{"id":19076,"date":"2025-10-11T10:49:17","date_gmt":"2025-10-11T08:49:17","guid":{"rendered":"https:\/\/www.darda.de\/penetration-depth"},"modified":"2026-04-02T09:37:02","modified_gmt":"2026-04-02T07:37:02","slug":"penetration-depth","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/penetration-depth","title":{"rendered":"Penetration depth"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Penetration depth describes how far a tool, a wedge, a cutting edge, or a pair of jaws penetrates into concrete, masonry, or rock and creates an <em>effective zone<\/em> of breakage, cutting, or splitting. It is a central planning parameter in concrete demolition, rock excavation, tunnel construction, strip-out\/gutting, and natural stone extraction. For tools from Darda GmbH &#8211; such as <a href=\"https:\/\/www.darda.de\/en\/product-overview\/concrete-crushers\">concrete crushers by Darda<\/a> or <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a> &#8211; penetration depth largely determines how controlled, efficient, and safe structural elements can be separated, reduced in size, or split. In practice, it governs productivity, quality of separation surfaces, and the achievable selectivity when working close to sensitive assets.<\/p>\n<h2>Definition: What is meant by penetration depth?<\/h2>\n<p>Penetration depth refers to the <strong>geometric depth<\/strong> to which a tool body (jaw, blade, wedge, cylinder assembly) engages the material, as well as the <strong>effective depth<\/strong> within which mechanical effects (crack formation, shearing, crushing) actually occur. For concrete crushers, this is the depth to which the jaws grip and pulverize the concrete; for stone and concrete splitters, it comprises the inserted wedge set in the borehole and the splitting crack depth propagating from it. When cutting steel (e.g., steel shears, tank cutters), penetration depth denotes the travel of the blades through the cross-section until complete separation. In technical communication, <em>engagement depth<\/em> or <em>insertion depth<\/em> are sometimes used synonymously for the geometric component; the effective depth can be smaller due to material heterogeneity or reinforcement.<\/p>\n<h2>Mechanics and influencing factors of penetration depth<\/h2>\n<p>Penetration depth results from the interaction of tool geometry, available energy (hydraulic pressure and flow rate), material properties (compressive and tensile strength, aggregate structure, reinforcement content), component geometry (thickness, edge distances, supports), and the respective working method. In concrete, high compressive strength, dense reinforcement, and hard aggregates increase resistance to penetration; in natural stone, bedding, joints, and moisture influence crack propagation depth. Hydraulic units from Darda GmbH provide the necessary pressure for concrete crushers, combi shears, Multi Cutters, or stone splitting cylinders; fine-tuning of pressure and oil flow controls penetration speed and the stability of the cracking or cutting process. A high penetration depth only makes sense when it is controlled: decisive are a defined crack initiation, sufficient edge distances, and a steady force build-up without oscillations to avoid unwanted spalling, kickback, or uncontrolled crack paths. Additional influences include <strong>tool wear<\/strong> (rounded teeth or dull blades reduce bite), <strong>temperature<\/strong> (viscosity of hydraulic oil), and <strong>fixture stability<\/strong> (machine guidance and support conditions).<\/p>\n<h2>Penetration depth with concrete crushers<\/h2>\n<p>Darda GmbH concrete crushers create a combined compressive and shear loading through the form-fitting interlocking of the jaws and the hydraulic clamping force. Penetration depth determines whether only the surface is crushed or whether the comminution process reaches across the cross-section to the reinforcement and exposes it. Jaw geometry (tooth profile, jaw length, and opening width) and the pivot arrangement influence how quickly a stable crack zone forms and how effectively reinforcement can be reached without excessive re-feeding.<\/p>\n<h3>Influence of component and material properties<\/h3>\n<ul>\n<li>Reinforcement density: High reinforcement ratios limit the penetration depth of the jaws and shift effective comminution to multiple feed steps.<\/li>\n<li>Concrete strength and aggregate hardness: High-strength concretes, dense aggregate structures, and low porosity increase resistance to jaw tooth engagement.<\/li>\n<li>Component geometry: Large cross-sections require a staged approach (pre-chamfer, deep bite, re-feed) to achieve sufficient effective depth.<\/li>\n<li>Edge proximity and support: Small edge distances or insufficient support encourage edge break-offs; increased distance and temporary shoring promote deeper, guided cracks.<\/li>\n<li>Surface condition: Coatings or compact laitance layers can delay initial bite; light pre-scoring improves first engagement.<\/li>\n<\/ul>\n<h3>Working method to control penetration depth<\/h3>\n<ol>\n<li>Create a starter cut: First apply over an area to establish a defined fracture zone.<\/li>\n<li>Deep bite: Reposition the jaws and increase pressure once the initial material break is stable.<\/li>\n<li>Expose reinforcement: Upon reaching reinforcement, relieve tensile stresses, expose the rebar in a targeted manner, and then cut it (e.g., with steel shears or Darda GmbH Multi Cutters, if required).<\/li>\n<\/ol>\n<p><strong>Best practice:<\/strong> Maintain a low-vibration feed and use short hold phases to stabilize crack growth before re-feeding. Monitor sound and visual cues from the fracture face to avoid over-penetration that might compromise adjacent components.<\/p>\n<h2>Penetration depth with stone and concrete splitters<\/h2>\n<p>Stone and concrete splitters use wedge sets in pre-drilled holes to convert radial pressure into a controlled splitting crack. Penetration depth consists of the borehole depth, the insertion depth of the wedge, and the resulting splitting depth along the weakest lines. Accurate drilling patterns and consistent hole quality are prerequisites for repeatable, deep crack propagation.<\/p>\n<h3>Borehole and wedge: the geometric basis<\/h3>\n<ul>\n<li>Borehole depth: It must accommodate the full wedge length with a safety allowance so the wedge can act fully and transfer the splitting energy into the cross-section.<\/li>\n<li>Borehole diameter: Precisely matched to the wedge system; holes that are too tight increase friction, those too wide reduce wedge action and thus the effective splitting depth.<\/li>\n<li>Edge distances: Sufficient distance prevents edge spalling and guides the crack deeper into the component or rock.<\/li>\n<li>Drilling quality: Straight holes, clean walls, and proper flushing reduce friction and enable uniform pressure transfer to greater depths.<\/li>\n<\/ul>\n<h3>Crack propagation and effective splitting depth<\/h3>\n<p>The effective penetration depth of the splitting crack depends on the material\u2019s fracture toughness, existing joints, reinforcement, and the stress distribution. In massive cross-sections, the crack is guided step by step: several aligned boreholes with a coordinated wedge sequence increase splitting depth without risking uncontrolled breakage. Orientation of the wedge set parallel to bedding or joint planes promotes deeper, energy-efficient splitting.<\/p>\n<h2>Penetration depth when cutting and shearing steel<\/h2>\n<p>For steel shears, tank cutters, and Darda GmbH Multi Cutters, penetration depth is identical to the travel of the blades through the material until complete separation. Sheet thickness, material grade, and multilayer build-ups (coatings, composites) influence resistance. A uniform, low-vibration feed reduces upsetting and preserves cut quality &#8211; particularly relevant for strip-out and cutting, as well as for special operations on hollow bodies. Proper blade alignment, sufficient overlap, and timely blade rotation or replacement maintain cut-in performance and limit burr formation at increasing thicknesses.<\/p>\n<h2>Measurement and documentation of penetration depth<\/h2>\n<p>For planning, quality assurance, and occupational safety, traceable recording of penetration depth is advisable. In practice, depth markings on the tool, mechanical depth stops, borehole depth gauges, and visual inspections of fracture or cut faces have proven effective. Brief photo documentation for each work step helps assess crack paths, exposure of reinforcement, and progress through the cross-section. Complementary logs with date, tool configuration, hydraulic settings, and observations on material behavior support reproducibility and later evaluation.<\/p>\n<ul>\n<li><strong>Recommended records:<\/strong> tool type and wear state, hydraulic pressure\/flow range, number and spacing of re-feeds or wedges, measured depths at reference points, anomalies (spalling, deflection), and safety checks performed.<\/li>\n<\/ul>\n<h2>Planning: From the target depth to tool selection<\/h2>\n<ol>\n<li>Define the target: Should only the cover layer be crushed, the reinforcement exposed, or the cross-section completely separated?<\/li>\n<li>Material analysis: Strength, reinforcement ratio, aggregate structure, moisture, existing joints.<\/li>\n<li>Select the tool: Concrete crushers for controlled comminution, stone and concrete splitters for low-noise and low-vibration splitting, steel shears\/Multi Cutters for reinforcement and steel components.<\/li>\n<li>Choose approach points: Ensure sufficient edge distances and support conditions.<\/li>\n<li>Set parameters: Match hydraulic units in pressure and flow rate to the tool; trial step at a non-critical location.<\/li>\n<li>Stage the sequence: Work in steps (initiation &#8211; deep bite &#8211; re-feed) to increase effective penetration depth while maintaining control.<\/li>\n<\/ol>\n<p>Where constraints are tight, include contingency measures such as temporary supports, intermediate cuts, or additional boreholes to maintain a defined crack course at the planned depth.<\/p>\n<h2>Penetration depth in application areas<\/h2>\n<h3>Concrete demolition and special deconstruction<\/h3>\n<p>Here, penetration depth defines the separation line within the component. Concrete crushers create a steadily growing fracture zone through sequential re-feeding. Splitters complement the process when vibrations must be minimized or massive cross-sections need to be opened in a controlled manner. Sequencing both methods can reduce rework and improve exposure quality of embedded elements.<\/p>\n<h3>Strip-out and cutting<\/h3>\n<p>In buildings with live loads on adjacent components, a limited, precise penetration depth is essential to release only defined layers. Steel shears and Multi Cutters separate reinforcement and inserts; concrete crushers handle comminution of the concrete matrix. Clean depth control protects claddings, utilities, and finishes that are to remain in place.<\/p>\n<h3>Rock excavation and tunnel construction<\/h3>\n<p>In in-situ rock, splitting depth depends greatly on joints and bedding. Stone splitting cylinders create crack lines that follow natural weaknesses more deeply; adequate borehole depths and spacing patterns control the path. Adjusting spacing and charge points to match discontinuity orientation yields deeper effective cracks with lower energy input.<\/p>\n<h3>Natural stone extraction<\/h3>\n<p>The required penetration depth determines block dimensions and the quality of the fracture surface. Uniform wedge placements at coordinated depth promote clean separation faces with minimal rework. High-quality drilling and synchronized wedge actuation reduce step formation across the break line.<\/p>\n<h3>Special operations<\/h3>\n<p>For tanks, beams, or coated components, penetration depth is often limited for safety reasons. Stepwise cuts and inspection pauses reduce the risk of uncontrolled deformation or unwanted reactions in cavities. Controlled venting of hollow bodies and monitoring of internal residual stresses help maintain a safe penetration profile.<\/p>\n<h2>Safety and legal aspects (general)<\/h2>\n<p>Penetration depth affects structural behavior, load paths, and fracture behavior. Before work on load-bearing components, load-bearing capacities and load redistributions must be assessed by qualified personnel. Personal protective equipment, barriers, dust and noise mitigation, and a kept-clear hazard zone are mandatory. Legal requirements may vary by project and region; relevant guidelines and Darda GmbH technical documentation should be considered. Prior to intervention, verify the presence of utilities, hazardous substances, and special protective requirements; coordinate permits and method statements accordingly.<\/p>\n<h2>Typical mistakes and how to avoid them<\/h2>\n<ul>\n<li>Insufficient borehole depth when splitting: Incomplete wedge action; cracks run shallow or near the edge.<\/li>\n<li>Excessively fast pressure build-up: Oscillations, spalling, reduced effective depth.<\/li>\n<li>Lack of edge distances: Edge break-offs instead of deep cracks.<\/li>\n<li>Ignoring reinforcement layers: Blocked comminution, uncontrolled fracture patterns.<\/li>\n<li>Unsuitable tool geometry: Jaws too short or incorrect wedge diameter limit penetration depth.<\/li>\n<li>Neglected tool maintenance: Worn teeth or blades reduce initial bite and require unnecessary re-feeding.<\/li>\n<li>Unstable support conditions: Component movement absorbs energy and shortens effective penetration paths.<\/li>\n<\/ul>\n<h2>Optimization: Hydraulics, tool geometry, and procedure<\/h2>\n<p>With appropriately sized hydraulic units, well-maintained concrete crushers, and correctly designed splitting cylinders, <em>stable<\/em> penetration depth increases. Gentle pressure ramps, short hold phases for crack build-up, and consistent re-feeding into already weakened zones increase effective depth without loss of control. Regular inspection of cutting edges and jaw teeth, as well as precise borehole preparation, are simple yet effective levers for better results. Calibrated pressure gauges, suitable hose diameters and lengths, and correct lubrication of wedge sets further reduce losses, enabling deeper and more predictable engagement.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Penetration depth describes how far a tool, a wedge, a cutting edge, or a pair of jaws penetrates into concrete, masonry, or rock and creates an effective zone of breakage, cutting, or splitting. It is a central planning parameter in concrete demolition, rock excavation, tunnel construction, strip-out\/gutting, and natural stone <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/penetration-depth\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19076","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Penetration Depth in Concrete, Masonry &amp; Rock<\/title>\n<meta name=\"description\" content=\"Master penetration depth in concrete demolition, rock splitting &amp; steel cutting \u2713 Measurement, factors, control.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/penetration-depth\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Penetration Depth in Concrete, Masonry &amp; Rock\" \/>\n<meta property=\"og:description\" content=\"Master penetration depth in concrete demolition, rock splitting &amp; steel cutting \u2713 Measurement, factors, control.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/penetration-depth\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-02T07:37:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/penetration-depth\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/penetration-depth\",\"name\":\"Penetration Depth in Concrete, Masonry & Rock\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-10-11T08:49:17+00:00\",\"dateModified\":\"2026-04-02T07:37:02+00:00\",\"description\":\"Master penetration depth in concrete demolition, rock splitting & steel cutting \u2713 Measurement, factors, control.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/penetration-depth#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/penetration-depth\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/penetration-depth#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Penetration depth\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Penetration Depth in Concrete, Masonry & Rock","description":"Master penetration depth in concrete demolition, rock splitting & steel cutting \u2713 Measurement, factors, control.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/penetration-depth","og_locale":"en_US","og_type":"article","og_title":"Penetration Depth in Concrete, Masonry & Rock","og_description":"Master penetration depth in concrete demolition, rock splitting & steel cutting \u2713 Measurement, factors, control.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/penetration-depth","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-04-02T07:37:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/penetration-depth","url":"https:\/\/www.darda.de\/en\/knowledge\/penetration-depth","name":"Penetration Depth in Concrete, Masonry & Rock","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-10-11T08:49:17+00:00","dateModified":"2026-04-02T07:37:02+00:00","description":"Master penetration depth in concrete demolition, rock splitting & steel cutting \u2713 Measurement, factors, control.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/penetration-depth#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/penetration-depth"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/penetration-depth#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Penetration depth"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19076","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19076"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19076\/revisions"}],"predecessor-version":[{"id":25893,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19076\/revisions\/25893"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19076"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}