{"id":19118,"date":"2025-10-06T14:53:11","date_gmt":"2025-10-06T12:53:11","guid":{"rendered":"https:\/\/www.darda.de\/specialist-contractor-declaration"},"modified":"2026-04-06T08:12:03","modified_gmt":"2026-04-06T06:12:03","slug":"specialist-contractor-declaration","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/specialist-contractor-declaration","title":{"rendered":"Specialist contractor declaration"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>The specialist contractor declaration is a central document in the construction industry, in demolition works and in special demolition. It serves as a verifiable confirmation that work was performed professionally, safely, and in accordance with the recognized state of the art. Especially for mechanical cutting and splitting methods with hydraulic tools &#8211; such as the use of concrete demolition shears, hydraulic splitter (wedge), hydraulic power pack, rock splitting cylinders, combination shears, <a href=\"https:\/\/www.darda.de\/en\/product-overview\/multi-cutters\">Multi Cutters<\/a>, steel shear or cutting torch &#8211; it creates transparency for the client, site supervision and authorities. It classifies methods, qualifications and test results without advertising, focusing instead on quality, safety and documentation. In addition, it strengthens traceability across the project lifecycle and supports auditable closeout documentation.<\/p>\n<h2>Definition: What is meant by a specialist contractor declaration?<\/h2>\n<p>A specialist contractor declaration is the written confirmation by a qualified company that the commissioned services were executed in compliance with applicable rules and standards, observing the relevant technical rules, safety and environmental requirements, and in accordance with the contractually agreed procedures. It typically includes details on scope of work, methods and equipment used, personnel qualifications, test and measurement records, acceptances, and any deviations with justification. The specific design may vary depending on project, contract, and regional requirements. For evidentiary value, <em>clear identifiers<\/em> such as project number, component IDs, date, signatures, and a structured annex list are recommended.<\/p>\n<ul>\n<li><strong>Typical attachments:<\/strong> method statement or RAMS, calibration and inspection certificates, permits and releases, photo logs and measurement summaries, disposal and transfer documents.<\/li>\n<\/ul>\n<h2>Typical contents and structure of a specialist contractor declaration<\/h2>\n<p>A robust specialist contractor declaration is clearly structured, precise, and traceable. It states what was done, how, with what, and under which boundary conditions. In the deconstruction and demolition context with hydraulic cutting and splitting methods, the following modules have proven effective:<\/p>\n<ul>\n<li><strong>Scope of work:<\/strong> Description of the structural elements processed (e.g., reinforced concrete walls, foundations, natural stone blocks, tanks), quantities, and the limits of the commission.<\/li>\n<li><strong>Methods and equipment:<\/strong> Identification of the tools used (e.g., concrete demolition shears, hydraulic splitter (wedge), rock splitting cylinders, steel shear, cutting torch) and the associated hydraulic power pack (<a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power units<\/a>) including relevant parameters.<\/li>\n<li><strong>Technical parameters:<\/strong> Information on working pressure, splitting or cutting forces, jaw openings, jaw configurations, cut sequences, and safety measures.<\/li>\n<li><strong>Qualification:<\/strong> Evidence of the competence of operators and supervisors (e.g., trainings, instructions, experience in special demolition).<\/li>\n<li><strong>Occupational safety and environment:<\/strong> Measures taken to minimize noise, dust, and vibration, traffic management and fire protection, and controlled media clearance (e.g., for tank dismantling).<\/li>\n<li><strong>Test and measurement records:<\/strong> Spot checks, acceptances, readings (e.g., emissions, tolerances), visual and dimensional inspections, functional tests.<\/li>\n<li><strong>Documentation:<\/strong> Photo documentation, equipment identifications, maintenance and inspection certificates, batches and serial numbers of relevant components.<\/li>\n<li><strong>Disposal and recycling:<\/strong> Information on selective separation, material classification, and transfer to disposal or recycling routes.<\/li>\n<li><strong>RAMS or method statement:<\/strong> Concise risk assessment with method sequence and defined controls.<\/li>\n<li><strong>Permits and releases:<\/strong> Hot work permits, access releases, utility isolation confirmations where applicable.<\/li>\n<li><strong>Acceptance criteria:<\/strong> Tolerances and measurable pass or fail criteria for interim and final acceptance.<\/li>\n<li><strong>Sign-off and version control:<\/strong> Responsible persons, dates, document revisions, and change log.<\/li>\n<\/ul>\n<h2>Specialist contractor declaration for hydraulic cutting and splitting methods<\/h2>\n<p>For mechanical cold-cutting methods, documentation is especially important because the benefits &#8211; low spark generation, reduced dust output, low vibration levels &#8211; depend on the project and the component. The specialist contractor declaration records why the chosen method was appropriate and how it was implemented. It distinguishes cold-cutting solutions from thermal processes in terms of emission profile, edge quality, and risk control, and it states constraints such as access, overhead work, and load paths. Examples:<\/p>\n<h3>Concrete demolition shears in concrete demolition and special demolition<\/h3>\n<p>When dismantling reinforced concrete components with concrete demolition shears, sequence, grip position, jaw type, and the handling of reinforcement are decisive. A substantiated declaration documents the <em>separation cuts<\/em>, temporary shoring, the approach to exposing reinforcement, and the removal of the sections. It states the boundary conditions (ceiling thickness, concrete compressive strength class) and demonstrates compliance with the safety distances. Where relevant, it includes debris management, control of falling hazards, the chosen jaw configuration for crushing versus cutting, and the verification of residual capacities for staged works.<\/p>\n<h3>Hydraulic splitter (wedge) in rock excavation and tunnel construction<\/h3>\n<p>When splitting rock or mass concrete with a hydraulic splitter (wedge), drill-hole patterns, splitting sequences, and required splitting forces are specified for the chosen <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a>. The declaration explains the reason for the low vibration levels approach, the choice of borehole diameters, and the securing against edge breakout. Especially in tunnel cross-sections, the dust and noise emission profile is described factually. Additional details such as drilling quality, hole cleaning, lubrication of wedges per specification, and monitoring of vibration or displacement where required increase traceability.<\/p>\n<h3>Special tools in special applications<\/h3>\n<p>For cutting torch, steel shear, or Multi Cutters the following applies: media clearance, explosion protection, and spark management are documented for the specific operation. Cutting plans, releases, and temporary protective enclosures are presented transparently. Where hot work is involved, permits, gas-free measurements, fire watch duration, and post-work inspections are recorded in a structured manner.<\/p>\n<h2>Legal framework and technical rules<\/h2>\n<p>The specialist contractor declaration is aligned with generally recognized rules of technology as well as with contractual and regulatory requirements. These include standards and rules on occupational safety and health, environmental protection, and proper disposal. Specific requirements may differ by region, contract, and component type. Therefore, the declaration should always clearly refer to the standards agreed in the project, without replacing case-specific legal advice.<\/p>\n<ul>\n<li><strong>Areas typically referenced:<\/strong> occupational safety obligations, hot work governance, protection against explosive atmospheres where applicable, noise and dust thresholds, waste classification and transport documentation, and structural verification responsibilities.<\/li>\n<\/ul>\n<h2>Qualifications, competence, and responsibilities<\/h2>\n<p>The declaration names responsible persons, their competence, and their roles in the project. This includes operators of hydraulic power packs and shears, supervisory personnel, and specialist site management. For the use of concrete demolition shears or a hydraulic splitter (wedge), trainings on equipment safety, correct jaw or cylinder selection, and the hazard analysis must be documented. Maintenance and inspection intervals of the equipment must be evidenced in an appropriate form. A simple competence matrix with roles, authorizations, and valid certificates supports clarity, including arrangements for subcontracted personnel.<\/p>\n<ul>\n<li><strong>Evidence examples:<\/strong> equipment-specific instruction records, toolbox talk minutes, certificates for working at height or confined spaces, and proof of medical fitness where required.<\/li>\n<\/ul>\n<h2>Documenting technical parameters and measured values correctly<\/h2>\n<p>The evidentiary value of a specialist contractor declaration increases with reliable measured and test values. The following have proven effective:<\/p>\n<ul>\n<li><strong>Hydraulic data:<\/strong> set working pressure; observed splitting or cutting forces within the equipment specification.<\/li>\n<li><strong>Component data:<\/strong> concrete compressive strength class, reinforcement level, masonry type, rock category, moisture content.<\/li>\n<li><strong>Process parameters:<\/strong> borehole spacing for splitting, cut sequence for combined cutting steps, jaw reach and opening travel of the concrete demolition shear.<\/li>\n<li><strong>Protective measures:<\/strong> dust suppression, dust extraction, barriers, shoring, scaffolding and lifting device concept.<\/li>\n<li><strong>Controls:<\/strong> visual inspections, dimensional checks, function-related checks on hydraulic hose lines and couplings.<\/li>\n<li><strong>Acceptance criteria:<\/strong> defined tolerances, surface quality, allowable vibration or noise levels, and cleanliness of interfaces.<\/li>\n<li><strong>Time and place:<\/strong> time stamps, shift references, and where permissible, component IDs or geolocation for unambiguous assignment.<\/li>\n<li><strong>Calibration and traceability:<\/strong> IDs and validity of gauges and sensors used, cross-reference to certificates.<\/li>\n<\/ul>\n<h2>Interfaces with structural analysis, site supervision, and acceptance<\/h2>\n<p>For structurally relevant components, work steps are often coordinated with site supervision. The specialist contractor declaration provides traceable references to releases, interim acceptances, and to safeguarding measures such as temporary shoring or staged cuts. In particular, when using concrete demolition shears on load-bearing walls or when splitting massive foundations, the residual load-bearing capacity is documented where agreed. Deviations from the planned sequence and their impact on the structural concept are recorded with the corresponding approvals.<\/p>\n<h2>Selective deconstruction, resource conservation, and disposal routes<\/h2>\n<p>Hydraulic cold-cutting methods support clean separation of material fractions. This facilitates reuse and recycling. The declaration describes, in a factual way, source-separated steps, processing, and transfer points. This makes material flow and recovery transparent, without value judgments but with clear documentation of the routes.<\/p>\n<ul>\n<li><strong>Good practice:<\/strong> material coding and weight records per fraction, contamination screening and decontamination notes, evidence of transfer to approved facilities.<\/li>\n<\/ul>\n<h2>Practical examples from application areas<\/h2>\n<ul>\n<li><strong>Concrete demolition and special demolition:<\/strong> Use of concrete demolition shears for slab-preserving dismantling. Documented are cut sequence, temporary shoring, handling of reinforcement, and the removal of sections.<\/li>\n<li><strong>Gutting works and cutting:<\/strong> Combination of Multi Cutters and steel shear. The separation sequence, fire protection measures, and the separate collection of metallic fractions are explained.<\/li>\n<li><strong>Rock excavation and tunnel construction:<\/strong> Hydraulic splitter (wedge) as well as rock wedge splitter for low vibration levels extraction. Recorded are borehole pattern, splitting sequence, protection against secondary breakage, and dust reduction measures.<\/li>\n<li><strong>Natural stone extraction:<\/strong> Documentation of the splitting technique to release raw blocks gently. Parameterization of splitting forces and quality control of fracture faces.<\/li>\n<li><strong>Special application:<\/strong> Cutting torch under controlled conditions. Evidence of media clearance, gas-free measurements, spark management, and the approval chain.<\/li>\n<li><strong>Infrastructure refurbishment:<\/strong> Staged cutting near sensitive assets. Defined monitoring, barrier concepts, and coordination with traffic or operations management are included.<\/li>\n<\/ul>\n<h2>Typical errors and how to avoid them<\/h2>\n<ul>\n<li><strong>Unclear methods:<\/strong> Missing justification for the chosen cutting or splitting method. Remedy: short, precise method description with parameters.<\/li>\n<li><strong>Incomplete equipment features:<\/strong> No data on jaw or cylinder configuration. Remedy: include type, opening width, splitting force range.<\/li>\n<li><strong>Missing protective measures:<\/strong> Safety and environmental aspects not documented. Remedy: measures list with responsibilities.<\/li>\n<li><strong>No interim acceptances:<\/strong> Critical steps without releases. Remedy: define and document milestones.<\/li>\n<li><strong>Scattered documents:<\/strong> Records and photos without reference. Remedy: clear assignment via component or step ID.<\/li>\n<li><strong>Missing signatures and dates:<\/strong> No responsible sign-off. Remedy: include name, role, signature, and date fields.<\/li>\n<li><strong>No calibration proof:<\/strong> Instruments or gauges without valid certificates. Remedy: reference certificate numbers and validity.<\/li>\n<li><strong>Undefined acceptance criteria:<\/strong> Quality targets not measurable. Remedy: set tolerances and thresholds in advance.<\/li>\n<\/ul>\n<h2>Process from preparation to handover<\/h2>\n<ol>\n<li><strong>Work preparation:<\/strong> hazard analysis, choice of method (e.g., concrete demolition shear or hydraulic splitter (wedge)), cutting or splitting plan. <em>Deliverables:<\/em> method statement, risk controls, required releases.<\/li>\n<li><strong>Resource planning:<\/strong> hydraulic power packs, tools, jaw sets, splitting cylinders, lifting devices and safety equipment. <em>Verification:<\/em> availability, suitability, inspection status.<\/li>\n<li><strong>Releases:<\/strong> coordination with site supervision, documentation of prerequisites (e.g., media clearance, access, barriers). <em>Record:<\/em> scope, conditions, validity period.<\/li>\n<li><strong>Execution:<\/strong> defined sequence, checks, interim acceptances, adjustments in case of findings deviating from assumptions. <em>Note deviations:<\/em> with cause and approval.<\/li>\n<li><strong>Quality assurance:<\/strong> measurements, visual and dimensional inspections, photo documentation, maintenance evidence. <em>Acceptance criteria:<\/em> measured against tolerances.<\/li>\n<li><strong>Closeout and handover:<\/strong> consolidation of documents, signature of the specialist contractor declaration, orderly handover to the client. <em>Archiving:<\/em> index of annexes and version-controlled files.<\/li>\n<\/ol>\n<h2>Specifics for concrete demolition shears and hydraulic splitter (wedge)<\/h2>\n<p><strong>Concrete demolition shears:<\/strong> In the declaration, grip paths, jaw selection, and cut sequence are to be described so that edge breakouts and uncontrolled load redistribution were excluded. Relevant points include the handling of reinforcement, the shoring concept, and the set-down points for sections. Where necessary, include limits on jaw opening for component thickness, planned bite sizes, exclusion zones, and the communication protocol for coordinated lifting or section removal.<\/p>\n<p><strong>Hydraulic splitter (wedge):<\/strong> Important details include borehole grids, split wedge positions, splitting cycles, and the controlled ramping of splitting force. In enclosed spaces or underground, the emissions situation (dust, noise) with the mitigation measures taken is presented. Recording of drilling tolerance, hole cleaning method, maximum pressure settings, and measures against secondary breakage at edges improves reproducibility.<\/p>\n<h2>Digital traceability<\/h2>\n<p>Photo documentation, unique equipment IDs, digital logs, and structured file naming increase verifiability. A clear assignment of measured values to components and work steps strengthens the evidentiary power of the specialist contractor declaration and facilitates later proof, for example in warranty matters. Practical measures include QR or UID references on equipment, time-stamped image series aligned with work steps, immutable audit trails, and consistent naming conventions that reflect project, location, component, and date.<\/p>\n<h2>Benefits for clients and project stakeholders<\/h2>\n<p>A carefully prepared specialist contractor declaration reduces queries, supports acceptances, and facilitates proof of a compliant service. It builds trust because it brings together methods, qualification, and results &#8211; especially for complex tasks such as concrete demolition, gutting works, rock excavation, tunnel construction, natural stone extraction, or special applications with hydraulic cutting and splitting tools. The presentation remains factual: <em>It documents what was agreed and executed<\/em>.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The specialist contractor declaration is a central document in the construction industry, in demolition works and in special demolition. It serves as a verifiable confirmation that work was performed professionally, safely, and in accordance with the recognized state of the art. Especially for mechanical cutting and splitting methods with hydraulic <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/specialist-contractor-declaration\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19118","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Specialist Contractor Declaration in Construction<\/title>\n<meta name=\"description\" content=\"Clear, verifiable specialist contractor declaration for construction &amp; demolition \u2713 methods, safety, tests and handover.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/specialist-contractor-declaration\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Specialist Contractor Declaration in Construction\" \/>\n<meta property=\"og:description\" content=\"Clear, verifiable specialist contractor declaration for construction &amp; demolition \u2713 methods, safety, tests and handover.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/specialist-contractor-declaration\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-06T06:12:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/specialist-contractor-declaration\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/specialist-contractor-declaration\",\"name\":\"Specialist Contractor Declaration in Construction\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-10-06T12:53:11+00:00\",\"dateModified\":\"2026-04-06T06:12:03+00:00\",\"description\":\"Clear, verifiable specialist contractor declaration for construction & demolition \u2713 methods, safety, tests and handover.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/specialist-contractor-declaration#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/specialist-contractor-declaration\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/specialist-contractor-declaration#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Specialist contractor declaration\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Specialist Contractor Declaration in Construction","description":"Clear, verifiable specialist contractor declaration for construction & demolition \u2713 methods, safety, tests and handover.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/specialist-contractor-declaration","og_locale":"en_US","og_type":"article","og_title":"Specialist Contractor Declaration in Construction","og_description":"Clear, verifiable specialist contractor declaration for construction & demolition \u2713 methods, safety, tests and handover.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/specialist-contractor-declaration","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-04-06T06:12:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/specialist-contractor-declaration","url":"https:\/\/www.darda.de\/en\/knowledge\/specialist-contractor-declaration","name":"Specialist Contractor Declaration in Construction","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-10-06T12:53:11+00:00","dateModified":"2026-04-06T06:12:03+00:00","description":"Clear, verifiable specialist contractor declaration for construction & demolition \u2713 methods, safety, tests and handover.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/specialist-contractor-declaration#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/specialist-contractor-declaration"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/specialist-contractor-declaration#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Specialist contractor declaration"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19118","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19118"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19118\/revisions"}],"predecessor-version":[{"id":25993,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19118\/revisions\/25993"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19118"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}