{"id":19000,"date":"2025-10-20T16:17:36","date_gmt":"2025-10-20T14:17:36","guid":{"rendered":"https:\/\/www.darda.de\/drilling-rig"},"modified":"2026-03-28T15:08:03","modified_gmt":"2026-03-28T14:08:03","slug":"drilling-rig","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/drilling-rig","title":{"rendered":"Drilling rig"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>A drilling rig is the central tool when precise openings must be produced in concrete, masonry, or rock &#8211; whether for anchors, core drilling, relief boreholes, or wedge holes. In deconstruction, strip-out, rock demolition, and tunnel construction, drilling technology often forms the first work step that is followed by mechanical cutting and splitting processes. Especially in combination with products from Darda GmbH such as <em><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a><\/em>, <em>rock splitting cylinders<\/em>, or <em>concrete shears<\/em>, the quality of the bore determines how controlled and safe the subsequent work steps proceed. A well-aligned <strong>drill rig<\/strong> with the right tool chain defines interfaces precisely and reduces rework in subsequent hydraulic separation.<\/p>\n<h2>Definition: What is meant by a drilling rig?<\/h2>\n<p>A drilling rig is a machine or system that advances a core bit or chisel into the substrate by rotation and\/or percussive action to create cylindrical voids (boreholes). In professional usage, the term also covers <em>core drilling rigs<\/em> and <em>rock drill rigs<\/em> that provide guided axial feed for dimensional accuracy. Depending on the method, drilling rigs operate electrically, hydraulically, or pneumatically, dry or with water flushing. In practice, the spectrum ranges from handheld rotary hammers to core drilling systems to carriage-mounted rock drilling rigs. Typical application fields include concrete demolition and special deconstruction, strip-out and cutting, rock demolition and tunnel construction, dimension stone extraction, and special operations with particular constraints. For interior work and sensitive zones, low-dust wet core drilling with collection systems is preferred, while dry drilling with extraction is used where water is not feasible.<\/p>\n<h2>Design and operating principle of a drilling rig<\/h2>\n<p>Drilling rigs consist of a drive, feed, tool holder, and the actual drilling tool. The interaction of torque, speed, impact energy, and feed force determines drilling progress, dimensional accuracy, and edge quality. Equally decisive are the <strong>stiffness of the guidance<\/strong>, the runout of the spindle, and the correct pairing of tool bond and substrate hardness.<\/p>\n<h3>Main components<\/h3>\n<ul>\n<li>Drive unit: electric motor, hydraulic or compressed-air drive; with core drilling rigs often infinitely variable. Pay attention to sufficient power reserves under load.<\/li>\n<li>Feed system: manual, mechanical, or hydraulic; precisely adjustable on stands and carriages for reproducible axial feed.<\/li>\n<li>Tool holder: chuck or SDS\/hex interfaces; for core drilling, threaded\/quick connections with low runout.<\/li>\n<li>Drilling tool: carbide drill, chisel, DTH hammer, diamond core bit; selection according to material and objective, including segment bond hardness.<\/li>\n<li>Flushing\/extraction system: water supply for cooling and removal of cuttings, or dust extraction during dry drilling with effective filtration.<\/li>\n<li>Guidance: drill stand, slide, or carriage for true-to-axis and low-vibration drilling.<\/li>\n<li>Fixing system: anchors, vacuum plates, chains, or bracing to secure the stand safely on differing substrates.<\/li>\n<li>Control and monitoring: speed and feed control, pressure gauges, and overload protection to keep parameters within specification.<\/li>\n<\/ul>\n<h3>How it works in practice<\/h3>\n<ol>\n<li>Position and secure: align using drill stand\/carriage, observe edge distances and center-to-center spacing, and ensure stable fixing.<\/li>\n<li>Energy input: rotation and, if applicable, percussion drive the core bit forward; feed is adapted to the material and tool diameter.<\/li>\n<li>Removal of cuttings: water or air\/extraction ensures chip clearance and visibility; retain and manage slurry for clean operation.<\/li>\n<li>Quality assurance: check diameter, depth, breakout edges, and angular accuracy; document deviations and adjust parameters.<\/li>\n<li>Post-processing: deburr and clean bore mouths, remove slurry or dust residues, and protect openings until the next process step.<\/li>\n<\/ol>\n<h2>Drilling methods and suitable tools<\/h2>\n<p>The choice of method is guided by the material, target geometry, boundary conditions (dust, noise, water), and the planned subsequent process, such as the use of <strong>rock and concrete splitters<\/strong> or <strong>concrete shears<\/strong> from Darda GmbH. Method selection also affects productivity, tool life, and the achievable tolerances.<\/p>\n<h3>Typical methods<\/h3>\n<ul>\n<li>Rotary drilling (dry): for masonry and weak concrete; rapid production of small to medium diameters with minimal setup.<\/li>\n<li>Percussive drilling\/rotary hammer: for dense concrete and rock; efficient near reinforcement shadowing, but with increased vibration and potential edge spalling.<\/li>\n<li>Core drilling (wet\/dry): with diamond crown for dimensionally accurate, low-spall openings, e.g., for penetrations and samples; suitable for tight tolerances and clean edges.<\/li>\n<li>Top-hammer\/DTH (rock): for deep, straight boreholes in rock; relevant in rock demolition and tunnel advance where high straightness and penetration rates are required.<\/li>\n<\/ul>\n<h3>Tool selection<\/h3>\n<ul>\n<li>Diamond core bits: for reinforced concretes and precise edges; minimize edge spalling and enable accurate depths and angles.<\/li>\n<li>Carbide twist drills: for rapid wedge-hole or anchor drilling in concrete and natural stone; robust in intermittent contact.<\/li>\n<li>DTH\/hydraulic hammers: for large-caliber rock drilling with high straightness; effective for deep holes and tough formations.<\/li>\n<\/ul>\n<h2>Drilling planning: drilling pattern, dimensional accuracy, and boundary conditions<\/h2>\n<p>A well-considered drilling pattern defines diameter, depth, center spacing, edge distance, and inclination. These parameters are critical when boreholes are intended for <em>rock splitting cylinders<\/em> or when a surface is to be weakened for the use of <em>concrete shears<\/em>. Planning should also establish reference axes, measurement points, and a sequence that limits cumulative tolerances.<\/p>\n<h3>Planning fundamentals<\/h3>\n<ul>\n<li>Define the objective: anchor hole, core drilling, relief borehole, wedge-hole grid for splitters.<\/li>\n<li>Assess the substrate: strength, reinforcement density, aggregates, moisture; non-destructive probing if necessary.<\/li>\n<li>Edge distances: provide sufficient distance to edges and construction joints to prevent spalling.<\/li>\n<li>Tolerances: adapt diameter and depth tolerances to downstream processes (e.g., fit for splitting wedges and cylinders).<\/li>\n<li>Media handling: clarify water availability for wet drilling or dust management for dry drilling.<\/li>\n<li>Stand fixing: determine anchor or vacuum fixing and verify permissible loads on the base material.<\/li>\n<li>Access and protection: plan access routes, splash containment, and protection of adjacent components and finishes.<\/li>\n<\/ul>\n<h2>Interaction with rock and concrete splitters and concrete shears<\/h2>\n<p>Drilling rigs create the basis for controlled splitting and crushing processes. Wedge holes or cylindrical bores enable force-fit introduction of splitting and shear forces. Precise bores reduce energy losses, support predictable crack initiation, and increase process safety.<\/p>\n<h3>Rock and concrete splitters, rock splitting cylinders<\/h3>\n<ul>\n<li>Borehole quality: uniform diameter and sufficient depth are important so that <em>rock splitting cylinders<\/em> can take a force-fit seat.<\/li>\n<li>Drilling pattern: a uniform grid supports straight crack propagation and controlled breakup of concrete or rock bodies.<\/li>\n<li>Subsequent processes: after splitting, segments can be efficiently detached and reduced with <em>concrete shears<\/em> or <em>combination shears<\/em>.<\/li>\n<li>Orientation: align bores with expected crack planes and structural restraints to guide fracture paths reliably.<\/li>\n<li>Cleanliness: flush and clean bores to remove slurry and fines for reliable placement and frictional engagement.<\/li>\n<\/ul>\n<h3>Concrete shears, combination shears, and other hydraulic cutting tools<\/h3>\n<ul>\n<li>Preparation by drilling: relief or deliberate-crack boreholes reduce the cross-section and facilitate crushing with <em>concrete shears<\/em>.<\/li>\n<li>Attachment and fixing points: boreholes serve for temporary fastenings, slinging points, or guiding aids during controlled deconstruction.<\/li>\n<li>Power supply: Darda GmbH <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power units<\/a><\/strong> supply splitting and cutting tools; a coordinated workflow between drilling and hydraulic separation shortens cycle times.<\/li>\n<li>Segmentation strategy: drilling enables defined segment sizes and lifting weights, improving handling and cutting efficiency.<\/li>\n<\/ul>\n<h2>Fields of use and typical applications<\/h2>\n<p>Drilling rigs are cross-sectional technology across numerous industries and work steps. In the Darda GmbH context, particularly clear interfaces emerge. From refurbishment to underground operations, consistent bore quality streamlines subsequent processes.<\/p>\n<h3>Concrete demolition and special deconstruction<\/h3>\n<ul>\n<li>Wedge-hole grids for <em>rock and concrete splitters<\/em> in heavily reinforced components.<\/li>\n<li>Core drilling for penetrations, cable routes, sampling, as well as defined weakening before using <em>concrete shears<\/em>.<\/li>\n<li>Relief drilling to lower internal stresses and steer fracture lines in complex geometries.<\/li>\n<\/ul>\n<h3>Strip-out and cutting<\/h3>\n<ul>\n<li>Precise core drillings as start and end points for sawing separation cuts or segmented removal.<\/li>\n<li>Boreholes for temporary propping and safe load handling when lifting out components that are then reduced with <em>combination shears<\/em>.<\/li>\n<li>Stitch drilling for openings where saw access is limited or to minimize overcuts.<\/li>\n<\/ul>\n<h3>Rock demolition and tunnel construction<\/h3>\n<ul>\n<li>Rock drilling for controlled splitting with <em>rock splitting cylinders<\/em> in sensitive areas without explosives.<\/li>\n<li>Anchor and drainage boreholes for stabilization and water management in the heading.<\/li>\n<li>Pilot holes for geological probing and verification of strata transitions.<\/li>\n<\/ul>\n<h3>Natural stone extraction<\/h3>\n<ul>\n<li>Rows of boreholes along natural joints as the basis for gentle splitting.<\/li>\n<li>Dimensionally accurate drilling patterns for raw block extraction to facilitate subsequent processing with <em>multi cutters<\/em>.<\/li>\n<li>Pre-splitting to optimize block geometry and reduce waste during primary extraction.<\/li>\n<\/ul>\n<h3>Special operations<\/h3>\n<ul>\n<li>Drilling in sensitive environments with strict noise and dust requirements; choose low-dust core drilling technology.<\/li>\n<li>Preparatory pilot boreholes for work with <em>steel shears<\/em> or <em>tank cutters<\/em>, e.g., to install auxiliary fixtures.<\/li>\n<li>Remote-capable rigs and compact setups for confined spaces or areas with restricted access.<\/li>\n<\/ul>\n<h2>Safety, health, and environmental protection<\/h2>\n<p>Safe drilling operations protect personnel and surroundings. At the same time, they improve the quality of downstream processes with splitting and cutting tools. A task-specific risk assessment and clear work area demarcation are essential.<\/p>\n<ul>\n<li>Dust management: wet drilling or efficient extraction reduces fine dust exposure.<\/li>\n<li>Noise and vibration: choose suitable methods and damping setups; protect sensitive areas.<\/li>\n<li>Water and slurry management: collect, filter, and properly dispose of drilling slurry.<\/li>\n<li>Electrical and hydraulic safety: secure media lines, avoid leaks, relieve pressure.<\/li>\n<li>Occupational safety: personal protective equipment, clean bearing surfaces, secure fixing of drill stands.<\/li>\n<li>Machine safety: lockout\/tagout during setup and maintenance; prevent unintentional starts.<\/li>\n<li>Stability: verify stand anchoring and vacuum integrity; use fall protection at edges and heights.<\/li>\n<li>Environmental care: prevent spills, use drip trays, and segregate waste from consumables and filters.<\/li>\n<\/ul>\n<h2>Selection criteria for drilling rigs and tools<\/h2>\n<p>Selection is based on the component, objective, and environment. This ensures that subsequent work with <em>concrete shears<\/em> or <em>rock and concrete splitters<\/em> proceeds efficiently. Consider the full process chain from fixing to media management and disposal.<\/p>\n<ul>\n<li>Material and reinforcement: concrete strength, aggregate structure, reinforcement density; locate reinforcement in advance if necessary.<\/li>\n<li>Geometry: required diameter, depth, angular accuracy, and surface quality.<\/li>\n<li>Operating mode: electric, hydraulic, or pneumatic to match the construction site infrastructure.<\/li>\n<li>Boundary conditions: interior areas (dust, noise), water availability, working heights, and accessibility.<\/li>\n<li>Compatibility: ensure fit and tolerances for splitting wedges, cylinders, and mounts.<\/li>\n<li>Fixing concept: feasibility of anchors or vacuum plates and the permissible loads of the substrate.<\/li>\n<li>Logistics and service: tool availability, dressing options, and spare parts to maintain uptime.<\/li>\n<\/ul>\n<h2>Typical mistakes and how to avoid them<\/h2>\n<ul>\n<li>Insufficient fixing: drill stand not anchored leads to angular deviations &#8211; always fasten securely.<\/li>\n<li>Wrong tool choice: carbide instead of diamond core bit in heavily reinforced concrete increases wear &#8211; adapt the tool.<\/li>\n<li>Excessive feed force: edge spalling and jammed tools &#8211; couple feed to the material.<\/li>\n<li>Deficiencies in dust\/water management: loss of visibility, health risks, and tool wear &#8211; manage media cleanly.<\/li>\n<li>Inadequate drilling pattern: edge distances too small or irregular grids impair splitting success.<\/li>\n<li>Incorrect coolant supply: too little or dirty water reduces cooling and accelerates segment wear.<\/li>\n<li>No trial drilling: skipping a pilot hole overlooks reinforcement or voids and leads to rework.<\/li>\n<\/ul>\n<h2>Maintenance, service life, and quality assurance<\/h2>\n<p>Regular maintenance increases process reliability and the quality of the bores &#8211; a prerequisite for reproducible results in splitting and crushing. Consistent documentation supports troubleshooting and continuous improvement.<\/p>\n<ul>\n<li>Tool condition: check segment height, tooth sharpness, and runout; replace or dress in good time.<\/li>\n<li>Drives and gearboxes: service bearings, clutches, and seals; keep speed\/torque characteristics within specification.<\/li>\n<li>Guides: low-play slides and clean columns guarantee straight feed.<\/li>\n<li>Documentation: record drilling parameters (speed, feed, flushing volume) and results.<\/li>\n<li>Spindle and chuck: inspect for wear and concentricity; clean interfaces to maintain low runout.<\/li>\n<li>Media quality: ensure adequate water flow and filtration; maintain extraction filters for constant airflow.<\/li>\n<li>Calibration: verify gauges and limiters for pressure, speed, and feed to maintain repeatability.<\/li>\n<\/ul>\n<h2>Normative and organizational notes<\/h2>\n<p>General safety and health requirements as well as relevant technical standards apply to drilling work. Observing the respective requirements is important, especially for work in buildings, in public areas, or in security-sensitive zones. All information is to be understood as general guidance and does not replace case-by-case assessment. Obtain necessary permits in advance, coordinate shutdowns of building services where required, and align drilling times with site-specific restrictions.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A drilling rig is the central tool when precise openings must be produced in concrete, masonry, or rock &#8211; whether for anchors, core drilling, relief boreholes, or wedge holes. In deconstruction, strip-out, rock demolition, and tunnel construction, drilling technology often forms the first work step that is followed by mechanical <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/drilling-rig\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19000","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Drilling Rig Guide for Construction &amp; Demolition<\/title>\n<meta name=\"description\" content=\"Explore drilling rigs for concrete, masonry and rock - methods, planning and safety \u2713 for precise boreholes.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/drilling-rig\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Drilling Rig Guide for Construction &amp; Demolition\" \/>\n<meta property=\"og:description\" content=\"Explore drilling rigs for concrete, masonry and rock - methods, planning and safety \u2713 for precise boreholes.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/drilling-rig\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-03-28T14:08:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/drilling-rig\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/drilling-rig\",\"name\":\"Drilling Rig Guide for Construction & Demolition\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-10-20T14:17:36+00:00\",\"dateModified\":\"2026-03-28T14:08:03+00:00\",\"description\":\"Explore drilling rigs for concrete, masonry and rock - methods, planning and safety \u2713 for precise boreholes.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/drilling-rig#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/drilling-rig\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/drilling-rig#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Drilling rig\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Drilling Rig Guide for Construction & Demolition","description":"Explore drilling rigs for concrete, masonry and rock - methods, planning and safety \u2713 for precise boreholes.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/drilling-rig","og_locale":"en_US","og_type":"article","og_title":"Drilling Rig Guide for Construction & Demolition","og_description":"Explore drilling rigs for concrete, masonry and rock - methods, planning and safety \u2713 for precise boreholes.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/drilling-rig","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-03-28T14:08:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/drilling-rig","url":"https:\/\/www.darda.de\/en\/knowledge\/drilling-rig","name":"Drilling Rig Guide for Construction & Demolition","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-10-20T14:17:36+00:00","dateModified":"2026-03-28T14:08:03+00:00","description":"Explore drilling rigs for concrete, masonry and rock - methods, planning and safety \u2713 for precise boreholes.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/drilling-rig#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/drilling-rig"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/drilling-rig#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Drilling rig"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19000","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19000"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19000\/revisions"}],"predecessor-version":[{"id":25773,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19000\/revisions\/25773"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19000"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}