{"id":19111,"date":"2025-10-08T16:47:12","date_gmt":"2025-10-08T14:47:12","guid":{"rendered":"https:\/\/www.darda.de\/soil-layer"},"modified":"2026-09-12T19:53:10","modified_gmt":"2026-09-12T17:53:10","slug":"soil-layer","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/soil-layer","title":{"rendered":"Soil layer"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Soil layer refers to a naturally formed or anthropogenic stratum in the subsoil that differs from overlying or underlying layers in composition, structure, and bedding. In the planning and execution of concrete demolition, special demolition, rock excavation, tunnel construction, and natural stone extraction, the sequence of layers determines the approach, the order of work steps, and the appropriate technique. Tools such as concrete demolition shears, concrete splitters, rock wedge splitters, and <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power pack units<\/a> by Darda GmbH are selected based on the strength, joint spacing, water flow, and layer thickness of a soil layer for controlled separation or splitting; dust, noise, vibration and energy effects must be assessed for the application. A well-documented layer model supports risk management, emission control, and compliance with execution standards across all phases from investigation to dismantling.<\/p>\n<h2>Definition: What is meant by a soil layer?<\/h2>\n<p>A soil layer is a relatively homogeneous section of the subsoil that is distinguished from adjacent strata by petrography (rock or soil type), bedding-related features (stratification, cleavage, bedding), and geotechnical parameters (density, strength, water content). Soil layers may consist of unconsolidated materials such as sand, gravel, and clay, of rock such as limestone, granite, or sandstone, as well as of artificially placed materials such as fills or residual concrete. Characteristic parameters include layer thickness, layer boundaries, permeability, and discontinuities (joints, shear planes). For construction and deconstruction work, these attributes are decisive because they determine stability, load-bearing capacity, water flow, and behavior during separation, cutting, or splitting. In practice, standardized soil and rock classifications and consistent layer naming improve comparability, traceability, and the selection of suitable techniques.<\/p>\n<ul>\n<li><strong>Material identity:<\/strong> Grain size or lithology, cementation, and weathering grade.<\/li>\n<li><strong>Fabric and structure:<\/strong> Bedding, foliation, joint sets, and discontinuity persistence.<\/li>\n<li><strong>Hydrogeology:<\/strong> Permeability, water content, and expected pore water pressure ranges.<\/li>\n<\/ul>\n<h2>Geological stratification and geotechnical parameters<\/h2>\n<p>The stratification at a site results from the sequence of cover layer, weathering zone, and deeper load-bearing rock or compacted soil; key factors are lithology, grain-size distribution, relative density, cohesion and angle of friction, the joint system, as well as pore water pressure and groundwater level. In practice, these factors directly influence the choice of method: In brittle, jointed rock, concrete splitters and rock wedge splitters enable controlled split lines along existing weakness zones; in reinforced or massive concrete, concrete demolition shears perform selective material separation. Cohesive soils are sensitive to water content and loading, whereas non-cohesive soils (gravel, sand) tend to show particle rearrangement and settlement. Common field and laboratory investigations such as probings, core drilling, and density and strength tests provide the parameters required for safe planning, sizing of the hydraulic power pack units, and the assessment of emissions (vibration, noise, dust). Effective stress conditions, anisotropy due to bedding, and the continuity of joints govern crack propagation, so aligning splitting patterns with these features improves precision and reduces secondary breakage.<\/p>\n<h2>Typical soil layers in construction, deconstruction, and extraction<\/h2>\n<ul>\n<li><strong>Unconsolidated materials (sand, gravel):<\/strong> Low cohesion, good drainage, but sensitivity to vibration and settlement. For work in layered sequences, orderly exposure is recommended before separating load-bearing components with concrete demolition shears or treating underlying rock with splitting techniques. When groundwater is near the surface, pre-drainage and compaction control reduce the risk of flow or piping.<\/li>\n<li><strong>Cohesive soils (loam, clay):<\/strong> High water affinity, plastic behavior. Pore water pressure affects the stability of the excavation pit. During building gutting and cutting near ground level, stable supports and controlled load transfer are important before heavy components are released. Short-term strength loss after rainfall requires adaptive sequencing and temporary works.<\/li>\n<li><strong>Weathering zones in rock:<\/strong> Transition between unconsolidated and competent rock, often with irregular strength. Concrete splitters can be applied along natural weakness zones here to avoid uncontrolled rock breakout. Detailing of insertion points along softened seams reduces spalling at the interface.<\/li>\n<li><strong>Massive rock (e.g., limestone, granite, sandstone):<\/strong> High compressive strengths, anisotropic splitting behavior due to joints and bedding planes. Splitting provides low vibration levels and precision, for example in tunnel excavation near sensitive infrastructure. Borehole layout and wedge orientation follow joint spacing and orientation for optimal performance.<\/li>\n<li><strong>Fills and anthropogenic layers:<\/strong> Heterogeneous compositions of gravel, construction debris, concrete, and steel fractions. Selective separation with concrete demolition shears, steel shears, and hydraulic demolition shears facilitates source-separated haulage logistics and minimizes damage to adjacent layers. Variable stiffness demands continuous reassessment of support and bearing paths.<\/li>\n<li><strong>Concrete and foundation layers:<\/strong> Part of the foundation system; their position within the ground profile determines accessibility. For deconstruction, cutting layout, load transfer, and emission control must be planned; concrete demolition shears often work in combination with a hydraulic power pack for continuous performance. Reinforcement density and embedments influence bite spacing and tool selection.<\/li>\n<\/ul>\n<p><em>Transitions between layers are critical<\/em>: gradual changes in stiffness and permeability can shift load paths and water flow, so safeguards and sequencing should reflect these boundary effects.<\/p>\n<h2>Investigation and assessment of soil layers<\/h2>\n<h3>Procedure<\/h3>\n<p>A robust subsoil and layer description combines the evaluation of existing documents with on-site investigations. Common practices include probings, test pits, borehole drilling with core extraction, as well as geophysical methods to identify layer boundaries and discontinuities. Visual inspections at cuts, slopes, and existing components complete the picture. The results feed into layer logs and work plans. Where feasible, in-situ index tests and monitoring during trial cuts provide early feedback on tool performance and emission levels.<\/p>\n<h3>Parameters for selecting demolition and splitting techniques<\/h3>\n<ul>\n<li><strong>Strength and toughness:<\/strong> Govern the required splitting or cutting force.<\/li>\n<li><strong>Joint spacing and bedding:<\/strong> Define splitting distances and insertion points for hydraulic wedge splitters.<\/li>\n<li><strong>Layer thickness:<\/strong> Influences the work sequence and the positioning of starting points.<\/li>\n<li><strong>Water flow:<\/strong> Affects stability, frictional resistance, and emissions.<\/li>\n<li><strong>Vibration sensitivity:<\/strong> Splitting methods are advantageous in sensitive environments.<\/li>\n<li><strong>Space constraints:<\/strong> Require compact tools and a hydraulic power pack.<\/li>\n<li><strong>Material mix:<\/strong> Combinations of concrete, steel, and rock favor the tandem use of concrete demolition shears, steel shears, and hydraulic demolition shears.<\/li>\n<li><strong>Reinforcement and prestress:<\/strong> Influence bite sequence, pre-cuts, and the need for stress release before splitting.<\/li>\n<li><strong>Access and overhead limits:<\/strong> Dictate equipment size, lifting strategy, and bite or drill pattern geometry.<\/li>\n<li><strong>Adjacent risks and utilities:<\/strong> Proximity to sensitive structures or services narrows permissible emission and vibration windows.<\/li>\n<\/ul>\n<h3>Documentation<\/h3>\n<p>Layer sequences, cuts, and parameters are documented continuously. Marking layer boundaries, joint traces, and utility lines reduces risks. Separate material flow supports later recycling and lowers disposal costs. Georeferenced photos, consistent layer codes, and as-built updates to the layer log improve traceability; retaining test records and calibration data for measuring equipment strengthens quality assurance.<\/p>\n<h2>Method selection: from concrete demolition shears to rock splitting<\/h2>\n<p>The properties of the soil layer dictate the technique. In reinforced concrete with a defined layer position, concrete demolition shears work precisely, enable selective dismantling, and reduce secondary breakage, for example during building gutting and cutting. In rock layers with existing joints, concrete splitters and <a href=\"https:\/\/www.darda.de\/en\/product-overview\/rock-splitters\">rock wedge splitters<\/a> allow controlled opening of the layer along natural lines, often with lower vibration than alternative methods. A hydraulic power pack supplies these tools with the required operating pressure and flow; where steel or tank components occur within a layer, steel shears, hydraulic demolition shears, or cutting torch complete the chain. This produces a process sequence adapted to the layered system that secures load transfer and controls emissions. Additional planning benefits arise from combining pre-sawing or drilling with splitting to guide fracture paths, reduce dust, and improve piece geometry for handling.<\/p>\n<h3>Work sequence in layered systems<\/h3>\n<ol>\n<li>Expose and secure layer boundaries, especially at slopes and cut faces. Establish exclusion zones, edge protection, and temporary drainage where required.<\/li>\n<li>Identify joints, reinforcement, and embedded items; define insertion points. Confirm alignment with bedding and the intended crack propagation direction.<\/li>\n<li>Pre-separation: saw or cut cover layers, open joints and separation lines. Pre-drilling may be used to set consistent spacing and depth control.<\/li>\n<li>Splitting or shearing along planned lines; controlled release into manageable pieces. Coordinate lifting or support to maintain load paths during release.<\/li>\n<li>Finishing of contact faces, shoring or backfilling where required. Inspect for overbreak and reinstate protections before proceeding.<\/li>\n<li>Source-separated haulage logistics and documentation of progress per layer package. Update layer logs and emission records to inform the next cycle.<\/li>\n<\/ol>\n<h3>Emissions and boundary conditions<\/h3>\n<p>Dust, noise, and vibration depend strongly on layer properties. Splitting techniques are often low-vibration and precise. In water-bearing layers, dewatering and stabilizing the work space are advisable. Temperature effects on hydraulic systems are addressed by suitable operating intervals and maintenance. Water suppression, local exhaust, acoustic shielding, and real-time vibration monitoring at sensitive receptors improve compliance with site-specific thresholds.<\/p>\n<h2>Groundwater, frost, and weather<\/h2>\n<p>Groundwater level and pore water pressure alter the stability of soils and the brittleness of weathered rock. In cohesive layers, softening can occur; in non-cohesive layers, water increases the tendency to flow. Under frost, cover layers become more brittle, whereas thawing reduces relative density. For work with concrete demolition shears or hydraulic wedge splitters, this means choosing starting and holding points in weather- and water-stable areas, planning drainage, and scheduling equipment operation to suit conditions. Sequencing high-precision steps for cool, dry periods and providing contingency for sudden inflow or thaw improves predictability and safety.<\/p>\n<h2>Safety, permits, and environment<\/h2>\n<p>Safe work in soil layers requires graded protective measures: stable slopes, timely shoring, controlled release of larger components, and secured transport routes. In vibration-sensitive areas, splitting methods are an option to protect adjacent structures. Depending on the location, permits, protective conditions, or requirements for groundwater protection may apply. In general, a low-emission mode of operation with dust suppression, orderly material flow, and early coordination with stakeholders is proven. Formal risk assessments, energy isolation for hydraulic systems, and clear communication of hold points and inspection criteria reduce residual risk.<\/p>\n<h2>Practical examples from application areas<\/h2>\n<ul>\n<li><strong>Concrete demolition and special demolition:<\/strong> Foundation layers in contact with cohesive soil layers are first exposed, then separated into sections with concrete demolition shears; on rocky subgrade, the contact zone can be opened with concrete splitters to keep tensile forces away from the structure edge.<\/li>\n<li><strong>Building gutting and cutting:<\/strong> Components embedded in fills often contain steel, utility lines, or tank segments. Selective separation with concrete demolition shears, steel shears, and cutting torch reduces risks to underlying layers.<\/li>\n<li><strong>Rock excavation and tunnel construction:<\/strong> In bedded limestone, splitting along bedding planes yields smooth excavation faces; the spacing of splits is set according to joint spacing and bed thickness.<\/li>\n<li><strong>Natural stone extraction:<\/strong> The goal is to obtain plane-parallel rough blocks along natural bedding planes. Rock wedge splitters are placed to exploit existing cleavage and minimize waste.<\/li>\n<li><strong>Special application:<\/strong> In sensitive areas with vibration limits, massive components can be split layer by layer or released with shears; the soil layer defines the sequence and the safeguarding measures.<\/li>\n<li><strong>Water-bearing or dense urban zones:<\/strong> Controlled splitting with staged dewatering and shielding reduces transmission of vibration and noise to neighboring structures while maintaining stable working conditions.<\/li>\n<\/ul>\n<h2>Planning and costing based on the soil layer<\/h2>\n<p>The soil-layer structure determines cycle, equipment deployment, and logistics. Layer thickness and material mix feed into quantity takeoff. For the hydraulic power pack, provide sufficient drive power with a stable supply; where space is limited, compact units are advantageous. Transport routes follow the layer pattern to avoid edge break-offs and settlements. Separate storage of rock, concrete, and steel facilitates recycling and shortens haul-off times. Allowances for dewatering, monitoring, and temporary works, as well as buffers for layer variability, improve cost certainty and schedule resilience.<\/p>\n<h2>Terms and parameters in the soil-layer context for practice<\/h2>\n<ul>\n<li><strong>Layer thickness:<\/strong> Thickness of the soil layer; controls insertion spacing and load transfer.<\/li>\n<li><strong>Layer boundary:<\/strong> Transition between strata; preferred zone for cuts or splits.<\/li>\n<li><strong>Joint\/joint spacing:<\/strong> Natural discontinuities in rock; define split lines.<\/li>\n<li><strong>Bedding\/cleavage:<\/strong> Direction-dependent structure; influences fracture behavior.<\/li>\n<li><strong>Relative density:<\/strong> Compaction of unconsolidated material; affects stability and settlement.<\/li>\n<li><strong>Cohesion\/angle of friction:<\/strong> Describe shear strength of soils and influence slope angles.<\/li>\n<li><strong>Water content\/pore water pressure:<\/strong> Influences load-bearing capacity and emissions during processing.<\/li>\n<li><strong>Degree of weathering:<\/strong> Measure of strength loss in the cover and transition zone.<\/li>\n<li><strong>Structure-soil contact zone:<\/strong> Critical location for shear and splitter start points because load paths change.<\/li>\n<li><strong>Permeability coefficient:<\/strong> Governs drainage needs and the likelihood of fines migration during works.<\/li>\n<li><strong>Effective stress:<\/strong> Controls stability and crack initiation under changing groundwater conditions.<\/li>\n<li><strong>Overburden pressure:<\/strong> Constrains feasible splitting energy and affects displacement control.<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Soil layer refers to a naturally formed or anthropogenic stratum in the subsoil that differs from overlying or underlying layers in composition, structure, and bedding. In the planning and execution of concrete demolition, special demolition, rock excavation, tunnel construction, and natural stone extraction, the sequence of layers determines the approach, <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/soil-layer\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19111","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Soil Layer Definition, Geology &amp; Construction Uses<\/title>\n<meta name=\"description\" content=\"Discover how soil layers shape geology and construction work \u2713 parameters, excavation, controlled splitting, and dust control.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/soil-layer\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Soil Layer Definition, Geology &amp; Construction Uses\" \/>\n<meta property=\"og:description\" content=\"Discover how soil layers shape geology and construction work \u2713 parameters, excavation, controlled splitting, and dust control.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/soil-layer\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-12T17:53:10+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/soil-layer\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/soil-layer\",\"name\":\"Soil Layer Definition, Geology & Construction Uses\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-10-08T14:47:12+00:00\",\"dateModified\":\"2026-09-12T17:53:10+00:00\",\"description\":\"Discover how soil layers shape geology and construction work \u2713 parameters, excavation, controlled splitting, and dust control.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/soil-layer#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/soil-layer\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/soil-layer#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Soil layer\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Soil Layer Definition, Geology & Construction Uses","description":"Discover how soil layers shape geology and construction work \u2713 parameters, excavation, controlled splitting, and dust control.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/soil-layer","og_locale":"en_US","og_type":"article","og_title":"Soil Layer Definition, Geology & Construction Uses","og_description":"Discover how soil layers shape geology and construction work \u2713 parameters, excavation, controlled splitting, and dust control.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/soil-layer","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-09-12T17:53:10+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/soil-layer","url":"https:\/\/www.darda.de\/en\/knowledge\/soil-layer","name":"Soil Layer Definition, Geology & Construction Uses","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-10-08T14:47:12+00:00","dateModified":"2026-09-12T17:53:10+00:00","description":"Discover how soil layers shape geology and construction work \u2713 parameters, excavation, controlled splitting, and dust control.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/soil-layer#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/soil-layer"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/soil-layer#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Soil layer"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19111","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19111"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19111\/revisions"}],"predecessor-version":[{"id":29087,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19111\/revisions\/29087"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19111"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}