{"id":19033,"date":"2025-10-16T15:31:21","date_gmt":"2025-10-16T13:31:21","guid":{"rendered":"https:\/\/www.darda.de\/expansion-joint"},"modified":"2026-03-31T09:40:03","modified_gmt":"2026-03-31T07:40:03","slug":"expansion-joint","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/expansion-joint","title":{"rendered":"Expansion joint"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Expansion joints enable controlled movements in concrete and masonry structures. They prevent restraint, cracking, and consequential damage caused by temperature changes, shrinkage, and settlements. In deconstruction and when working on existing structures, expansion joints are also natural separation and weakening planes. This is where methods using hydraulic tools such as <strong>concrete demolition shears<\/strong> and <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a> come in: components can be precisely separated along the joint, adjacent areas remain protected, and emissions are reduced.<\/p>\n<ul>\n<li><strong>Precision and control<\/strong> in separation along existing joints, with reproducible results<\/li>\n<li><strong>Lower emissions<\/strong> in terms of noise, dust, and vibration for sensitive environments<\/li>\n<li><strong>Reduced collateral damage<\/strong> and preservation of adjacent waterproofing and finishes<\/li>\n<\/ul>\n<h2>Definition: What is meant by an expansion joint?<\/h2>\n<p>An expansion joint (also movement or dilation joint) is a deliberately created interruption in components made of concrete, reinforced concrete, masonry, or composite systems. It accommodates length changes due to thermal effects, moisture variations, creep, and shrinkage. The joint separates component panels, limits restraint stresses, and transfers movements via elastic sealants, waterstops, or profiles. The goal is to avoid cracking, protect waterproofing, and ensure long-term serviceability. In practice, a distinction is made between true expansion joints and control joints (induced joints created by saw cut).<\/p>\n<p>Related joint terms are often used alongside expansion joints and should be differentiated for planning clarity:<\/p>\n<ul>\n<li><em>Expansion joints<\/em>: separate components to accommodate thermal and long-term movements<\/li>\n<li><em>Isolation joints<\/em>: decouple structural elements from one another to prevent load transfer<\/li>\n<li><em>Construction joints<\/em>: unavoidable workday joints from staged concreting, detailed for durability<\/li>\n<li><em>Control joints<\/em>: saw-cut induced joints guiding shrinkage cracking<\/li>\n<\/ul>\n<h2>Construction, working principle, and joint types<\/h2>\n<p>Expansion joints consist of the joint faces, a backing material (e.g., backer rod), an elastic sealant or waterstop, and, where applicable, edge protection and load transfer elements. The joint width and depth depend on the expected movement capacity, exposure (water, chemicals, UV), component cross-section, and execution technique. Typical forms include expansion joints in slabs and floor slabs, wall connection joints, panel boundaries in industrial floors, bridge expansion joints, and segmented sections in tunnel and trough structures. Control joints are saw-cut soon after concreting to steer shrinkage and direct cracks in a controlled manner.<\/p>\n<ul>\n<li><strong>Design parameters<\/strong>: movement envelope, sealant modulus and movement class, width-to-depth ratio, backer selection, and surface preparation<\/li>\n<li><strong>Edge detailing<\/strong>: protection profiles for traffic areas, load transfer devices across joints where required<\/li>\n<li><strong>Exposure<\/strong>: resistance to moisture, chemicals, UV, temperature cycling, and fire<\/li>\n<\/ul>\n<h2>Planning and execution of expansion joints<\/h2>\n<p>The arrangement of expansion joints follows the geometry, spans, support conditions, and the thermal, moisture-related, and structural behavior. Panel sizes are chosen so that movements can be accommodated without creating critical restraint conditions. For water-exposed components, internal waterstops are used; for highly stressed traffic surfaces, load transfer elements and edge protection are advisable. For durable sealing, correct joint geometry (e.g., the 2:1 rule between width and sealant depth), clean faces, suitable primers, and appropriate backing materials are crucial. Execution follows recognized rules of practice and project-specific requirements.<\/p>\n<ol>\n<li>Survey the existing or planned structure, including restraints, re-entrant corners, and anticipated movement paths<\/li>\n<li>Define the movement envelope from thermal action, shrinkage, creep, and support movements<\/li>\n<li>Lay out joint positions to segment panels logically and avoid stress concentrations<\/li>\n<li>Select sealing systems and accessories compatible with exposure and movement<\/li>\n<li>Specify execution details, QA measures, and documentation for traceability<\/li>\n<\/ol>\n<h3>Thermal, moisture-related, and load-induced actions<\/h3>\n<p>Temperature changes lead to elongation and contraction. Shrinkage and creep change component dimensions over time. Support movements, settlements, and traffic loads create additional deformations. Expansion joints decouple these effects, collect deformations in defined zones, and thus protect adjacent component sections. The combined effects are evaluated as a movement envelope to dimension joint width and the sealing system.<\/p>\n<h2>Expansion joints in concrete demolition and specialist deconstruction<\/h2>\n<p>In selective deconstruction, expansion joints are valuable \u201cpredetermined separation lines.\u201d Components can be segmented along existing joints without risking uncontrolled crack formation. In sensitive environments, such as occupied existing buildings, hydraulic methods with <em>low vibration levels<\/em> are suitable for selectively opening joint areas:<\/p>\n<ul>\n<li>Targeted application of <strong>concrete demolition shears<\/strong> at the joint faces for controlled separation of individual slab or wall bays<\/li>\n<li>Force-controlled splitting near the joint with <strong>hydraulic splitters<\/strong> to relieve stresses and steer crack paths<\/li>\n<li>Gentle release of edge strips and edges without damaging adjacent waterproofing<\/li>\n<li>Preparation for removing waterstops, sealants, and profiles<\/li>\n<\/ul>\n<p>Benefits in practice include predictable fracture patterns, reduced overbreak, and shorter downtimes for surrounding operations.<\/p>\n<h3>Procedure and tool selection<\/h3>\n<p>In practice, joints are first exposed, contaminants and coatings removed, and their course documented. This is followed by opening or widening the joint: pinpoint shearing strokes with the shears, followed by splitting wedges or cylinders, produce reproducible fracture patterns. Where required, cutting methods complement the separation process. <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">compact hydraulic power units<\/a> supply the tools with the necessary energy while allowing precise control of forces.<\/p>\n<ul>\n<li><strong>Selection criteria<\/strong>: component thickness, reinforcement density, access and working clearance, and permissible emission limits<\/li>\n<li><strong>Process control<\/strong>: stepwise loading and continuous inspection of crack development along the joint<\/li>\n<li><strong>Protection<\/strong>: shielding of adjacent finishes and sealing systems before tool engagement<\/li>\n<\/ul>\n<h2>Application areas related to expansion joints<\/h2>\n<h3>Concrete demolition and specialist deconstruction<\/h3>\n<p>Expansion joints structure demolition into manageable sections. Working along the joint reduces vibrations and keeps adjacent components stable. <strong>Concrete demolition shears<\/strong> engage at the joint faces, and <strong>hydraulic splitters<\/strong> create defined separation cracks parallel to the joint. Interfaces to building services are identified and secured before sectioning.<\/p>\n<h3>Strip-out and cutting<\/h3>\n<p>During strip-out, joints serve as start or end points for cuts. Expansion joints in floor slabs and slabs are locally opened to expose lines or to remove components section by section. Careful edge guidance prevents damage to waterstops and sealants. Dust control and slurry management are coordinated with building operations.<\/p>\n<h3>Rock excavation and tunnel construction<\/h3>\n<p>In tunnel construction, segment joints and construction joints provide controlled movement and sealing planes. During deconstruction or strengthening works, protecting the joint sealing is essential. Hydraulic splitting methods, such as <a href=\"https:\/\/www.darda.de\/en\/product-overview\/rock-splitters\">Rock Splitters<\/a>, can relieve stresses in the edge zone before cutting precisely along the joint.<\/p>\n<h3>Natural stone extraction<\/h3>\n<p>Natural fractures in rock behave in extraction similarly to expansion or separation joints in concrete: they define preferred fracture planes. <strong>Hydraulic splitters<\/strong> exploit these zones of weakness to detach blocks in a controlled manner and control formats.<\/p>\n<h3>Special applications<\/h3>\n<p>In sensitive areas, such as operating production facilities or listed buildings, work on expansion joints must be planned with particular care. Priorities are low vibrations, dust suppression, and preserving adjacent components and surfaces.<\/p>\n<h3>Water-retaining and marine structures<\/h3>\n<p>In tanks, treatment plants, and quay structures, joints must balance movement accommodation with watertightness. During interventions, sequencing and temporary sealing are planned so that waterstops and joint faces remain intact and functional.<\/p>\n<h2>Materials and components for joint technology<\/h2>\n<p>For expansion joints, elastic sealants (e.g., polyurethane-, silicone-, or hybrid-based), precompressed profiles, waterstops made of TPE or PVC, and backing materials are used. Selection criteria include movement accommodation, adhesion to joint faces, resistance to water, chemicals, UV radiation and temperature, as well as fire protection requirements. Correct three-sided adhesion is avoided by appropriate backings; the bonding surfaces are cleaned and pretreated with primer if necessary.<\/p>\n<ul>\n<li><strong>Checklist for selection<\/strong>: movement class, modulus and recovery, substrate compatibility, service temperature range, and expected maintenance intervals<\/li>\n<li><strong>Execution aids<\/strong>: bond-breaker tapes, primers, and edge protection profiles for trafficked joints<\/li>\n<li><strong>Documentation<\/strong>: product data, approvals, and test reports aligned with project exposure and use<\/li>\n<\/ul>\n<h2>Joint cutting, repair, and refurbishment<\/h2>\n<p>Control joints are created by saw cuts shortly after set to steer shrinkage. In refurbishment, aged sealants and any damaged waterstops are removed, joint faces are reworked, and then resealed. For exposure, precise, low-vibration methods are suitable. <strong>Concrete demolition shears<\/strong> can notch out weathered edges, and <strong>hydraulic splitters<\/strong> release adhering edge zones without tearing the joint faces.<\/p>\n<ol>\n<li>Assess existing joint function and movement demand, including leaks and edge damage<\/li>\n<li>Remove defective materials and re-establish clean, sound joint faces<\/li>\n<li>Restore geometry with appropriate backings and primers<\/li>\n<li>Install the selected sealing system and cure per specification<\/li>\n<li>Verify function with visual checks and, where required, watertightness tests<\/li>\n<\/ol>\n<h3>Avoiding common mistakes<\/h3>\n<ul>\n<li>Joint width too small for the required movement capacity<\/li>\n<li>Incorrect joint geometry and missing backing<\/li>\n<li>Damage to waterstops during separation or demolition<\/li>\n<li>Unsuitable sealants for media or UV exposure<\/li>\n<li>Excessive heat input during cutting affecting bonding surfaces<\/li>\n<\/ul>\n<h2>Safety, protected assets, and quality assurance<\/h2>\n<p>Work on expansion joints requires safeguarding adjacent components, protecting waterproofing and fire stops, and controlling vibrations, noise, and dust. Structural considerations must be clarified at an early stage. Measurement and monitoring measures (e.g., crack widths, settlements) increase execution safety. Requirements from design and standards must be observed project-specifically; binding assessments are provided by the responsible specialist planners.<\/p>\n<ul>\n<li>Permit-to-work procedures, utility locates, and exclusion zones for safe access<\/li>\n<li>Emission control measures: extraction, wet suppression, and noise management<\/li>\n<li>Continuous visual checks at joint edges to prevent overbreak and seal damage<\/li>\n<li>QA records of materials, settings, and achieved joint dimensions<\/li>\n<\/ul>\n<h2>Sustainability and circularity<\/h2>\n<p>Expansion joints facilitate selective deconstruction, as components can be released along existing separations. This reduces energy demand and emissions and improves material purity during removal. Precise separation methods support the reuse and recycling of components and materials.<\/p>\n<ul>\n<li>Selective dismantling along joints increases recoverability of slabs, panels, and profiles<\/li>\n<li>Clean separation of sealants and waterstops reduces contamination of mineral fractions<\/li>\n<li>Documented joint layouts support material passports and future interventions<\/li>\n<\/ul>\n<h2>Design and practical values at a glance<\/h2>\n<p>The spacing and widths of expansion and control joints depend on component thickness, geometry, exposure, and use. In practice, floor slabs are segmented into panels whose side lengths limit deformation behavior. Expansion joints receive sufficient width for the expected expansion and contraction, and control joints are cut early to steer shrinkage. All parameters must be defined on a project basis; the recognized rules of practice and the design specifications are authoritative.<\/p>\n<ul>\n<li>Align joint grids with structural supports and minimize re-entrant corners<\/li>\n<li>Detail edges for the expected traffic and maintenance regime<\/li>\n<li>Coordinate movement joints with finishes, fa\u00e7ade interfaces, and services penetrations<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Expansion joints enable controlled movements in concrete and masonry structures. They prevent restraint, cracking, and consequential damage caused by temperature changes, shrinkage, and settlements. In deconstruction and when working on existing structures, expansion joints are also natural separation and weakening planes. This is where methods using hydraulic tools such as <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/expansion-joint\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19033","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Expansion Joint in Concrete and Masonry Guide<\/title>\n<meta name=\"description\" content=\"Learn how expansion joints in concrete &amp; masonry control movement and prevent cracks \u2713 plus safe deconstruction tips.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/expansion-joint\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Expansion Joint in Concrete and Masonry Guide\" \/>\n<meta property=\"og:description\" content=\"Learn how expansion joints in concrete &amp; masonry control movement and prevent cracks \u2713 plus safe deconstruction tips.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/expansion-joint\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-03-31T07:40:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/expansion-joint\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/expansion-joint\",\"name\":\"Expansion Joint in Concrete and Masonry Guide\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-10-16T13:31:21+00:00\",\"dateModified\":\"2026-03-31T07:40:03+00:00\",\"description\":\"Learn how expansion joints in concrete & masonry control movement and prevent cracks \u2713 plus safe deconstruction tips.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/expansion-joint#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/expansion-joint\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/expansion-joint#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Expansion joint\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Expansion Joint in Concrete and Masonry Guide","description":"Learn how expansion joints in concrete & masonry control movement and prevent cracks \u2713 plus safe deconstruction tips.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/expansion-joint","og_locale":"en_US","og_type":"article","og_title":"Expansion Joint in Concrete and Masonry Guide","og_description":"Learn how expansion joints in concrete & masonry control movement and prevent cracks \u2713 plus safe deconstruction tips.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/expansion-joint","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-03-31T07:40:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/expansion-joint","url":"https:\/\/www.darda.de\/en\/knowledge\/expansion-joint","name":"Expansion Joint in Concrete and Masonry Guide","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-10-16T13:31:21+00:00","dateModified":"2026-03-31T07:40:03+00:00","description":"Learn how expansion joints in concrete & masonry control movement and prevent cracks \u2713 plus safe deconstruction tips.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/expansion-joint#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/expansion-joint"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/expansion-joint#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Expansion joint"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19033","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19033"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19033\/revisions"}],"predecessor-version":[{"id":25823,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19033\/revisions\/25823"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19033"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}