{"id":19026,"date":"2025-10-16T16:16:11","date_gmt":"2025-10-16T14:16:11","guid":{"rendered":"https:\/\/www.darda.de\/roof-demolition"},"modified":"2026-03-30T08:12:03","modified_gmt":"2026-03-30T06:12:03","slug":"roof-demolition","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/roof-demolition","title":{"rendered":"Roof demolition"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Roof demolition is a central step in the deconstruction of buildings, in refurbishment works and in special demolition. It comprises the controlled removal of roof build-ups, waterproofing layers and the load-bearing roof structure made of timber, steel or reinforced concrete. To ensure a safe, low-vibration and material-efficient approach, hydraulic tools are commonly used. Products from Darda GmbH such as <em>concrete pulverizers<\/em> and <em><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a><\/em> enable precise work with low noise and dust, especially on reinforced concrete slabs and parapets, which is advantageous in urban environments and on sensitive structures. In addition to safety and precision, a selective, recycling-oriented methodology supports circular economy targets and reduces project risk.<\/p>\n<h2>Definition: What is meant by roof demolition?<\/h2>\n<p>Roof demolition means the planned, step-by-step dismantling of a roof system &#8211; starting at the surface (covering, waterproofing, insulation), through build-ups (parapets, upstands, rooflights, solar arrays, building services) and down to the load-bearing structure (roof truss, steel beams, reinforced concrete slab). The aim is selective deconstruction with source-separated construction waste and minimal impact on the surroundings. Roof demolition can be carried out as a stand-alone measure in existing buildings or as part of a complete demolition and, depending on the construction, falls within the fields of <strong>concrete demolition and special demolition<\/strong> as well as <strong><a href=\"https:\/\/www.darda.de\/en\/applications\/core-removal-and-cutting\">core removal and cutting<\/a><\/strong>. In practice, it differs from pure surface stripping through engineered sequencing, stability checks and documented waste management.<\/p>\n<h2>Planning, structural analysis and occupational safety in roof demolition<\/h2>\n<p>A safe roof demolition starts with an as-built assessment: structural analysis, materials, build-ups, embedded components and services. Based on these data, deconstruction steps, shoring, lifting and securing equipment, and the material flow are planned. A structural concept defines the sequence in which components are removed. A safety and dust-control concept defines <strong>fall protection<\/strong>, personnel routes, rescue resources and emission reduction. Legal requirements &#8211; such as notification or permit obligations and handling of potentially hazardous substances &#8211; are location- and project-specific and should be considered early on. Surveys for legacy materials (e.g., bituminous layers with PAH, PCB-containing sealants or asbestos in old fiber cement) should be clarified in advance and integrated into the method statement.<\/p>\n<ul>\n<li><strong>Key planning deliverables<\/strong>: method statement and sequence, lifting plan and exclusion zones, rescue plan, waste management plan, and a monitoring concept for dust, noise and vibrations.<\/li>\n<li><strong>Interface management<\/strong>: coordination with roofing, structural and building services trades to secure transitions and temporary weatherproofing.<\/li>\n<\/ul>\n<h2>Roof build-ups and typical materials<\/h2>\n<p>The construction type determines the deconstruction approach. Common roof types differ in layer build-up, fasteners and load-bearing systems &#8211; and thus in the suitable tools. The choice of technique depends on the bond of layers, type of fixings and accessibility of joints and edges.<\/p>\n<h3>Pitched roofs<\/h3>\n<p>On steep roofs, the covering and battens often consist of tiles, fiber cement sheets or metal profiles on a timber structure. Demolition proceeds from the covering through battens and sheathing to rafters, purlins and joints. Metal connectors and nails are cut off, timber is collected separately. Fragile rooflights are treated as fall-through hazards and secured. Legacy fiber cement may require special handling in line with regulations.<\/p>\n<h3>Flat roofs<\/h3>\n<p>Flat roofs feature waterproofing made of bituminous or plastic membranes, insulation, tapered screed and often a load-bearing reinforced concrete slab. Parapets, upstands and frames are often made of reinforced concrete, masonry or steel. Here, Darda GmbH <em>concrete pulverizers<\/em> and <em>hydraulic splitters<\/em> are used especially on edge beams, penetrations and massive build-ups. Ballast and gravel are removed in sections, roof drains are protected against debris, and hot works are minimized to reduce fire risk.<\/p>\n<h3>Industrial and hall roofs<\/h3>\n<p>Trapezoidal sheet roofs on steel frames or glued-laminated timber require the orderly release of large-format elements and cutting of connections. For steel beams and sections, steel shears and <a href=\"https:\/\/www.darda.de\/en\/product-overview\/multi-cutters\">multi cutters<\/a> are suitable, while combination shears help when switching between concrete, masonry and metal. Skylights and translucent panels are secured as potential fall-through openings before removal.<\/p>\n<h3>Build-ups and installations<\/h3>\n<p>Rooflights, PV modules, ventilation units, cable runs and fire-protection upstands are selectively separated. Material separation reduces disposal costs and facilitates recycling. Electrical systems are isolated, media lines are depressurized and capped, and penetrations are checked for hidden fixings before release.<\/p>\n<h2>Methods and sequence: from stripping the surface to dismantling the load-bearing structure<\/h2>\n<p>Deconstruction follows a top-down principle. It starts at the surface and ends at the load-bearing roof structure to avoid uncontrolled load redistribution. A clear sequence reduces rework and limits temporary loads on the structure.<\/p>\n<ol>\n<li>Strip coverings, waterproofing and protective layers in sections with dust control.<\/li>\n<li>Detach installations and build-ups, then secure openings and edges.<\/li>\n<li>Open concrete and masonry selectively with low-vibration methods.<\/li>\n<li>Dismantle the load-bearing structure with defined lifting and cut points.<\/li>\n<li>Remove residues, clean interfaces and prepare for follow-on trades.<\/li>\n<\/ol>\n<h3>Selective deconstruction and sorting<\/h3>\n<ul>\n<li>Remove the covering\/waterproofing in partial areas, package systematically and transport off site.<\/li>\n<li>Record and collect insulation materials, gravel fills and protective layers separately.<\/li>\n<li>Dismantle build-ups and building services components.<\/li>\n<li>Expose the load-bearing structure with visual inspection of the connections.<\/li>\n<\/ul>\n<h3>Working on concrete and masonry<\/h3>\n<p>For reinforced concrete slabs, parapets and upstands, a low-vibration deconstruction is important. <em>Concrete pulverizers<\/em> break components in a controlled manner and separate concrete and reinforcement. <em>Hydraulic splitters<\/em> create split lines with minimal vibration for precise separation cuts, for example along joints, on edge beams or around penetrations. Pre-drilled boreholes define the splitting direction and reduce breakout. Darda GmbH power units supply the tools with energy &#8211; flexibly and mobile. Where necessary, diamond coring or saw pre-cuts are combined with splitting to achieve clean edges.<\/p>\n<h3>Cutting and separating steel and composites<\/h3>\n<p>For reinforcing bars, sections, trapezoidal sheets and embedded parts, combination shears, multi cutters and steel shears are suitable. This opens composite joints without introducing excessive sparks or heat into the roof structure, which supports work in sensitive environments and can reduce hot work permits. The cutting order is planned to avoid binding and uncontrolled movement.<\/p>\n<h3>Use in confined areas<\/h3>\n<p>Space on roofs is often limited. Compact, hydraulic tools from Darda GmbH allow work with low tool weight and reduced space requirements. This reduces peak loads and facilitates material transport via freight elevators, stairwells or cranes. Permissible surface loads and piece weights are coordinated with the structural concept to prevent overload.<\/p>\n<h3>Special deployments<\/h3>\n<p>After fire damage or storm impacts, partial deconstruction may be required. Low-vibration methods and targeted splitting of concrete minimize risks to damaged components and adjacent areas. Temporary shoring and interim weatherproofing maintain stability and prevent water ingress during staged works.<\/p>\n<h2>Equipment selection for roof demolition in existing buildings<\/h2>\n<p>The equipment depends on construction type, component thickness, reinforcement, accessibility and emission requirements. Compatibility between tools and power units, hose lengths and available power supply is clarified in advance to minimize setup time.<\/p>\n<ul>\n<li><strong>Concrete pulverizers<\/strong>: For reinforced concrete slabs, parapets, upstands, ring beams and connection areas. Advantageous for controlled fracture guidance and simultaneous rebar exposure.<\/li>\n<li><strong>Hydraulic splitters<\/strong>: For precise, low-vibration separation joints in concrete or natural stone, for detaching edge strips or for low-damage opening of slab fields.<\/li>\n<li><strong>Combination shears<\/strong>: When switching between concrete\/masonry and metal, e.g., at composite joints and embedded parts.<\/li>\n<li><strong>Multi cutters<\/strong>: For sheets, sections, sandwich panels and thin-walled components, e.g., trapezoidal sheet roofs.<\/li>\n<li><strong>Steel shears<\/strong>: For beams, purlins, frames and heavy steel connections.<\/li>\n<li><strong>Tank cutters<\/strong>: Especially in industrial settings when tanks, silos or pipelines on roofs need to be dismantled.<\/li>\n<li><strong>Power units<\/strong>: For stable power supply to the tools, even with changing work locations on the roof surface.<\/li>\n<\/ul>\n<h3>Selection criteria<\/h3>\n<p>Tool weight, achievable cutting or splitting forces, component thicknesses, emissions (noise, dust, vibrations) and the roof\u2019s load-bearing capacity determine the selection. A modular equipment mix increases flexibility. Additional criteria include access routes, available electrical supply, wind limits for lifting, and the required finish quality of separation faces.<\/p>\n<h2>Specifics of flat roof demolition with reinforced concrete<\/h2>\n<h3>Removal of build-ups<\/h3>\n<p>Waterproofing, falls, insulation and protective layers are removed in sections. Water for dust suppression is used sparingly to avoid soaking. Roof drains are sealed or covered, and temporary edge protection along parapets is verified before concrete works start.<\/p>\n<h3>Parapets, upstands, edge beams<\/h3>\n<p>These components are often trimmed back with <em>concrete pulverizers<\/em>. <em>Hydraulic splitters<\/em> are suitable for pre-separation along planned edges before segments are lifted out or broken in a controlled manner. Where tolerance-critical interfaces are required, saw or core-assisted pre-cuts can be combined with splitting.<\/p>\n<h3>Embedded parts and reinforcement<\/h3>\n<p>Exposed reinforcement is cut with multi cutters or steel shears. An orderly material flow facilitates recycling of concrete and steel. Anchors, embedded plates and connectors are released flush with the surface, and cut rebar ends are treated to prevent corrosion where specified.<\/p>\n<h2>Roof trusses made of timber or steel<\/h2>\n<p>In timber structures, connections are released, nodes are dismantled and components are lowered safely. Steel structures are segmented and removed via defined lifting points. Temporary bracing remains in place until the structural handover confirms stability of the remaining system.<\/p>\n<h3>Timber structures<\/h3>\n<p>Screws, nails and metal connectors are released or cut. Components are unloaded, secured and removed in a controlled manner. Timber is collected separately. Hidden joints at supports and wall plates are inspected, and long elements are shortened into transportable lengths before lowering.<\/p>\n<h3>Steel structures<\/h3>\n<p>Sections, purlins and bracing are cut with steel shears or multi cutters. Connections to concrete elements can be opened with concrete pulverizers to expose composite joints. Cutting sequences and sling arrangements are defined to control rotation and prevent snap-back from residual stresses.<\/p>\n<h2>Environment, emissions and disposal<\/h2>\n<p>In roof demolition, dust, noise and vibrations must be minimized. Hydraulic methods using shears and splitting techniques operate with low emissions. Waste is collected by type:<\/p>\n<ul>\n<li>Mineral fractions (concrete, masonry) for recycling.<\/li>\n<li>Metals (rebar, sections) for reuse.<\/li>\n<li>Collect timber and composite materials separately.<\/li>\n<li>Dispose of waterproofing, insulation materials and old coatings in accordance with regulations; for older assets, a general screening for hazardous substances can be sensible.<\/li>\n<li>Protect drains and downpipes with filters and seals to prevent contamination; retain and treat process water where used.<\/li>\n<\/ul>\n<p>Transport routes should be kept low-dust. Avoid dropping materials; instead use secured containers, cranes or chutes. Time windows and noise limits are respected, and monitoring results are documented to evidence compliance.<\/p>\n<h2>Logistics, accessibility and transport<\/h2>\n<p>Access via stairwells, roof hatches, scaffolds or cranes is coordinated with the deconstruction sequence. Load distribution on the roof surface must be planned. Intermediate storage areas are kept small, material is removed in phases. Weather windows and wind thresholds for lifting are defined in advance, including fallback options.<\/p>\n<h3>Material flow<\/h3>\n<p>Prefabricated segments simplify handling. Components are cut or split into transportable sizes to limit weights. Clear labeling, stacking aids and defined removal routes accelerate turnover and reduce manual handling.<\/p>\n<h3>Protection of interior spaces<\/h3>\n<p>Underside coverings, dust protection walls and protection plates prevent consequential damage. Openings are closed temporarily. Where required, negative-pressure zones and air filtration units limit dust migration into occupied areas.<\/p>\n<h2>Quality assurance and documentation<\/h2>\n<p>Photo documentation, measurement of deconstruction areas, proof of material flows and monitoring of emissions increase process reliability. For sensitive structures, accompanying vibration and crack monitoring can be useful. Hold points for critical cuts, acceptance of protection measures and sign-off of temporary works improve control.<\/p>\n<h3>Follow-up works<\/h3>\n<p>Residual edges are cut flush, reinforcement is cut flush, and contact surfaces are prepared for subsequent trades. Clean cut and split faces facilitate further processing. If specified, corrosion protection on exposed steel and surface roughening classes for bonding interfaces are documented.<\/p>\n<h2>Typical risks, mistakes and how to avoid them<\/h2>\n<ul>\n<li>Unclear load-bearing capacities: Shore before releasing components and verify load paths.<\/li>\n<li>Unplanned fractures: Remove in a controlled manner with concrete pulverizers and use splitters for defined separation lines.<\/li>\n<li>Overloading of the roof surface: Distribute loads, minimize intermediate storage.<\/li>\n<li>Insufficient fall protection: Secure edges, segregate access routes, keep escape paths clear.<\/li>\n<li>Unsorted disposal: Separate materials early, label containers.<\/li>\n<li>Fall-through hazards: Secure rooflights and fragile elements, define no-step zones.<\/li>\n<li>Hidden prestressing or live services: Clarify post-tensioning and isolate electrics before cutting.<\/li>\n<\/ul>\n<h2>Time and cost drivers in roof demolition<\/h2>\n<ul>\n<li>Component thickness and degree of reinforcement of concrete.<\/li>\n<li>Accessibility, lifting technology and transport routes.<\/li>\n<li>Emission requirements in existing buildings (noise, dust, vibrations).<\/li>\n<li>Hazardous materials and additional protective measures.<\/li>\n<li>Weather impacts and required safeguards against precipitation.<\/li>\n<li>Segregation requirements and documentation scope for waste streams.<\/li>\n<li>Restricted working hours and wind-related lifting constraints.<\/li>\n<\/ul>\n<h2>Fields of application and classification<\/h2>\n<p>Roof demolition links several fields of application: In <strong>concrete demolition and special demolition<\/strong>, Darda GmbH <em>concrete pulverizers<\/em> and <em>hydraulic splitters<\/em> dominate to open reinforced concrete slabs and parapets in a controlled manner. In <strong>gutting works and cutting<\/strong>, combination shears and multi cutters show their strengths on sheets, connectors and embedded parts. In special situations &#8211; such as on confined roofs or with sensitive existing structures &#8211; <strong>special deployments<\/strong> with low-vibration methods and compact hydraulic technology are key. The specific tool mix is derived from component geometry, reinforcement, access and the proximity of occupied areas.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Roof demolition is a central step in the deconstruction of buildings, in refurbishment works and in special demolition. It comprises the controlled removal of roof build-ups, waterproofing layers and the load-bearing roof structure made of timber, steel or reinforced concrete. To ensure a safe, low-vibration and material-efficient approach, hydraulic tools <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/roof-demolition\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19026","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Roof Demolition in Construction | Methods &amp; Safety<\/title>\n<meta name=\"description\" content=\"Discover safe roof demolition for building deconstruction \u2713 selective methods, low noise &amp; dust, concrete, steel &amp; timber.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/roof-demolition\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Roof Demolition in Construction | Methods &amp; Safety\" \/>\n<meta property=\"og:description\" content=\"Discover safe roof demolition for building deconstruction \u2713 selective methods, low noise &amp; dust, concrete, steel &amp; timber.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/roof-demolition\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-03-30T06:12:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"11 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/roof-demolition\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/roof-demolition\",\"name\":\"Roof Demolition in Construction | Methods & Safety\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-10-16T14:16:11+00:00\",\"dateModified\":\"2026-03-30T06:12:03+00:00\",\"description\":\"Discover safe roof demolition for building deconstruction \u2713 selective methods, low noise & dust, concrete, steel & timber.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/roof-demolition#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/roof-demolition\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/roof-demolition#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Roof demolition\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Roof Demolition in Construction | Methods & Safety","description":"Discover safe roof demolition for building deconstruction \u2713 selective methods, low noise & dust, concrete, steel & timber.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/roof-demolition","og_locale":"en_US","og_type":"article","og_title":"Roof Demolition in Construction | Methods & Safety","og_description":"Discover safe roof demolition for building deconstruction \u2713 selective methods, low noise & dust, concrete, steel & timber.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/roof-demolition","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-03-30T06:12:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"11 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/roof-demolition","url":"https:\/\/www.darda.de\/en\/knowledge\/roof-demolition","name":"Roof Demolition in Construction | Methods & Safety","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-10-16T14:16:11+00:00","dateModified":"2026-03-30T06:12:03+00:00","description":"Discover safe roof demolition for building deconstruction \u2713 selective methods, low noise & dust, concrete, steel & timber.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/roof-demolition#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/roof-demolition"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/roof-demolition#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Roof demolition"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19026","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19026"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19026\/revisions"}],"predecessor-version":[{"id":25787,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19026\/revisions\/25787"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19026"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}