection.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/drop-weight","og_locale":"en_US","og_type":"article","og_title":"Drop Weight in Construction, Demolition & Testing","og_description":"Understand drop weight impact energy in demolition and geotechnical engineering \u2713 physics, safety, method selection.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/drop-weight","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-04-06T07:06:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/drop-weight","url":"https:\/\/www.darda.de\/en\/knowledge\/drop-weight","name":"Drop Weight in Construction, Demolition & Testing","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-10-06T10:19:37+00:00","dateModified":"2026-04-06T07:06:02+00:00","description":"Understand drop weight impact energy in demolition and geotechnical engineering \u2713 physics, safety, method selection.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/drop-weight#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/drop-weight"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/drop-weight#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Drop weight"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19119","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19119"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19119\/revisions"}],"predecessor-version":[{"id":26001,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19119\/revisions\/26001"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19119"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}