{"id":19083,"date":"2025-10-10T12:41:42","date_gmt":"2025-10-10T10:41:42","guid":{"rendered":"https:\/\/www.darda.de\/work-planning"},"modified":"2026-04-02T08:13:03","modified_gmt":"2026-04-02T06:13:03","slug":"work-planning","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/work-planning","title":{"rendered":"Work planning"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p><strong>Work planning<\/strong> is the strategic and operational backbone of demanding tasks in concrete demolition, building gutting, rock excavation as well as special demolition. It connects analysis, process engineering, occupational safety and construction logistics into a transparent, auditable sequence. For applications with devices from Darda GmbH &#8211; from <strong>concrete pulverizers<\/strong> and <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a> to <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power packs<\/a> and combination shears &#8211; this means: the right method, in the right time window, with the appropriate power unit and a team setup that minimizes risks and makes quality measurable. Clear interfaces, standards-compliant documentation and measurement-based control ensure reproducible results across the entire project lifecycle.<\/p>\n<h2>Definition: What is meant by work planning?<\/h2>\n<p>Work planning means the systematic preparation, control, and monitoring of all steps required for a safe, efficient, and compliant intervention in concrete or rock structures. This includes the selection of methods and tools, scheduling and resource planning, hazard analysis, construction site setup, coordination with other trades, and documentation. The aim is a <em>risk-based<\/em> and <em>performance-stable<\/em> execution with verifiable results, aligned with regulatory requirements and project specifications.<\/p>\n<ul>\n<li><strong>Typical outputs:<\/strong> method statement, risk assessment including hazard register, schedule with milestones, inspection and test plan, as-built and acceptance documentation.<\/li>\n<\/ul>\n<h2>Process and methods of work planning<\/h2>\n<p>Robust work planning follows a clearly structured process. An iterative approach has proven itself, in which technical findings and boundary conditions are continuously fed back and plans are adapted. Decision gates with defined criteria elevate transparency and enable controlled adjustments.<\/p>\n<h3>1. Initial situation and objective definition<\/h3>\n<ul>\n<li>Inventory of structure, geology, reinforcement, access, load-bearing capacity, utility lines.<\/li>\n<li>Definition of objectives: removal quantities, permissible low-vibration levels and noise emission, cuts and sequences, reuse or disposal routes.<\/li>\n<li>Constraints and approvals: protected structures, groundwater influence, operational restrictions, working hours and hot-work permits.<\/li>\n<\/ul>\n<h3>2. Method selection and equipment logic<\/h3>\n<ul>\n<li>Mechanical splitting, cutting, shearing, controlled deconstruction in separate construction sections.<\/li>\n<li>Matching component geometry, degree of reinforcement, environmental constraints and time window with available equipment (e.g., concrete pulverizers, rock split cylinders, combination shears, Multi Cutters, steel shears, cutting torch) and hydraulic power packs.<\/li>\n<li>Compatibility and availability: jaw types, blade materials, hose lengths, spare parts and consumables with defined reorder points.<\/li>\n<\/ul>\n<h3>3. Resource and schedule planning<\/h3>\n<ul>\n<li>Team sizes and qualifications, shift sequences, supply and waste disposal logistics.<\/li>\n<li>Schedule with buffers for weather, permits, inspections and measurements.<\/li>\n<li>Dependencies: interface dates with other trades, crane windows, delivery time slots, inspection and hold points.<\/li>\n<\/ul>\n<h3>4. Safety and environmental management<\/h3>\n<ul>\n<li>Hazard analysis, protective measures (dust suppression, noise control, low-vibration levels), exclusion zones, emergency exits.<\/li>\n<li>Dewatering system, wastewater treatment, emissions reduction, construction waste separation.<\/li>\n<li>Hazardous substances and materials: handling of coatings, infill and residues with documented disposal routes and waste codes.<\/li>\n<\/ul>\n<h3>5. Site setup and energy supply<\/h3>\n<ul>\n<li>Staging areas, crane concept, anchor points, hose and cable routing, hydraulic power packs with sufficient drive power and reserve.<\/li>\n<li>Accessibility for haulage logistics, route guidance, lighting.<\/li>\n<li>Energy resilience: ventilation for power packs, refueling concepts, spill protection and fire safety around energy units.<\/li>\n<\/ul>\n<h3>6. Execution, monitoring and adjustment<\/h3>\n<ul>\n<li>Ongoing control of cut patterns, splitting progress, tool wear and working pressure\/flow rate.<\/li>\n<li>Adjustments based on measurement data and team feedback, clean documentation.<\/li>\n<li>Operational monitoring: KPIs in short cycles, tool change strategies, threshold-based stop criteria.<\/li>\n<\/ul>\n<h2>Tool and method selection in concrete demolition<\/h2>\n<p>The selection of the appropriate tool is based on the goals, the structure, and the boundary conditions. In practice, mixed methods often provide the best risk and performance balance when carefully sequenced and monitored.<\/p>\n<ul>\n<li><strong>Concrete pulverizers<\/strong>: suitable for selective removal, exposing reinforcement, stepwise reduction of cross-sections; advantageous in gutting works and controlled deconstruction. Choice of jaw geometry and tooth profile influences bite behavior and surface quality.<\/li>\n<li><strong>Rock and concrete splitters<\/strong>: hydraulic splitting with low-vibration levels; ideal in sensitive environments, massive components and rock; pinpoint separation along prepared boreholes. Pre-drilling patterns define force introduction and crack propagation.<\/li>\n<li>Combination shears and Multi Cutters: flexible for mixed tasks when different materials must be separated in one sequence. Plan jaw changes and set-up times as part of the cycle.<\/li>\n<li><a href=\"https:\/\/www.darda.de\/en\/product-overview\/steel-shears\">Steel shears<\/a>: focused on sectional and reinforcing steel; a frequent complement to concrete pulverizers for heavily reinforced elements.<\/li>\n<li>Concrete pulverizers in combination with hydraulic power packs: flow stability, pressure stability and thermal balance are essential; plan buffer times for cooling phases and ensure clean filtration and hose protection.<\/li>\n<li>Cutting torch (under special demolition conditions): for tank and vessel work only after thorough clearance measurement and with special protective measures. Hot-work permits, fire watch and spark containment are mandatory.<\/li>\n<li>Pre-drilling and layout: borehole diameters, spacing and depth aligned with splitting forces and structural constraints to minimize overbreak.<\/li>\n<\/ul>\n<h2>Application areas and planning specifics<\/h2>\n<h3>Concrete demolition and special deconstruction<\/h3>\n<p>In selective deconstruction, sequence and load transfer are crucial: relieve first, then separate. Concrete pulverizers generate controllable piece sizes and enable a stepwise approach. For massive cores or foundations, low-vibration splitting with rock and concrete splitters can protect the surroundings and minimize crack risks. Monitoring of deflection and settlement during key stages secures stability.<\/p>\n<h3>Building gutting and cutting<\/h3>\n<p>For interior work, vibration and noise limits take priority. Concrete pulverizers provide clean cut patterns on fit-out elements, split cylinders help with thick walls where sawing is limited. Logistically decisive: short routes, low-dust working methods and rapid disposal. Negative pressure zones and air exchange concepts reduce secondary contamination.<\/p>\n<h3>Rock excavation and tunnel construction<\/h3>\n<p>In rock, geology, bedding and stresses are decisive. Rock and concrete splitters allow controlled volume reduction when blasting works are not possible or not desired. Work planning considers drill pattern, splitting sequence, earth pressure, water inflows and the protection of existing structures. Continuous geotechnical feedback loops refine the method as conditions evolve.<\/p>\n<h3>Natural stone extraction<\/h3>\n<p>In quarries, the quality of the stone surface counts. Split cylinders support precise, reproducible separations along natural joints. Target sizes, block weights and lifting chains are defined in advance to optimize transport and further processing. Damage minimization increases yield and downstream value.<\/p>\n<h3>Special demolition<\/h3>\n<p>For tanks, sensitive infrastructure or contaminated sites, work planning is particularly cautious. Cutting torch and concrete pulverizers are used only after approvals, clearance measurements and with redundant safety measures. Safety fence, spark protection and firefighting water reserve are integral components. Coordination with operations and clear lockout-tagout procedures prevent inadvertent energization.<\/p>\n<h2>Sequencing, separation cuts and load transfer<\/h2>\n<p>The sequence determines safety and pace. Proven procedures free loads early and create stable intermediate states.<\/p>\n<ul>\n<li>Pre-separation along clearly defined lines; marking and control measurement.<\/li>\n<li>Step-by-step removal: concrete pulverizers for edges and cantilevers, split cylinders for massive core zones.<\/li>\n<li>Shoring, temporary bearings and anchor points to be checked before starting.<\/li>\n<li>Planned steel separation: reinforcement is exposed, then cut with steel shears or hydraulic shear.<\/li>\n<li>Controlled lowering and lifting points defined in advance; lifting gear selection verified by calculation and inspection.<\/li>\n<\/ul>\n<h2>Safety, environmental and permitting aspects<\/h2>\n<p>Safety has priority. Planning includes hazard analysis, operating instructions, briefing and measurable limits.<\/p>\n<ul>\n<li>Vibrations and noise: splitting methods are often low vibration; secure limits with a monitoring system.<\/li>\n<li>Dust and water: pinpoint wetting, dust extraction, wastewater routing; protection of sensitive areas.<\/li>\n<li>Permits: work in protected areas, traffic zones or water-bearing layers only after general approval; clarify responsibilities early.<\/li>\n<li>Emergency management: routes, assembly points, first-aid equipment, reduce fire load.<\/li>\n<li>Training and briefings: toolbox talks, method demonstrations, and permit-to-work checks before critical activities.<\/li>\n<\/ul>\n<h2>Logistics, site setup and energy supply<\/h2>\n<p>Efficiency results from short routes and clear order. Hydraulic power packs require secured staging areas, sufficient ventilation and protection from damage. Defined material and equipment flows reduce waiting times and prevent interface conflicts.<\/p>\n<ul>\n<li>Access and load-bearing capacity: check surface load, ramps, floor slab loads; mark transport routes.<\/li>\n<li>Hose and cable management: avoid trip hazards, provide protection bridges, secure pressure hose lines.<\/li>\n<li>Material flow: defined buffer zones for construction debris, separate containers for recycling fractions.<\/li>\n<li>Maintenance: integrate visual inspections and pressure and temperature checks into work cycles.<\/li>\n<li>Noise and dust zoning: route high-emission activities into time windows and protected zones with signage.<\/li>\n<\/ul>\n<h2>Quality assurance and documentation<\/h2>\n<p>Quality is planned, measured and evidenced. Clear criteria help to objectify decisions.<\/p>\n<ul>\n<li>Metrics: daily output, piece sizes, cut accuracy, vibration and noise values, downtime.<\/li>\n<li>Documents: photo logs, measurement reports, inspection and maintenance records, handover reports.<\/li>\n<li>Feedback: evaluation for equipment selection (e.g., jaw types, splitting force, power pack drive power) for future deployments.<\/li>\n<li>Acceptance criteria: defined tolerances and witness points, non-conformance handling and corrective action tracking.<\/li>\n<\/ul>\n<h2>Digital planning aids and data<\/h2>\n<p>Digital surveys, building models and progress documentation support transparent work planning. Relevant data include material thicknesses, reinforcement layers, utility line routing, allowable loads and restricted areas. Visual checklists and simple dashboards increase readability and reduce error rates. Machine telematics and sensor data help predict wear, plan maintenance and stabilize output.<\/p>\n<ul>\n<li>Useful datasets: point clouds for clash checks, georeferenced borehole logs, noise and vibration baselines, route maps for internal logistics.<\/li>\n<\/ul>\n<h2>Typical planning errors and how to avoid them<\/h2>\n<ul>\n<li>Underestimated reinforcement: plan early probing and test cuts.<\/li>\n<li>Schedules that are too tight: provide buffers for measurements, cooling phases and tool changes.<\/li>\n<li>Unclear responsibilities: fix roles, approvals and communication paths in writing.<\/li>\n<li>Inadequate emissions control: define measuring points and actively monitor limits.<\/li>\n<li>Unsuitable equipment selection: use a criteria catalog (component, environment, objective) in advance; combine concrete pulverizers and splitters.<\/li>\n<li>Missing interface management: coordinate crane times, waste logistics and access with neighboring trades to avoid standstills.<\/li>\n<li>Thermal overload of power packs: monitor temperatures, define duty cycles and provide ventilation reserves.<\/li>\n<\/ul>\n<h2>Checklist for practice<\/h2>\n<ol>\n<li>Clarify objectives and boundary conditions: scope of removal, limits, neighborhood.<\/li>\n<li>Component and environment analysis: load-bearing capacity, utilities, access, reinforcement.<\/li>\n<li>Define method selection: pulverizer, splitting, shearing, combinations.<\/li>\n<li>Energy and logistics: hydraulic power packs, staging areas, routes, disposal.<\/li>\n<li>Safety concept: hazards, protection measures, emergency exits.<\/li>\n<li>Schedule and resource plan: personnel, shifts, buffers.<\/li>\n<li>Measurement and QA plan: target values, logs, acceptances.<\/li>\n<li>Site start: briefing, trial section, fine-tuning.<\/li>\n<li>Ongoing control: performance, wear, emissions, adjustment.<\/li>\n<li>Completion: documentation, evaluation, lessons learned.<\/li>\n<li>Archiving and data handover: structured storage of plans, measurements, permits and acceptance records.<\/li>\n<\/ol>\n<h2>Practice-oriented deployment scenarios<\/h2>\n<h3>Massive floor slab in an existing building<\/h3>\n<p>Low-vibration separation using rock and concrete splitters reduces risks for neighboring buildings; edge areas are trimmed in advance with concrete pulverizers to create lifting points. Monitoring plates and crack gauges document building responses.<\/p>\n<h3>Building gutting of a multi-story building<\/h3>\n<p>Concrete pulverizers for selective removal, steel shears for reinforcement; short internal routes, consistent dust suppression and noise control measures. Hydraulic power packs decentralized, with clear hose routes. Waste fractions are pre-sorted to increase recycling rates.<\/p>\n<h3>Rock excavation in a sensitive location<\/h3>\n<p>Drill pattern planning, step-by-step splitting, monitoring of vibrations and slope movements; material logistics with defined intermediate storage areas. Water ingress is controlled via staged dewatering and real-time flow observation.<\/p>\n<h3>Confined basement demolition with access limits<\/h3>\n<p>Segmenting components into calculated piece sizes using concrete pulverizers, complemented by splitters for thick zones; compact power packs positioned with enhanced ventilation. Sequenced removal prevents overload of temporary shoring and narrow access routes.<\/p>\n<h2>Cost-effectiveness and resource efficiency<\/h2>\n<p>Cost-effectiveness results from appropriate equipment selection, stable processes and minimal downtime. Combined methods &#8211; for example, pre-separation with concrete pulverizers and volume reduction with split cylinders &#8211; reduce emissions and transport quantities. Planned piece sizes facilitate handling and recycling. Higher availability of equipment, fewer reworks and better material recovery improve both project economics and environmental balance.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Work planning is the strategic and operational backbone of demanding tasks in concrete demolition, building gutting, rock excavation as well as special demolition. It connects analysis, process engineering, occupational safety and construction logistics into a transparent, auditable sequence. For applications with devices from Darda GmbH &#8211; from concrete pulverizers and <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/work-planning\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19083","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Work Planning for Concrete &amp; Rock Demolition<\/title>\n<meta name=\"description\" content=\"Plan safe, efficient demolition and excavation \u2713 Work planning for concrete, rock &amp; site logistics with low vibration.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/work-planning\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Work Planning for Concrete &amp; Rock Demolition\" \/>\n<meta property=\"og:description\" content=\"Plan safe, efficient demolition and excavation \u2713 Work planning for concrete, rock &amp; site logistics with low vibration.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/work-planning\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-02T06:13:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/work-planning\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/work-planning\",\"name\":\"Work Planning for Concrete & Rock Demolition\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-10-10T10:41:42+00:00\",\"dateModified\":\"2026-04-02T06:13:03+00:00\",\"description\":\"Plan safe, efficient demolition and excavation \u2713 Work planning for concrete, rock & site logistics with low vibration.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/work-planning#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/work-planning\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/work-planning#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Work planning\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Work Planning for Concrete & Rock Demolition","description":"Plan safe, efficient demolition and excavation \u2713 Work planning for concrete, rock & site logistics with low vibration.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/work-planning","og_locale":"en_US","og_type":"article","og_title":"Work Planning for Concrete & Rock Demolition","og_description":"Plan safe, efficient demolition and excavation \u2713 Work planning for concrete, rock & site logistics with low vibration.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/work-planning","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-04-02T06:13:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/work-planning","url":"https:\/\/www.darda.de\/en\/knowledge\/work-planning","name":"Work Planning for Concrete & Rock Demolition","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-10-10T10:41:42+00:00","dateModified":"2026-04-02T06:13:03+00:00","description":"Plan safe, efficient demolition and excavation \u2713 Work planning for concrete, rock & site logistics with low vibration.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/work-planning#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/work-planning"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/work-planning#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Work planning"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19083","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19083"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19083\/revisions"}],"predecessor-version":[{"id":25889,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19083\/revisions\/25889"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19083"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}