{"id":19018,"date":"2025-10-17T11:14:26","date_gmt":"2025-10-17T09:14:26","guid":{"rendered":"https:\/\/www.darda.de\/chromate-reduction"},"modified":"2026-03-30T08:04:03","modified_gmt":"2026-03-30T06:04:03","slug":"chromate-reduction","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/chromate-reduction","title":{"rendered":"Chromate reduction"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Chromate reduction refers to the targeted decrease of water-soluble chromium(VI) compounds in materials and work environments. In construction, this is primarily relevant for cement and concrete because chromates can be critical to health. For concrete demolition, special demolition, and rock excavation, chromate reduction has a practical role: dust, slurries, and eluates from work processes can contain Cr(VI). Choosing low-emission methods such as hydraulic splitting and selective crushing with concrete demolition shears or <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a>, correct handling of demolition material, and careful investigation before the project starts help minimize chromate exposure. Complementary process control, documentation, and consistent dust and water management anchor the topic in day-to-day site practice.<\/p>\n<h2>Definition: What is meant by chromate reduction?<\/h2>\n<p>Chromate reduction describes a condition in which the concentration of water-soluble chromates (in particular Cr(VI) species such as chromate and dichromate) in materials, dusts, and aqueous phases is significantly reduced. In the context of construction materials, this often concerns <em>chromate-reduced cement<\/em>, in which reductants (e.g., iron(II) sulfate) convert allergenic and oxidizing Cr(VI) to the less mobile Cr(III). Chromate reduction is not an absolute term; it indicates the lowest technically achievable residual concentration and serves occupational, health, and environmental protection. In practice, residual levels are often expressed as mg\/kg of water-soluble Cr(VI) relative to dry cement; in many markets, thresholds apply at the time of placing on the market (e.g., below 2 mg\/kg in the EU). The achieved state is time dependent, as reductants can be consumed or deactivated during storage.<\/p>\n<h2>Chemical fundamentals and sources of chromates in construction<\/h2>\n<p>Chromium occurs as a trace element in cement clinker and, during hydration, can transition into water-soluble Cr(VI) forms. Chromates are strongly oxidizing anions, mobile under alkaline conditions, and can promote skin sensitization as well as other health effects. Chromates are found in concrete dust from deconstruction activities especially when the base material was not chromate-reduced or when the reduction has partially reverted over storage time. Historic corrosion-protective coatings on steel components could also contain chromates. These sources must be considered during planning and execution in concrete demolition, building gutting, and cutting.<\/p>\n<ul>\n<li><strong>Key drivers for Cr(VI) occurrence:<\/strong> clinker chemistry and kiln conditions, oxidizing environments, long storage or unfavorable storage conditions of cement, and the presence of manganese oxides that can re-oxidize Cr(III).<\/li>\n<li><strong>Relevant matrices:<\/strong> fine dust fractions (PM10 and PM2.5), process water and slurries, and surface residues from legacy coatings.<\/li>\n<\/ul>\n<h2>Chromate reduction in cement and concrete: regulation and practice<\/h2>\n<p>In practice, chromate reduction in cements is achieved via reductants. Such additives have a limited duration of effectiveness, which is why storage conditions and shelf life matter. For currently manufactured cements on the European market, strict requirements exist regarding the content of water-soluble Cr(VI) compounds. Older structures (from before the widespread introduction of chromate-reduced formulations) can nevertheless exhibit relevant chromate contents in concrete dust. For deconstruction projects this means: building age classes, material sampling, and, where necessary, laboratory analyses must be included in the investigation. Legal requirements, limit values, and technical rules are to be reviewed based on location and project; binding information is provided by the competent authorities.<\/p>\n<ul>\n<li><strong>Practical handling:<\/strong> observe use-by dates for chromate-reduced cements, store cool and dry, and avoid extended interim storage that could impair the reductant.<\/li>\n<li><strong>Verification:<\/strong> where necessary, check water-soluble Cr(VI) according to recognized test methods and document results with sampling dates and conditions.<\/li>\n<\/ul>\n<h2>Relevance in deconstruction: understanding and controlling exposure<\/h2>\n<p>Mechanical size reduction of concrete generates fine particles that may contain <strong>Cr(VI)<\/strong> depending on the base material. Dust avoidance and dust suppression are therefore central measures. Methods with limited impact energy and targeted material separation generally reduce fine dust release. In the practical context of concrete demolition shears, rock and concrete splitters, and stone splitting cylinders, emission rates can often be lowered through an adapted process strategy, a well-considered sequence of work steps, and the use of water. Exposure pathways include inhalation of respirable fractions, dermal contact with moist dust and slurries, and indirect intake via contaminated gloves or tools.<\/p>\n<ul>\n<li><strong>Determinants of emissions:<\/strong> base material moisture, tool selection, contact pressure, duration of engagement, and spatial confinement.<\/li>\n<li><strong>Supplementary controls:<\/strong> enclosure or isolation of work areas and optimized ventilation concepts for interiors and semi-enclosed spaces.<\/li>\n<\/ul>\n<h3>Investigation and assessment<\/h3>\n<p>A systematic investigation covers construction year, construction phases, and refurbishment history. Material samples from concrete, plasters, or screeds can provide insight into potential chromate sources. For projects in tunnel construction or natural stone extraction, the geological situation must be considered, as natural chromite occurrences can locally be present.<\/p>\n<ul>\n<li><strong>Sampling strategy:<\/strong> define target components, number of samples per area, and depth profiles; maintain chain-of-custody.<\/li>\n<li><strong>Analytical options:<\/strong> eluate tests for water-soluble chromium and, where indicated, specific Cr(VI) determinations using recognized colorimetric or instrumental methods.<\/li>\n<li><strong>Documentation:<\/strong> assign sample IDs to exact locations, include photos, and record ambient conditions during sampling.<\/li>\n<\/ul>\n<h3>Dust and emission control<\/h3>\n<p>Key levers include low-threshold measures such as local water spray systems, point extraction, controlled fracture guidance, and an adjusted feed rate. Hydraulic concrete demolition shears and rock and concrete splitters enable selective separation with low peripheral zone stress; this supports a low-emission work approach. Personal protective measures and organizational precautions complement the technology.<\/p>\n<ul>\n<li><strong>Engineering controls:<\/strong> on-tool extraction with suitable filtration, wetting at the source, and negative-pressure zones where feasible.<\/li>\n<li><strong>Process control:<\/strong> optimize sequence and tool geometry to reduce reworking and secondary breakage that raise fines.<\/li>\n<li><strong>Verification:<\/strong> carry out indicative dust measurements where required and use observations to fine-tune parameters.<\/li>\n<\/ul>\n<h3>Occupational health precautions<\/h3>\n<p>Dusts containing Cr(VI) can have a sensitizing effect. An appropriate selection of protective gloves, skin protection plans, and respiratory protection is advisable. Specific limit values, medical surveillance, and classifications must be taken from the applicable rules; binding individual assessments are the responsibility of those in charge on site.<\/p>\n<ul>\n<li><strong>Personal protective equipment:<\/strong> respiratory protection according to risk assessment, tight-fitting eye protection, and chemical-resistant gloves suited to wet or slurry contact.<\/li>\n<li><strong>Hygiene measures:<\/strong> clean change areas, dedicated hand-washing facilities, and decontamination routines for tools and PPE.<\/li>\n<li><strong>Organizational measures:<\/strong> task rotation for high-exposure steps and briefings on safe handling of damp dusts and slurries.<\/li>\n<\/ul>\n<h2>Influence of the demolition method on chromate exposure<\/h2>\n<p>The nature of the intervention in the structural element determines the dust fraction and thus potential chromate release. Methods with high impact energy typically generate more respirable particles. <strong>Hydraulic splitting<\/strong> and <strong>shearing<\/strong> with concrete demolition shears promote controlled crack initiation and propagation, resulting in less freely airborne fine dust than intensive impact breakage. The combination of precise load shedding, low vibration, and targeted material separation is advantageous for chromate reduction but requires professional planning, <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">suitable hydraulic power units<\/a>, and matched tools. Where impact methods are necessary, pair them with robust wet suppression, capture, and carefully timed work cycles.<\/p>\n<h2>Handling demolition material, slurries, and eluates<\/h2>\n<p>Chromates can transfer into aqueous phases. This concerns flushing and cooling water, slurries from wet processing, and leachate from demolition material. Careful water management including collection, sedimentation, and &#8211; where necessary &#8211; further treatment reduces the risk of emissions. Material classification and decisions regarding recovery or disposal follow the applicable rules of the art and regulatory requirements.<\/p>\n<ul>\n<li><strong>Water treatment options:<\/strong> staged sedimentation, filtration, pH control, and approved chemical reduction steps for Cr(VI) in line with local permits.<\/li>\n<li><strong>Control measures:<\/strong> segregate clean and contaminated streams, prevent uncontrolled overflows, and log discharge volumes and parameters.<\/li>\n<\/ul>\n<h3>Intermediate storage and moistening<\/h3>\n<p>Moistened stockpiles and covered containers reduce dust resuspension. Separate storage of fractions (concrete, masonry, reinforced\/non-reinforced) facilitates subsequent evaluation. Clean logistics support traceability.<\/p>\n<ul>\n<li><strong>Good practice:<\/strong> keep materials damp, not dripping; minimize drop heights; use wheel-wash and sweeping to control track-out.<\/li>\n<\/ul>\n<h3>Water management in tunnel construction<\/h3>\n<p>Water control is particularly sensitive in tunnel construction. Slurry and water streams from cutting or splitting processes should be captured in a controlled manner. Buffer tanks and sedimentation stages serve to separate fines before water is discharged into further systems.<\/p>\n<ul>\n<li><strong>Containment:<\/strong> use curbs, trays, and sumps to prevent uncontrolled migration into the surrounding geology.<\/li>\n<li><strong>Monitoring:<\/strong> deploy regular checks for turbidity and, where indicated, quick tests for Cr(VI) in process water; document readings and corrective actions.<\/li>\n<\/ul>\n<h3>Disposal and recovery<\/h3>\n<p>The decision on reuse, recycling, or disposal depends on material quality and local requirements. Elution tests may be indicated to assess chromium mobility. Internal operating procedures should be documented and reviewed regularly.<\/p>\n<ul>\n<li><strong>Stream management:<\/strong> separate materials with legacy coatings or suspect components for specialized handling.<\/li>\n<li><strong>Evidence:<\/strong> maintain sampling records, laboratory reports, and weighbridge tickets to substantiate decisions.<\/li>\n<\/ul>\n<h2>Chromate reduction in rock excavation and natural stone extraction<\/h2>\n<p>Most natural stones contain only very small amounts of chromium. However, chromite-bearing rocks can occur in certain geological units. For rock excavation and natural stone extraction, a geological pre-check is recommended. Hydraulic splitting limits dust generation and preserves block quality, which simultaneously helps reduce exposure. Where geological indications suggest elevated chromium, targeted sampling and conservative control measures are appropriate.<\/p>\n<h2>Material-related aspects: reinforcement, coatings, metal separation<\/h2>\n<p>Chromates were also historically used as corrosion inhibitors in coatings. During the separation of reinforcing steel or the deconstruction of coated steel components, traces of such legacy coatings can appear. Processes with steel shears and cutting torch should be executed such that coating residues are separated as completely as possible and disposed of properly. A visual recording before starting and clear labeling of material streams facilitate safe handling. Cold-cutting or shearing reduces fume formation compared with hot-work and supports low-emission workflows in sensitive environments.<\/p>\n<h2>Planning, documentation, and quality assurance<\/h2>\n<p>Chromate reduction results from the interaction of investigation, methodology, and control. Project leads integrate material data, select suitable methods (e.g., concrete demolition shears for selective separation, rock and concrete splitters for controlled opening), and define measurement and test points. Results are continuously documented to demonstrate the effectiveness of measures and to adjust if necessary.<\/p>\n<ul>\n<li><strong>Targets and KPIs:<\/strong> define acceptance criteria for dust and water parameters (e.g., task-based dust indicators, process water quality bands) and track trends.<\/li>\n<li><strong>Checkpoints:<\/strong> establish hold points for method changes, verification sampling, and housekeeping reviews.<\/li>\n<li><strong>Continuous improvement:<\/strong> apply plan-do-check-act cycles and incorporate lessons learned into method statements.<\/li>\n<\/ul>\n<h2>Practical guide: action chain for low-chromate deconstruction<\/h2>\n<ol>\n<li>Preliminary investigation: construction age, materials, possible chromate sources, work environment (interior, tunnel, open site).<\/li>\n<li>Method selection: prioritize low-dust techniques, e.g., hydraulic splitting and selective crushing with concrete demolition shears.<\/li>\n<li>Dust and water management: point wetting, extraction, slurry and water capture with sedimentation.<\/li>\n<li>Personal protective measures: suitable respiratory, eye, and skin protection; skin protection plan.<\/li>\n<li>Logistics: separate collection of fractions, low-dust transfer points, short transport routes.<\/li>\n<li>Monitoring: visual checks, dust measurements if needed; documentation of findings and corrective actions.<\/li>\n<li>Disposal\/recovery: compliant assessment, evidence, and complete documentation.<\/li>\n<\/ol>\n<ul>\n<li><strong>Tip:<\/strong> define roles, communication lines, and escalation paths for exceedances or unexpected findings before work starts.<\/li>\n<\/ul>\n<h2>Terminological classification and typical misunderstandings<\/h2>\n<p>Chromate-reduced does not necessarily mean chromate-free. Even at reduced levels, measurable Cr(VI) fractions can occur under certain conditions. Conversely, not every concrete dust is automatically relevant to chromates. Building age and material information and, where necessary, analytical testing provide meaningful insight. Clear communication within the team prevents misinterpretations. In everyday language, terms such as <em>low-chromate cement<\/em> or <em>chromate-controlled cement<\/em> are sometimes used synonymously with chromate-reduced cement; technically, only the measured water-soluble Cr(VI) content is decisive.<\/p>\n<h2>Health and environmental aspects<\/h2>\n<p>Cr(VI) compounds can be sensitizing and, in certain forms, harmful to health. The goal of chromate reduction is to lower risk in day-to-day work and prevent releases into the environment. Specific limit values, technical rules, and regulatory requirements must be observed for each project; this presentation does not replace legal advice or a binding case-by-case assessment. In environmental terms, attention focuses on preventing entry into soils and waters and on minimizing residuals in recyclates and secondary raw materials.<\/p>\n<h2>Link to typical equipment and work methods<\/h2>\n<p>In many Darda GmbH projects, concrete demolition shears, rock and concrete splitters, stone splitting cylinders, <a href=\"https:\/\/www.darda.de\/en\/product-overview\/multi-cutters\">Multi Cutters<\/a>, steel shears, as well as hydraulic power packs are used. Their common strength lies in controlled force transmission. This approach supports <em>low-emission<\/em> cutting and splitting processes, which is helpful in terms of chromate reduction. Decisive factors are a suitable equipment configuration, a coordinated sequence of interventions, and consistent dust and water management throughout the entire workflow. Effective setups also integrate reliable water supply at the point of action and, where feasible, on-tool extraction with appropriate separation stages.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Chromate reduction refers to the targeted decrease of water-soluble chromium(VI) compounds in materials and work environments. In construction, this is primarily relevant for cement and concrete because chromates can be critical to health. For concrete demolition, special demolition, and rock excavation, chromate reduction has a practical role: dust, slurries, and <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/chromate-reduction\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19018","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Chromate Reduction in Concrete &amp; Rock Demolition<\/title>\n<meta name=\"description\" content=\"Learn how chromate reduction lowers hexavalent chromium in construction \u2713 cement, concrete dust and water management.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/chromate-reduction\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Chromate Reduction in Concrete &amp; Rock Demolition\" \/>\n<meta property=\"og:description\" content=\"Learn how chromate reduction lowers hexavalent chromium in construction \u2713 cement, concrete dust and water management.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/chromate-reduction\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-03-30T06:04:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/chromate-reduction\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/chromate-reduction\",\"name\":\"Chromate Reduction in Concrete & Rock Demolition\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-10-17T09:14:26+00:00\",\"dateModified\":\"2026-03-30T06:04:03+00:00\",\"description\":\"Learn how chromate reduction lowers hexavalent chromium in construction \u2713 cement, concrete dust and water management.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/chromate-reduction#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/chromate-reduction\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/chromate-reduction#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Chromate reduction\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Chromate Reduction in Concrete & Rock Demolition","description":"Learn how chromate reduction lowers hexavalent chromium in construction \u2713 cement, concrete dust and water management.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/chromate-reduction","og_locale":"en_US","og_type":"article","og_title":"Chromate Reduction in Concrete & Rock Demolition","og_description":"Learn how chromate reduction lowers hexavalent chromium in construction \u2713 cement, concrete dust and water management.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/chromate-reduction","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-03-30T06:04:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/chromate-reduction","url":"https:\/\/www.darda.de\/en\/knowledge\/chromate-reduction","name":"Chromate Reduction in Concrete & Rock Demolition","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-10-17T09:14:26+00:00","dateModified":"2026-03-30T06:04:03+00:00","description":"Learn how chromate reduction lowers hexavalent chromium in construction \u2713 cement, concrete dust and water management.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/chromate-reduction#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/chromate-reduction"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/chromate-reduction#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Chromate reduction"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19018","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19018"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19018\/revisions"}],"predecessor-version":[{"id":25783,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19018\/revisions\/25783"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19018"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}