{"id":19019,"date":"2025-10-17T10:06:33","date_gmt":"2025-10-17T08:06:33","guid":{"rendered":"https:\/\/www.darda.de\/container-service"},"modified":"2026-03-30T10:12:02","modified_gmt":"2026-03-30T08:12:02","slug":"container-service","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/container-service","title":{"rendered":"Container service"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>A container service organizes the provision, swap, and haulage of containers for construction sites, industry, and deconstruction. In combination with deconstruction methods such as <em>concrete pulverizer<\/em> and <em>rock wedge splitter<\/em> as well as <em>concrete splitter<\/em>, a seamless workflow emerges: construction materials are purposefully crushed, sorted, and disposed of in compliance with regulations or routed to recycling. In this way, the container service connects practical logistics with the technical requirements of <a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">concrete demolition and deconstruction<\/a>, building gutting, rock excavation, and special demolition. Clear interfaces, traceable documentation, and contamination control ensure that waste management, recycling quotas, and site logistics align without delays.<\/p>\n<h2>Definition: What is meant by the container service?<\/h2>\n<p>A container service refers to providing suitable containers for waste and recyclables, scheduling placement, swap, and pickup, and the documented handover to recycling or disposal routes. In construction and deconstruction projects, this includes selecting appropriate container types, separating the material flow (for example construction debris, metals, wood), and coordinating with the construction workflow. In projects with <strong>concrete pulverizer<\/strong>, <strong>hydraulic wedge splitter<\/strong>, or <strong>hydraulic demolition shear<\/strong>, the container service is closely integrated with crushing and sorting technology so that material sizes, weights, and time windows align. Service levels typically cover on-time swaps, clean provision, and rapid response in case of changed output, supported by verifiable records for compliance and audits.<\/p>\n<h2>Container types, sizes, and typical use cases<\/h2>\n<p>Containers come as skip or roll-off containers, with and without lids, in different volumes. Decisive criteria are payload, throw-in edge, footprint, and suitability for specific fractions. In combination with deconstruction tools, piece sizes are prepared to enable safe and economical loading.<\/p>\n<ul>\n<li><strong>Selection criteria in practice:<\/strong> site access and turning radius, load distribution on the subgrade, required filling height, need for lids or seals, and compatibility with lifting and securing equipment.<\/li>\n<\/ul>\n<h3>Skip containers (typically 5-10 m\u00b3)<\/h3>\n<ul>\n<li>Advantages: compact, well-suited for tight city centers, low space requirements.<\/li>\n<li>Use: construction debris, mixed construction and demolition waste, wood; ideal for paced loading during manual work or small equipment deployments.<\/li>\n<li>Note: avoid oversized pieces and protruding reinforcement to maintain safe fill lines and legal axle loads.<\/li>\n<\/ul>\n<h3>Roll-off containers (typically 10-40 m\u00b3)<\/h3>\n<ul>\n<li>Advantages: large volumes, low filling heights, high throughput.<\/li>\n<li>Use: larger quantities of concrete and masonry, metal scrap after pre-cutting with <em>steel shear<\/em> or <em>Multi Cutters<\/em>, bulky light fractions.<\/li>\n<li>Note: ensure sufficient staging length for roll-off maneuvers and verify ground bearing capacity.<\/li>\n<\/ul>\n<h3>Lidded and sealed containers<\/h3>\n<ul>\n<li>Advantages: weather-protected, low dust, reduced emissions.<\/li>\n<li>Use: fine-grained materials, sensitive areas during <em>special demolition<\/em> or urban <em>building gutting<\/em>.<\/li>\n<li>Note: seals and covers help control odor and littering, especially with light fractions and fines.<\/li>\n<\/ul>\n<h2>Waste fractions in deconstruction and their specifics<\/h2>\n<p>For an efficient container service, separation of material flows is crucial. The cleaner the fractions, the more reliable the disposal routes and the better the recycling rate. Acceptance criteria should be defined in writing, including limits for contaminants, moisture, and embedded metals.<\/p>\n<h3>Construction debris and concrete<\/h3>\n<ul>\n<li>Concrete and masonry are often removed with <strong>concrete pulverizer<\/strong> and brought into container-suitable pieces. The goal is compact, angular pieces without protruding <strong>reinforcing steel<\/strong>.<\/li>\n<li><strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/rock-splitters\">Rock splitters<\/a><\/strong> and <strong>concrete splitter<\/strong> enable low-vibration removal in sensitive areas and help meet piece-size requirements for container loading.<\/li>\n<li>Moisture and fines increase mass and reduce air voids; plan container sizes to avoid overweight.<\/li>\n<\/ul>\n<h3>Reinforcing steel and metals<\/h3>\n<ul>\n<li><strong>Steel shear<\/strong> and <strong>hydraulic demolition shear<\/strong> cut reinforcement and sections to lengths that fit metal containers and are easy to load.<\/li>\n<li>Separately collected scrap facilitates recycling and reduces misthrows in construction debris.<\/li>\n<li>Bundle and secure long pieces to prevent shifting and to improve handling at the recycler.<\/li>\n<\/ul>\n<h3>Wood, plastics, insulation materials<\/h3>\n<ul>\n<li>Light fractions often require large volumes at low mass; roll-off containers with lids reduce wind drift and dust.<\/li>\n<li>Source-separated collection improves material reuse.<\/li>\n<li>Keep residues of coatings or insulation within agreed thresholds to maintain recyclability.<\/li>\n<\/ul>\n<h3>Special materials<\/h3>\n<ul>\n<li>Materials with potential hazardous substances are carefully planned, collected separately, and coordinated with the container service. This requires regular coordination and suitable containers. Binding case-by-case evaluations remain with qualified specialists.<\/li>\n<li>Labels and documentation accompany each container to ensure traceability from set-down to receiving facility.<\/li>\n<\/ul>\n<h2>Interfaces between the container service and deconstruction technology<\/h2>\n<p>The quality of container logistics is determined at the removal interface. Tools and process steps are coordinated so that loading, fill level, and safety are ensured.<\/p>\n<ul>\n<li><strong>Piece-size management:<\/strong> Define the maximum edge dimension allowed in the container; <em>concrete pulverizer<\/em> produces repeatable piece sizes.<\/li>\n<li><strong>Pre-breaking and splitting:<\/strong> <em>rock wedge splitter<\/em> and <em>concrete splitter<\/em> enable calm, controlled removal in <em>special demolition<\/em>, tunnel tie-ins, or sensitive neighborhoods.<\/li>\n<li><strong>Drive technology:<\/strong> <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">mobile hydraulic power units<\/a> supply wedge splitters, <em>Multi Cutters<\/em>, and <em>concrete pulverizer<\/em> with energy; cycle times are synchronized with the container swap.<\/li>\n<li><strong>Metal handling:<\/strong> <em>steel shear<\/em> cuts out reinforcement to avoid misthrows in construction debris; facilitates loading of separate scrap containers.<\/li>\n<li><strong>Container and tank dismantling:<\/strong> When cutting tanks with <em>cutting torch<\/em>, material is collected separately; the container service provides suitable containers and coordinates pickups.<\/li>\n<li><strong>On-site staging:<\/strong> Provide interim stockpiles and short transfer routes to keep equipment utilization high and swaps predictable.<\/li>\n<\/ul>\n<h2>Planning container logistics on the construction site<\/h2>\n<p>Early planning saves time, travel, and costs. Key factors are set-down areas, access, takt scheduling, and safe loading.<\/p>\n<h3>Location and access<\/h3>\n<ul>\n<li>Short, direct routes from removal to the container.<\/li>\n<li>Sufficient maneuvering space for vehicles and equipment.<\/li>\n<li>Clear traffic routing and safeguarded pedestrian paths.<\/li>\n<li>Signage and lighting for loading zones, including night or winter operations.<\/li>\n<\/ul>\n<h3>Set-down area and subgrade<\/h3>\n<ul>\n<li>Load-bearing, level subgrade; protect finishes in sensitive areas.<\/li>\n<li>Maintain distances to shafts, edges, and excavations.<\/li>\n<li>Use mats or steel plates where point loads or edge loads may occur.<\/li>\n<\/ul>\n<h3>Takt scheduling and swaps<\/h3>\n<ul>\n<li>Synchronize the cycle times of <em>concrete pulverizer<\/em> and <em>hydraulic wedge splitter<\/em> with container changeovers.<\/li>\n<li>Keep swap containers on hand to prevent downtime.<\/li>\n<li>Define response times and cutoff times for orders to secure same-day or next-shift swaps.<\/li>\n<\/ul>\n<p><strong>Operational KPIs:<\/strong> track contamination rate, average load factor, turnaround time per swap, and unplanned waiting times to identify optimization potential.<\/p>\n<h2>Sizing: volume, mass, and densities<\/h2>\n<p>The suitable container size depends on the material\u2019s volume and mass density as well as the load-bearing capacity of the set-down area. Concrete is heavy; wood and insulation are voluminous. Practical reference values help avoid overloads.<\/p>\n<ul>\n<li>Concrete\/masonry: high density; smaller containers help avoid overweight.<\/li>\n<li>Metals: high density; short lengths for better compaction and safe load distribution.<\/li>\n<li>Wood\/plastics: low density; larger volumes with lids to prevent wind drift.<\/li>\n<li><strong>Rule of thumb:<\/strong> verify permissible total weight and axle loads, and consider moisture content and fines that increase mass.<\/li>\n<\/ul>\n<h2>Safety, environment, and legal notes<\/h2>\n<p>Occupational safety, emissions control, and proper disposal are paramount. Requirements can vary by location and project and must be verified on a case-by-case basis.<\/p>\n<ul>\n<li><strong>Load securing:<\/strong> Even distribution, no protrusions, secured doors and tarps.<\/li>\n<li><strong>Dust and noise reduction:<\/strong> Misting, covers, quiet techniques such as <em>rock wedge splitter<\/em> and <em>concrete splitter<\/em> in sensitive environments, complemented by dust suppression and noise control measures.<\/li>\n<li><strong>Placement permits:<\/strong> On public areas, permits and protective measures may be required.<\/li>\n<li><strong>Documentation:<\/strong> Source-separated collection facilitates documentation and recycling; binding legal issues are clarified on a project basis.<\/li>\n<li><strong>Hazard controls:<\/strong> define no-go zones for swinging loads, use spotters during reversing, and ensure PPE compliance at loading points.<\/li>\n<\/ul>\n<h2>Specifics in concrete demolition, special demolition, tunnel construction, and rock excavation<\/h2>\n<p>Each field of application imposes its own requirements on the container service. The decisive factor is aligning logistics with the removal technique.<\/p>\n<ul>\n<li><strong>Concrete demolition and special demolition:<\/strong> Selective deconstruction with <em>concrete pulverizer<\/em>, <em>hydraulic demolition shear<\/em>, and <em>hydraulic power pack<\/em>; tight cycles and small set-down areas require precise scheduling.<\/li>\n<li><strong>Building gutting and cutting:<\/strong> Clean separation of fit-out, metals, and construction debris; lidded containers reduce dust and provide visual shielding.<\/li>\n<li><strong>Rock excavation and tunnel construction:<\/strong> Material flow in limited cross-sections; <em>hydraulic wedge splitter<\/em> for controlled release, rapid container swaps with short cycle times.<\/li>\n<li><strong>Natural stone extraction:<\/strong> Split boulders into container-suitable formats; protect against edge loads when setting down.<\/li>\n<li><strong>Special operations:<\/strong> Low-emission methods, quiet technology, and covered containers for sensitive environments.<\/li>\n<\/ul>\n<h2>Practical workflow: concrete demolition with a concrete pulverizer and coordinated container service<\/h2>\n<p>A coordinated workflow increases safety and efficiency. The following steps illustrate a typical approach to deconstructing reinforced concrete components.<\/p>\n<ol>\n<li>Survey and planning of set-down areas, access routes, and container sizes.<\/li>\n<li>Define the maximum piece size for the construction debris container.<\/li>\n<li>Removal with <strong>concrete pulverizer<\/strong>; simultaneous exposure of the reinforcement.<\/li>\n<li>Cutting off reinforcement with <strong>steel shear<\/strong> or <strong>hydraulic demolition shear<\/strong>; separate collection in metal containers.<\/li>\n<li>Secondary breakage of oversized pieces with <strong>rock wedge splitter<\/strong> and <strong>concrete splitter<\/strong> for safe loading.<\/li>\n<li>Paced container swaps according to removal output and set-down area situation.<\/li>\n<li>Documented pickup and handover to the respective recycling routes.<\/li>\n<li>Interim quality check: verify contamination limits and load security before release for transport.<\/li>\n<\/ol>\n<h2>Checklist for collaboration with the container service<\/h2>\n<ul>\n<li>Define fractions: What will arise, and how cleanly can it be separated?<\/li>\n<li>Select container types and sizes, avoid overweight.<\/li>\n<li>Check set-down areas: load-bearing capacity, protective measures, access.<\/li>\n<li>Align takt scheduling between removal technology and container swaps.<\/li>\n<li>Loading concept: set piece-size requirements for <em>concrete pulverizer<\/em> and <em>hydraulic wedge splitter<\/em>.<\/li>\n<li>Consider dust and noise protection, choose suitable lidded containers.<\/li>\n<li>Organize documentation and records without replacing case-specific advice.<\/li>\n<li>Agree on acceptance criteria, contamination thresholds, and response times; define contacts for dispatch and on-site coordination.<\/li>\n<\/ul>\n<h2>Terms and professional classification<\/h2>\n<p>The container service links construction material logistics and deconstruction technology into one system: crushing, sorting, loading, hauling. Tools such as <strong>concrete pulverizer<\/strong>, <strong>hydraulic wedge splitter<\/strong>, <strong>Multi Cutters<\/strong>, <strong>steel shear<\/strong>, and <strong>cutting torch<\/strong> determine piece sizes and fractions; <strong>hydraulic power pack<\/strong> delivers the required energy. In collaboration with Darda GmbH, the container service is planned so that the material flow is handled in a controlled, safe, and resource-efficient manner. In professional terms, this forms part of site logistics and waste management, with measurable targets for safety, cost, and recycling performance.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A container service organizes the provision, swap, and haulage of containers for construction sites, industry, and deconstruction. In combination with deconstruction methods such as concrete pulverizer and rock wedge splitter as well as concrete splitter, a seamless workflow emerges: construction materials are purposefully crushed, sorted, and disposed of in compliance <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/container-service\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19019","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Container Service for Construction &amp; Demolition<\/title>\n<meta name=\"description\" content=\"Smart container service for construction sites &amp; demolition waste \u2713 safe loading, timed swaps &amp; compliant recycling.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/container-service\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Container Service for Construction &amp; Demolition\" \/>\n<meta property=\"og:description\" content=\"Smart container service for construction sites &amp; demolition waste \u2713 safe loading, timed swaps &amp; compliant recycling.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/container-service\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-03-30T08:12:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/container-service\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/container-service\",\"name\":\"Container Service for Construction & Demolition\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-10-17T08:06:33+00:00\",\"dateModified\":\"2026-03-30T08:12:02+00:00\",\"description\":\"Smart container service for construction sites & demolition waste \u2713 safe loading, timed swaps & compliant recycling.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/container-service#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/container-service\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/container-service#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Container service\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Container Service for Construction & Demolition","description":"Smart container service for construction sites & demolition waste \u2713 safe loading, timed swaps & compliant recycling.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/container-service","og_locale":"en_US","og_type":"article","og_title":"Container Service for Construction & Demolition","og_description":"Smart container service for construction sites & demolition waste \u2713 safe loading, timed swaps & compliant recycling.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/container-service","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-03-30T08:12:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/container-service","url":"https:\/\/www.darda.de\/en\/knowledge\/container-service","name":"Container Service for Construction & Demolition","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-10-17T08:06:33+00:00","dateModified":"2026-03-30T08:12:02+00:00","description":"Smart container service for construction sites & demolition waste \u2713 safe loading, timed swaps & compliant recycling.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/container-service#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/container-service"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/container-service#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Container service"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19019","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19019"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19019\/revisions"}],"predecessor-version":[{"id":25795,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19019\/revisions\/25795"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19019"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}