{"id":19021,"date":"2025-10-17T13:23:39","date_gmt":"2025-10-17T11:23:39","guid":{"rendered":"https:\/\/www.darda.de\/container-parking-area"},"modified":"2026-03-30T12:32:02","modified_gmt":"2026-03-30T10:32:02","slug":"container-parking-area","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/container-parking-area","title":{"rendered":"Container parking area"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>A <em>container parking area<\/em> is a central component of construction logistics, especially in demolition, special demolition, and interior demolition. It consolidates material flows, shortens routes, and enables source-sorted collection of construction debris, metal, and other fractions. Wherever concrete demolition shears, <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a>, combination shears, steel shears or <a href=\"https:\/\/www.darda.de\/en\/product-overview\/multi-cutters\">Multi Cutters<\/a> are used, a wide range of material pieces are generated &#8211; from reinforced concrete and natural stone to steel parts. A well-planned container parking area ensures swift haulage, protects employees and the environment, and supports smooth workflows in all application areas of Darda GmbH.<\/p>\n<ul>\n<li><strong>Efficiency gains<\/strong> through short, clearly separated routes and low idle times<\/li>\n<li><strong>Quality of fractions<\/strong> by source-sorted collection with low contamination rates<\/li>\n<li><strong>Risk and cost reduction<\/strong> via defined traffic guidance, robust ground build-up, and minimized rehandling<\/li>\n<\/ul>\n<h2>Definition: What is meant by a container parking area?<\/h2>\n<p>A container parking area is a <strong>designated, load-bearing, and secured area<\/strong> for parking and maneuvering skip or roll-off containers, mesh boxes, collection bins, or big bags. It includes the standing area itself, the access route, maneuvering and safety zones, and, where applicable, provisions for ground protection, drainage, and signage. In practice, the container parking area serves <em>material consolidation and separation<\/em>, interim storage, and fast transshipment. In concrete demolition, special demolition, rock excavation and tunnel construction, or in natural stone extraction, the area is positioned so that routes from the worksite &#8211; e.g., where concrete demolition shears or rock and concrete splitters are used &#8211; remain short, safe, and clearly organized. A consistent <strong>labeling and color-coding concept<\/strong> for fractions and container IDs supports error-free allocation and documentation.<\/p>\n<h2>Planning and requirements for the container parking area<\/h2>\n<p>Planning begins with an analysis of material flows and the methods employed. Decisive factors are the expected volumes, piece sizes, weights, vehicle types (skip loaders, roll-off trucks), lines of sight, escape routes and circulation, neighbor protection, and environmental aspects. The goal is a standing area that <strong>minimizes loading and unloading times<\/strong>, reduces repositioning, and lowers the risk of misthrows, collisions, and contamination. Input from pre-demolition audits, mass estimates, and disposal specifications should be incorporated early to dimension the area appropriately.<\/p>\n<h3>Site selection and material flow<\/h3>\n<p>The area is ideally located within sight of the work areas with the highest material generation rates. Where concrete demolition shears reduce concrete components to size or rock and concrete splitters induce precise cracks, defined piece sizes are created; these can be loaded directly into correctly sized containers. Short, straight travel routes and clear routing between the demolition edge, intermediate staging, and container reduce cycle times and the risk of accidents. Avoid reverse travel where possible and establish <em>one-way circulation<\/em> for vehicles and equipment.<\/p>\n<h3>Access, maneuvering, and safety zones<\/h3>\n<ul>\n<li>Adequate maneuvering space for skip and roll-off vehicles, including tipping or set-down zones with no pedestrian traffic<\/li>\n<li>Keep-clear zones above the container (free of obstacles, no low-hanging lines)<\/li>\n<li>Slope and flatness of the area to avoid edge loading, rolling, or uneven load distribution<\/li>\n<li>All-weather drivability, clear sightlines, and safe crossing areas<\/li>\n<li>Turning radii and lane widths sized for the longest vehicle combination; gradients suitable for loaded trucks<\/li>\n<li><strong>Hose and cable management<\/strong> via ramps or protection mats where lines must cross traffic routes<\/li>\n<\/ul>\n<h3>Ground bearing capacity and build-up<\/h3>\n<p>The bearing capacity must accommodate the axle loads of the vehicles and the point loads of container feet. Compacted gravel base layers or paved surfaces have proven effective. On sensitive subgrades, steel plates, heavy-duty mats, or load distribution plates should be used. During frost-prone periods, drainage and regular checks are essential to avoid settlement and softening. Where necessary, verify load transfer with a geotechnical assessment and define inspection intervals for surface integrity.<\/p>\n<h3>Environmental and emissions protection<\/h3>\n<p>The area takes into account dust, noise emission, vibrations, and the risk posed by water-hazardous substances. For contaminated materials, impervious surfaces and, where necessary, containment are required. Controlled drainage to designated facilities prevents unintended discharge. Covers or misting can reduce dust emissions during handling. Track-out prevention at exits and provision of spill control materials increase environmental safety.<\/p>\n<h2>Container types and suitability of the standing area<\/h2>\n<p>The choice of container format follows the material mix, piece size, and disposal route. The standing area is adapted to the container type.<\/p>\n<ul>\n<li>Skip containers: require level, edge-stable ground; suitable for construction debris, mixed waste, metals<\/li>\n<li>Roll-off containers: require longer maneuvering distances and sufficient front set-down space; ideal for high volumes and long components<\/li>\n<li>Mesh boxes: for source-pure metal parts from steel shears, combination shears, or Multi Cutters; observe stackability<\/li>\n<li>Big bags: for fine-grained fractions and defined materials; dry, clean standing area to prevent damage<\/li>\n<li>Special containers: for hazardous substances with impervious surface and protection against precipitation<\/li>\n<\/ul>\n<p>Where emissions must be contained, <em>lidded or tarped containers<\/em> and windbreaks help reduce dust. Clearly visible fraction labels and <strong>container-specific loading limits<\/strong> prevent overfilling and improve transport safety.<\/p>\n<h2>Material separation and sorting logistics in demolition<\/h2>\n<p>A container parking area is the heart of source-sorted collection. The closer separation occurs to the point of generation, the more efficient transport and recycling become. Devices such as concrete demolition shears produce typical concrete\/steel fractions; rock and concrete splitters enable defined break lines in natural stone and concrete that can be assigned precisely. Acceptance specifications of disposal partners, including contamination thresholds, should be posted at the standing area to avoid re-sorting.<\/p>\n<ul>\n<li>Concrete and reinforced concrete: ideally in construction debris containers; reinforcement exposed beforehand and collected separately<\/li>\n<li>Pure metals (steel, non-ferrous metals): separate mesh boxes or containers for high purity<\/li>\n<li>Natural stone: depending on gradation, as raw material for further processing or as bulk material<\/li>\n<li>Other materials: wood, plastics, cables &#8211; each separated to avoid mixing<\/li>\n<\/ul>\n<h3>Relation to Darda GmbH products<\/h3>\n<p>The location of the area is aligned with the work zones of concrete demolition shears, rock and concrete splitters, combination shears, steel shears, and Multi Cutters. <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">Hydraulic power units<\/a> must be positioned so that hoses and lines do not cross traffic routes. For tank cutting or special cutting tasks, maintain distance to ignition sources and ensure clear separation of potentially hazardous substances. Rock wedge splitters in rock excavation promote a fractionation that can be loaded directly into suitable containers. Where lines must traverse pathways, use hose bridges to maintain trip-free routes.<\/p>\n<h2>Safety and marking<\/h2>\n<p>The container parking area features highly visible markings, information signs, and unambiguous assignment of fractions. Traffic routes are marked, tipping and slewing zones are secured, and unauthorized access is prevented. Lighting and slip-resistant surfaces increase safety, especially during early or late operating hours.<\/p>\n<ul>\n<li><strong>Fall protection<\/strong> at edges and changes in level<\/li>\n<li>Warnings about suspended loads and crane movements<\/li>\n<li>Spatial separation of pedestrian and vehicle traffic<\/li>\n<li>Regular visual and functional inspections of the standing area<\/li>\n<li>Retroreflective markings and color-coded fraction signage; maintain legibility under dust and moisture<\/li>\n<li>Minimum illuminance appropriate to task complexity; glare control in driver approach zones<\/li>\n<\/ul>\n<h2>Legal and organizational aspects<\/h2>\n<p>The establishment and use of a container parking area must take into account applicable statutory and regulatory requirements. These include requirements for occupational safety, environmental protection, noise, and traffic. Site-specific coordination with disposal companies and &#8211; if necessary &#8211; with authorities is recommended. The information in this article is general and does not replace a case-by-case assessment. A documented risk assessment and operating instructions ensure compliance and provide clarity for site personnel and contractors.<\/p>\n<h2>Practical examples from the application areas<\/h2>\n<h3>Concrete demolition and special demolition<\/h3>\n<p>Where concrete demolition shears break down load-bearing components, heavy fractions arise. The area is located on a short, straight line to the demolition edge, with an intermediate staging area for short-term sorting of concrete and reinforcing steel. Roll-off containers with high edge stability accelerate removal. Defined crane or grapple approach paths reduce swing-over risks.<\/p>\n<h3>Interior demolition and cutting<\/h3>\n<p>Interior demolition generates many lightweight, mixing-prone materials. Several smaller containers near the work areas improve source purity. Multi Cutters and combination shears produce defined lengths of sections that are placed in mesh boxes with a short grapple approach. Noise- and dust-sensitive environments benefit from timed collection windows and covered containers.<\/p>\n<h3>Rock excavation and tunnel construction<\/h3>\n<p>Rock and concrete splitters as well as rock wedge splitters enable controlled fragmentation. The container parking area requires robust access routes, adapted to slopes and limited visibility. Slip-resistant surfaces and adequate drainage are essential. In confined headings, one-way traffic concepts and spotter-assisted maneuvering increase safety.<\/p>\n<h3>Natural stone extraction<\/h3>\n<p>During the extraction and shaping of natural stone, pieces in defined sizes are produced. Container parking areas are selected so that crane or grapple travel distances remain short and the quality of natural stone fractions is safeguarded by clean, firm surfaces. Separate areas for premium blocks and for bulk material prevent downgrading.<\/p>\n<h3>Special operations<\/h3>\n<p>When cutting tanks or in sensitive areas, protective distances, impervious surfaces, and organizational measures for ignition source control are required. The area is clearly separated from work and break areas and is accessible only to authorized personnel. Fire watch, gas monitoring, and documented release procedures complement the setup.<\/p>\n<h2>Step-by-step checklist for setup<\/h2>\n<ol>\n<li>Material and volume analysis by construction phase (fractions, piece sizes, weights)<\/li>\n<li>Area selection with proof of bearing capacity, weather and drainage concept<\/li>\n<li>Plan access and maneuvering routes, remove obstacles, secure lines of sight<\/li>\n<li>Prepare standing areas: compaction, load distribution, edge stability<\/li>\n<li>Signage and marking: fractions, traffic routes, tipping zones<\/li>\n<li>Trial run with typical vehicles and equipment, adjust geometries<\/li>\n<li>Brief personnel, define responsibilities and reporting paths<\/li>\n<li>Ongoing checks: cleanliness, damage, emissions, weather effects<\/li>\n<li>Optimization based on KPIs (travel and handling times, repositioning cycles, fill levels)<\/li>\n<li>Deconstruction and site restoration upon completion<\/li>\n<li>Establish emergency and spill response measures, including contact chains and equipment<\/li>\n<\/ol>\n<h2>Avoid common planning mistakes<\/h2>\n<ul>\n<li>Standing area too narrow and missing tipping zones<\/li>\n<li>Insufficient bearing capacity leading to settlement and edge breakage<\/li>\n<li>Poor signage, mixed fractions, and additional sorting effort<\/li>\n<li>Missing drainage causing mud formation and slip hazards<\/li>\n<li>Underestimated weather impacts, especially frost, heavy rain, and heat<\/li>\n<li>No allowance for container turnover rates and waiting space for swap cycles<\/li>\n<\/ul>\n<h2>Measurable criteria and key figures<\/h2>\n<p>Objectively verifiable key figures support optimization: travel and loading times per container, number of repositioning operations per week, fill level at pickup, damage rate to containers and standing areas, share of source-pure fractions. A <strong>continuous evaluation<\/strong> of these values leads to targeted improvements in layout and in the control of material flows.<\/p>\n<ul>\n<li>Queue times for vehicles and equipment at the standing area<\/li>\n<li>Contamination rate per fraction and number of rejected loads<\/li>\n<li>Incident and near-miss counts related to maneuvering and tipping<\/li>\n<li>Surface condition index and maintenance intervals of the standing area<\/li>\n<\/ul>\n<p>Digital logs, geo-tagged photos, and simple dashboards help identify trends early and verify the impact of layout changes.<\/p>\n<h2>Temporary, mobile, and space-constrained container parking areas<\/h2>\n<p>In inner cities or during ongoing operations, areas are often temporary and constrained. Mobile load distribution plates, modular ramp elements, and compact container formats help maintain functionality. Time windows for arrivals and departures reduce conflicts with delivery traffic and residents. Where cranes or lifting equipment are used, collision zones must be clearly separated and communication between crane operator, equipment carriers, and suppliers must be clearly defined. Permit conditions, noise windows, and neighbor communication plans should be reflected in the operating schedule.<\/p>\n<h2>Documentation and continuous improvement<\/h2>\n<p>A simple plan with standing areas, access routes, traffic routes, safety zones, and fraction assignment creates clarity. Photo documentation before setup, after changes, and for special events facilitates assessment. Regular walkdowns with site management, equipment operations (e.g., concrete demolition shears, rock and concrete splitters, etc.), and the disposal contractor are used for fine-tuning. This keeps the container parking area efficient, safe, and compliant throughout the entire project. Versioned plan updates and archived changes provide traceability for audits and lessons learned.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A container parking area is a central component of construction logistics, especially in demolition, special demolition, and interior demolition. It consolidates material flows, shortens routes, and enables source-sorted collection of construction debris, metal, and other fractions. Wherever concrete demolition shears, rock and concrete splitters, combination shears, steel shears or Multi <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/container-parking-area\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19021","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Container Parking Area for Demolition Logistics<\/title>\n<meta name=\"description\" content=\"Optimize construction logistics with a container parking area for demolition sites \u2713 Planning, safety &amp; source sorting.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/container-parking-area\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Container Parking Area for Demolition Logistics\" \/>\n<meta property=\"og:description\" content=\"Optimize construction logistics with a container parking area for demolition sites \u2713 Planning, safety &amp; source sorting.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/container-parking-area\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-03-30T10:32:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/container-parking-area\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/container-parking-area\",\"name\":\"Container Parking Area for Demolition Logistics\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-10-17T11:23:39+00:00\",\"dateModified\":\"2026-03-30T10:32:02+00:00\",\"description\":\"Optimize construction logistics with a container parking area for demolition sites \u2713 Planning, safety & source sorting.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/container-parking-area#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/container-parking-area\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/container-parking-area#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Container parking area\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Container Parking Area for Demolition Logistics","description":"Optimize construction logistics with a container parking area for demolition sites \u2713 Planning, safety & source sorting.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/container-parking-area","og_locale":"en_US","og_type":"article","og_title":"Container Parking Area for Demolition Logistics","og_description":"Optimize construction logistics with a container parking area for demolition sites \u2713 Planning, safety & source sorting.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/container-parking-area","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-03-30T10:32:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/container-parking-area","url":"https:\/\/www.darda.de\/en\/knowledge\/container-parking-area","name":"Container Parking Area for Demolition Logistics","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-10-17T11:23:39+00:00","dateModified":"2026-03-30T10:32:02+00:00","description":"Optimize construction logistics with a container parking area for demolition sites \u2713 Planning, safety & source sorting.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/container-parking-area#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/container-parking-area"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/container-parking-area#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Container parking area"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19021","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19021"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19021\/revisions"}],"predecessor-version":[{"id":25803,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19021\/revisions\/25803"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19021"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}