{"id":19048,"date":"2025-10-14T14:07:58","date_gmt":"2025-10-14T12:07:58","guid":{"rendered":"https:\/\/www.darda.de\/cut-off-wall"},"modified":"2026-03-31T15:55:02","modified_gmt":"2026-03-31T13:55:02","slug":"cut-off-wall","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/cut-off-wall","title":{"rendered":"Cut-off wall"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>A cut-off wall is a central element of special foundation engineering when groundwater needs to be retained, excavation pits secured, or contaminants contained. It separates hydraulic systems, reduces throughflow, and creates the basis for dry, stable, and safe workspaces. In many projects, the planning and execution of a cut-off wall intersect with deconstruction and cutting works: openings, connections, and repairs on reinforced concrete are often carried out in a controlled, low-vibration manner &#8211; for example with <strong>concrete crushers<\/strong> or <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a> from Darda GmbH, so as not to impair adjacent components and the sealing function.<\/p>\n<p>Key performance drivers are continuity of the barrier, <em>low permeability<\/em> across the full depth, and reliable tie-ins to impermeable strata and existing structures. Early coordination between geotechnical design, construction sequence, and low-vibration processing methods reduces risks to watertightness and neighboring assets.<\/p>\n<h2>Definition: What is a cut-off wall?<\/h2>\n<p>A cut-off wall is a continuous in-ground barrier with <em>very low hydraulic conductivity<\/em>. It serves as a seal against groundwater or contaminated media and can also take on structural tasks. Cut-off walls are constructed as diaphragm walls, mixed-in-place elements, jet-grouted bodies (jet grouting), grout curtains, or as sheet pile or bored pile constructions with sealed joints. Typical applications include excavation pits, landfill sealing, dam rehabilitation, enclosure of <strong>contaminated sites<\/strong>, as well as cut-offs in tunnel and shaft construction. Depending on the objective, designs target <strong>k<sub>f<\/sub><\/strong> values in the order of tight fine sediments and ensure durability under chemical and mechanical loads.<\/p>\n<h2>Functions and fields of application of cut-off walls<\/h2>\n<p>Depending on the project, cut-off walls perform different tasks. Central is hydraulic separation, supplemented by constructional and geotechnical functions.<\/p>\n<ul>\n<li><strong>Hydraulic sealing:<\/strong> Limitation of groundwater inflows, protection against hydraulic heave, reduction of uplift.<\/li>\n<li><strong>Barrier effect:<\/strong> Containment of contaminant plumes, enclosure of contaminated land areas.<\/li>\n<li><strong>Excavation support:<\/strong> Combination of cut-off wall and shoring (e.g., as a diaphragm wall with infill), temporary or permanent.<\/li>\n<li><strong>Dams and hydraulic engineering:<\/strong> Impermeable core in earth dams, sealing along watercourses and dikes.<\/li>\n<li><strong>Shaft and tunnel construction:<\/strong> Construction of tight launch and reception pits, sealing of portal areas.<\/li>\n<li><strong>Flood protection and groundwater management:<\/strong> Reduction of seepage paths along flood defense structures and controlled groundwater drawdown to protect adjacent buildings.<\/li>\n<\/ul>\n<p>In these contexts, <em>interfaces to deconstruction and cutting operations<\/em> frequently arise. Openings in cut-off walls, the removal of capping beams, or exposing joints are preferably carried out with low vibration to avoid settlement, cracking, and leakage. Tools such as concrete crushers, multi cutters, and rock and concrete splitters from Darda GmbH are selected on a project-specific basis. Benefits include minimized microcracking, compliance with vibration limits, and preservation of the sealing function.<\/p>\n<h2>Construction methods and materials<\/h2>\n<h3>Diaphragm walls made of cement-bentonite<\/h3>\n<p>Diaphragm walls are constructed in a trench filled with support fluid. Cement-bentonite slurries combine <em>low permeability<\/em> with adequate durability. The wall is built in sections; when load-bearing, reinforcement and concreting are used, whereas for pure cut-off walls the slurry itself forms the structural element.<\/p>\n<ul>\n<li><strong>Strengths:<\/strong> High continuity and precise geometry; adjustable thickness and embedment; good adaptability to variable depths.<\/li>\n<li><strong>Attention points:<\/strong> Control of slurry properties (filter stability, viscosity), cleanliness of the trench base, and careful joint formation to prevent preferential flow.<\/li>\n<\/ul>\n<h3>Soil-bentonite and mixed-in-place cut-off walls<\/h3>\n<p>In the soil-bentonite method, the soil is loosened and homogenized with bentonite (and, if applicable, cement). Mixed-in-place (MIP) or deep soil mixing blends soil with cement grout into continuous, overlapping columns. Both methods achieve <strong>k<sub>f<\/sub> values<\/strong> in the range of tight fine sediments and are suitable for large-area barriers.<\/p>\n<ul>\n<li><strong>Strengths:<\/strong> Efficient coverage of large lengths and variable ground conditions; reduced spoil; good cost-performance ratio for area cut-offs.<\/li>\n<li><strong>Attention points:<\/strong> Homogeneous mixing energy and dosage control; verification of continuity at overlaps; assessment of chemical compatibility with groundwater.<\/li>\n<\/ul>\n<h3>Jet-grouted bodies and grout curtains<\/h3>\n<p>Jet grouting forms cement-bound, dense bodies through high-pressure injection. Grout curtains (e.g., gel, silicate, or cement systems) are installed via boreholes to selectively reseal joints, contact zones, or subsoil areas.<\/p>\n<ul>\n<li><strong>Strengths:<\/strong> High flexibility and selective treatment of leakage paths; suitable for underpinning and tie-ins where access is limited.<\/li>\n<li><strong>Attention points:<\/strong> Geometry control of columns and fans; verification of penetrability; monitoring of returns to avoid uncontrolled losses.<\/li>\n<\/ul>\n<h3>Sheet pile walls with sealing profiles and bored pile walls<\/h3>\n<p>For sheet pile walls, the interlocks are fitted with sealing profiles to minimize throughflow. Bored pile walls receive joint seals (profile or injection joints), creating a quasi-impermeable wall. These systems are often part of <em>excavation pits in inner-city environments<\/em>.<\/p>\n<ul>\n<li><strong>Strengths:<\/strong> Combines sealing with structural support; rapid installation with modular elements.<\/li>\n<li><strong>Attention points:<\/strong> Interlock tightness, joint sealing details, corrosion protection, and watertight connections to slabs and base plugs.<\/li>\n<\/ul>\n<h2>Planning, design, and hydraulic verifications<\/h2>\n<h3>Permeability, embedment depth, and impermeable base<\/h3>\n<p>The required tightness results from the allowable inflow and the protection objective. From this follow target values for the coefficient of permeability and the embedment depth into low-permeability layers. An <strong>impermeable base<\/strong> (e.g., jet grouting plug or natural barrier layer) prevents underflow and hydraulic heave.<\/p>\n<ul>\n<li><strong>Key checks:<\/strong> Hydraulic gradient and uplift; seepage length and potential underflow; stability against piping; interaction with dewatering.<\/li>\n<li><strong>Design notes:<\/strong> Dimensioning for serviceability and ultimate limit states; consideration of construction stages and temporary groundwater levels.<\/li>\n<\/ul>\n<h3>Joints, connections, and transitions<\/h3>\n<p>Particular attention is paid to joints and tie-ins to existing components. Overlaps, sealing profiles, injection channels, and controlled overlaps reduce the risk of leakage. Numerical groundwater models and flow nets support the verification.<\/p>\n<ul>\n<li><strong>Detailing essentials:<\/strong> Robust waterstop concepts, controllable injection paths, and test sections to calibrate workmanship.<\/li>\n<li><strong>Verification:<\/strong> Sensitivity analyses for defects and joints; conservative assumptions at interfaces to heterogeneous strata.<\/li>\n<\/ul>\n<h2>Execution and quality assurance<\/h2>\n<h3>Site workflow and support fluids<\/h3>\n<p>Guide walls ensure alignment and trench stability. Support fluids are monitored for density, viscosity, and sand content. Construction proceeds in sections with documented joint sequence and material batches.<\/p>\n<ul>\n<li><strong>Process control:<\/strong> Continuous logging of excavation parameters, spoil management, and base cleaning; verification of embedment into the target layer.<\/li>\n<li><strong>Support fluids:<\/strong> Regular rheology checks, filter cake assessment, and replacement strategies to maintain performance.<\/li>\n<\/ul>\n<h3>Testing and monitoring<\/h3>\n<p>Quality assurance includes laboratory tests (e.g., <em>k<sub>f<\/sub><\/em>, strength, filter stability) and field diagnostics (pumping tests, tightness tests, water level observation). Geometry and verticality are continuously checked. At impacted sites, supplementary environmental monitoring is added.<\/p>\n<ul>\n<li><strong>Laboratory:<\/strong> Permeability on cores or reconstituted specimens, unconfined compression, chemical resistance where relevant.<\/li>\n<li><strong>Field:<\/strong> Pumping or infiltration tests, piezometer readings, settlement and deformation monitoring, targeted post-injection if thresholds are exceeded.<\/li>\n<\/ul>\n<h2>Cut-off walls in existing structures: openings, deconstruction, and repair<\/h2>\n<h3>Controlled demolition and processing of reinforced concrete<\/h3>\n<p>For openings, connections, or the removal of capping beams, <strong>low-vibration<\/strong> methods are advantageous. <strong>Concrete crushers<\/strong> from Darda GmbH break reinforced concrete precisely without introducing impact energy into the structure. <strong>Multi cutters<\/strong> and <strong>steel shears<\/strong> cut reinforcement, anchor heads, or sheet pile components. <strong>Rock and concrete splitters<\/strong> allow low-stress widening of cracks and targeted opening of concrete areas, for example to install injection packers or expose joints. For power supply, <strong>hydraulic power units<\/strong> are used. A structural verification and approval of the interventions are mandatory.<\/p>\n<ul>\n<li><strong>Execution focus:<\/strong> Defined cutting lines, staged rebar separation, and protection of sealing layers and waterstops.<\/li>\n<li><strong>Quality:<\/strong> Immediate surface inspection, crack mapping, and sealing of exposed interfaces to maintain watertightness.<\/li>\n<\/ul>\n<h3>Work in groundwater and emissions control<\/h3>\n<p>When working on water-loaded components, controlling water ingress, suspended solids, and turbidity is paramount. The choice of quiet, low-vibration tools reduces impacts on neighboring structures and minimizes the risk of leaks. Sealing works are usually carried out in combination with temporary dewatering, grout curtains, or injections.<\/p>\n<ul>\n<li><strong>Measures:<\/strong> Temporary sealing and cofferdams, staged pumping with treatment of discharge water, turbidity and particle load monitoring.<\/li>\n<li><strong>Emissions:<\/strong> Project-specific limits for noise and vibration with real-time monitoring; capture of fines and wash water during processing.<\/li>\n<\/ul>\n<h2>Relation to products and areas of application of Darda GmbH<\/h2>\n<ul>\n<li><strong><a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">Concrete demolition and special deconstruction<\/a>:<\/strong> Openings in cut-off walls, the removal of caps and beams, and the exposure of joints are often carried out with concrete crushers and multi cutters from Darda GmbH to work in a controlled and dimensionally accurate manner.<\/li>\n<li><strong>Strip-out and cutting:<\/strong> When tying new components into existing diaphragm walls, concrete crushers help with selective removal of concrete; steel shears cut reinforcement, anchor heads, or embedded parts.<\/li>\n<li><strong>Rock demolition and tunnel construction:<\/strong> For launch shafts and portal areas where impermeable bodies (e.g., jet plugs) connect to rock, <strong>rock and concrete splitters<\/strong> assist with the precise removal of rock protrusions or reworking of contact zones.<\/li>\n<li><strong>Natural stone extraction:<\/strong> In water-bearing <a href=\"https:\/\/www.darda.de\/en\/applications\/natural-stone-quarrying\">quarries<\/a>, cut-off walls can limit inflows. Rock and concrete splitters from Darda GmbH are then used to selectively expose connection edges or to produce joint areas with precise fit.<\/li>\n<li><strong>Special applications:<\/strong> Confined workspaces, sensitive neighbors, and vibration limits favor the use of compact hydraulic tools with precise force control. Hydraulic power units provide the required performance.<\/li>\n<li><strong>Refurbishment and sealing repair:<\/strong> Selective concrete removal for post-injection, reworking of interfaces, and controlled exposure of joints to restore tightness.<\/li>\n<\/ul>\n<h2>Occupational safety, environment, and permitting notes<\/h2>\n<p>Work on cut-off walls touches on water and waste regulations. Permits, contingency plans, and coordinated monitoring must be clarified in advance. Handling of support fluids, cement suspensions, and drill cuttings follows the applicable standards. Emissions (noise, vibrations, turbidity) are limited project-specifically; the use of low-vibration processing methods supports this.<\/p>\n<ul>\n<li><strong>Safety:<\/strong> Hazard assessments, exclusion zones, securing edges and trenches, hydraulic hose management, and emergency measures in case of water ingress.<\/li>\n<li><strong>Environment:<\/strong> Proper storage and disposal of slurry and cuttings, spill prevention, and compatibility checks for additives.<\/li>\n<\/ul>\n<h2>Typical failure patterns and prevention<\/h2>\n<ul>\n<li><strong>Leaky joints or connections:<\/strong> Avoid through precise joint alignment, sealing profiles, and, where necessary, post-injection.<\/li>\n<li><strong>Inhomogeneous material zones:<\/strong> Consistent mixing and placement control, as well as laboratory testing.<\/li>\n<li><strong>Underflow and hydraulic heave:<\/strong> Sufficient embedment depth, impermeable base, and staged dewatering.<\/li>\n<li><strong>Damage to existing structures:<\/strong> Avoid vibrations; controlled removal with concrete crushers or rock and concrete splitters.<\/li>\n<li><strong>Excessive deformation and cracking:<\/strong> Monitor wall deflections, adapt excavation sequence, and strengthen where needed.<\/li>\n<li><strong>Chemical incompatibility:<\/strong> Select binders and additives resistant to site-specific groundwater chemistry; verify long-term performance.<\/li>\n<\/ul>\n<h2>Documentation and monitoring beyond construction<\/h2>\n<p>Traceable documentation is essential for durability: production logs, test certificates, water level records, and tightness verifications. Monitoring of groundwater levels and settlements secures operation and indicates the need for action at an early stage. For adjustments or refurbishments, interventions are planned and executed with suitable, measured methods &#8211; such as selective concrete removal, targeted injections, and seamless success control.<\/p>\n<ul>\n<li><strong>As-built and QA:<\/strong> Layer profiles, embedment confirmation, joint sequence, material batches, calibration of mixing and injection systems.<\/li>\n<li><strong>Instrumentation:<\/strong> Piezometers, settlement points, inclinometers if relevant, and threshold-based action plans for responsive management.<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A cut-off wall is a central element of special foundation engineering when groundwater needs to be retained, excavation pits secured, or contaminants contained. It separates hydraulic systems, reduces throughflow, and creates the basis for dry, stable, and safe workspaces. In many projects, the planning and execution of a cut-off wall <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/cut-off-wall\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19048","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Cut-off Wall for Groundwater &amp; Containment<\/title>\n<meta name=\"description\" content=\"Understand cut-off walls \u2713 Geotechnical groundwater barriers for excavation pits, dams and contaminated sites.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/cut-off-wall\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Cut-off Wall for Groundwater &amp; Containment\" \/>\n<meta property=\"og:description\" content=\"Understand cut-off walls \u2713 Geotechnical groundwater barriers for excavation pits, dams and contaminated sites.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/cut-off-wall\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-03-31T13:55:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/cut-off-wall\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/cut-off-wall\",\"name\":\"Cut-off Wall for Groundwater & Containment\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-10-14T12:07:58+00:00\",\"dateModified\":\"2026-03-31T13:55:02+00:00\",\"description\":\"Understand cut-off walls \u2713 Geotechnical groundwater barriers for excavation pits, dams and contaminated sites.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/cut-off-wall#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/cut-off-wall\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/cut-off-wall#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Cut-off wall\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Cut-off Wall for Groundwater & Containment","description":"Understand cut-off walls \u2713 Geotechnical groundwater barriers for excavation pits, dams and contaminated sites.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/cut-off-wall","og_locale":"en_US","og_type":"article","og_title":"Cut-off Wall for Groundwater & Containment","og_description":"Understand cut-off walls \u2713 Geotechnical groundwater barriers for excavation pits, dams and contaminated sites.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/cut-off-wall","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-03-31T13:55:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/cut-off-wall","url":"https:\/\/www.darda.de\/en\/knowledge\/cut-off-wall","name":"Cut-off Wall for Groundwater & Containment","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-10-14T12:07:58+00:00","dateModified":"2026-03-31T13:55:02+00:00","description":"Understand cut-off walls \u2713 Geotechnical groundwater barriers for excavation pits, dams and contaminated sites.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/cut-off-wall#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/cut-off-wall"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/cut-off-wall#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Cut-off wall"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19048","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19048"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19048\/revisions"}],"predecessor-version":[{"id":25847,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19048\/revisions\/25847"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19048"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}